Loading...
4.13 REVISED 4.13 AMEND%Amend 331 of 2024—Additional Paving Work by Peckham at Cemetery—9-23-2024 RESOLUTION AMENDING RESOLUTION NO.: 331,2024 REGARDING ASPHALT PAVING WORK PROJECT AT PINE VIEW CEMETERY BY PECKHAM INDUSTRIES, INC. REST LUTIO NO.: i 2024 INTRODUCED BY. WHO MOVED ITS ADOPTION SECONDEDBY: WHERE,AS,Resolution No.: 331,2024 the Queensbury Town Board authorized engagement of Peckham Industries, Inc. (Peckbam) .for asphalt paving work at the Pine View Cemetery (Project) by the Town "piggybacking" with Warren COLL11ty in accordance with Warren County Heavy Highway Construction Bid#WC 62-21 for an amount not to exceed$14.1,896.10, and WHEREAS, the Town Cemetery Superintendent has advised that additional shoulder back Lip and shin/overlay work for this Project is needed as set f"orth in Peckham's two(2)Hot Mix Asphalt Pavement Estimates dated 9/19/2024. and 9/23/2024 for the additional amounts of$67,493.78 and $37,963,30 respectively J,,,or a total additional sum of $105,457.08 and, therefore the Town Board wishes to amend Resolution No. 331,2024 to provide for the additional work and expense, NOW, THEREFORE, BE IT RESOLVED,that the Queensbury Town Board her(-,by amends ResolutionNo.: 331,2024 and authorizes and ratifies Peckham's additional work at the: Pine View Cemetery as set forth in Peckham's two (2) Hot Mix Asphalt Pavement Estimates dated 9/19/2024 and 9/23/2024 for the additional amounts ol' $67,493.78 and $37,963.30 respectively J."bi, a total additional sum of $105,457.08, for a total amount due to Peckham for this Project in an arnount of$247,353.18 to be paid from Misc. Contractual Account No.: 002-8810-4400, and, BE IT FURT11ER, RESOLVED, that the 'rown Board further authorizes a $105,458 transfer from Capital Reserve No.: 64 to Misc. Contractual Account No.: 002-8810-4400 and authorizes and directs the Town Budget Officer to amend the Town, Budget and increase appropri ati oils and revenues as follows: • Revenue Aect No. —002-0000-55031 (Interfund Revenue) - $105,458; • Expense Acct No. —002-8810-4400 (Misc. Contractual - $105,458; • Increase Appr 001-9901-9128-0064 Transfer to Operating Funds - $1.05,458; and BE IT FURTHER, RESOLVED, that this Resolution is subject to a permissive referendum in accordance with the provisions of Town Law Article 7 and the Town, Board hereby authorizes and directs the Town Clerk to publish and post such notices and take such other actions as may be required by law,and 13E IT FUW114ER, RESOLVED, that the Town Board hereby affirms and ratifies Resolution No.: 331,2024 in all other respects. Duly adopted this 23 d day oll'September, 2024, by the following vote'. AYES NOES ABSENT: Peckham Industries,Inc. 20 Haarlem Avenue,White Plains, Ny 10603 (914)949.2000 Hat Mix Asphalt Pavement Estimate Customer, Queensbury emetery I Imltmm Project., Queensbury Cemetery Marne., Michael Graham Description: §tr%rm.- back up Phone: Estimate Date. 9119 Mobile: Fax. Email:, mgrah@peckham.com Total Square Uraiag% 8,899,99 Dimensions(in feet) Area Length=26000, idth=l0 288PW Comments. Rate of Material Course depth Appl* Qty Unit Price cost Aggregate 1 #1 3.00 100,000 1,444,44 24.50 35,388.78 "ltas per Sq Yrd per In depth Total Material $35,388,78 Equipment Rental Number Unit* Units Rate cast Shoulder Machine with 6 marl crew 3 0 1.00 0,380.00 31,140,00 Mobilization 1 E 1.00 966,00 955.00 *Rental Measure:D=Day, H=Hour; l4=Week, tI=Minimum Total Equipment $3 ,105 00 OGS AC Index: Total Protect Estimate. $67,493,78 This pricing is an estimate only based upon measurements shown and the process selected. Municipal pricing is subject to change either up or down based upon the current asphalt price index at the time the work is performed. An updated estimate can be provided upon request during the month in which the work is performed. Peckham Industries,Inc. 20 Haarlem Avenue,White Plains,14Y 10603 (914)949-2000 --h-6--t MIx-A- s"p—h-a"It Pavement Estimate ............................. t�u'ee"nsbury Cemetery'-'-"' .. ..... ...... Project-, Queensbury Cemetery Name. Michael Graham Description. ShirnlOverlay Phone: Estimate Date, 9/23,/2024 Mobile- Fax; Email: mgrah@peckham,corn 'rob,5auutylihiam, 5,969,33 Dimensions(in feet) Area engt =38 17WTItF614 59-5y Comments; Shirred and widned road:ways,intersections,reshaped crematorium parking lot to allow water to drain properly , .......... Material COM O Depth Appl* Qty Unit Price Cost Pavement I T-6 1,50 115.000 613.99 73,86 37,963.30 Iffis per Sq Yid per la depth Total Material $37,963-30 AC Index: $621.00 LOIG!. Total Project Estimate: $37,963.30 UT ................... This pricing is an estimate only based upon measurements shown,and the process selected. Municipal pricing is Subject to change either up or down based upon the current asphalt price index at the time the work is Performed. An updated estimate can be Provided upon request during the month in which the work is performed, RESOLUTION AUTHORIZING ASPHALT PAVING WORK AT PINE VIEW CEMETERY BY PECKHAM INDUSTRIES, INC. RESOLUTION NO.: 331,2024 INTRODUCED BY: Mr. Anthony Metivier WIIO MOVED ITS ADOPTION SECONDED 13Y� Mr, Michael Dixon WHEREAS, the New York State Legislature adopted legislation allowing any political subdivision in New York State to "piggyback"off an existing County Bid, and WHEREAS,the Town of Queensbury's Cemetery Superintendent has requested Town Board approval to engage Peckham Industries,Inc. (Peckham)for additional asphalt paving work at the Pine View Cemetery by the Town"piggybacking"with Warren County in accordance witli WatTen County Heavy Highway Construction Bid#WC 62-21 as set forth in Peckham's Hot Mix Asphalt Pavement Estimate dated 8/2 9/2024 for an amount not to exceed$141,8 96.10, and WHERE,AS, in accordance with New York State General Municipal Law §6(c), the Town Board is authorized to withdraw and expend funds from Capital Reserve #64 subject to pennissive referendum and the Town Board wishes to approve this work, NOW, THEREFORE,BE 11' RESOLVED, that the Queensbury Town Board approves and authorizes engagement of Peckham Industries,Inc. (Peckham)for asphalt paving work at the Pine View Cernetery by the Town "piggybacking" with. Warren County in accordance with Warren County Heavy Highway Construction Bid 4WC 62-21 as set tbrth in Peckham's Hot Mix Asphalt Pavement Estimate dated 8/29/2024 in the form substantially presented at this meeting for an amount not to exceed$141,896,1,0 to be paid firom Misc.. Contractual, Account No.: 002,-8810-4400, and BE IT FURTHER, RES(")LVED, that the Town Board further authorizes a $141,900 transfer from Capital Reserve No.: 64 to Misc. Contractual Account No.: 002-8810-4400, and BE IT FURTHER, RE,SOLVED, that the Town Board further authorizes and directs the Town Budget Officer to amend the Town Budget and increase appropriations and revenues as follows: • Revenue Acct No. —002-0000-55031 (Interfund Revenue) - $141:,900; • Expense Acct No. —002-8810-4400 (Misc. Contractual - $1,41:,900; • Increase Appi, 001-9901-9128-0064 Transfer to Operating Funds - $141,900; and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs. the Town Supervisor/Deputy Supervisor, Cemetery Superintendent and/or Budget Officer to sign any needed documentation and take any other actions necessary to effectuate the ternis of this Resolution, and BE IT FURTHER, RESOLVED, that this Resolution is subject to a permissive referendum in accordance with the provisions of Town Law Article 7 and the Town Board hereby authorizes and directs the Town Clerk to publish and post such notices and take such other actions as may be required by law. Duly adopted this 01 day of September, 2024, by the following vote- AYES Mr. Dixon,Mr. McNulty,Mr. Strough, Mr. Metivier NOES None ABSENT: None F4varausMoyN I Peckham Industries,Inc, 20 Haarlem Avenue,White plains,NY 10603 (914)949-2000 "Ot MIX Asphalt 9 Queens bury Cemetery wrOJOct. Queensbury Cemetery Description: overlay Phone: Michael Graham pstimatO Date' 8/2 912 0 24 wham„ Mobile: raix:. Email: mgrah@peckham.com 14,155,66 Dimensions (in feet) Area d. ngth= 100, tlilbdth- m . � . ts; C�amu�ten Material Course kite—or _ Depth AAPi* ' kve . �� ..�,.,... ,..,_ Q Unit Prime ::rent �.� m,....._�_� Alt 1 T-5 -,�......, 115,000 1,220.92 74.24 90, 41,10 per Sq Ytd per In depth Total $90,041,10 tarlui i NumberEquipment . Unit* Units Rate Cast milling rebates Paver with(Verator a many crew and roller 15 H 1.00 205.00 3,075,00 Mobilizationn0 1,00 9,250,00 46,250.00 1.00 965.00 1,930.00 'Renta l Measure L1 D= eY, H=l-dour, Week, M-Mlnlrnum Total Equipment $51,255.00 OGSJIC Index, $63 ,00 _. . ... .,............ Project Estimate: This i pricing s an estimate to only based upon measurements shown and the process selected. � 9 Municipal pricing is subject to change either up or down based upon the current asphalt price index at the time the work is performed. An updated estimate can be provided upon request during the month in which the work is performed.