Loading...
D and G Management Queensbury NY concrete test report 24 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:9 INSPECTOR & TEST SET: DONALD HOOK #9 ATT'N: AMBIENT WEATHER: OUR FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 2 : PLACEMENT LOCATION OF LOAD # 3 : 1 2 0 3 44 / 4004817 39 / 4004818 84 / 4004819 5.50 / 5.50 4 10.00 / 15.50 4 9.00 / 24.50 4.67 2.14 / 3.01 0 ##2.48 / 3.06 0 3.11 / 3.28 0 3.04 / 3.41 # 3 3.19 / 4.13 ##4.16 / 4.40 4.00 MAX: 1.50 )2 1.45 0 2 1.42 0 3 1.48 0 0.14 3.50 3 0.48 3.75 4 0.11 3.50 4 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.40 0.00 0.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: -5.50 ) 3.50 0 3.75 0 3.50 0 ENTRAINED AIR ( % VOL) (SPEC: -7.00 ) 5.50 0 0.00 0 0.00 0377100 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 142.83 0 0.00 0 0.00 0 - 90 ) 71 0 72 0 71 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 244907 - 244912 0 0 0 0 0 0 0 CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.244907 08/21/24 7 2310 X COARSE AGGREGATE #2: LBS.244908 08/21/24 7 2270 X COARSE AGGREGATE #3: LBS.244909 09/11/24 28 3080 0 FINE AGGREGATE: LBS.244910 09/11/24 28 3200 0 ADMIXTURE #1: OZS.244911 09/11/24 28 3220 0 ADMIXTURE #2: OZS.244912 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 2 08/14/24 1670.004 244907 80's: CLEAR PROJECT: CONSTRUCTION TECHNOLOGY MR. DALE BALDWIN DALE BALDWIN MASON CONTRACTOR 621 BUTTERMILK FALLS ROAD FORT ANN, NEW YORK 12827 D & G MANAGEMENT: 114 LUZERNE ROAD, QUEENSBURY, NEW YORK IF APPLICABLE: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: 0 0 DESIGN STRENGTH & FORMULA: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: 0 0 0 40,200 28,450 0 0 38,700 40,450 TIME CONC. BATCHED / ARRIVED: 29,000 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DISCREPANCIES & REMARKS: 0.0 08/15/24 0.00 PLACEMENT AREA REINFORCEMENT: PLACEMENT AREA FORMWORK: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): LAB CYLINDER CONTROL NUMBERS: WATER: 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 3: JOHN O'BRIEN, QBD 0 0 0 0 0 0 0 0.0 0 0 0 0 BONDED CONCRETE, INC. ULTIMATE C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 0.00 TEST AGE 3000 FOUNDATION WALL: NORTH WALL AND EAST WALL, SOUTH SECTION FOUNDATION WALL: WEST WALL AND EAST WALL, NORTH SECTION PLACEMENT LOCATION OF LOAD # FOUNDATION WALL: SOUTH WALL 0.00 45 PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. PER DRAWING: S-202, DETAIL: 5 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS.