Loading...
Westbrook Sr Housing Phase III concrete test report 114 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:5 INSPECTOR & TEST SET: DAVE CASAW #5 ATT'N: AMBIENT WEATHER: OUR FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 2 : 0 0 0 1 2 0 0 4908 / 849284 4525 / 849285 0 0 0 11.00 / 11.00 7 11.00 / 22.00 8 0.00 0 0.00 0 6.40 / 7.00 0 ##6.52 / 7.21 0 0.00 0 0.00 0 7.03 / 7.29 # 7 7.30 / 8.17 ## 0.00 0 0.00 0.00 MAX: 1.50 )6 0.82 0 6 1.42 0 0 0.00 0 0.40 5.50 7 0.52 6.00 8 0.00 0.00 0 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00 5.50 6.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 5.00 )5.50 1 6.00 1 0.00 0 ENTRAINED AIR ( % VOL) (SPEC: -7.00 ) 5.20 0 0.00 0 0.00 0371900 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 140.86 0 0.00 0 0.00 0 - 90 ) 70 0 70 0 0 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 211056 - 211061 0 0 0 0 0 0 1: CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.211056 09/24/21 7 3490 X COARSE AGGREGATE #2: LBS.211057 09/24/21 7 3400 X COARSE AGGREGATE #3: LBS.211058 10/15/21 28 4160 0 FINE AGGREGATE: LBS.211059 10/15/21 28 4360 0 ADMIXTURE #1: OZS.211060 10/15/21 28 4350 0 ADMIXTURE #2: OZS.211061 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 11 09/17/21 1162.010 211056 60's: CLOUDY PROJECT: CONSTRUCTION TECHNOLOGY MR. DARREN VanDeWARKER SCHEMERHORN CONSTRUCTION, INC. 536 BAY ROAD, SUITE 2 QUEENSBURY, NEW YORK 12804 WESTBROOK SENIOR HOUSING: PHASE III: QUEENSBURY, NY. IF APPLICABLE: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): LAB CYLINDER CONTROL NUMBERS: WATER: 0 0 DESIGN STRENGTH & FORMULA: 3: TIME CONC. BATCHED / ARRIVED: 43,800 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DISCREPANCIES & REMARKS: 0.0 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 0 0 0 54,750 42,650 0 0 52,200 54,600 0 0 0 0 0 0 0 0.0 0 0 0 0 JOINTA-GALUSHA CONCRETE, INC. CONTRACTOR NOTIFIED: LOAD 1,2: SLUMP ULTIMATE 09/20/21 0.00 C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 0.00 TEST AGE 4000 BUILDING #3: SLAB ON GRADE: CENTER SECTION AND REAR CENTER PORCH BUILDING #3: SLAB ON GRADE: CENTER SECTION AND FRONT CENTER PORCH PLACEMENT LOCATION OF LOAD # 0 0.00 45 PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. PER DRAWING: S-202, DETAIL: 5 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: