Signed Inspection Report (04-25-2024) Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road -(518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number: RC-0275-2023 Case Module: Permit
Inspection Date: April 25, 2024 Inspection Status: Reinspect
Inspector: Charles Dyer Inspection Type: Residential Final
Job Address: 81 ASSEMBLY POINT RD Parcel Number:
Contact Type Company Name Name
Owner N/A G. THOMAS MOYNIHAN JR
Contractor J. Clarke Constructiion
Architect Flynn Design Studios LLC
Owner N/A Joan Moynihan
Checklist Item Status
received blower door, final electric, septic asbuilt
conditions for temp C/O : final survey 2. maintenance agreement for Fuji
waste water 3. site plan certification
Building Inspector notes PASS
4 inch min building number address
visible from road FAIL
Chimney height, B vent, direct vent
location PASS
Chimney rain cap installed PASS
Fresh air intake PASS
Fresh air supply 3 feet from grade PASS
3 inch plumbing vent through roof,
minimum 18 inches PASS
Outside spigots have air gap PASS
Roof complete PASS
Exterior finish complete PASS
provide temp stairs at patio
Platform at all exterior doors FAIL
Handrail required with 4 or more risers PASS
Guard at stairwell at 34 inches or more PASS
Window guards req at less than 2' above
floor and 6' above grade PASS
Handrail termination at newell post or wall PASS
Interior and exterior handrails 34" to 38"
high PASS
Grade away from foundation sloping 6
inches in the first 10 feet PASS
6 inch clearance to sill plate from grade PASS
HVAC vent terminal 10 feet from lot line
and openings PASS
Interior privacy doors and trim required PASS
Exterior main entrance door min 36"wide PASS
Bathroom and Kitchen floors must be
watertight PASS
Low flow toilet 1.3 gallon per flushing
cycle PASS
Safety glazing required within 5 feet of
tub and shower PASS
Smoke detectors are min of 3 feet
horizontally from opening of bathroom PASS
Smoke Detectors are required on every
level and in every bedroom PASS
Smoke Detectors are required outside
every bedroom area PASS
provide letter of certification from Mahoney notifier. received
Smoke Detectors have battery back up PASS
Smoke detectors are interconnected PASS
Carbon monoxide detectors are within 10
ft of all sleeping areas PASS
Carbon monoxide detectors are required
on all levels with gas appliances (i.e.
furnace) PASS
Heat detector required in attached garage PASS
Attic access 22 inches x 30 inches
minimum with 30 inch high clearance PASS
foam at ceiling
Attic access insulation R-value must
equal ceiling R-value PASSN/O
Attic access gasketed PASS
Foam in basement and attics covered
with thermal barrier PASS
Knee wall and crawl space areas require
18 inches x 24 inches access PASS
Crawl space and knee wall access
insulated and gasketed PASS
Bathroom fans required, if no window PASS
II plumbing fixtures complete PASS
Backflow preventors where required PASS
Foundation insulation to basement floor PASS
Energy sticker on elec. panel, R values
and heating systems PASS
II Hot Water Systems R 3 on 3/4 inches
or larger piping PASS
Duct work sealed properly PASS
Intake openings for HVAC PASS
Range Hood 400 or more cfm make up
air required PASS
received
Blower door test certification PASS
HRV or ERV installed per bedroom
requirements PASS
Furnace shut off within 30 ft. or within line
of site PASS
Propane tank proper setback from
property line or structure PASS
Furnace and hot water heater operating PASS
Low water shut off required for boiler PASS
Pressure relief valve, heat trap, water
temp 110 degrees or less PASS
Pressure relief valve down spout within 6
inches of floor PASS
1/2 inch Gypsum or House Wall and
Gable PASS
5/8 inch Type X with living space above PASS
20 minute fire door and self-closing
hardware PASS
Seals on garage doors, esp. wood PASS
Basement stairs closed rise greater than
4 inches PASS
5 ft crawl area
Basement wall insulation R-value verified N/O
tap con bases/verified 4/25/24
Jack posts in basement lagged at top and
bottom PASS
Garage floor pitched PASS
1/2" Gypsum board req. in basement for
framing if 2"x 8"or TJI/Floor Trusses PASSN/O
Gas log in sealed or glass enclosure PASS
Fin elect; energy saving light bulbs 90
percent PASS
Final survey plot plan FAIL
Arc fault breaker habitable spaces PASS
Flex gas pipe bonding PASS
received
s built septic system PASS
Site plan or variance approval inspection FAIL
provide sticker for TJI's
Truss ID signage installed at electrical
meter FAIL
Electronic as builts
CONDITIONS: provide final electric 2. Engineer septic asbuilt 3. Fuji
maintenance contract agreement 4. Site plan certification 5. Final survey
6. Blower door results—OK to issue temp CO when final electric and
blower door received 4/16/24
Ok to issue temporary certificate of
occupancy PASSN/O
Ok to issue certificate of occupancy FAIL
Charles Dyer
Code Enforcement Officer