Loading...
CC-0683-2023 J . Office Use Only PRINCIPLE STRUCTURE 2-6 i - Permit#: CC, -D�g13 - Z� PERMIT APPLICATI ON Permit Fee:$ g�` Town of Queensbury 742 Bay Road, Queensbury, NY 12804 *Rec Fee: $ P: 518-761-8256 www.queensbury.net Invoice It :.(Q. Flood Zone? Y 'eviewed /V" Project Location: 1172 State Route 9, Queensbury, NY 12804 Tax Map.#: 288.20-1-20 Subdivision Name: Six Flags Great Escape *TOWN BD.RESOLUTION 385-2020:$1000 recreatio f fn-rr .welling.. nits:single family,duplexes/two-family, multiple family, apartments, condominiums,town o sIgn• ler arrguftaturd & 'odular homes, but not mobile homes.This is in addition to the permit fee(s). I) PROJECT INFORMATION: ®Cr 25 2023 TOWN OFQUEENSSU,Rv X Commrcl'a1—Pro ioe1S4PeC' Q t r Coster Residential p �' Single-Family: Two-Family Multi-Family (#of units: ) 1. Custom 2. _Modular(REQUIRED: NYS stamped engineered drawings of foundation plans) • Townhouse Garage (#of cars ) Business Office Retail ' Hotel/Motel Industrial Heated Warehouse/Storage Building Unheated Warehouse/Storage Building X Amusement Ride Other (describe: MAIN STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: sr 33,030 sqft 1ST floor: 1 floor: 2nd floor: 2nd floor: 3rd floor: Total square feet: Basement(habitable space): Total square feet: _ 33,030 sqft Principle Structure Packet Revised March 2022 ADDITIONAL PROJECT INFORMATION: 1.. Estimated Cost of Construction:$ $8,500,000 • 2. Proposed use of the building: Amusement Ride 3. If Commercial or Industrial, indicate the name of the business: Six Flags Great Escape Theme Park 4. Source of Heat: Gas Oil Propane Solar Other: N/A (Fireplaces need a separate fuel Burning Appliances&Chimney Application, one per appliance) 5. Are there any structures not shown on the plot plan? X YES NO Explain, if yes: Six Flags Great Escape 6; Are there any easements on the property? YES X NO 7. SITE INFORMATION: .. a. What is the dimensions or acreage of the parcel? 237.64 Acres b. Is this a corner lot? . YES. X NO c. Will the grade be changed as a result of the construction? X YES NO . d.What is the water source? X PUBLIC PRIVATE . WELL e. What type of wastewater system is on the parcel? X SEWER PRIVATE SEPTIC DECLARATION: 1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans, additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of . Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. .I certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I, or my agents,will obtain a certificate of • occupancy, 5. I also„understand that I/we are required'to.pi-ovide an as-built survey by a NYS licensed land surveyor of all. newly constructed facilities prior to issuance of certificate of occupancy, I have read and agree to the above: RRINT NAME::. Rebec a Wood - - SI:GNATURE: . :. :- DATE: 10/25/2023 Principle Structure Packet Revised March 2022 • CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s):Six Flags Great Escape Theme Park Mailing Address, C/S/Z: 1172 State Route 9, Queensbury, NY 12804 Cell Phone:. ( 518 ) 364-7601 Land Line: ( 518 ) 824-6000:ext. 4050 Email: dmularz@sftp.com • Primary Owner(s): Name(s):Six Flags Entertainment Corporation Mailing Address, C/S/Z: 1000 Ballpark Way Arlington, Texas 76011 Cell Phone: (N/A ) Land Line: ( 707 ) 644-4000 Email: N/A 0 Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contractor Name(s): Rozell Industries Contractor Trade: Construction Mailing Address, C/S/Z: 129 Park Road, Queensbury, NY 12804 Cell Phone: ( 518 ) 932-1286 Land Line: ( 518 ) 793-2634. . Email: Mike Willigan <mwilliganRrozellind.com> **Workers' Comp documentation must be submitted with this application** • Architect(s)/Enaineer(s): Business Name: CT Male Associates Engineering Contact Name(s): Frank Palumbo & Owen Speulstra Mailing Address, C/S/Z: 50 Century Hill Dr, Latham, NY 12110 . Cell Phone: ( 518 ) 338-5242 Land Line: ( 518. ) 786-7400 Email: f.paluimbo@ctmale.com Contact Person for Compliance in regards to this project: Duncan Mularz Cell Phone: ( 518 ) 364-7601 . Land Line: (. 518 ) 824-60.00 ext. 4050 Email:. dmularzsftp.com • Principle Structure Packet Revised March 2022 /THE GRAVTTY - aFT t GROUP 23 May 2024 To Whom it May Concern: This letter is to certify that The Bobcat was built in accordance to the drawings that were provided by The Gravity Group, LLC. The structure of the ride consists of prefabricated members that were machined in Cincinnati and installed on-site in Queensbury, New York. In the picture below, you can see the specific mark numbers that were on each of the main structural members. These were assembled using individual drawings of each cross-section (bent drawings) and a series of typical detail drawings. s ''' . ---. • �_ \ 11`. ` ,' ! \ F � : • ti ," 16.,- i r, _ ;� ilot Jam,,,. k , -.:-, Q �3 4• cr} w .« - ..r_ s - 8 JvA y ,,1f i '.0 i'_' 4y C% ice. ,j� r _ i i r �� �i/■_ 4 fr 4 •kf F 5 f' ar - / ? r ' 1 li f q. i , Once the structure and track for the ride was completed, a team has gone through the entire ride structure and verified the tightness of the bolts and marked the nut and thread with a yellow paint stripe. p:513.948.8400 • f:513.948.8420 • p.o.box 62050,cincinnati,oh 45262 • www,thegravitygroup.com A I THE ( GRAVTTY Cr-`= - ' 4"aFT GROUP , The integrity of the structure was verified throughout the construction process through multiple visits to the project site in addition to regular communication (including video calls from the project site) with the project foreman. The following site visits were made during the construction of The Bobcat wooden roller coaster. Engineer Start Date End Date Purpose of Trip KTK 12/17/2023 12/18/2024 Inspect Foundation Installation KTK 1/3/2024 1/6/2024 Inspect Foundation Installation/Anchor Strap Layout Training KTK 1/18/2024 1/19/2024 Inspect First Structure Installed/Assist with Anchor Layout KTK 2/28/2024 2/29/2024 Inspect Structure/Track Installation KTK 4/3/2024 4/4/2024 Inspect Structure/Track Installation CMM 4/15/2024 4/19/2024 Oversee Installation of Mechanical Equipment KTK 5/7/2024 5/9/2024 Review Ride Structure&Track/Perform Clearance Check CMM 5/13/2024 5/17/2024 Perform Track Measurements&Verification KTK 5/21/2024 5/24/2024 Review Ride Structure/Inspect Track/Train Park Personnel During a typical visit, the engineer walked the jobsite with the project foreman and they discussed the current work and future work. These visits demonstrated that the ride was built in accordance with the drawings. Because members were pre-machined and marked, there was limited ability for something to be built incorrectly. In terms of the ride design and details, this ride is based on the same ride system that is used for rides that are significantly taller and longer. As the main project engineer, I have been involved with the structural design of 30 new rides at The Gravity Group, LLC since 2002. These rides are located in the USA, China, Europe, and Australia and all follow their associated design codes for amusement rides. Additionally, I have taught classes at AIMS (Amusement Industry Manufacturers & Suppliers Internationals) seminars to train park personnel on the proper --=�=_,,e techniques for wooden roller coasters. `:kc�OF NEIy1: Kind Regar. .i1'I. �� �"-----• ''( It1"at�I 11 -,e,® 108252 Korey T. Kiepert, -.E. P10�, - VESS p:513.948.8400 • f:513,948,8420 • p.o.box 62050,cincinnati,oh 45262 • www.thegravitygroup.com