Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Six Flags Bobcat Roller Coaster NY concrete test report 6
4 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:5 INSPECTOR & TEST SET: DAVE CASAW #5 ATT'N: AMBIENT WEATHER: BOBCAT ROLLER COASTER: SIX FLAGS GREAT ADVENTURE: QUEENSBURY, NY OUR FILE LOCATION: 1 : 0 0 0 0 0 0 1 0 0 0 4912 / 864510 0 0 0 0 0 0 10.00 / 10.00 # 0.00 0 0.00 0 0.00 0 0.00 0 9.31 / 10.00 0 ## 0.00 0 0.00 0 0.00 0 0.00 0 10.10 / 10.48 # 0 0.00 0 0.00 ## 0.00 0 0.00 0.00 MAX: 1.50 )9 1.28 0 0 0.00 0 0 0.00 0 0.31 4.00 # 0.00 0.00 0 0.00 0.00 0 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00 0.00 0.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 7.00 ) 4.00 0 0.00 0 0.00 0 ENTRAINED AIR ( % VOL) (SPEC: - 7.00 ) 6.10 0 0.00 0 0.00 0379900 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 143.89 0 0.00 0 0.00 0 - 90 ) 71 0 0 0 0 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 240699 - 240704 0 0 0 0 0 0 0 CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.240699 03/21/24 7 4280 0 COARSE AGGREGATE #2: LBS.240700 03/21/24 7 4230 0 COARSE AGGREGATE #3: LBS.240701 04/11/24 28 5590 0 FINE AGGREGATE: LBS.240702 04/11/24 28 5560 0 ADMIXTURE #1: OZS.240703 04/11/24 28 5360 0 ADMIXTURE #2: OZS.240704 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN, (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 5.00 TEST AGE 4000 TIME CONC. BATCHED / ARRIVED: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): FOOTING: EXIT RAMP NORTH SECTION 0 PLACEMENT LOCATION OF LOAD # 0 0 0 JOINTA-GALUSHA CONCRETE, INC. CONCRETE SLUMP IS AFTER PLASTICIZER ADDITION. ULTIMATE 03/15/24 4.00 IF APPLICABLE: 0.00 45 PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: 0 0 0 0 0 0 0 0 0 0 0 0 0 70,250 67,350 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 3: 0 0.0 0 DISCREPANCIES & REMARKS: 0.0 LAB CYLINDER CONTROL NUMBERS: WATER: 0 DESIGN STRENGTH & FORMULA: 69,800 53,150 PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 6 03/14/24 574.047 240699 20's: CLOUDY PROJECT: CONSTRUCTION TECHNOLOGY MR. MIKE WILLIGAN ROZELL INDUSTRIES 129 PARK ROAD QUEENSBURY, NEW YORK 12804 53,750 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064