Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Six Flags Bobcat Roller Coaster NY concrete test report 2 (2)
4 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:14 INSPECTOR & TEST SET: PAUL SANTIAGO #14 ATT'N: AMBIENT WEATHER: BOBCAT ROLLER COASTER: SIX FLAGS GREAT ADVENTURE: QUEENSBURY, NY OUR FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 5 : PLACEMENT LOCATION OF LOAD # 10 : 1 5 0 10 4907 / 863781 4525 / 863785 4910 / 863792 11.00 / 11.00 9 11.00 / 55.00 10 11.00 / 110.00 10.5 8.10 / 8.30 0 ##8.50 / 9.10 0 9.40 / 10.09 0 8.40 / 8.50 # 9 9.28 / 9.37 ##10.23 / 10.31 10.00 MAX: 1.50 )8 0.67 0 8 0.78 0 9 0.85 0 0.10 6.75 8 0.50 6.50 9 0.40 7.00 10 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.31 6.75 6.50 7.00 PLACEMENT SLUMP (INCH) (SPEC: - 7.00 ) 6.75 0 6.50 0 7.00 0 ENTRAINED AIR ( % VOL) (SPEC: - 7.00 ) 6.20 0 6.20 0 6.30 0399339213830 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 151.24 0 148.51 0 145.07 0 - 90 ) 69 0 66 0 66 0 NUMBER OF TEST SPECIMEN CAST:6 0 6 0 6 239368 - 239373 239374 - 239379 239380 - 239385 0 CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.239368 01/11/24 7 6450 0 COARSE AGGREGATE #2: LBS.239369 01/11/24 7 6370 0 COARSE AGGREGATE #3: LBS.239370 02/01/24 28 8300 0 FINE AGGREGATE: LBS.239371 02/01/24 28 8140 0 ADMIXTURE #1: OZS.239372 02/01/24 28 8340 0 ADMIXTURE #2: OZS.239373 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.239374 01/11/24 7 5770 0 0 1 0 239375 01/11/24 7 5920 0 REPORT DISTRIBUTION:0 1 0 239376 02/01/24 28 6790 0 0 1 0 239377 02/01/24 28 6940 0 0 1 0 239378 02/01/24 28 6840 0 0 1 0 239379 01/00/00 SPARE 0 X 1 1 239380 01/11/24 7 5780 0 RESPECTFULLY SUBMITTED,0 0 1 239381 01/11/24 7 5830 0 CONSTRUCTION TECHNOLOGY 0 0 1 239382 02/01/24 28 6970 0 0 0 1 239383 02/01/24 28 6950 0 ROBERT BEHAN, (NICET)0 0 1 239384 02/01/24 28 7050 0 MANAGER TECHNICAL SVCS.0 0 1 239385 01/00/00 SPARE 0 X Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 2 01/04/24 574.047 239368 30's: CLOUDY PROJECT: CONSTRUCTION TECHNOLOGY MR. MIKE WILLIGAN ROZELL INDUSTRIES 129 PARK ROAD QUEENSBURY, NEW YORK 12804 80,950 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DISCREPANCIES & REMARKS: 0.0 LAB CYLINDER CONTROL NUMBERS: WATER: 0 DESIGN STRENGTH & FORMULA: 102,200 80,000 PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: 72,500 0 104,200 104,700 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 3: 0 0.0 0 0 72,600 73,200 87,550 87,250 88,600 85,900 87,150 85,300 0 0 74,400 0 JOINTA-GALUSHA CONCRETE, INC. CONCRETE SLUMP IS AFTER PLASTICIZER ADDITION. ULTIMATE 01/05/24 4.00 IF APPLICABLE: 0.00 45 PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 5.00 TEST AGE 4000 TIME CONC. BATCHED / ARRIVED: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): FOOTING: P-57 - P-53, WEST PROCEEDING EAST FOOTING: P-57 - P-53, WEST PROCEEDING EAST PLACEMENT LOCATION OF LOAD # FOOTING: P-57 - P-53, WEST PROCEEDING EAST 4 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 2 INSPECTION DATE: OUR FILE NUMBER:14 INSPECTOR & TEST SET: PAUL SANTIAGO #14 ATT'N: AMBIENT WEATHER: BOBCAT ROLLER COASTER: SIX FLAGS GREAT ADVENTURE: QUEENSBURY, NY OUR FILE LOCATION: 14 : 0 0 0 0 0 0 14 0 0 0 4913 / 863796 0 0 0 0 0 0 11.00 / 154.00 # 0.00 0 0.00 0 0.00 0 0.00 0 11.26 / 11.51 0 ## 0.00 0 0.00 0 0.00 0 0.00 0 11.55 / 12.08 # 0 0.00 0 0.00 ## 0.00 0 0.00 0.00 MAX: 1.50 )11 0.70 0 0 0.00 0 0 0.00 0 0.26 6.25 # 0.00 0.00 0 0.00 0.00 0 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00 6.25 0.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 7.00 ) 6.25 0 0.00 0 0.00 0 ENTRAINED AIR ( % VOL) (SPEC: - 7.00 ) 5.80 0 0.00 0 0.00 0392600 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 148.70 0 0.00 0 0.00 0 - 90 ) 67 0 0 0 0 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 239386 - 239391 0 0 0 0 0 0 0 CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.239386 01/11/24 7 5610 0 COARSE AGGREGATE #2: LBS.239387 01/11/24 7 5560 0 COARSE AGGREGATE #3: LBS.239388 02/01/24 28 6640 0 FINE AGGREGATE: LBS.239389 02/01/24 28 6520 0 ADMIXTURE #1: OZS.239390 02/01/24 28 6660 0 ADMIXTURE #2: OZS.239391 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN, (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY ROZELL INDUSTRIES 2 MR. MIKE WILLIGAN 30's: CLOUDY PROJECT:239386 C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S PLACEMENT LOCATION OF LOAD # FOOTING: P-57 - P-53, W EST PROCEEDING EAST 129 PARK ROAD 01/04/24 QUEENSBURY, NEW YORK 12804 574.047 TIME CONC. BATCHED / ARRIVED: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): 0 0 DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: 0.00 CONCRETE TEMP. (F) (SPEC:45 LAB CYLINDER CONTROL NUMBERS: SLUMP OF CONCRETE INTO PUMP: IF APPLICABLE: 5.00 4.00 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT WEATHER PROTECTION: PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 JOINTA-GALUSHA CONCRETE, INC. DISCREPANCIES & REMARKS: CONCRETE SLUMP IS AFTER PLASTICIZER ADDITION. PLACEMENT AREA REINFORCEMENT: CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. WATER:0.0 DESIGN STRENGTH & FORMULA: 4000 01/05/24 0 TEST AGE ULTIMATE 70,400 69,850 0 DAYS APPLIED LOAD 0.0 83,700 0 83,450 0 81,900 0 0 1: FILE 5:0 2: SUPPLIER 6:0 0 0.0 0 0 0 0 0 Robert BehanRobert BehanRobert BehanRobert Behan 0 0 3:7:0 4:8:0