Westbrook Sr Housing Phase III concrete test report 54 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:7 INSPECTOR & TEST SET: MIKE MARQUETTE #7 ATT'N: AMBIENT WEATHER: OUR FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 2 : PLACEMENT LOCATION OF LOAD # 3 : 1 2 0 3 4904 / 846756 4588 / 846757 4905 / 846758 11.50 / 11.50 #11.50 / 23.00 11 11.50 / 34.50 12.2 9.37 / 10.10 0 ##10.10 / 10.43 0 10.38 / 11.05 0 10.16 / 10.50 # 10 10.51 / 11.29 ##11.33 / 12.12 12.00 MAX: 1.50 )9 1.22 0 10 1.32 0 10 1.57 1 0.37 6.25 # 0.10 6.00 11 0.38 5.75 12 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.12 0.00 0.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 5.00 )6.25 1 6.00 1 5.75 1 ENTRAINED AIR ( % VOL) (SPEC: - 7.00 ) 6.40 0 0.00 0 0.00 0374600 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 141.88 0 0.00 0 0.00 0 - 90 ) 68 0 69 0 69 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 207579 - 207584 0 0 0 0 0 0 1: CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.207579 06/02/21 7 2280 X COARSE AGGREGATE #2: LBS.207580 06/02/21 7 2180 X COARSE AGGREGATE #3: LBS.207581 06/23/21 28 3120 0 FINE AGGREGATE: LBS.207582 06/23/21 28 3240 0 ADMIXTURE #1: OZS.207583 06/23/21 28 3110 0 ADMIXTURE #2: OZS.207584 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. PER DRAWING: S-202, DETAIL: 5 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: BUILDING #3: FOUNDATION WALL: EAST INTERIOR WALL BUILDING #3: FOUNDATION WALL: CENTER INTERIOR WALLS PLACEMENT LOCATION OF LOAD # BUILDING #3: FOUNDATION WALL: WEST INTERIOR WALL 0.00 45 C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 0.00 TEST AGE 3000 0 JOINTA-GALUSHA, LLC CONTRACTOR NOTIFIED: LOAD 1,2,3: SLUMP ULTIMATE 05/27/21 4.00 0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 40,700 27,400 0 0 39,200 39,100 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 3: TIME CONC. BATCHED / ARRIVED: 28,650 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DISCREPANCIES & REMARKS: 0.0 LAB CYLINDER CONTROL NUMBERS: WATER: 0 0 DESIGN STRENGTH & FORMULA: IF APPLICABLE: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): PROJECT: CONSTRUCTION TECHNOLOGY MR. DARREN VanDeWARKER SCHEMERHORN CONSTRUCTION, INC. 536 BAY ROAD, SUITE 2 QUEENSBURY, NEW YORK 12804 WESTBROOK SENIOR HOUSING: PHASE III: QUEENSBURY, NY. Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 5 05/26/21 1162.010 207579 50's: CLEAR