Loading...
Six Flags Bobcat Roller Coaster Proof Roll observation report 3CONSTRUCTION TECHNOLOGY INSPECTION & TESTING DIVISION, P.D.& T.S., INC. 4 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT:ROZELL INDUSTRIES REPORT NUMBER: REPORT DATE: OUR FILE NUMBER: FIELD INSPECTOR: ATT'N: PROJECT: MANAGER TECHNICAL SERVICES 1. FILE 2: 3: 4: 5: 6: 7: 8: CONSTRUCTION TECHNOLOGY ROBERT BEHAN (NICET) Robert BehanRobert BehanRobert BehanRobert Behan REPORT DISTRIBUTION FIELD OBSERVATION REPORT: RESPECTFULLY SUBMITTED, : PAGE 13 Should there be any questions, or additional information requested, please contact this office immediately. As requested, CONSTRUCTION TECHNOLOGY visited the referenced project site for the purpose of observing the proof-rolling operations conducted by the site contractor. The site contractor employed a 10 ton roller on footing Subgrade sections P58 - P61 sub-subbase material. The contractor made overlapping passes with the roller over the entire area. We hope the foregoing information is of assistance. MR. MIKE WILLIGAN SCOTT ROBBINS BOBCAT ROLLER COASTER: SIX FLAGS GREAT ADVENTURE: QUEENSBURY, NEW YORK 12/27/2023 574.047 129 PARK ROAD QUEENSBURY, NEW YORK 12804 Upon completion, the following information is provided: The entire area appeared stable with NO apparent weaving or pumping of the subgrade. Deflection of the subgrade was limited to less than 0.5" under the weight of the roller.