Westbrook Sr Housing Phase III concrete test report 34 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:7 INSPECTOR & TEST SET: MIKE MARQUETTE #7 ATT'N: AMBIENT WEATHER: OUR FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 2 : PLACEMENT LOCATION OF LOAD # 3 : 1 2 0 3 4904 / 846584 4903 / 846585 4525 / 846586 11.00 / 11.00 #11.00 / 22.00 12 10.00 / 32.00 1 10.22 / 10.58 0 ##10.49 / 11.20 0 11.31 / 12.03 0 11.00 / 11.42 # 11 11.42 / 12.25 ##12.26 / 1.00 1.00 MAX: 1.50 )10 1.33 0 10 1.60 1 11 1.48 0 0.22 4.00 # 0.49 4.50 12 0.31 4.00 1 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00 0.00 0.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 5.00 ) 4.00 0 4.50 0 4.00 0 ENTRAINED AIR ( % VOL) (SPEC: - 7.00 )7.50 1 0.00 0 0.00 0374100 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 141.70 0 0.00 0 0.00 0 - 90 ) 80 0 81 0 82 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 207471 - 207476 0 0 0 0 0 0 1: CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.207471 05/27/21 7 2300 X COARSE AGGREGATE #2: LBS.207472 05/27/21 7 2400 X COARSE AGGREGATE #3: LBS.207473 06/17/21 28 3140 0 FINE AGGREGATE: LBS.207474 06/17/21 28 3180 0 ADMIXTURE #1: OZS.207475 06/17/21 28 3240 0 ADMIXTURE #2: OZS.207476 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. PER DRAWING: S-202, DETAIL: 5 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: BUILDING #3: FOUNDATION WALL: NORTH WALL, WEST SECTION; WEST WALL BUILDING #3: FOUNDATION WALL: WEST PORCHES; SOUTH W ALL, WEST SECTION PLACEMENT LOCATION OF LOAD # BUILDING #3: FOUNDATION WALL: SOUTH WALL, WEST CENTER SECTION 0.00 45 C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 0.00 TEST AGE 3000 0 JOINTA-GALUSHA, LLC CONTRACTOR NOTIFIED: LOAD 1: ENTRAINED AIR; LOAD 2: OVERTIME. ULTIMATE 05/21/21 4.00 0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 39,950 30,150 0 0 39,400 40,700 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 3: TIME CONC. BATCHED / ARRIVED: 28,950 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DISCREPANCIES & REMARKS: 0.0 LAB CYLINDER CONTROL NUMBERS: WATER: 0 0 DESIGN STRENGTH & FORMULA: IF APPLICABLE: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): PROJECT: CONSTRUCTION TECHNOLOGY MR. DARREN VanDeWARKER SCHEMERHORN CONSTRUCTION, INC. 536 BAY ROAD, SUITE 2 QUEENSBURY, NEW YORK 12804 WESTBROOK SENIOR HOUSING: PHASE III: QUEENSBURY, NY. Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 3 05/20/21 1162.010 207471 70's: CLEAR