Westbrook Sr Housing Phase III concrete test report 144 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:17 INSPECTOR & TEST SET: SCOTT ROBBINS #17 ATT'N: AMBIENT WEATHER: OUR FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 2 : PLACEMENT LOCATION OF LOAD # 3 : 1 2 0 3 4904 / 3406 4905 / 3408 4598 / 3409 11.00 / 11.00 9 11.00 / 22.00 10 6.00 / 28.00 10.42 7.28 / 8.15 0 ##7.51 / 8.30 0 8.26 / 8.58 0 8.23 / 9.00 # 8 9.08 / 9.51 ##9.53 / 10.25 10.00 MAX: 1.50 )7 1.53 1 7 2.00 1 8 1.98 1 0.28 6.00 9 0.51 6.50 9 0.26 6.00 10 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.25 0.00 0.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 5.00 )6.00 1 6.50 1 6.00 1 ENTRAINED AIR ( % VOL) (SPEC: -7.00 ) 6.50 0 0.00 0 0.00 0376400 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 142.57 0 0.00 0 0.00 0 - 90 ) 62 0 62 0 63 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 215201 - 215206 0 0 0 0 0 0 1: CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.215201 02/02/22 7 3440 X COARSE AGGREGATE #2: LBS.215202 02/02/22 7 3500 X COARSE AGGREGATE #3: LBS.215203 02/23/22 28 4700 0 FINE AGGREGATE: LBS.215204 02/23/22 28 4910 0 ADMIXTURE #1: OZS.215205 02/23/22 28 4980 0 ADMIXTURE #2: OZS.215206 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. PER DRAWING: S-202, DETAIL: 5 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: MAINTENANCE BUILDING: SLAB ON GRADE: WEST PROCEEDING EAST MAINTENANCE BUILDING: SLAB ON GRADE: WEST PROCEEDING EAST PLACEMENT LOCATION OF LOAD # MAINTENANCE BUILDING: SLAB ON GRADE: WEST PROCEEDING EAST 0.00 45 C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 0.00 TEST AGE 4000 0 JOINTA-GALUSHA CONCRETE, INC. CONTRACTOR NOTIFIED: LOAD 1,2,3: SLUMP, OVERTIME ULTIMATE 01/27/22 0.00 0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 61,650 43,900 0 0 59,000 62,500 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 3: TIME CONC. BATCHED / ARRIVED: 43,150 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DISCREPANCIES & REMARKS: 0.0 LAB CYLINDER CONTROL NUMBERS: WATER: 0 0 DESIGN STRENGTH & FORMULA: IF APPLICABLE: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): PROJECT: CONSTRUCTION TECHNOLOGY MR. DARREN VanDeWARKER SCHEMERHORN CONSTRUCTION, INC. 536 BAY ROAD, SUITE 2 QUEENSBURY, NEW YORK 12804 WESTBROOK SENIOR HOUSING: PHASE III: QUEENSBURY, NY. Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 14 01/26/22 1162.010 215201 10's: CLEAR