Westbrook Sr Housing Phase III concrete test report 104 William Street, Ballston Lake, New York 12019
Phone: (518) 399-1848 Email: constructiontech@live.com
CLIENT: REPORT NUMBER: : PAGE #: 1
INSPECTION DATE:
OUR FILE NUMBER:5
INSPECTOR & TEST SET: DAVE CASAW #5
ATT'N: AMBIENT WEATHER:
OUR FILE LOCATION:
1 :
PLACEMENT LOCATION OF LOAD # 2 :
PLACEMENT LOCATION OF LOAD # 3 :
1 2 0 3
4905 / 849192 4903 / 849193 4913 / 849194
11.00 / 11.00 7 11.00 / 22.00 8 11.00 / 33.00 8.667
6.40 / 7.00 0 ##7.00 / 7.20 0 7.20 / 7.46 0
7.05 / 7.24 # 7 7.31 / 7.43 ##7.47 / 8.40 8.00
MAX: 1.50 )6 0.73 0 7 0.72 0 7 1.33 0
0.40 5.75 7 0.00 5.50 7 0.20 6.00 8
WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0
WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.40
5.75 5.50 6.00
PLACEMENT SLUMP (INCH) (SPEC: - 5.00 )5.75 1 5.50 1 6.00 1
ENTRAINED AIR ( % VOL) (SPEC: -7.00 ) 6.80 0 0.00 0 0.00 0375100
UNIT WEIGHT (PCF) (SPEC:-0.00 ) 142.07 0 0.00 0 0.00 0
- 90 ) 74 0 73 0 74 0
NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0
210909 - 210914 0 0 0 0 0 0
1:
CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39
P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED:
CEMENT:LBS.CYLINDER TEST UNIT
CEMENT:LBS. NUMBER DATE P.S.I.
GAL.
COARSE AGGREGATE #1: LBS.210909 09/21/21 7 3440 X
COARSE AGGREGATE #2: LBS.210910 09/21/21 7 3590 X
COARSE AGGREGATE #3: LBS.210911 10/12/21 28 4590 0
FINE AGGREGATE: LBS.210912 10/12/21 28 4550 0
ADMIXTURE #1: OZS.210913 10/12/21 28 4670 0
ADMIXTURE #2: OZS.210914 01/00/00 SPARE 0 X
ADMIXTURE #3: OZS.
AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 01/00/00 0 0 X
RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X
CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X
MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X
PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE.
PER DRAWING: S-202, DETAIL: 5
GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS.
PLACEMENT AREA REINFORCEMENT:
PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW.
CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED.
PLACEMENT WEATHER PROTECTION:
BUILDING #3: SLAB ON GRADE: EAST SECTION: WEST PROCEEDING EAST
BUILDING #3: SLAB ON GRADE: EAST SECTION: WEST PROCEEDING EAST
PLACEMENT LOCATION OF LOAD #
BUILDING #3: SLAB ON GRADE: EAST SECTION: WEST PROCEEDING EAST
0.00
45
C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S
0.00
TEST AGE
4000
0
JOINTA-GALUSHA CONCRETE, INC.
CONTRACTOR NOTIFIED: LOAD 1,2,3: SLUMP
ULTIMATE
09/15/21
0.00
0
0.0
0
0
0
0
0
0
0
0
0
0
0
0
57,150
45,150
0
0
57,700
58,600
4:
0.0
5:
6:
7:
8:
1: FILE
2: SUPPLIER
3:
TIME CONC. BATCHED / ARRIVED:
43,200
DAYS
UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064
DISCREPANCIES & REMARKS:
0.0
LAB CYLINDER CONTROL NUMBERS:
WATER:
0
0
DESIGN STRENGTH & FORMULA:
IF APPLICABLE:
DELIVERED LOAD NUMBER:
TRUCK NUMBER / TICKET NUMBER:
YARDAGE DELIVERED / SUBTOTAL:
CONCRETE TEMP. (F) (SPEC:
SLUMP OF CONCRETE INTO PUMP:
TIME PLACEMENT BEGAN / ENDED:
CONCRETE AGE ( HOURS ) (SPEC:
SLUMP ON ARRIVAL (INCHES):
PROJECT:
CONSTRUCTION TECHNOLOGY
MR. DARREN VanDeWARKER
SCHEMERHORN CONSTRUCTION, INC.
536 BAY ROAD, SUITE 2
QUEENSBURY, NEW YORK 12804
WESTBROOK SENIOR HOUSING: PHASE III: QUEENSBURY, NY.
Robert BehanRobert BehanRobert BehanRobert Behan
APPLIED LOAD
10
09/14/21
1162.010
210909
50's: CLEAR