Loading...
PT-0766-2023 4 ., Property Transfer Sewage Disposal Information Form Y--1 -�./ Date: ( 123 Town of Queensbury 742 Bay Road,Queensbury,NY 12804 - . P:518-761-8256 www.queensbury.net lldkzak_ (Name of Owner/Applicant) - - Re: Onsite Wastewater Treatment System Inspection Information Request for: (Site Address for Inspection) Thank you for requesting an inspection for the onsite,wastewater treatment system (OWTS) located on the property referenced above. We look forward to completing a thorough inspection for you. You can help us do the best job possible by:,p`rr�oviding some advanced information about the site. Prior to our inspection,we request this completed applicati n, a site map indicating the location of the septic components and confirmation the pre-inspection IW arat'ion see the last page of this acket will be completed prior to our arrival. ?-,,,A: Enclosed his a S,eptiC,System Inspection Information form, which must be completed, signed and returned to this offic ith tr;erappropri,ate fee(s) and documentation, prior to scheduling an inspection. gi, : : '',:%.,,,.-;. 2 '''', ,..! - . Please noteAhe Town of Queenhury's fee for this service is$275. Be advised that all fees must be paid prior to 0,scheduling the inspection •eve• ''iire 48 hours notification prior to scheduling the inspection. f:; 'r `'= 'If the purchaser is requesting an exemption, please submit this application along with a notarized letter stating ' the septic system will be inspleted or repaired/replaced within 6 months from'the date of the Property • Conveyance or June 15t of the current, or following year (whichever comes first), a map locating the septic system and payment totaling$2275 ($2000 refundable deposit plus $275 permit fee). The deposit is forfeited if the owner fails to complete the repairs or installation a's'stated above: . If you have any questions, please call. Phone: (518) 761-8256 Email: kated@queensbury.net Thank you. Sincerely, • 0 (70/16 12/fry‘ • John O'Brien, Director BU9ding.and Code Enforcement Town of Queensbury . • Property Transfer Packet Revised July 2022 Office Use Only Permit#: PI-0 Q - 20 L6 Town of C. ecnsiiury Fee:_$ 2-2 -1 J 742 Bay Road,Queensbury,NY 12804 -A-1-6 P:518-761-8206 or 518-761-8205 Invoice#: www.queensbury.net SEWAGE DISPOSAL SYSTEM INSPECTION INFORMATION Individual Residential Wastewater Treatment System CONTACT INFORMATION (please print legibly or type and include an email address) Property and Owner Information: (Please attach property survey or tax parcel map) Property address for inspection: 5< Lr� �C, L Tax map number: nn Property owner: b:,›J;.ck Mailing Address (c/s/z): 144 viu*kd o ) qm9 2- Cell #: 'Si 1cm Land Line#: Ten 20.23 tiPt Email: re. AI-1 �Q s cs��rn.—�`Nb s G O v�6t\.. c c5w• �C Applicant (if different than above): Mailing Address (c/s/z): Cell #: Land Line#: Email: ❑ Proposed Owner ❑ Realtor ❑ Attorney ❑ Other (explain: - ) Septic Contractor: PS )s-�c 1 (), n 1r1A Mailing Address (c/s/z): q �i Cell #: 1 r-2?. /2 97/- Land Line#: Email: n J vs. r1--'e �7 Sr' l (3\ `ram-,1e , 1 , c_o rra. LJ Reason for Inspection Request: ❑ On the market ❑ Future listing ❑Sale Pending Deed Transfer ❑ Other: • Property Transfer Packet Revised July 2022 HOUSEHOLD INFORMATION **PLEASE SEE SEPARATE PAGE FOR EXEMPTIONS** # Bedrooms 2# Bathrooms k # Kitchens \ Jacuzzi tub(s) p Garbage grinder 6 Onsite Wastewater Treatment System: How many systems are on the property? 7 Year system(s) installed: Tank � f/Size of Septic Tank f uh Type of Absorption System: ,e Are all system components wholly within the property boundaries? ❑Yes ❑ No ? Are system plans available? ❑ Yes ❑ No Does the system(s) serve multiple properties? ❑ Yes FA No If yes, describe Maintenance: Service agreement? ❑ Yes p No; If yes, business' name Date of last inspection N/A Er Date tank last pumped f! N/A ❑ Frequency of pumping N/A ❑ List known repairs/replacements, with dates: Date Type of Repair/Replacement • • Operation: System problems? Yes IN No • Sewage odors? ❑ Yes [-No • Direct surface discharge(s)? ❑ Yes I1No 7 • Back-up of toilets? ❑ Yes I f No • Back-up of any other fixtures? (e.g. slow drains) ❑ Yes E(No • Seasonal ponding or breakout of leach field? ❑ Yes 0 No ?• Property Transfer Packet Revised July 2022 Statement of Acceptance of Conditions: I agree to: • Ensure that the septic tank(s), distribution box (es), and/or seepage pit(s), if any, will be uncovered prior to the requested inspection time; • Have a septage hauler on site (to pump the tank after*the inspector verifies flow from fixtures); ➢ Tank must be pumped in presence of inspector • Have an authorized representative present at the site; • Allow the inspector to verify information provided above, and to conduct an inspection of the indicated onsite wastewater treatment system(s), including all system components and interior plumbing in crawl spaces and basements. To the best of my knowledge,the information provided above is accurate and I acknowledge the following: After 1 year from date of submission and there is no activity on this permit, the permit will expire and will be subject to submission of a renewal application and payment of the renewal fee based on the current fee schedule. All fees must be paid PRIOR TO SCHEDULING any inspections. In addition, if the permit is withdrawn 30% of the fee is retained by the Town of Queensbury. Signature of property owner or authorized agent: Affiliation: gKmner ❑ agent ❑ other: Please print-name: (AAA 4 1�� Signature: Date: 17i`3 Prior to scheduling with the Town of Queensbury, you MUST: 1. Schedule a sewage hauler to be on site to-pump tank while inspector is on site. Hauler should arrive 30-45 minutes after scheduled time with the Town of Queensbury's Code Enforcement Officer. 2. Expose inlet and.outlet of septic tank, and/or pump station, expose d=box, expose any seepage pit covers. 3. Excavate test hole in leach field if there is no d-box. Property Transfer Packet Revised July 2022 • EXEMPTION CONDITION OPTIONS Due to one of the conditions listed below, I am requesting an exemption from the Septic Inspection Upon Property Transfer by the Town of Queensbury: PLEASE CHOOSE ONLY ONE CONDITION BELOW IF YOU ARE.REQUESTING A WAIVER ❑ The property to be sold or transferred will not be inhabited, and the new owner plans to demolish the existing structure. In order to qualify for the exemption, a notarized affidavit must be submitted to the Building and Codes Enforcement Office stating that the dwelling will not be inhabited and that it will be demolished with no immediate plans to rebuild or the dwelling will not be inhabited, it will be demolished and rebuilt, in which case the affidavit shall be accompanied by a site plan, including adequate detail to demonstrate a lawful OWTS, together with a check payable to the Town of Queensbury in the amount of$2,000. Such funds will be held in a non-interest-bearing escrow account and will be released;in the former case, upon issuance of a demolition permit and, in the latter case, upon issuance of a certificate of compliance from the Building and Codes Enforcement Office. If the Property Transfer inspection is not completed within that 6 (six),month timeframe, the $2000 will be forfeited. ❑ An OWTS inspection was not able to be completed prior to the conveyance of real property due to inclement weather. In order to qualify for the exemption, a notarized affidavit from the new property owner to complete the requisite OWTS inspection within six months of the date of the conveyance of real property, or June 1, whichever comes first,must be filed with the Building and Codes Enforcement Office. A check payable to the Town of Queensbury in the amount of$2,000 will be held in a non- interest-bearing escrow account and shall be released upon the completion of a satisfactory OWTS inspection from the Building and Codes Enforcement Office. If the Property Transfer inspection is not completed within that 6 (six) month or June 1st timeframe, the $2000 will be forfeited. 71, The property to be sold or transferred contains an existing OWTS that does not comply with the provisions of this article, and the prospective purchasers and/or the Seller wish to forgo an inspection in favor of installing an approved OWTS within six months of the transfer of property. In order to qualify for the exemption, a notarized affidavit must be submitted to the Building and Codes Enforcement Office stating that the existing OWTS will be replaced within six months from transfer of property. The affidavit must be accompanied by a.site plan, including adequate detail to demonstrate that the replacement OWTS will comply with this article, together with a check payable to the Town of Queensbury in the amount of$2,000. Such funds will be held in a non-interest-bearing escrow account and will be released upon issuance of a certificate of compliance from the Building and Codes Enforcement Office. If the Property Transfer inspection is not completed within that 6 (six) month timeframe, the $2000 will be forfeited. Property Transfer Packet Revised July 2022 ❑ During the OWTS inspection, a failure of the septic system was determined. Due to winter and frozen conditions, the repair to an existing OWTS could not occur or a new OWTS could not be installed before the conveyance of real property. In order to qualify for the exemption, a notarized affidavit from the new property owner to complete the installation or repair of the septic system within six months from the date of the conveyance of real property, or June 1,whichever comes first,must be filed with the Building and Codes Enforcement Office. A check payable to the Town of Queensbury in the amount of$2,000 will be held in a non-interest-bearing escrow account and shall be released upon the completion of the repair or installation of a new septic system and a satisfactory OWTS inspection from the Building and Codes Enforcement Office. If the Property Transfer inspection is not completed within that 6 (six) month or June 1st timeframe, the $2000 will be forfeited. ❑ There is a record of a septic system inspection upon property transfer permit and inspection completed and passed within the last three years. Please provide a copy of this record. PLEASE READ NOTICE THOROUGHLY: Failure to complete the inspection, obtain the permit or complete all repairs/installations identified in the preceding subsections of this section within the time provided or any subsequent deadline established by the Building and Codes Enforcement Office will result in forfeiture of the moneys held in escrow, and the Town may use such funds toward abating the conditions caused by each such violation of this article. • Inspections must take place within one (1) year of submission of a completed application. Inspections scheduled to take place after the one year period will be subject to submission of a renewal application and payment of the renewal fee based on the current fee schedule. ***ONLY SIGN THIS PAGE IF YOU ARE OPTING FOR A WAIVER REQUEST!!*** I have read and understand the above notice regarding the expectations and possible forfeiture of moneys submitted to the Town of Queensbury for an exemption request. Seller: Print Name: . Sign Name:. Date: Buyer: Print Name: . Sign Name: Date: it— it ' 2 3 Property Transfer Packet Revised July 2022 12" COVER MIN. 4" INLET PIPE MIN. SLOPE 1 /8 "/FT. O 12" MIN. COURSE SAND OR PEA STONE SECTION A -A EACH OUTLET FITTED _ WITH SPEED LEVELERS �A INLET I 4" OUTLET PIPE MIN. SLOPE 1 /8 "/FT. OUTLET (TYP. OF 8) GROUT UNUSED OPENINGS PLAN VIEW —DISTRIBUTION BOX TO BE #2 DB BY FORT MILLER CO. OR EQUAL. —PROVIDE EXTENSION COLLAR IF COVER OVER BOX EXCEEDS 12". —BAFFLE MUST BE PROVIDED. PIPING BENDS CANNOT BE UTILIZED AS A BAFFLE. —FOR PUMPED FEED TO D—BOX PROVIDE A RETAINING FITTING AT THE ENTRANCE AND EXPAND FTHE DISTRIBUTION BOX —MOUND GRADEORCE OVER DISTRIBUTION BOX TO HELPMAIN PIPE SIZE T4" 8EP ERVENTTFR EZINGSTRIBUTION BOX. NOT TO SCALE ti PROPOSED LEACH FIELD —1 ELJEN LINE @ 44', 11 ELJEN PADS —FIELD SIZE OF 4'x45' PROPOSED —10' MIN. TO PROPERTY 100% RESERVE PT LINE AREA —100' MIN. TO WELL —20MIN. TO HOUSE � EXIST. PROPOSED i HOME DISTRIBUTION BOX TP \ A PUMP STATION HAS BEEN REQUIRED AND A 2" HDPE / FORCE MAIN RUNS FROM THE M / PS TO THE DISTRIBUTION BOX l 1 EXISTING WELL — 100' FROM LEACH FIELD I EXISTING WELL NO LONGER IN USE I 1 EXISTING 1000 GAL. ' SEPTIC TANK P ERTY SINE SRO LAYOUT PUMP STATION (500 gallon tank) 4"0 GRAVITY LINE FROM ST. TO PS. DREAM LAKE SCAL ZABEL RETROFIT ACCESS SYSTEM OR EQUAL 26"0 RISER DEPTH TO FIT LIQUID 4"0 OU',tET PIPE LEVEL MIN. SLOPE J"/FT OUTLET EFFLUENT FILTER EFFLUENT FILTER REQUIRED TO BE PLAN VIEW INSTALLED FOR r ELJEN WARRANTY :: :......,:. TO BE IN EFFECT SECTION VIEW EFFLUENT FILTER ADDITION RECOMMENDED NOT TO SCALE FINISH GRADE 4" TOPSOIL ♦ + i + + i + + + + + + + + + + ♦ + + P ♦ + + 4 4 ♦ + + + i ♦ 4 4 + + ♦ ♦ + + ♦ + ♦ + + + + ♦ ♦ i + + + + ♦ 4 + + ♦ + + + + ♦ ♦ + + + ♦ ♦ a + + + + 4 + + + SUITABLE BACKFILL 4" PERF. PIPE (ROCK, COBBLES TO BE REMOVED) LAID LEVEL GEOTEXTILE COVER TYP. HOLES AT BANDING STRAPS 5 & 7 O'CLOCK GSF UNIT LAID LEVEL TYP. ........ CONCRETE SAND ......•.•.•.•.•.•.•.•. ........... N.Y.S.D.O.T. #703-07................................. ............................................... SEE DETAIL THIS SHEET 6" 36" 6" NOTE: — _ _ 2' MIN. TO IMPERVIOUS STRATA, BEDROCK OR SEASONAL HIGH GROUNDWATER ELJEN GSF CROSS SECTION NOT TO SCALE 6" CONCRETE SAND (SEE SPECS) ALL AROUND AND UNDERNEATH UNITS 45' 4"0 PVC ® A"/FT 11 ELJEN GSF UNITS 4' TYP. �3' TYP. FROM — SEPTIC — — — — — — — — ---- � TANK D-BOX GSF UNITS 4"4 PVC —, LAID LEVEL LAID LEVEL ELJEN GSF SYSTEM PLAN NOT TO SCALE 4' MIN. 4' TYP. 10' MIN TO STABILIZED PROPERTY LINE FILL TOPSOIL & SEED ELJEN GSF UNIT 3 /1 �— SANG GR PST - EX� _ / T �T T xi SKI AY IIIIII�IIIIIIIlII�IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII� 'IIII�IIIIIIII ELJEN GSF SYSTEM SECTION NOT TO SCALE ALTHOUGH THIS PROPERTY IS LOCATED PARTIALLY IN A FLOOD TONE, TOWN MAPPING INDICATES THAT THE ELJEN SYSTEM IS LOCATED OUT OF THAT ZONE._ SYSTEM MAINTENANCE NOTES IT IS IMPERATIVE THAT THE OWNER PROVIDE QUALITY MAINTENANCE FOR THIS SYSTEM. SEND AS LITTLE GREASE AS POSSIBLE TO HOUSE DRAINS. MONITOR EFFLUENT FILTER AND CLEAN AS REQ'D, I.E. INITIALLY CHECK AT 3 MONTHS AND IF NOT CLOGGED CHECK AT 6 MONTHS, ETC. UNTIL A TIME PERIOD FOR CLEANING THE FILTER CAN BE ESTABLISHED. REMOVE FILTER & HOSE CLEAN THEN REPLACE. MONITOR SEPTIC TANK AND CLEAN TANK WHEN THE DEPTH TO THE SLUDGE LAYER IS 10" BELOW THE BOTTOM OF THE OUTLET BAFFLE AND THE DEPTH FROM THE BOTTOM OF THE SCUM LAYER IS 3" ABOVE THE BOTTOM OF THE OUTLET BAFFLE. PROPER MAINTENANCE WILL EXTEND THE LIFE OF THE LEACHING SYSTEM. PROVIDE CERTIFICATION TO ENGINEER FROM PIT THAT MATERIAL PROVIDED MEETS THE SPECS SHOWN BELOW. ELJEN SAND ASTM C33 SAND SPECIFICATION SIEVE SIEVE SQ. % PASSING SIZE OPENING SIZE WET SIEVE .375" 9.5 MM 100 #4 4.75 MM 95-100 #8 2.36 MM 80-100 #16 1.18 MM 50-85 #30 600 NM 25-60 #50 300 NM 5-30 #100 150 N M <10 #200 75 N M <5 PERCOLATION TEST RESULTS: PERC. RATE DEPTH No. MIN: SEC INCH IN. EXISTING SOILS PT 1 2 min. 18 sec. 22 PT 2 1 min. 57 sec. 24 TEST PIT RESULTS No. DESCRIPTION 1 0-5" TOPSOIL & SHALLOW ROOTS 2 5"-5t' MED. TO FINE BROWN SAND NO MOTTLING, GROUNDWATER OR ROCK PERCOLATION TESTS COMPLETED BY CARRY ROBINSON, P.E. ON 12-29-23 A NOTE ABOUT EFFLUENT FILTERS AND WIPES THE USE OF AN EFFLUENT FILTER IS HIGHLY RECOMMENDED. AN EFFLUENT FILTER PROVIDES ANOTHER CHANCE TO REMOVE SOLIDS FROM THE WASTE STREAM PRIOR TO THEM ENTERING THE DISTRIBUTION BOX AND CAUSING PROBLEMS WITH THE LEACHING SYSTEM. DO NOT REMOVE IT ACCEPT FOR CLEANING. WHEN CLEANING PULL THE FILTER OUT BUT DO NOT PUT FILTERED MATERIAL BACK IN THE TANK. PUT THE FILTER IN A HEAVY DUTY GARBAGE BAG, SHAKE THE FILTER THEN SPRAY IT WITH THE HOSE TO CLEAN IT. THROW OUT THE GARBAGE BAG AND PLACE THE CLEAN EFFLUENT FILTER BACK IN THE EFFLUENT TEE BAFFLE. HAVE YOUR CONTRACTOR SHOW YOU HOW TO FIND THE EFFLUENT FILTER. WIPES, BABY WIPES, TAMPONS, KOTEX, ETC. THESE ITEMS DO NOT BELONG IN THE SEPTIC SYSTEM. THEY EXPAND AND THEN CLOG PIPING, THE EFFLUENT FILTER AND IF THEY GET THERE, THE DISTRIBUTION BOX & POTENTIALLY THE LEACHING SYSTEM. IF YOUR EFFLUENT FILTER OR OTHER SYSTEM COMPONENTS ARE CLOGGED YOU MAY NOTICE THAT THE TOILET IS SLUGGISH AND YOU MAY HEAR SOME GURGLING WHEN IT FLUSHES. IF THIS OCCURS CLEAN YOUR EFFLUENT FILETER AND IT SHOULD TAKE CARE OF THE SITUATION. IF IT DOES NOT YOU MAY HAVE OTHER ISSUES THAT REQUIRE THE HELP OF A PROFESSIONAL. THIS PLAN IS FOR A REPLACEMENT SYSTEM AND INCLUDES THE INSTALLATION OF A DISTRIBUTION BOX AND AAN ELJEN GSF LEACHING SYSTEM. THE EXISTING SERVICE FROM THE HOME AND THE SEPTIC TANK ARE TO REMAIN AS IS, IF AFTER INSPECTION IT IS DEEMED TO BE IN GOOD CONDITION AND NOT LEAKING. IT IS RECOMMENDED THAT AN EFFLUENT FILTER BE INSTALLED AND THE OPENING OVER THE FILTER BE EXTENDED TO GRADE. THE EXISTING DISTRIBUTION BOX AND LEACH FIELD ARE TO BE EXCAVATED AND MOVED OUT OF THE AREA OF THE PROPOSED FACILITIES. PIPE IS TO BE CLEANED AND DISPOSED OF. DBOX AND STONE ARE TO BE BURIED ONSITE OR REMOVED TO A LEGAL DISPOSAL FACILITY. IT IS RECOMMENDED THAT THE DBOX AND STONE REMAIN ON SITE. CONTRACTOR NOTIFICATION: THE CONTRACTOR SHALL CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF CONSTRUCTION TO ENSURE COMPLETE UNDERSTANDING OF SYSTEM DESIGN INTENT. IF DIFFERING SITE CONDITIONS FROM THOSE PRESENTED IN THIS PLAN ARE ENCOUNTERED, THE CONTRACTOR SHALL CONTACT THE DESIGN ENGINEER IMMEDIATELY PRIOR TO ANY FURTHER WORK BEING COMPLETED. LEMAIL: BINSON, P.E. PHONE: 518-695-3655 obinsonpe@gmail.com I HEREBY CERTIFY THAT THE ONSITE SEPTIC SYSTEM WAS CONSTRUCTED, TESTED AND IS OPERATING IN SUBSTANTIAL ACCORDANCE WITH THE APPROVED SEPTICDESIGN PLANS AND THIS RECORD DRAWING. P.E. LIC, NO.: NY-060 ss R� fo°d SITE SITE LOCATION MAP N TS SEWAGE DISPOSAL SYSTEM NOTES: 1.) SEWAGE FLOWS: 2 BEDROOM AT 110 GAL/DAY/BEDROOM TOTAL EXPECTED FLOW = 220 GAL/DAY 2.) SEPTIC TANK DESIGN SIZING: 2 BEDROOMS - 1000 GAL (EXISTING). ELJEN GSF LEACHING SYSTEM PERCOLATION RATE = 1-5 MINUTES/INCH - LOADING RATE = MINIMUM 5 ELJEN UNITS PER BEDROOM - USE A TOTAL OF 11 ELJEN UNITS —AT ONE LEACHING LINE - 11 ELJEN UNITS = 44' TOTAL LENGTH: — ELJEN SYSTEM SIZE = 4' WIDE FIELD SIZE = 4'x45' — MAX. SLOPE IN EXISTING SOILS IS LESS THAN 15% TO BE FLAT WITH THE ADDITION OF FILL - SEE DETAIL 4.) CONTRACTOR SHALL AT ALL TIMES COMPLY WITH THE REQUIREMENTS OF THE N.Y.S.D.O.H. DESIGN DOCUMENT APPENDIX 75-A-WASTEWATER TREATMENT STANDARDS FOR INDIVIDUAL HOUSEHOLD SYSTEMS THE N.Y.S.D.O.H. PUBLICATION "INDIVIDUAL RESIDENTIAL WASTEWATER TREATMENT SYSTEMS DESIGN HANDBOOK" (MOST RECENT EDITION) & NY GSF DESIGN & INSTALLATION MANUAL, NOVEMBER 2020 EDITION., 5.) THE LOT INFORMATION HAS BEEN TAKEN FROM THE QUEENSBURY GI,S MAPPING SYSTEM AND ASSOCIATED TAX INFORMATION. THE PARCEL IS XXX ACRES IN SIZE AND IS TAX PARCEL # 279.13-1-18. 6.) HOUSE, DRIVE, WELL AND SEPTIC SYSTEM LOCATIONS INDICATE ONE 'SCENARIO THAT MEETS REGULATORY REQUIREMENTS. OTHER LAYOUTS MAY BE ACCEPTABLE. 7.) CONTRACTOR TO SECURE ALL REQUIRED PERMITS FOR PROJECT. 8.) CONTRACTOR RESPONSIBLE FOR COMPLIANCE WITH ALL OSHA REGULATIONS AND REQUIREMENTS. 9.) ALL WORK MUST CONFORM TO ALL FEDERAL, STATE AND LOCAL CODES, SPECIFICATIONS, ORDINANCES, RULES AND REGULATIONS. 10.) ALL UTILITY LOCATIONS, IF SHOWN, ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY AND CONTACT UFPO AS REQUIRED. 11.) CONTRACTOR TO PROVIDE RECORD DRAWINGS FOR THE ON -SITE SEWAGE DISPOSAL SYSTEM TO THE TOWN OF QUEENSBURY CODE ENFORCEMENT OR BUILDING DEPARTMENT OFFICE IF REQUIRED. 12.) A PROFESSIONAL ENGINEER CAN PERFORM INSPECTIONS OF THE SYSTEM AT THE FOLLOWING TIMES: SEPTIC TANK OPEN, LEACH FIELD W/LATERALS EXPOSED. A 48 HR. NOTICE REQUIRED. ENGINEER TO CERTIFY THAT THE SYSTEM WAS INSTALLED IN SUBSTANTIAL ACCORDANCE W/PLANS. A FEE IS REQUIRED FOR THIS SERVICE. THIS DOES NOT CONSTITUTE FULL TIME INSPECTION OR PROJECT SUPERVISION. THESE SERVICES CAN BE PROVIDED AT ADDITIONAL COSTS. 13.) THERE ARE NO EXISTING DRILLED WELLS WITHIN 100 FEET OF PROPOSED LEACH FIELD. 14.) 50% REPLACEMENT AREA IS LOCATED ADJACENT TO THE PROPOSED LEACH AREA 15.) ALL REFUSE, DEBRIS AND MISC. ITEMS TO BE REMOVED SHALL BE LEGALLY DISPOSED OF OFF SITE BY THE GENERAL CONTRACTOR. 16.) ALL POINTS OF CONSTRUCTION INGRESS OR EGRESS SHALL BE MAINTAINED TO PREVENT TRACKING OR FLOWING OF SEDIMENT OR DEBRIS ONTO A PUBLIC ROAD j AUG 2 U OR ON THE PAVED AREAS OF THE SITE. 17.) GRAVITY PIPING TO BE PVC SDR-35 OR SCH. 40. nF QU 18.) CONTRACTOR TO FOLLOW EROSION CONTROL GUIDELINES FOR ALL WORK AS PROVIDED' FOR IN "NEW YORK GUIDELINES FOR URBAN EROSION AND SEDIMENT CONTROL" DATED APRIL 1997 OR ITS MOST CURRENT UPDATE. 19.) OWNER SHALL NOT ALLOW ANY CLEAR WATER DISCHARGES SUCH AS A SUMP PUMP DISCHARGE, ROOF OR FOUNDATION DRAINS OR WATER SOFTENER BACKWASH TO BE !N, OF QU DIRECTED TO THE SEPTIC SYSTEM AS IT WILL CAUSE SYSTEM FAILURE. UIL®ING 20.) NO STRUCTURES SUCH AS SHEDS, POOLS, BARNS, ETC. ARE TO BE CONSTRUCTEfbwi0wed By WITHIN 5' OR ON TOP OF THE LEACHING SYSTEM. ALL TRAFFIC OR ANY USE TH,�T MAY CAUSE COMPACTION OF THE SOILS OR RESULT IN COLLAPSE OF THE LEACHING ' - SYSTEM COMPONENTS MUST BE DIVERTED FROM THE LEACHING SYSTEM AREA. 21.) SOME LEACHING SYSTEMS REQUIRE THAT AN EFFLUENT FILTER BE INSTALLED PRIOR TO THE LEACHING SYSTEM IN ORDER TO VALIDATE AND KEEP ANY WARRANTY IN FORCE. AMONG OTHER TYPES OF LEACHING SYSTEMS THIS INCLUDES ELJEN GSF SYSTEMS AND PUR-A-FLO PEAT FIBER SYSTEMS. EFFLUENT FILTERS REMOVE SOLIDS THAT MIGHT PASS THROUGH THE SEPTIC TANK AND CONTINUE INTO THE LEACHING SYSTEM. THEY REQUIRE ROUTINE MAINTENANCE (SEE OTHER NOTES) TO OPERATE PROPERLY. A BACK UP FROM A CLOGGED EFFLUENT FILTER IS NOT A FAILURE OF THE SEPTIC SYSTEM, IT MERELY INDICATES THAT THE EFFLUENT FILTER NEEDS MAINTENANCE. AN EFFLUENT FILTER IS RECOMMENDED ON ALL ON SITE SEPTIC SYSTEMS. NOTE: CONTRACTOR TO ADJUST GRADES TO ENSURE THAT THE ELJEN FIELD CAN BE FED BY GRAVITY. IF IT CANNOT AND A PUMP STATION BECOMES REQUIRED IT IS TOCOMPLY WITH THE DESIGN ON SHEET 2 OF THESE PLANS. AS BUI RECORD DRAWtNG Lands of Revival Designer Homes 12 Chelsie Way TOWN OF QUEENSBURY WARREN COUNTY STATE OF NEW YORK SEWAGE DISPOSAL SYSTEM PLAN DATE: 1-15-24 SCALE: AS NOTED DWG. NO.:burkseptic.dwg a/12/24 RECORD opAwlNc GARR Y ROBINSON, P♦ r' ' SHEET 1 of 2 SATE NOTE CONSULTING ENGINEER I BI RY '.DES Y1a1w PROVIDE SEAL OFF - FITTINGS IN ACCORDANCE WITH NEC AND 10 STATES STANDARDS TO PREVENT MOVEMENT OF C'�S INTO THE PANEL CONTROL PANEL -WALL MOUNTE!1 ,,.-- ON BUILDING EXTERIOR OR ON 6x6 TR. POST. NEMA 3R OR 4X MOUNTED SECURELY TO A POST OR / BUILDING 4"0 SCEREENED PVC VENT (SHOWN HERE FOR CLARITY) INSTALL FREE STANDING OR RUN TO BUILDING PLUMBING VENT MIN 2' ABOVE GRADE FINISHED GRADE 2" MIN. PVC CONDUIT W+I'TH LEVEL SWITCH AND POWER WIRES -SEPARATE CONDUITS PREFERRED -COORDINATE W/MANUFACTURER NEMA 3R OR 4 JUNCTION BOX IF REQUIRED BY CODE r-� lmJ In SEAL OFF FITTING IF JCT. ns BOX UTILIZED it A e� pw RISER WALL AI �- 2" MIN. PVC- SCH 40 CONDUIT/POWER - - FROM BUILDING SECURELY MOUNT LEVEL------ FROM FROM SEPTIC TANK SWITCH SUPPORT ROD TO SLOPE WALL WITH STANDOFFS. FIRMLY ATTACH LEVEL SWITCHES TO ROD. ALARM C FLOAT SWITCH ELEVATIONS PUMP PUMP OFF 2.0' AFF PUMP TO BE SUBMERGED PER ON C PUMP ON 2.2' AFF MANUFACTURER'S SPECIFICATION PUMP OFF ALARM 2.8' AFF A 750 GAL. OR 500 GAL. CONCRETE OR PLASTIC TANK 500 GALLON PRECAST CONCRETE SEPTIC MAY BE SUITABLE FOR THE TANK (SEE CONSTRUCTION DETAIL BELOW ) PUMP STATION. SUBMIT SHOP DRAWING FOR USE OF AN ALTERNATE. PUMP STATION SCHEMATIC SECTION PUMP CONTROL WALL MOUNT ON GARAGE HEIGHT & LOCATION BY OWNER HOME ELECTRICAL DISTRIBUTION PANEL MIN, 1-1/4" CONTROL PVC CONDUIT PANEL 15A CONTROLS (IN CONDUIT) 20A 1 PUMPS MIN. 1-1/4- (IN CONDUIT) PVC CONDUIT MOUNT ON 4X4 'REATED JCT LUMBER AT 30" MIN. ABOVE BOX GRADE. NO WIRE SPLICES TO OR IN PUMP TANK - EXPLOSION PROOF SEAL NEMA 4X OFF FITTING WITHIN 18" OF JCT. BOX t ZOELLER 98-FLOW MATE LEVEL SWITCHES ' ( SUBMERSIBLE PUMP OR -PUMP WATER ALARM EQUAL. ON -PUMP OFF LEVELS TO BE FIELD SET PER CHART -SEE ABOVE NOTES: 1. ALL WOPK IS TO COMPLY WITH THE MOST RECENT EDITION OF THE NEC WHICH HAS BEEN ADOPTED BY NYS. 2. ALL ELECTRICAL WORK MUST BE INSPECTED BY A CERTIFIED ELECTRICAL INSPECTOR. ELECTRIC SCHEMATIC NOT TO SCALE INLET 4" INLET PIPE MIN. SLOPE 1/8"/FT. NOTE: THE CONTRACTOR SHA11 FIFI_D VFF?IF'Y 01P1= RENOF IN PT TI .�.Au� ELEVATIONS AND PROVIDE THE ENGINEER WITH SHOP DRAWINGS OF SELECTED PUMP FOR APPROVAL. RISER COVER, EXTENSION AND FRAME PLASTIC IN NON -TRAFFIC AREA CONCRETE RING/HEAVY DUTY FRAME AND COVER IF IN TRAFFIC AREA PVC TEE FITTING SCH 40 -TANK COVER J.,---QUICK DISCONNECT _____----BALL VALVE TO DISTRIBUTION BOX & ABSORPTION SYSTEM, I - - SLOPE CONTINUOUSLY UP SO MAIN WILL DRAIN WHEN PUMP IS DE -ENERGIZED PROVIDE MINIMUM OF 24" COVER. PIPE TO BE 2"0 HDPE. Y4"0 DRAIN HOLE SUBMERSIBLE PUMP TO BE ZOELLER 98 FLOW MATE I HP 1725 RPM MOTOR 220V. COORDINATE WITH CONTROL PANEL. TYP OF 1. IT IS RECOMMENDED THAT A a SPARE PUMP BE KEPT ON SITE. ---CONCRETE BLOCK 8'-8- PLAN VIEW -, 1. PUMP STATION PIT TO BE FULLY WATERPROOF AND WATERTIGHT. 2. PUMPS, CONTROLS, VALVES, HATCHWAY, ETC TO BE PROVIDED BY EMMONS PUMP OR EQUAL. 3. ALL INTERIOR PIPING AND VALVES TO BE 1-1/2" DIAMETER. 4. INTERIOR PIPING TO BE GALVANIZED STEEL OR PVC SCH 80. 5. ALL PIPE OPENINGS THROUGH CONCRETE PIT TO BE PROVIDED WITH LINK SEAL AND BE WATERTIGHT. 6. PUMP STATION POWER SUPPLY TO BE RUN FROM CIRCUIT BREAKER PANEL IN BUILDING TO PUMP STATION CONTROL PANEL. EXTERIOR RUN TO BE IN CONDUIT. PROVIDE CIRCUIT BREAKER SIZE AT CB PANEL AS RECOMMENDED BY MANUFACTURER. MAKE MODIFICATIONS REQUIRED AT ELECTRIC PANEL. 7. ALL WORK TO CONFORM TO NATIONAL ELECTRIC CODE AND THE BUILDING CODE OF NYS. ALL ELECTRICAL WORK TO BE INSPECTED BY NEW YORK STATE BOARD OF FIRE UNDERWRITERS OR AN EQUIVALENT ORGANIZATION. 8. CONTROL PANEL TO BE A SIMPLEX MODEL BY RHOMBUS TECHNOLOGIES OR EQUAL. RHOMBUS MODEL 112-1-W-1-0-4-H-3A,6A,10E,14B,19B WITH A LOCKABLE LATCH IN A NEMA 4X EXTERIOR ENCLOSURE, PROVIDE 3 FLOAT SWITCHES (OFF, ON, ALARM), SWITCH LEADS TO MEET FIELD REQUIRED LENGTH. MOUNT ON THE GARAGE EXTERIOR WALL ADJACENT TO THE PUMP STATION. MOUNTING BOARD TO BE 3/4" PAINTED AC PLYWOOD WITH PINE EDGE TRIM. FASTEN TO WALL ATTACH PANEL TO BOARD. CONTRACTOR TO MAKE ALL CONNECTIONS TO AND FROM THE PANEL. 9. CONTRACTOR TO INSPECT ELECTRIC PANEL. IF PANEL IS NOT GROUNDED PROVIDE TWO 5/8"x8' GROUND RODS. CONNECT TO WATER SERVICE. PROVIDE A SURGE ARRESTOR IN THE ELECTRICAL PANEL. IF NO SPACE IS AVAILABLE IN THE EXISTING PANEL PROVIDE A SO D TYPE QO LOAD CENTER ADJACENT TO THE EXISTING PANEL. BREAKER SIZE AND WIRE SIZE FOR THE PUMP CONTROL PANEL TO BE AS RECOMMENDED BY THE MANUFACTURER. CONTRACTOR TO COMPLETE ALL REQUIRED WORK TO ENSURE THAT THE PUMP STATION CONTROLS AND PUMPS ARE FULLY OPERATIONAL. PROVIDE START UP TESTING TO ENSURE THAT ALL SYSTEMS PERFORM PROPERLY. ENGINEER TO WITNESS TESTING. NOTE: OUTLET 1. SEPTIC TANK TO BE FORT MILLER OR EQUAL. TANK TO BE HEAVY DUTY IF WITHIN TRAFFICED AREA. TANK TO PREFERABLY BE SEAMLESS IF NOT PROVIDE SECURE WATERPROOF JOINTS. 2. PROVIDE 6"-12" OF COVER OVER TANK. PROVIDE EXTENSION COLLAR IF COVER OVER TANK EXCEEDS 12". 3. PROVIDE MIN. 3" PEA STONE, COARSE SAND OR GRAVEL BASE UNDER SEPTIC TANK. -ZABEL RETROFIT ACCESS SYSTEM 4. WHERE SEASONAL HIGH GROUNDWATER (SHGW) CAN RISER DEPTH AS REQ.-26" DIA. RISE ABOVE THE TANK BASE, ANCHOR AGAINST 1-1/2" FORCE MAIN FLOTATION. THIS APPLIES. 18" reduced to ° °D 8� 500 gal. tank in 1� 1 in 3" WALLS 4 (TYP.) 4" TYP. 3" TAPER ALL SIDES - ` �.".r•" 8'-8" 3" MIN. COARSE SAND, GRAVEL OR PEA STONE SECTION VIEW PUMP STATION TANK DETAILS - 500 GAL. (ST) CONCRETE "EARS" WERE POURED AND RODDED INTO THE PUMP STATION TANK AT THE FACTORY. THIS WAS ADEQUATE TO I RESIST FLOTATION OF I' THE PUMP STATION TANK. FINAL GRADE CONCRETE DEADMAN PALLETTE VERSATILE BLOCKi SEE CHART FOR SIZE (TYP) STRAPPING OVER CONCRETE TOP OF TANK DEADMAN 2 REQUIRED STRAPPING OVER integral to TOP OF TANK base of tank SEPTIC 2 REQUIRED no holdown TANK/PUMP strapping -71 STATION SEPTIC TANK/PUMP STATION SECTION VIEW PLAN VIEW BUOYANCY CONTROL CHART CAPACITY DEADMAN SIZE 1000 GALLONS 2- 24"x24"x48" BUOYANCY CONTROL SCHEMATIC DETAIL 1500 GALLONS 2- 24"x24"x72" Scale: None SEPTIC TANK AND PUMP STATION BUOYANCY CONTROL IT IS LIKELY THAT IF THE SEPTIC TANK IS PUMPED DURING PERIODS OF SEASONAL HIGH GROUNDWATER THAT THE TANK MAY FLOAT DUE TO BUOYANT FORCES. IN ORDER TO PREVENT THIS IT IS RECOMMENDED THAT A DEADMAN SYSTEM IS PROVIDED UTILIZING PALLETTE VERSATILE WALL BLOCKS. UTILIZE ONE BLOCK ON EACH SIDE OF THE TANK AND STRAP OVER THE TANKS FROM FROM BLOCK TO BLOCK. STRAPS ARE TO BE NYLON OR POLYESTER WITH A MINIMUM OF 10,000 POUNDS CAPACITY. ALL HARDWARE TO BE CORROSION RESISTANT BY WAY OF COATING OR ENCAPSULATING. THEY SHALL HAVE TURN BUCKELS OR A RATCHET SYSTEM TO TIGHTEN THEM OVER THE TANK AND AROUND THE DEADMAN. PLACE STRAPS AS SHOWN. AS THE PUMP STATION IS NEVER MEANT TO BE FULL IT MUST BE PROTECTED AS WELL. IT IS IMPERITIVE THAT SEPTIC AND PUMP STATION TANKS ARE WATERTIGHT AS THEY MAY BE LOCATED BENEATH SEASONAL HIGH GROUNDWATER FOR A CONSIDERABLE PART OF THE YEAR. STEPS SHOULD BE TAKEN TO SECURE JOINTS AND ENSURE WATER TIGHTNESS. IF EITHER TANK LEAKS IT WILL EVENTUALLY CAUSE THE LEACH FIELD TO FAIL. NOT TO SCALE HOUSE EXISTING EXISTING ASSUMED 100.0 77'-4"0 PVC ® 1 /8"/FT. INV. OUT-\ 98.Ot EXISTING SEPTIC TANK 10. THE PUMP STATION CONTAINS 1.5' OF CAPACTY ABOVE THE HIGH LEVEL ALARM SWITCH PRIOR TO THE SEPTIC TANK BACKING UP. THS EXCEEDS. 1 DAYS STORAGE (275 GAL/FT x 1.5 FT = 412 GAL.) IN EVEN- OF A POWER OUTAGE OR PUMP FAILURE. 11. DO NOT INSTALL JUNCTION BOXES OR SPLICE WIRE INSIDE PUMP PIT OR UNDERGROUND. 12. PUMP TO BE LOCATED SO AS TO BE EASILY REMOVED FROM PUMP PIT THROUGH HATCH. 13. CONTROL PANEL AND SCREENED VENT CAN 8- INSTALLED ON BUILDING EXTERIOR IF DESIRED OR BE POST MOUNTED NEAR PUMP 'TATION. 14. WHERE SEASONAL HIGH GROUNDWATER CAN ESE ABOVE THE BASE OF THE PUMP PIT, ANCHOR AGAINST FLOATATION (SEE DETAIL). 15.) DOSE VOLUME FOR THE ELJEN SYSTEM TO IE NO MORE THAN 4 GAL. PER UNIT (44 GAL.). TOTAL DOSE VOLUME = 112 LF x (.75/12� : 3.14 x 7.48 = 10.3 GALLONS PLUS ELJEN LIN VOLUME = 44 LF x (.2/12} x 3.'4 x 7.48 = 29.3 FOR A TOTAL OF 39.6 GAL. DRAIN BACK VOLUME = 112 LF x (.75/12� 3.14 x 7.48 = 10.3 GALLONS PUMP PIT VOL. = 4.5' X 8.16' X 7.48 GAL`T = 275 GAL./FT. APPROXIMATE DOSE VOLUME IS TO BE 0.20' (2.4") OF PUMP PIT DEPTH. CONTRACTOR TO FIELD TEST DOSE VOLUME '0 ENSURE MAX. 40 GALLON DOSE VOLUME. 16.) HEAD REQUIRED FOR PUMP DISCHARGE IS A'PROX. 10.0' OF STATIC AND UTILIZING A 1-1/2" PVC SDR 21 OR HDPE DR11 FORC_ MAIN, 10 GPM ® 12.5 TDH & 30 GPM ® 19.0 TDH. ZOELLER 98-FLOW MATE PUMPS APPROX. 2c GPM ® 18 TDH. PUMP RUN TIME PER DOSE ESTIMATED AT 1.4 MINUTES/CYCLE. PUMP Sl`JTOFF HEAD TO BE A MIN. OF 23 FT. 17.) THE ATMOSPHERE IN THE PUMP STATION PUMP PROR WET WELL IS CONSIDERED TO BE A CLASS 1, GROUP D, DIVISION 1 RATED SPACE UNDER THE NAIONAL ELECTRIC CODE. THE CONTRACTOR SHALL PROVIDE THAT ALL WORK CONFORMS TO THE APPROPRIATE DETAILS FOR THIS CONSTRUCTION. THIS INCLUDES INSTALLING SEAL OFF FITTINGS ON ANY EECTRICAL LINE THAT RUNS BETWEEN THE PUMP STATION AND THE CONROL PANEL AND/OR OTHER IL ECTRICAL PANELS, FILLED WITH THE APPROPRIATE SEALANT TO PREVENT GASSES FROM ENTERING THE ELECTRICAL PANELS. THEY ARE TO BE INSTALLED NO CLOSER THAN 18" FROM THE ELECTRICAL PANELS. 18.) THE CONTRACTOR TO TEST THE PUMP STATION TO DETERMINE PROPER FLOAT SETTING LEVELS, PUMP RATE AND SPECIFIED DOSE VOLUME. IN ADDITION ALARM SYSTEMS ARE TO BE TESTED. ENGINEER TO WITNESS ALL TESTII`G. 19.) IT IS RECOMMENDED THAT A SPARE PUMP BE KEPT ON SITE SO IT IS AVAILABLE AT A MOMENTS NOTICE FOR REPLACEMENT. 1000 GALLON 1-1/2"0 GALVANIZED SEPTIC TANK OR SCH. 80 PIPING reduced to 500 INSIDE THE P.S. gal. tank SUBMERSIBLE PUMP _ 1-1/2"0 DISCHARGE OPENING ABOVE QUICK _DISCONNECT SIZED TO EASILY REMOVE PUMPS. RAIL SYSTEM MAY BE USED 1-1/2"0 BALL VALVE FOR PUMP WITHDRAWAL. PUMP STATION SCHEMATIC PLAN VENT PIPE 4"0 PVC TO GARAGE INV. OU I 96.8f INV. IN 97.1 f PUMP STATION 107f' FROM PUMP STATION TO DIST. BOX OUTLET - NOT TO SCALE FORCE MAIN TO BE PVC SDR21 OR HDPE DR11 RUN ENTIRELY UPHILL FROM PUMP STATION TO DIST. BOX -LAST 5' MIN. SECTION TO BE 4"0 PIPE INV. OUT 102.7f 10 7 v INV. IN E- INV. IN 102.86f 102.5t GSF UNITS 4" DIA PVC LAID LEVE-L 2" DROP TO GSF UNIT EXISTING NOTE: ALL DIMENSIONS ARE APPROXIMATE AND THE SYSTEM IS TO BE CONSTRUCTED BASED ON ACTUAL FIELD CONDITIONS I SCHEMATIC PROFILE OF ONSITE 'SEPTIC SYSTEM I HEREBY CERTIFY THAT THE ONSITE SEPTIC SYSTEM L RUCTED, TESTED AND IS OPERATING INL ACCORDANCE WITH THE APPROVEDGN PLANS AND THIS RECORD DRAWING. NOT TO SCALE BASE EL. 101.4f GW ® EL. 96.2f NOT TO SCALE PUMP STATION 0 & M NOTES IN GENERAL, THERE ARE NO ROUTINE MAINTENANCE MEASURES THAT NEED TO BE TAKEN FOR THE PUMP STATION. PUMP STATIONS HOUSE MECHANICAL AND ELECTRICAL EQUIPMENT THAT THE HOMEOWNER SHOULD NOT ALTER. TRAINED PROFESSIONALS SHOULD MAINTAIN A PUMP STATION. THE PUMP STATION IS EQUIPPED WITH AN ALARM THAT WILL BE ENERGIZED WHEN THE WATER LEVEL IN THE STATION BECOMES TOO HIGH. A LEVEL SWITCH ENERGIZES AN AUDIO AND VISUAL ALARM LOCATED IN THE PUMP STATION CONTROL PANEL. AT SUCH TIME THE HOMEOWNER SHOULD LIMIT ACTIVITIES THAT GENERATE WASTEWATER AND CALL A REPAIR PERSON. TWO PUMPS ARE PROVIDED IN THE STATION AND NORMALLY SHOULD BE ALTERNATED. IF ONE PUMP FAILS IT SHOULD BE REPLACED AS SOON AS POSSIBLE. PUMP FAILURE IS ONE OF THE COMMON EMERGENCIES THAT OCCUR. IT IS, HOWEVER, RECOMMENDED THAT YOU VISUALLY CHECK THE INTERIOR OF THE PUMP STATION AT LEAST ONCE A YEAR TO SEE IF. GREASE BALLS OR OTHER FLOATING SOLIDS MAY EXIST AS THEY CAN FOUL THE OPERATION OF THE LEVEL SWITCH SYSTEM. REMOVE ANY SOLIDS FROM THE STATION AND DISCARD IN THE GARBAGE. TAKE CARE NOT TO MOVE THE LEVEL SWITCHES OUT OF POSITION AS THIS CAN CAUSE ISSUES DOWNSTREAM IN THE SYSTEM. 6" SEEDED LOAM PAVEMENT EXISTING GRASS 7 SURFACE 5' MIN. COVER UNLESS FULLY DRAINED AFTER BACKFILL WITH EACH PUMP EXCAVATED MATERIAL CYCLE (CAN FREE FROM ROCKS REDUCE TO 3' (COMPACTED UNDER ROADWAYS, WALKS 4r ;, >;; ?, 6" MIN. OR DRIVEWAYS) PIPE DIA. 4" MIN. PVC OR HDPE FORCE MAIN (TYP.) 2'+OD PIPE COARSE SAND OR PEA STONE BEDDING WHEN PIPING IS TO BE BURIED IN GROUNDWATER USE CRUSHED STONE WRAPPED IN FABRIC AS A BEDDING AND CONTINUE TO 6" ABOVE THE PIPE. USE HDPE PIPE OR PVC SCH. 80 PIPE WITH AS FEW JOINTS AS POSSIBLE. IF PIPING IS 1-0 BE CONSTRUCTED AT A DEPTH LESS THAN 5' INSTALL INSULATION BOARD - CONSULT W/ENGINEER. IF PIPE IS INSTALLED SLOPED TO DRAIN INSULATION BOARD IS NOT NEEDED. IF PIPING IS TO BE PLACED UNDER A DRIVEWAY W/LESS THAN 4 FT OF COVER USE HDPE PIPE. FORCE MAIN TRENCH DETAIL Scale: None RECORD DRAWtNG Lands of Revival Designer Homes 12 Chelsie Way TOWN OF QUEENSBURY WARREN COUNTY STATE OF NEW YORK PUMP STATION - ALTERNATE PLAN DATE: 1-15-24 ( SCALE: AS NOTED DV!^'• '.�..uurKsepuC.awg CARRY ROBINSON, P.11j. aHEET 2 OF 2 CONSULTING ENGINEER P.E. LIC. NO.: NY-060166 RECORD DRAWING NOTE PROPERTY TRANSFER SEWAGE DISPOSAL INSPECTION LETTER Satisfactory Compliance Notice Town of Qyccnsbury Building&Codes Enforcement 742 Bay Road,Queensbury, NY 12804-5902 P: 518-761-8256 www.gueensbury.net Date: 10 September 2024 To: Patrick Burke (Applicant) Re: System Inspection Site Report for: 12 & 18 Chelsie Lane, Town of Queensbury, NY (Site Address) As requested, the Town of Queensbury's Building and Code Enforcement Department has made an inspection of the wastewater system components serving the property referenced above. All system components have been found, and are noted in the System Inspections Findings Worksheet. Inspector's observations: The system appears to have functioned adequately under past and present loading. There can be no assurance or guarantee of future performance for any period of time. Numerous factors, such as household water usage, leaking toilets, soil characteristics and seasonal ground water table fluctuation, as well as owner failure to manage and maintain the system, will affect its performance. This approval is valid for five (5) years from20 August 2024, the date of the inspection. Sincerely, A John O'Brien, Director Budding & Codes Enforcement Town of Queensbury /kd Revised August 2023