Loading...
Application & DeedUPDATED 4/15/2024 40' Area Variance Pre-Submission Conference Form / Section 179-9-040 1. Applicant Name: __________________________________________________ 2. Tax Map ID ________________Location:_______________________ 3. Zoning Classification __________ 4. Reason for Review: __________________________________________________________ 5. Zoning Section #: ________________________ 6. Pre-Submission Meeting Notes: Provided Outstanding; Please provide by Deed ____ _____________ General Information complete ____ _____________ Site Development Data Complete ____ _____________ Setback Requirements Complete ____ _____________ Additional Project Information Complete ____ _____________ FAR addressed ____ _____________ Compliance with Zoning Ordinance ____ _____________ Checklist items addressed ____ _____________ Environmental Form completed ____ _____________ Signature Page completed ____ _____________ Staff Representative: ________________________________ Applicant / Agent: ________________________________ Date: ___________ Page 6 Tom West 239.7-1-16 79 Knox Road WR (1.22ac) The applicant has modified the detached garage location and design where the footprint of 1066 sf and the floor area is to be 2045.6 sf with the previous approval for footprint 1050 sf and floor area of 1950 sf. Site work includes a reduction of the hard-surfacing on the site. 179-5-020 garage X X X x x x NA X update data sheet and question update data sheet and question Laura Moore via email 04/12/2024 Connor Deymer via email 04/12/2024 04/12/2024 The applicant has modified the detached garage location and design where the footprint of 1066 sf and the floor area is to be 2045.6 sf with the previous approval for footprint 1050 sf and floor area of 1950 sf. The garage location will be 40 ft from the front property line versus 39 ft and then 42 ft from the wetland which was approved in 2023, then 180 ft from the lake (5 ft closer than 2023 approval). The project also modifies the main house configuration for a home with a footprint of 3,388 sf previous approval of 3,190 sf. The site work proposed includes a reduction in hard surfacing for the site - increasing to 85.46% permeable from 85.39% (from the 2023 approval). Area Variance for setback to wetland. Items reviewed -area variance application, site drawings, elevations drawings, floor plans, topo survey, previous applications Items to be updated or provided 1) data sheet note - update to 2024 date 2) data sheet permeability update 3) update data sheet and question - front setback to 40 ft