Loading...
1.3 1.3 WASTEWATER-SEWER\SetMOKeeffe—Replacement with Absorption Setback—In APA-8-5-2024 RESOLUTION SETTING PUBLIC HEARING ON SEWAGE DISPOSAL VARIANCE APPLICATION OF DANIEL AND MARY HELEN O'KEEFFE RESOLUTION NO.: ,2024 INTRODUCED BY: WHO MOVED ITS ADOPTION SECONDED BY: WHEREAS,the Queensbury Town Board serves as the Town's Local Board of Health and is authorized by Town Code Chapter 136 to issue variances from the Town's On-Site Sewage Disposal Ordinance, and WHEREAS, the O'Keeffe Revocable Trust (Applicant), has applied to the Local Board of Health for a variance from Chapter 136 to install a replacement wastewater system with fill material for the absorption field to be placed/located 4' from the east property line in lieu of the required 10' setback on property located at 102 Bay Parkway in the Town of Queensbury, NOW, THEREFORE, BE IT RESOLVED,that the Town of Queensbury Local Board of Health will hold a public hearing on Monday, August 19'', 2024 at 7:00 p.m. at the Queensbury Activities Center, 742 Bay Road, Queensbury, to consider the O'Keeffe Revocable Trust's sewage disposal variance application concerning property located at 102 Bay Parkway in the Town (Tax Map No.: 226.15-1-18) and at that time all interested persons will be heard, and BE IT FURTHER, RESOLVED, that the Local Board of Health authorizes and directs the Queensbury Town Clerk to publish the Notice of Public Hearing presented at this meeting and send a copy of the Notice to neighbors located within 500 feet of the property as required by law. Duly adopted this 5 h day of August, 2024,by the following vote: AYES NOES ABSENT: ♦ I / - - ■re Im ■re WIN sre ■m am ■m • I LANDS NIP OF I BRETT R. HEST 226.15-1-17 1 I LAKE HATER SUPPLY I 1 I : 1 1 I LANDS OF : 1 I DANIEL & MARY HELEN O'KEEFFE 1 I 226.15-1-18 I LAKE WATER SUPPLY 1 � I CQ a I 1 m ■ I � I ■ 1 \ 1 I \ ■ I \ 1 I \\�--------- 50' SHORELSETBACK INE ■ ■ 1 ■ PROPOSED 1,500 GALLON DUAL COMPARTMENT PRECAST CONCRETE SEPTIC TANK 1 1 i 1 EXISTING PUMP STATION TO BE DECOMMISSIONED AND REMOVED ' PROPOSED EFFLUENT SEWER 1 I 1 I ■ I 1 I 1 I 1 PROPOSED 1,000 GALLON PRECAST CONCRETE PUMP STATION I "LL I : l EXISTING OUTDOOR SHOWER 30 SUM 1 TO BE PIPED INTO NEW ■ I BUILDING SEWER WITH TRAP • LL ■ — — — — — — — — — — — — � 1 I 100' SHORELINE SETBACK I 6" TPL B I - I I LL ■ 1 1 PROPOSED 1-1/2` FORCEMAIN TAPER TO EXISRNG�� ■ LL ■ I 1 I wy ■ ■ I ■ ha 1 GRADE, MAX SLOPE 1:3 1: 3 1 I I 1 I 1 I PROPOSED (3) ELJEN TRENCHES, L 3 TRENCHES EACH 32' LONG WITH 8 MODULES EACH, 24 1 1O' — _ _ K MODULES TOTAL, 96 LF TOTAL PL SE�AC-' � \ \ S81•08'00-E ■■AK �■■�I■■�� \ IN, LAKE GEORGE • • E,Y/S17IVC • SAKE • = 'yOREC/NE • 3 44 3 , AKE E f /3 3 // • / tj : y ; / ` — f ij • • LANDS N/F OF CHRISTIAN E. SANDER KITCHEN SINK DRAIN • • 226.15-1-19 Arc Yn NCW wnr )Cr - LAKE HATER SUPPLY Qyc 1. 73Y ' • tiyC• 6 B / T- • z ti :'� i 'TP-2 �• VU W��• i \ '. / i}�► MIN \ Pqp, 'e • , •�•. / WASTEWATER SYSTEM PLAN :� / APPROX. SCALE: 1 "=to' sel�. '•sa SjllrG, ; LOCATION OF , GRAPHIC e49 '•� : NEIGHBORING / ABS. FIELD 25 10 ( IN FEET) •,` . / / CONTRACTOR TD FlELD VERIFY LOCATIONS AND DISTANCES SITE SOILS DATA TP-2 - 0911512023 BY TOM HUTCHINS, P.E. 0-4" - TOP SOIL 4-15" - DARK LOAM 15-32" - MEDIUM BROWN SILT LOAM FEW COBBLES AND BOULDERS 32-57" - DARK BROWN SILT- FIRM MOLTING MOTTLING 0 32" GROUNDWATER 0 51 " BOUNDARY CONDITION ® 32" PERCOLATION TEST - STABILIZED PERCOLATION RATE= 6:20 MIN/INCH DESIGN PERCOLATION RATE- 6-7 MINANCH WASTEWATER SYSTEM DESIGN 5-BEDROOM RESIDENCE WATER SAVING FIXTURES (1.6 GPF MAX. FLUSH, 3.0 GPM MAX. FAUCETS) DESIGN FLOW - 110 GPD/BEDROOM SYSTEM DESIGN FLOW - 550 GPD SEPTIC TANK - NEW 1,500 GALLON DUAL COMPARTMENT PRECAST CONCRETE SEPTIC TANK PUMP STATION - NEW 1,000 GAL PRECAST CONCRETE LEACH FIELD - 96 LF OF ELJEN TRENCHES ELJEN ABSORPTION AREA REQ'O = (550 GPD)/(1.0 GPD/SF) = 550 SF MINIMUM LINEAR FEET REQ'D = (550 SF)/(6 SF/LF) = 92 LF ELJEN LINEAR FEET PROVIDED = 96 LF (UP TO A 6 MIN PERCOLATION RATE IN NEW SYSTEM FILL MATERIAL PER NYSDOH APPENDIX 75-A) ELJEN MODULES REQ'D = (92 LF)/(4 FT/MODULE) = 23 MODULES ELJEN MODULES PROVIDED = (96 LF)/(4 FT/MODULE) = 24 MODULES (3 MODULE ROWS WITH 8 MODULES/ROW) APPLICATION RATE TO EXISTING SOIL: 1.0 GPD/SF, BASED ON 6-7 MIN/IN PERCOLATION RATE (APPENDIX 75-A) DOSING DOSING TO DISTRIBUTION BOX VIA SIMPLEX PUMP STATION. 62 GAL CAPACITY IN DISTRIBUTION PIPING VOLUME OF DOSE TO BE 40t GALLONS POTABLE WATER SUPPLY IS LAKE WATER -MAINTAIN 50' SETBACK TO SEPTIC TANK -MAINTAIN 100' SETBACK TO MOUND (EDGE OF TAPERS) MAP REFERENCE: 1. BASE MAP INFORMATION FROM "SURVEY OF LANDS FOR ASSEMBLY POINT TRUST," IN THE TOWN OF QUEENSBURY, WARREN COUNTY, NEW YORK. DATED OCTOBER 5, 2021. PREPARED BY CORNER POST LAND SURVEYING, PLLC. 2. WESTERN NEIGHBOR INFORMATION FROM "A MAP OF A SURVEY MADE FOR BRETT R. WEST" BY VAN DUSEN & SIEVES LAND SURVEYORS, DATED MAY 31, 20OZ 3. EASTERN NEIGHBOR INFORMATION FROM "A MAP OF A SURVEY MADE FOR CHRIS SANDER" BY VAN DUSEN & SIEVES LAND SURVEYORS, DATED FEBRUARY 6, 2018. -- `"`""-1. LULA 11UIV 1vIAIJ WASTEWATER SYSTEM FILL MATERIAL NOTES AFTER REMOVING ORGANICS AND TOPSOIL, PLACE WASTEWATER SYSTEM FILL OVER THE ENTIRE AREA OF PROPOSED ABSORPTION FIELD AND TAPER AREA. "WASTEWATER SYSTEM FILL" MATERIAL SHALL BE CAREFULLY SELECTED SAND, SANDY LOAN OR SANDY LOAMY GRAVEL WITH IN -PLACE PERCOLATION RATE OF 3-5 MIN/INCH AND NO ORGANICS OR OBJECTS OVER 3" IN SIZE. LESS THAN 109 BY WEIGHT SHALL BE FINER THAN 0.05mm. AT LEAST 25% OF THE MATERIAL BY WEIGHT SHALL BE IN THE RANGE OF 0.50mm TO 2.Omm. LESS THAN 159d OF THE MATERIAL BY WEIGHT SHALL BE LARGER THAN A 1/2" SIEVE. WASTEWATER SYSTEM FILL MATERIAL SHALL BE INSTALLED TO PROVIDE MINIMUM OF 3-FEET BETWEEN SEASONAL HIGH GROUNDWATER AND BOTTOM OF ABSORPTION FIELD. ONLY SYSTEM FILL MATERIAL SHALL BE INSTALLED THROUGHOUT THE ABSORPTION FIELD AREA AND TAPER AREAS. WASTEWATER SYSTEM FILL MATERIAL IS TO BE MECHANICALLY STABILIZED IN 12" LIFTS WITH TRACKED EQUIPMENT PRIOR TO INSTALLATION OF ABSORPTION TRENCHES. INSTALLER TO NOTIFY ENGINEER OF PROPOSED SOURCE OF WASTEWATER SYSTEM FlLL MATERIAL PRIOR TO TRANSPORTING TO S►TE MATERIAL REQUIRED TO PROVIDE COVER OF SEPTIC TANK MAY BE NATIVE MATERIAL OR OTHER MATERIAL WHICH IS NOT NECESSARILY "WASTEWATER SYSTEM FILL." SYSTEM INSTALLATION NOTES CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING AND IN ACCORDANCE WITH THE N.Y.S. DEPARTMENT OF HEALTH INDIVIDUAL HOUSEHOLD SYSTEMS AND ASTM F481 INSTALLATION OF THERMOPLASTIC PIPE AND CORRUGATED TUBING IN SEPTIC TANK LEACH FIELDS. THE PIPE SHOULD BE LAID AT THE GRADES INDICATED, MAINTAINING STRAIGHT CONTINUOUS GRADES WITHOUT SAGS, HUMPS, SEPARATED JOINTS, OR OTHER UNSUITABLE CONDITIONS. PIPE SHALL BE LAID WITH HOLES DOWN IN ALL CASES. ALL DISPOSAL FIELDS SHALL BE GRADED TO SHED RAINFALL AND DIVERT SURFACE RUNOFF AWAY FROM THE DISPOSAL FIELD. DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION AREA AFTER PIPING HAS BEEN INSTALLED. THE WASTEWATER TREATMENT SYSTEM IS DESIGNED AND APPROVED BASED UPON THE INSTALLATION OF WATER CONSERVING FIXTURES AND A DESIGN FLOW OF 110 GPD PER BEDROOM. THE SYSTEM IS NOT DESIGNED TO ACCOMMODATE EXTREME WATER USE FIXTURES, SUCH AS JACUZZI-TYPE SPA TUBS OR WATER TREATMENT EQUIPMENT. THE INSTALLATION OF NON -CONSERVING WATER FIXTURES OR EXTREME WATER USE FIXTURES IS CONTRARY TO THE APPROVAL OF THIS WASTEWATER TREATMENT SYSTEM. ROOF, FOOTING, GARAGE, CELLAR AND SURFACE WATER DRAINAGE MUST BE EXCLUDED FROM THE WASTEWATER SYSTEM. CONSTRUCT DRAINAGE SWALE UPGRADE OF SYSTEM IN ORDER TO DIVERT SURFACE RUNOFF AROUND ABSORPTION FIELD. SEPTIC TANK, PUMP STATION & ABSORPTION FIELD MUST BE INSPECTED BY LOCAL BUILDING DEPARTMENT AND DESIGN ENGINEER PRIOR TO BACKFILL AND FINAL GRADING. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY THE NECESSARY PARTIES AND REQUEST INSPECTIONS. VARIANCE REQUEST SUMMARY THE FOLLOWING RELIEF IS REQUESTED FROM THE TOWN OF QUEENSBURY SANITARY 1) INSTALL ABSORPTION FIELD FILL MATERIAL 4' FROM EAST PROPERTY LINE WHERE 10' IS REQUIRED. 6' RELIEF REQUESTED WASTEWATER SYSTEM SETBACK REQUIREMENTS STREAM, LAKE, PROPERTY LINE HOUSE WATERCOURSE, WELL WETLAND SEPTIC TANK 10' 10' 50' 50' ABSORPTION FIELD 10' 20' 100' 100' NPy ighSafely, e /York ■ Call Before You Dig ■ Walt The Required Time ■ Confirm Utility Response ■ Respect The Marks ■ Dig With Care 800.962.7962 www.dlgsafelymviyork.com o N v C) z 14 IN ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW. Hutchins Engineering PLLC 169 HoWand Road Queensbury, NY 12804 (518) 745-0307 Phone (518) 745-0308 Fax TAX MAP # 226.15-1-18 WASTEWATER SYSTEM PLAN prepared for: O'Keeffe Family Revocable Trust 102 Bay Parkway Town of Queensbury, County of Warren, State of New York Drawn: WOCIAVANIMI Chocked: OTH Scale: NOTED I Date: 08/02/2029 292201-01 -S 1 4" MIN. TOPSOIL, ESTABLISH TURF 4" SCH 40 PVC PERFORATED PIPE GEO-TEXTILE COVER WASHED CONCRETE SAND CONFORMING TO NYSDOT SPECIFICATION 703-07 IN -DRAIN UNIT HOLES ® 5&7 O'CLOCK 2' MIN & BETWEEN L-I APPROXIMATE EXISTING GRADE 4" PVC SDF INLET MIN. SLOPE 1/4" PER FOOT WATERTIGHT SLEEVE AND SEAL (TYP) 4" PVC TEE & TAIL PIECE INLET BAFFLE NEW 1,500 GAL DUAL COMPARTMENT PRECAST CONCRETE SEPTIC TANK 12" OF 3/4-1-1/2"- CRUSHED STONE PRECAST CONCRETE ANTI -FLOATATION BASE EXTENSION BY MANUFACTURER DETAILED EVEN MODULE SECTION NTS 2" POLYETHYLENE EXTENSION —TO GRADE WITH TAMPER —� RESISTANT ACCESS COVER APPROXIMATE FINISHED GRADE 12" MIN. COVER 6" MIN. N LIQ�ID LEVEL 16" 47H x18"W SLOT, (2) 4" ELBOWS OR 6" ELBOW zQ :XZ 60-75% OF TANK VOLUME MINIMUM 2X WIDTH 1 113 1 DEPTH 18" OF OUTLET MIN. INVERT 25-40% OF TANK VOLUME g" fN n1 I I.'1 V I—, — _V VI — I L J .- ELGEN ABSORPTION BED SECTION 1,000 GAL PRECAST CONCRETE PUMP STATION 4" PVC TEE & TAIL PIECE OUTLET BAFFLE BALL VALVE, ONE PER PUMP, INSTALL VALVES AND UNIONS SUCH THAT EITHER PUMP CAN E4. ,BE ISOLATED AND REMOVED WITHOUT REQUIRING PIT ENTRY v a 4" PVC SDR-35 OUTLET EFFLUENT SEWER MIN. SLOPE no- fi4 118" PER FOOT FLOAT SWITCHES - INSTALL INSIDE PUMP PIT IN LOCATION ACCESSIBLE WITHOUT PIT ENTRY ALARM 4" s e . a e ° d ° G ada a . °. < .. A ' < .d. <° SEPTIC TANK DETAIL NTS PUMP ON PUMP OFF VOLUME OF DOSE PER NOTE 16 MIN. I : BALL CHECK VALVE) SIMPLEX (1) EFFLUENT PUMP — 12" OF 314-1-112" CRUSHED STONE NTS 30" POLYETHYLENE EXTENSION TO GRADE WITH TAMPER RESISTANT ACCESS COVER CHAIN ON PUMP TO TOP OF TANK TO ALLOW FOR FUTURE PUMP REMOVAL WITHOUT ENTERING TANK PRECAST CONCRETE ANTI -FLOATATION BASE EXTENSION BY MANUFACTURER PUMP STATION DETAIL NTS 2" TEE JOINS TWO PUMP DISCHARGES INTO ONE FORCEMAIN MATERIAL WITH NATIVE SOILS TO DEPTH OF 1.5' EXTERIOR WEATHERPROOF JUNCTION BOX (IF NECESSARY). SEAL CONDUIT GAS TIGHT. INSTALL CONTROL PANEL IN HOUSE. ALL ELECTRICAL WORK TO BE INSPECTED BY A CERTIFIED ELECTRICAL INSPECTION AGENCY PRIOR TO START-UP OF PUMP STATION. 12"t COVER CONNECT TO 2" PVC J PRESSURE DISTRIBUTION MANIFOLD 2" PVC SDR-26 OR SCH-40 FORCEMAIN PROVIDE POSITIVE DRAINBACK TO PUMP STATION 2" SCH-40 PVC INSIDE WET WELL THROUGH WALL GATE VALVE REDUCING TEE POINTED DOWNWARD ° a WITH 1" BALL VALVE THROTTLED TO ALLOW TRICKLE DRAIN BACK INTO _f WETWELL � UNION (2)- LOCATE SUCH THAT UNION CAN BE DISCONNECTED AND EACH PUMP REMOVED WITHOUT TANK ENTRY SEPTIC TANK NOTES ALL UNITS SHALL COMPLY WITH THE REQUIREMENTS OF THE NEW YORK STATE DEPARTMENT OF HEALTH AND SHALL BE OF PRECAST CONCRETE AS MANUFACTURED BY UTOPIA ENTERPRISES OR EQUIVALENT. ALL STRUCTURES SHALL BE PLACED ON FIRM, COMPACT SAND OR GRAVEL BASE. WHERE EXISTING SOIL CONDITIONS ARE UNSUITABLE, CRUSHED STONE SHALL BE PLACED AS NECESSARY TO ACHIEVE A STABLE BASE. SEPTIC TANKS INSTALLED IN TRAFFIC AREAS SHALL BE OF EXTRA HEAVY CONSTRUCTION DESIGNED FOR H-20 WHEEL LOADING. ALL JOINTS MUST BE SEALED WITH BUTYL SEALANT. JOINTS BELOW THE LIQUID LEVEL MUST BE TESTED BEFORE BACKFILLING. PUMP STATION NOTES SEAL ALL TANK OPENINGS WATERTIGHT. PROVIDE AND INSTALL UL LISTED PACKAGED PUMP CONTROL PANEL WITH VISUAL AND AUDIBLE ALARM. INSTALL DUPLEX, ALTERNATING, DEMAND DOSE CONTROL PANEL INSIDE BUILDING IN ACCESSIBLE LOCATION. INSTALL POWER & CONTROL WIRING TO CONTROLLER WITH ALARM IN HOUSE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NATIONAL ELECTRIC CODE (N.E.C.) REQUIREMENTS. PUMP CONTROL AND FLOAT LEVELS TO BE INSTALLED TO PROVIDE A 40 GALLON DOSE. EFFLUENT PUMPS TO BE GOULDS 3885 MODEL WE03M, 230V, SINGLE PHASE, 30 GPM PUMP AT 20 FT TDH. VERIFY EXISTING ELECTRICAL SERVICE PRIOR TO PURCHASING PUMP. Dig ® Safely. ew/York ■ Call Before You Dig ■ Walt The Required Time ■ Confirm Utility Response ■ Respect The Marks ■ Dig With Care 800-962.7962 ,MwwAlgsafelynewyoik.com o N 4-1 p U Z U � O_ W p � N W o z ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW. Hutchins Engineering PLLC 169 Haviland Road Queensbury, NY 12804 (518) 745-0307 Phone (518) 745-0308 Fax TAX MAP # 226.15-1-18 WASTEWATER SYSTEM DETAILS prepared for: O'Keeffe Family Revocable Trust 102 Bay Parkway Town of Queensbury, County of Warren, State of New York Drawn: WOC/AVAMK B Checked. aTH Scale: NOTED Data: 0S/0*=3 292201-01 -S2