D and G Management Queensbury NY concrete test report 14 William Street, Ballston Lake, New York 12019
Phone: (518) 399-1848 Email: constructiontech@live.com
CLIENT: REPORT NUMBER: : PAGE #: 1
INSPECTION DATE:
OUR FILE NUMBER:5
INSPECTOR & TEST SET: DAVE CASAW #5
ATT'N: AMBIENT WEATHER:
OUR FILE LOCATION:
1 :
PLACEMENT LOCATION OF LOAD # 2 :
0 0 0
1 2 0 0
4620 / 3242417 4523 / 3242418 0 0 0
11.50 / 11.50 3 11.50 / 23.00 3 0.00 0 0.00 0
1.45 / 2.30 0 ##2.12 / 2.46 0 0.00 0 0.00 0
2.40 / 2.55 # 2 2.55 / 3.11 ## 0.00 0 0.00 0.00
MAX: 1.50 )1 1.17 0 2 0.98 0 0 0.00 0
0.45 5.00 2 0.12 5.25 3 0.00 0.00 0
WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0
WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00
0.00 0.00 0.00
PLACEMENT SLUMP (INCH) (SPEC: -5.50 ) 5.00 0 5.25 0 0.00 0
ENTRAINED AIR ( % VOL) (SPEC: -7.00 ) 5.40 0 0.00 0 0.00 0389900
UNIT WEIGHT (PCF) (SPEC:-0.00 ) 147.68 0 0.00 0 0.00 0
- 90 ) 80 0 78 0 0 0
NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0
244830 - 244835 0 0 0 0 0 0
0
CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39
P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED:
CEMENT:LBS.CYLINDER TEST UNIT
CEMENT:LBS. NUMBER DATE P.S.I.
GAL.
COARSE AGGREGATE #1: LBS.244830 08/20/24 7 2680 X
COARSE AGGREGATE #2: LBS.244831 08/20/24 7 2800 X
COARSE AGGREGATE #3: LBS.244832 09/10/24 28 0 X
FINE AGGREGATE: LBS.244833 09/10/24 28 0 X
ADMIXTURE #1: OZS.244834 09/10/24 28 0 X
ADMIXTURE #2: OZS.244835 01/00/00 SPARE 0 X
ADMIXTURE #3: OZS.
AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 01/00/00 0 0 X
RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X
CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X
MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X
Robert BehanRobert BehanRobert BehanRobert Behan
APPLIED LOAD
1
08/13/24
1670.004
244830
80's: CLEAR
PROJECT:
CONSTRUCTION TECHNOLOGY
MR. DALE BALDWIN
DALE BALDWIN MASON CONTRACTOR
624 BUTTERMILK FALLS ROAD
FORT ANN, NEW YORK 12822
D & G MANAGEMENT: 114 LUZERNE ROAD, QUEENSBURY, NEW YORK
IF APPLICABLE:
DELIVERED LOAD NUMBER:
TRUCK NUMBER / TICKET NUMBER:
YARDAGE DELIVERED / SUBTOTAL:
CONCRETE TEMP. (F) (SPEC:
0
0
DESIGN STRENGTH & FORMULA:
ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW.
CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED.
PLACEMENT WEATHER PROTECTION:
0
0
0
0
35,150
0
0
0
0
TIME CONC. BATCHED / ARRIVED:
33,700
DAYS
UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064
DISCREPANCIES & REMARKS:
0.0
08/14/24
0.00
PLACEMENT AREA REINFORCEMENT:
PLACEMENT AREA FORMWORK:
SLUMP OF CONCRETE INTO PUMP:
TIME PLACEMENT BEGAN / ENDED:
CONCRETE AGE ( HOURS ) (SPEC:
SLUMP ON ARRIVAL (INCHES):
LAB CYLINDER CONTROL NUMBERS:
WATER:
4:
0.0
5:
6:
7:
8:
1: FILE
2: SUPPLIER
3: JOHN O'BRIEN, QBD
0
0
0
0
0
0
0
0.0
0
0
0
0
PALLETTE CONCRETE, INC.
ULTIMATE
C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S
0.00
TEST AGE
3000
FOOTING: EAST AND SOUTH WALLS
FOOTING: WEST AND NORTH WALLS
PLACEMENT LOCATION OF LOAD #
0
0.00
45
PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE.
PER DRAWING: S-202, DETAIL: 5
GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS.