SEP-0643-2022 !-
't SEPTIC DISPOSAL PERMIT Office Use Only
APPLICATION Permit#: ' - '3z - 202Z
Town ofQueens•ury e)
Permit Fee:$ b
Invoice#: L s.
742 Bay Road,Queensbury,NY 12804
P:518-761-8256 www.queensbury.net Flood Zone N Reviewed By.
a_
1. C-le-ko Zt Q L V
c
Project Location: 28 COBY DRIVE
Tax Map #: 316.10-1-39
RESIDENCE INFORMATION:
Year Built Gallons #of bedrooms: X gallons per =total daily flow
per day bedroom Garbage Grinder Yes. No
1980 or older 150 Installed? (choose one) X _
1981-1991 130 Spa or Hot Tub Yes No
1992-Present 110 3 110 330 Installed? (choose one) X
PARCEL INFORMATION:
Topography ✓ Flat Rolling Steep Slope % Slope
Soil Nature Sand ✓ Loam Clay Other, explain:
Groundwater At what depth? 78"
Bedrock/Impervious material At what depth? NA
Domestic Water Supply ✓ Municipal Well Lake
(if well or lake, water supply from any septic system absorption is
ft.)
Percolation Test Rate: 2 MIN per minute per inch (test to be completed by a
licensed engineer/architect)
PROPOSED SYSTEM INFORMATION:
Tank size gallons (min. size 1,000 gallons, add 250 gallons for each garbage cylinder or
spa/hot tub NEW 1250
System Absorption field w/#2 stone Total length ft.; Each Trench ft.
Seepage Pit w/#3 stone How many: ; Size: ..
Alternative System _ Bed or other type:10 FT X 35 FT
Holding Tank System Total required capacity? ; tank size ,
# of tanks
Septic Application Revised January 2021
CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL
• Applicant:
Name(s): ROBERT MCDONALD
Mailing Address, C/S/Z: 593 CORINTH RD , QUEENSBURY,NY 12804
Cell Phone: Land Line:
Email:
• Primary Owner(s):
Name(s): SAME AS APPLICANT
Mailing Address, C/S/Z:
Cell Phone: Land Line:
Email:
Check if all work will be performed by property owner only
• Contractor:
Contact Name(s):SAME AS APPLICANT
Contractor Trade:
Mailing Address, C/S/Z:
Cell Phone: Land Line:
Email:
**Workers' Comp documentation must be submitted with this application**
• Engineer(s):
Name(s): HUTCHINS ENGINEERING, PLLC
Mailing Address, C/S/Z:169 HAVILAND ROAD, QUEENSBURY, NY 12804
Cell Phone: Land Line:
Email:
Contact Person for Compliance in regards to this project: COBY MCDONALD
Cell Phone: Land Line: 518-744-2808
Email:
NOTES: 1. Alarm system and associated electrical work must be inspected by a Town approved electrical
inspection agency; 2. We will no longer allow systems to be covered until such time as an as-built plan is
received and approved. The installed system must match the septic layout on file—no exceptions. 3. As-
built drawings must be submitted prior to the inspection, if there has been a change to the submitted
plans. 4. If, for any reason, the building permit application is withdrawn, 30% of the fee is retained by the
Town of Queensbury. After 1 year from the initial application date, 100% of the fee is retained.
Declaration: Any permit or approval granted which is based upon or is granted in reliance upon any material
representation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be
void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury
Sanitary Sewage Disposal Ordinance.
PRINT NAME: TOM CENTER- HUTCHINS ENGINEERING, PLLC
SIGNATURE: DATE:
Septic Application Revised January 2021
nv (,#
SEPTIC DISPOSAL PERMIT APPLICATION
Office Use Only
742 Bay Road,Queensbury,NY 12804
Town off eensbury > fi
P:518-761-8256 www.queensbury.net Permit#: " 9 -1�`
Tax Map ID#: 316.10-1-39 Permit Fee: $ ; Invoice#: J1O
Project Location: 28 COBY DRIVE Septic Variance? Yes No
Primary Owner(s) ROBERT MCDONALD
Mailing Address 593 CORINTH ROAD,QUEENSBURY NY
Phone & Email (� �� ��2� 1 Cl1.l� '1--z\ _ z&
Installer/Builder SAME AS OWNER r� i
Mailing Address IU) ` •' �= 11 w i7 11! 1
Phone & Email I Il 1i I nu 2 0 2099 I II II
Engineer TOM CENTER HUTCHINS ENGINEERING I l:!
Mailing Address 169 HAVILAND RD I TOWN OF QUE,E1;VU Y
P1111 rim ,,
rn,
Phone & Email 518-796-2515 TCENTER36@YAHOO.COM
Contact Person for Building&Code Compliance: COBY MCDONALD Phone: 518-744-2808
RESIDENCE INFORMATION:
Year Built #of bedrooms X gallons per bedroom =total daily flow Garbage Grinder Yes No
1980 or older Installed? (circle one)
1981-1991 Spa or Hot Tub Yes No
Installed? (circle one)
1992-Present 3 110 330
PARCEL INFORMATION:
Topography ✓ Flat Rolling Steep Slope %Slope
Soil Nature Sand ✓ Loam Clay Other
Groundwater At what depth? 78INCHES
Bedrock/Impervious material At what depth? NA
Domestic Water Supply ✓ Municipal _Well (if well,water supply from any septic system absorption is_ft.)
Percolation Test Rate: 2 per minute per inch (test to be completed by licensed engineer/architect)
PROPOSED SYSTEM FOR NEW CONSTRUCTION:
Tank size 1250 gallons (min. size 1,000 gallons, add 250 gallons for each garbage cylinder or spa/hot tub
System Absorption field with#2 stone Total length_ ft.; Each Trench ft.
Seepage Pit with#3 stone How many: ; Size:
• Alternative System Bed or other type: 10 FT X 35 FT
Holding Tank System Total required capacity? ;tank size ;#of tanks
NOTES: 1.Alarm system&associated electrical work must be inspected by a Town approved electrical inspection
agency; 2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved.
The installed system must match the septic layout on file—no exceptions.
Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material
representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void. I
have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage
Disposal Ordinance.
PRINT NAME: TOM CENTER HUTCHINS ENGINEERING DATE: 11-6-18
SIGNATURE:
Town of Queensbury Building&Code Enforcement Revised February 2017
Ie TOWN OF QUEENSBURY
742 Bay Road, Queensbury, NY. 12804-5902
Septic System Checklist
Plan to scale
Received Deep hole perc test results from engineer/Architect if applicable(Town Approved Engineers and
Architects;June 30 to April 15 Town Engineer for unapproved Engineers and Architects)
All wells on property and adjacent properties shown
Water line shown Municipal or well 10'separation to any part of system
Setback to property lines show 10'or more for any part of system
Septic tank and pump stations 10'from foundation 50'from any well/lake/wetland 10'from any waterline
Ne Septic tank to foundation crawl space/slab on grade,grade in crawl space must be above top of septic tank
for 0',Separation required (field verification required)
Septic tank sized for number of bedrooms and add 250 gals for Jacuzzi tubs/garbage grinder each
'N('Leech Field 20'from foundation 100'from any well 10'from water line
ON,Seepage pit 150'from well 50'from septic tank
�PSeepage Pits 3-times diameter apart
\(Septic tank and pump stations over 30 gallons 50'from watercourse or wetland
\(distance from bottom of trench or system 24"to bedrock or mottling 36"within 1000' of Lake George
Leech field 100'from watercourse or wetland
Toe of mound or bottom of retaining wall 10'from property line 100'from well 20'from
Foundation
Provide Engineer/Architect stamp for bed or design systems
4%Department of Health Approval for all mobile home park new systems Flood Plain requirements
NL(2'above established flood elevation to bottom of system
N( tanks anchored o 2' above flood elevation
MAP REFERENCE
BASE MAPPING PREPARED FROM WARREN COUNTY CIS MAPPING.
POINT ELEVATIONS PREPARED FROM BASE ELEVATIONS
PREPARED BY VAN DUSEN & STEVES SURVEYORS AND
HUTCHINS ENGINEERS.
CONTRACTOR TO VERIFY REQUIRED SETBACKS DURING INITIAL
S17E LAYOUT
NO nu
N/1 100 FT
4" PVC SDR-35 Lj
INLET
MIN. SLOE
1/4' PER FOOT
16'
WATERTIGHT SLEEVE AND
SEAL (n?)
1000 GAL PRECAST —
CONCRETE SEPTIC TANK
NO 1/BLL
w/I 100 FT
APPROXIMATE
FINISH GRADE
12" MIN, COVER
J
2"
18`MIN.
1•
s"
SEPTIC TANK NOTES
L UNITS SHALL COMPLY WI7H THE REQUIREMENTS OF THE NEW YORK STATE
'pfLOP TMENT OF HEALTH AND SHALL BE OF PRECAST CONCRETE AS MANUFACTURED
�y UTOPIA ENTERPRISES OR EQUIVALENT.
LE
STRUCTURES SHALL BE PLACED ON FIRM, COMPACT SAND OR GRAVEL BASE EXIS71NG SOIL CONDITIONS ARE UNSUITABLE, CRUSHED STONE SHALL BE
rCED AS NECESSARY TO ACHIEVE A STABLE BASE
all ANTS MUST BE SEATED IM Burn SEALANT, JOINTS BELOW THE LIQUID LEVEL
US16E TESTED SUNE BOUNG,
ECTED BY S1EEl CABLE ON SIDES OF
Sit CONCRETE S.1 BARRIERS CHIN TEa CAe� AND
...,,i, a uio VITIN FOR W-ROATAVON. USE S
10.0'
MIN. FROM
WATERLINE
TOP OF FILL ELEK---
= 29315
STABILIZED FILL
LIMITS
NO 11866
W/,z 100 FT
APPROXIMATE LOCATION OF STREAM
NO ABLE
W/1 100 FT
S05 ' TREA
SETBACK
EXISTI 2 BEM" CAMP
10'
MIN FROM
WA TER ELEV.
vi WATERLINE —-NEW HOUSE SEWER
NEW 1,000 GALLON PRECAST
CONCRETE SEPTIC TANK
100' STREAM cro
_ SETBACK 01
PROP. 500 GALLON PRECAST o
_2 PT-1 CONCRETE PUMP STATION
- '\ PROP. 1-112' SDR-11 Zcn
HDPE FORCEMAIN
10.0'
MIN. FROM \
PROPERTY LINE
PROP. DISTRIBUTION BOX
PROP. 10 FT WIDE BY 35 FT LONG
ABSORPTION BED WITH 2 - 30 FT LONG
INTERCONNECTED 4' PVC PERFORATED LATERALS
SITE SOILS DATA
W1W SYSTEM INSTALLATION NOTES
WASTEWATER SYSTEM DESIGN
SYSTEM MATERIAL SPECIFICATIONS
TEST PIT
• CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING AND IN
3-BEDROOM RESIDENCE
ABSORPTION FIELD AGGREGATE
TP-1 - 1014118 BY TOM CENTER, P.E.
ACCORDANCE WITH THE N.Y.S. DEPARTMENT OF HEALTH INDIVIDUAL
0-48" - LOAMY SAND FILL
DESIGN FLOW - 110 GPD/BEDROOM
HOUSEHOLD SYSTEMS AND ASTM F481 INSTALLATION OF THERMOPLASTIC
STONE IS TO BE 3/4" TO 1-1/2" WASHED CRUSHED STONE.
48-" - LOAMY MEDIUM FINE SAND
SYSTEM DESIGN FLOW - 330 GPD
PIPE AND CORRUGATED TUBING IN SEPTIC TANK LEACH FIELDS.
EFFLUENT FILTER
SEPTIC TANK - EX. 1,000 GAL. PRECAST CONCRETE
AFTER EXCAVA710N OF TRENCHES TO THE DEPTH REQUIRED, THE WALLS
EFFLUENT FILTER TO HAVE 1 16-INCH FILTRATION, POLYLOK
56-92" -LOAMY FINE SAND
AND FLOOR OF EACH TRENCH SHALL BE CLEANED AND RAKED IN ORDER TO
PL-122 OR EQUIVALENT. (RECOMMENDED)
92-98 - FINE SAND
LEACH FIELD - RAISED PIPE -IN -STONE ABSORPTION
LOOSEN SMEARED SECTIONS OF TRENCH.
EFFLUENT SEWER PIPE
BED
• PLACEMENT OF AGGREGATE SHALL BE AS SHOWN, AND CARE SHALL BE
PIPING TO BE 4" SDR-35 OR SCH-40 PVC. INSTALL WITH 118"
MOTTLING ®78"
EXERCISED TO AVOID INCLUSION OF FINE GRAINED SOILS AND WASTE
PER FOOT MINIMUM SLOPE.
GROUNDWATER OBSERVED 0 92"
DESIGN PERCOLATION RATE = 1-5 MINIIN
MATERIAL IN THE ABSORPTION TRENCHES.
FILTER FABRIC
APPLICATION RATE = 0.95 GPD/SF
• THE PIPE AND STONE SHALL BE LAID AT THE GRADES INDICATED,
FILTER FABRIC TO BE 4.8 OZ/SY NON -WOVEN SEPARATION FABRIC,
PROVIDE 24" VERTICAL SEPARATION TO
ABSORPTION TRENCH AREA REQUIRED = 348 SF
MAINTAINING STRAIGHT CONTINUOUS GRADES WITHOUT SAGS, HUMPS,
TENCATE MIRAFl 140N OR EQUIVALENT.
MOTTLING CONDITION
SEPARATED JOINTS, OR OTHER UNSUITABLE CONDITIONS.
HOUSE SEWER PIPE
PERCOLATION TESTS
INSTALL 10 FT X 35 FT ABSORPTION BED
• ALL DISPOSAL FIELDS SHALL BE GRADED TO SHED RAINFALL AND DIVERT
PIPING TO BE 4" SDR-35 OR SCHEDULE 40 PVC. INSTALL WITH
PT-1 - 1014118 BY TOM CENTER, P.E.
SURFACE RUNOFF AWAY FROM THE DISPOSAL FIELD.
1/4" PER FOOT MINIMUM SLOPE.
STABILIZED RATE = 2 MINUTES 15 SECONDS
POTABLE WATER IS TOWN OF QSBY MUNICIPAL WATER
• DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION AREA AFTER BED
TOPSOIL
PT-2 - 1014118 BY TOM CENTER, P.E.
- MAINTAIN 10' MIN. SEPARATION BETWEEN
HAS BEEN INSTALLED.
PLACE 4" MINIMUM TOPSOIL OVER ENTIRE BACKFlLL AREA. SEED,
STABILIZED RATE = 1 MINUTES 45 SECONDS
WATER LINE & ABSORPTION SYSTEM
THIS SYSTEM IS DESIGNED FOR WATER CONSERVING FIXTURES AND /S NOT
MULCH, AND ESTABLISH TURF.
DESIGNED TO ACCOMMODATE EXTREME WATER USE OR EXTREME ORGANIC
PERCOLATION RATE OF 1-5 MIN/INROOF,
LOADING DEVICES SUCH AS JACUZZI TYPE SPAS OR GARBAGE GRINDERS
FORCE MAIN
FOOTING, GARAGE, CELLAR AND SURFACE WATER DRAINAGE MUST BE
1- 112" HDPE SDR 11, FORCE MAIN SECTION UNDER THE
\USEESIGN
EXCLUDED FROM THE WASTEWATER SYSTEM.
DRIVEWAY SHALL MAINTAIN 5' OF COVER
4" MINIMUM TOPSOIL ON ENTIRE
BACKFlLL AREA;
SEED AND ESTABLISH TURF
4" TOPSOIL COVER ABOVE TOP OF STONE 4" PVC PERFORATED LATERAL INSTALLED FILTER FABRIC
BED; LEVEL, IN BED CONFIGURATION WITH MIRAFl 140N OR EQUAL
SEED & ESTABLISH TURF MANIFOLDED ENDS
5' PIPE SPACING 2.5' ro EDGE
OF BED
XF
„ .. -•W ate... ... ,. ..,...w .. .:..,.. •.y .. •••.: ..�. ..,..... rr. •••.. ..,,. .<• w• :rk,,,. t r.a, �,,w •'. 'Y..• ..•'. �: .. .. . • . ,• . •.r ,. r •1 : �••• it ' .t r
:Y aA•
a.y .
1 •� I :may :; .•�,.`, .•,�,.'..
•M: � t•t nr :
4�1 v
• a.•!ter r '+•�� :.L
i
COVER
Cr: •'
n
•a '
2 STONE 12 TOTAL
COVER OVER: w 7}I="
..... ... . _.., � TONE ...
...•• .. •... :`...�. ,:_a ^ i x y., � < < >� ;.a., _, '4^ �S r � < i. � r _ < a/�� .c <,�/ 1 < i� 'r � ati� :• •'}. •• ems.. 4. .,
...... � :
k � � wa•r •r
•,:. .•r w .stc `y,�:fi?.>•�." !-i.ztya, a,. ,w .x••4»•ua,`r ?.. .'�. `3i .,d ': ,"♦5x•'t n •;'s...y ii,:r!"•7r1 ,`k •'a
•„". `;.r ::. Y. .-.. .. .. }•: ''. ... , r ... t k.x�.. - ,..t ,, ] i t,.F f l-
,,, i'♦ t+:i'. k. 4. ..5 : "': x } •a `" 'u . y }-T'...< �` rt
6 MIN STONE"--'-`!_'- �• s ,>',,' c:" r�. 2 MINIMUM
10 BED WIDTH,r
7'
SEPARA N
•:♦Jti
} . t.w:, ......
BELOW
PIPE
• i•
9• Y
e' 'Y is
:�tin�
Y t .•J
TO BOUNDARY
f• ,
4
5: it ' •t.' +t , T..♦i..
.a•fa'r
•:;`��: .:,< :°;'.:..:::•: � N.• MIN..
..,- CONDITION & 2
1•
a' }
to
ABOVE 0
r
• r.
ii•
3/4"-1-1/2" WASHED-1TYPICAL ABSORPTION BED SECTION
CRUSHED STONE
SCALE: NTS r1
SUGGESTED: POLYETHYLENE EXTENSION
TO GRADE WITH TAMPER RESISTANT
ACCESS COVER
SUGGESTED: INSTALL POLYLOK
PL-122 FILTER SUCH THAT IT IS
READILY REMOVABLE THROUGH TANK
ACCESS COVER
4' PVC SDR-35
OUTLET EFFLUENT SEWER
MIN. SLOPE ON
zQ
1/8" PER FOOT
ALARM/LAG PUMP ON
LEAD PUMP ON
PUMP OFF
INSTALL FLOAT SWITCHES TO OPERATE PUMP AND
MAINTAIN LEVELS AS INDICATED
BALL VALVE
INSTALL VALVES AND UNIONS SUCH
THAT PUMP CAN BE ISOLATED AND
REMOVED WITHOUT REQUIRING PIT
ENTRY
FLOAT SWITCHES - INSTALL INSIDE PUMP
\ PIT IN LOCATION ACCESSIBLE WITHOUT P11
4' ENTRY
VOLUME OF DOSE /
9"SEE NOTE .': = 30 GALLONS = 2.25'
-{) (IF UTOPIA 500 GAL. TANK)
16' MIN.
NEW SEPUC
-1
BALL CHECK VALVE
EFFLUENT PUMP
"-EXTERIOR WEATHERPROOF JUNCTION
BOX (IF NECESSARY). SEAL CONDUIT
POLYETHYLENE EXTENSION TO
GAS TIGHT. INSTALL CONTROL PANEL
GRADE WITH TAMPER RESISTANT
IN HOUSE
ACCESS COVER
12 t COVER 2' MIN. DROP
DISTRIBUTION BOX
BETWEEN INVERTS
2' MIN.
TRANSITION TO
4" OUTSIDE OF
D-BOX
2' FORCEMAIN BAFFLE
USE SPEED LEVELERS TO ASSURE
ALL OUTLETS ARE AT EXACTLY
THE SAME ELEVATION
4" PVC SDR-35 SOLID HEADER TO
'
PERFORATED ABSORPTION BED PIPING,
1/8' PER FOOT MIN SLOPE
PUMP STATION NOTES
2" SCH-40 PVC OR SEAL ALL TANK OPENINGS WATERTIGHT,
GALVANIZED PIPING INSIDE WET
'•
WELL THROUGH WALL PROVIDE AND INSTALL UL LISTED PACKAGED PUMP CONTROL PANEL WITH VISUAL
GATE VALVE AND AUDIBLE ALARM. INSTALL DUPLEX, ALTERNATING, DEMAND DOSE CONTROL
PANEL INSIDE HOUSE IN ACCESSIBLE LOCATION.
REDUCING TEE POINTED DOWNWARD INSTALL POWER & CONTROL WIRING TO CONTROLLER WITH ALARM IN HOUSE IN
WITH 2' BALL VALVE THROTTLED TO ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NATIONAL ELECTRIC
ALLOW TRICKLE DRAIN BACK INTO CODE (N.E.C.) REQUIREMENTS
W 74M
' CONTROL AND FLOAT LEVELS TO BE INSTALLED TO 30 GALLON DOSE..
UNION - LOCATE SUCH THAT UNION PUMP)
TO BE GOULDS MODEL 3885, WE05H 230V; SINGLE PHASE, 20 GPM PUMP
CAN BE DISCONNECTED AND PUMP 5 F7 TDH.
PUMP
500 GAL PRECAST CONCRETE
REMOVED WITHOUT TANK ENTRY AT l ff EXISTING ELECTRICAL SERVICE PRIOR TO PURCHASING PUMP.
PUMP TANK
VERIF
10' BED WIDTH
RASIED ABSORPTION BED SECTION
SCALE: NTS
10'rv5'
Y x
:•'
f
_jr
r t
,
r 'Y
'—k-ir i<,.. _Yf`__ / .._. .Y'„_k
r r f r t f
J.
T :e.1.f
"_er'.. _..... ... rs.. .... ... is ..... r... rs, ,....rY
J. : J J 00,
x x_ .2.5 /
s
35'
L MATERIAL NOTES FILL
ABSORPTION BED SYSTEM PLAN
AFTER
SCALE: NTS
THE ENTIRE AREA OF PROPOSED
REMOVING ORGANICS PLACE SYSTEM FILL OVER ,
WITH TRACKEDEQUIPMENT, ABSORPTION BED AND TAPER AREA
P
FILEY�J
MOUND SYSTEM "SYSTEM FILL" MATERIAL SHALL BE CAREFULLY SELECTED SAND, SANDY
LOAM OR SANDY LOAMY GRAVEL IMTH IN -PLACE PERCOLATION RATE OF 1-3 MIN/INCH AND
NO ORGANICS OR OBJECTS OVER 3" IN SIZE. LESS THAN 10% BY WEIGHT SHALL BE FINER TOWN OF QU
THAN 0.075mm (1200 SIEVE). AT LEAST 25% OF THE MATERIAL BY WEIGHT SHALL BE IN BUILDING & O Pj
THE RANGE OF 0.50mm TO 2.0mm (jf35 SIEVE TO jf10 SIEVE). LESS THAN 15% OF THE
MATERIAL BY WEIGHT SHALL BE LARGER THAN A 1/2' SIEVE Reviewed B
Date:
"
"""POSED
RIBU71ON BOX
TRANSITION FORCE
MAIN TO 4" PVC
OUTSIDE OF D-BOX
SYSTEM FILL MATERIAL SHALL BE MIXED WITH THE FIRST 12 OF NATIVE MATERIAL. 316.1 - 39
SEP-0643-2022
SYSTEM FILL MATERIAL SHALL BE INSTALLED TO PROVIDE MINIMUM OF 24" BETWEEN TILLED 28 COb McDonald, Robert
NATIVE MATERIAL AND BOTTOM OF ABSORPTION TRENCHES ONLY SYSTEM FILL MATERIAL y Dr
SHALL BE INSTALLED THROUGHOUT THE MOUND AREA AND TAPER AREAS Residential Septic Alteration
SYSTEM FILL MATERIAL IS TO BE MECHANICALLY STABILIZED IN 6" LIFTS WITH TRACKED
EQUIPMENT PRIOR TO INSTALLATION OF BED. TAX MAP # 316.10-1-39
INSTALLER TO NOTIFY ENGINEER OF PROPOSED SOURCE OF SYSTEM FILL MATERIAL PRIOR TO ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSEDEDUCATION
PROFESSIONAL
ENGINEER IS A VIOLATION OF NYS EDUCATION LAW.
TRANSPORTING TO SITE
INSTALLER TO NOTIFY ENGINEER WHEN SOIL HAS BEEN PLACED PRIOR TO INSTALLATION OF
ABSORPTION TRENCHES TO CONFIRM IN -SITU SOIL PERCOLATION RATE MEETS THE REQUIRED
SPECIFICATIONS.
Dig
New York
■ Call Before You Dig
■ Wait The Required Time
■ Confirm Udi ft Response
Respect The harks
■ Dig With Care
800-962.7962
wwsr,digsafal�nwryoek coM
Safely.
/ .
1
ISSUED FOR SEPTIC PERMIT REVISED FOR 2' FLOOD PLAN SEPERA71ON
1110912022
0
ISSUED FOR SEPTIC PERMIT
1110512018
No.
Revisions
Date
WASTEWATER PLAN
prepared for:
Robert McDonald
28 Coby Drive
Town of Queensbury, Warren County, NY
Drawn: TRC Checked: GTH Scale: NOTED
Dote: 1012912018
169 Haviland Road
Queensbury, NY 12804
291398-01-S 1
(518) 745-0307 Phone
Hutchins Engineering 518745-0308 Fax
SITE SOILS DATA
WNV SYSTEM INSTALLATION NOTES
WASTEWATER SYSTEM DESIGN
SYSTEM MATERIAL SPECIFICATIONS
TEST PIT
• CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING " AND IN
TP-1 -
1014118 BY TOM CENTER P.E.
3-BEDROOM RESIDENCE
ACCORDANCE WITH THE N.Y.S. DEPARTMENT OF HEALTH 'INDIVIDUAL
ABSORPTION FIELD AGGREGATE
RECORD DRAWING WING
C0
MAP REFERENCE
0-48 "
- LOAMY SAND FILL
DESIGN FLOW - 110 GPD/BEDROOM
HOUSEHOLD. SYSTEMS AND ASTM F481 INSTALLATION OF THERMOPLASTIC
STONE IS TO BE 3 4 TO 1-112- WASHED CRUSHED STONE.
� /
BASE MAPPING PREPARED ..FROM WARREN COUNTY GIS MAPPING.
48-56"
- MEDIUM FINE SAND
SYSTEM DESIGN FLOW - 330 GPD
PIPE AND CORRUGATED TUBING IN SEPTIC TANK LEACH FIELDS.
EFFLUENT FILTER
INSTALLATION DATE. 1010612023
POINT ELEVATIONS PREPARED FROM BASE ELEVATIONS
56-92"
.LOAMY
-LOAMY FINE SAND
NK
SEPTIC TA - EX. 1,000 GAL. PRECAST CONCRETE
" AFTER EXCAVATION OF TRENCHES TO THE DEPTH REQUIRED, THE WALLS
EFFLUENT FILTER TO HAVE 1/16-INCH FILTRATION, POLYLOK
PREPARED BY VAN DUSEN & STEVES SURVEYORS AND
AND FLOOR OF EACH TRENCH SHALL BE CLEANED AND RAKED IN ORDER TO
PL-122 OR EQUIVALENT. (RECOMMENDED)
INSTALLED BY - OWNER
HUTCHINS ENGINEERS.
92-98
-FINE SAND
LEACH FIELD - R�AII�SED PIPE -IN -STONE ABSORPTION
LOOSEN SMEARED SECTIONS OF TRENCH.
EFFLUENT SEWER PIPE
RECORD DRAWING DIMENSIONS
TABLE
CORNER "A"
CORNER "B"
ST. OUTLET PORT
36.5'
21'
P.S. OUTLET PORT
45'
21.8'
DISTRIBUTION BOX
64'
32'
TO VERIFY REQUIRED SETBACKS DURING INITIAL
MOTTLING ®78 "
PLACEMENT OF AGGREGATE SHALL BE AS SHOWN, AND CARE SHALL BE
PIPING TO BE 4 SDR-35 OR SCH-40 PVC. INSTALL WITH 1/8"
CONTRACTOR
AppRQ AT$ LOCATION OF 5"rREAM
EXERCISED TO AVOID INCLUSION OF FINE GRAINED SOILS AND WASTE
PER FOOT MINIMUM SLOPE.
SITE LAYOUT
GROUNDWATER OBSERVED 0 92"
DESIGN PERCOLATION RATE = 1-5 MIN N
/I
MATERIAL IN THE ABSORPTION TRENCHES.
FILTER FABRIC
APPLICA 71ON RATE = 0.95 GPD/SF
• THE PIPE AND STONE SHALL BE LAID AT THE GRADES INDICATED,
FILTER FABRIC TO BE 4.8 OZ SY NON -WOVEN SEPARATION FABRIC,
/
PROVIDE 24' VER1)CAL SEPARATION TO
=
ABSORPTION TRENCH AREA REQUIRED - 348 SF
MAINTAINING STRAIGHT CONTINUOUS GRADES WITHOUT SAGS, HUMPS,
IENCATE MIRAFl 140N OR EQUIVALENT.
No HELL
MOT)UNG CONDITION
SEPARATED JOINTS, OR OTHER UNSUITABLE CONDITIONS.
HOUSE SEWER PIPE
1►j1 l0o FT
PERCOLATION TESTS
INSTALL 10 FT X 35 FT ABSORPTION BED
• ALL DISPOSAL FIELDS SHALL BE GRADED TO SHED RAINFALL AND DIVERT
PI PIPIPI
PIPING TO BE 4" SDR-35 OR SCHEDULE 40 PVC. INSTALL WITH
PT-1 - 1014118 BY TOM CENTER, P.E.
SURFACE RUNOFF AWAY FROM THE DISPOSAL FIELD.
PER FOOT MINIMUM SLOPE.
STABILIZED RATE = 2 MINUTES 15 SECONDS
POTABLE WATER IS TOWN OF QSBY MUNICIPAL WATER
• DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION AREA AFTER BED
TOPSOIL
PT-2 - 10/4/18 BY TOM CENTER, P.E.
-MAINTAIN 10' MIN. SEPARATION BETWEEN
HAS BEEN INSTALLED.
_
STABILIZED RATE 1 MINUTES 45 SECONDS
WATFR LINF & ABSORPTION SYSTFM
• THIS SYSTEM IS DESIGNED FOR WATER CONSERVING FIXTURES AND IS NOT
PLACE 4 MINIMUM TOPSOIL OVER ENTIRE BACKFILL AREA. SEED,
II.UU v
10 FT WIDE BY 35 FT LONG
ABSORPTION BED MTH 2 30 FT LONG
INTERCONNECTED 4" PVC PERFORATED LATERALS
NO HELL
W/I 100 Ff
4" TOPSOIL COVER ABOVE TOP OF STONE 4" PVC PERFORATED LATERAL INSTALLED FILTER FABRIC
BED; LEVEL, IN BED CONFIGURATION WITH
WASTEWATER SYSTEM PLAN Na "JIL MIRAFi 14oN OR EQUAL
W/1 100 FT SEED & ESTABLISH TURF MANIFOLDED ENDS
SCALE 1 `20' 5' PIPE SPACING 2.5' TO EDGE
OF BED
GRA PHIC SCA LE777
6-12
0 40
COVER
1 2 .�
,; ..J.. .......' .
.a>
-. -,.: ' �..,•:... '..:... ___ ... ..,... ._h.,....�, k....��'.?.� -.,.>.,� xA"r �•'k+ :.._- •z�, axr_r a
,•..y... i.r :..7.- xr-','r '',V' '.•' ">
2 STONE .12,l-
TOTA.,
L,..,;<,� �
IN FEET
351
.... .. COVER OVER,,,.
h� N .. 1. K•..,,mo_:. ... X...
TONE DEPTH,
1/
DISTANCES. NS AND DIST :.....::�.•�.�
A OR TO FIELD VERIFY PE
CONTR CT PI
�.a-:.•.- ::....:'. -.....................:..... ::....:..,. .....
..
2a6 MINIMUM
W...,.
a
�t
BELOW PIPE .ABSORP77ON BED SYSTEM PIANTO .BOUNDARYFILL MATERIAL NOTES
& 2 MIN..:: SCALE: NTS
- ...,_ ....: ....:.>.,:.,..:.:.: ,, . , .:.,......... ... . _ .. •. :. >. ,-.:'t..•..:<',' :...::.:.:.,..:,:' . ., ..., '...:• .. r., :.•:'::.;....... , .... .. ENTIRE AREA OF PROPOSE AFTER REMOVING ORGANICS PLACE SYSTEM -FILL OVER THE RE A D
:....:.
ABOVE 100 YR FLD.:;::
....., �..... _ .,: . , ' . ..: . . ... :. . ... .. ... , ,.> : • .,.: ,:.., .::.:-...:.'..:'. �'.. - ,.' ' .... <^ ,...., ..:.;'- , : '•.: �..::...•�,;:'...::..,.- _ .^ •:�.':;.:,:' :::.. ABSORP710N BED AND TAPER AREA WITH EQUIPMENT, "_ ,, MOUND SYSTEM "SYSTEM FILL" MATERIAL SHALL BE CAREFULLY SELECTED SAND, SANDY
314 1- 112 WASHED TYPICAL ABSORPTION BED SECTION LOAM OR SANDY LOAMY GRAVEL WITH IN -PLACE PERCOLATION RATE OF 1-3 MIN/INCH AND
CRUSHED STONE
SCALE: NTS NO ORGANICS OR OBJECTS OVER 3" IN SIZE. LESS THAN 10% BY WEIGHT SHALL _BE FINER
THAN 0.075mm (1200 SIEVE). AT LEAST 259 OF THE MATERIAL BY WEIGHT SHALL BE IN
EXTERIOR WEATHERPROOF JUNCTION THE RANGE OF 0.50mm TO 2.Omm (#35 SIEVE TO /10 SIEVE). LESS THAN 157. OF THE
SUGGESTED: POLYETHYLENE EXTENSION BOX (IF NECESSARY). SEAL CONDUIT
APPROXIMATE TO GRADE W17H TAMPER RESISTANT POLYETHYLENE EXTENSION TO GAS TIGHT. INSTALL CONTROL PANEL MATERIAL BY WEIGHT SHALL BE LARGER THAN A 1/2 SIEVE
FINISH GRADE ACCESS COVER GRADE WI7H TAMPER RESISTANT IN HOUSE ;
INSTALL FLOAT SWITCHES TO OPERATE PUMP AND ACCESS COVER SYSTEM FILL MATERIAL SHALL BE MIXED WI7H THE FIRST 12" OF NATIVE MATERIAL.
LIMIT
10'
PROPOSED
DISTRIBUTION BOX
TRANSITION FORCE
MAIN TO 4" PVC
OUTSIDE OF D—BOX
MAINTAIN LEVELS AS INDICATED
12 f COVER.. 2" MIN. DROP
SUGGESTED: INSTALL POLYLOK SYSTEM FILL MATERIAL SHALL BE INSTALLED TO PROVIDE MINIMUM OF 24 BETWEEN TILLED
i 12" MIN. COVER PL-122 FILTER SUCH THAT IT IS DISTRIBUTION BOX BETWEEN INVERTS Jt S B U I LT
READILY REMOVABLE THROUGH TANK 2' MIN. NATIVE MATERIAL AND BOTTOM OF ABSORPTION TRENCHES. ONLY SYSTEM FILL MATERIAL /-�
Y .: ' .. ., ACCESS COVER SHALL BE INSTALL THROUGHOUT 0 AREA AND TAPER
AC INSTALLED THROUG THE MOUND AREAS.
4" PVC SDR-35 77
2
INLET 4" PVC SDR-35 4 TRANSITION TO SYSTEM FILL MATERIAL IS TO BE MECHANICALLY STABILIZED IN 6" LIFTS WI7H TRACKED
LIQUID LEVEL OUTLET EFFLUENT SEWER BALL VALVE 4" OUTSIDE OF
EQUIPMENT PRIOR TO INSTALLATION OF BED.
MIN. SLOPE
d D-Box TAX MAP # 316.10-1-39
MIN. SLOPE INSTALL VALVES AND UNIONS SUCH BAFFLE ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED PROFESSIONAL
1/4' PER FOOT THAT PUMP CAN BE ISOLATED AND 2" FORCEMAIN
,. 1/8' PER FOOT YINSTALLER TO NOTIFY ENGINEER OF PROPOSED SOURCE OF SYSTEM FILL MATERIAL PRIOR TO ENGINEER IS A VIOLATION OF NYS EDUCATION LAW.
16" REMOVED WITHOUT REQUIRING PIT USE SPEED LEVELERS TO ASSURE
4 18"MIN. ENTRY ALL OUTLETS ARE AT EXACTLY TRANSPORTING TO SITE
WATERTIGHT SLEEVE AND THE SAME ELEVA71ON _
SEAL (TIP.)
4" PVC SDR-35 SOLID HEADER TO INSTALLER TO NOTIFY ENGINEER WHEN SOIL HAS BEEN PLACED PRIOR TO INSTALLATION OF
FLOAT SWITCHES -INSTALL INSIDE PUMP
PERFORATED ABSORPTION BED PIPING,
ate
o ALARM/LAG PUMP ON PIT IN LOCATION ACCESSIBLE WITHOUT PIT ABSORPTION TRENCHES TO CONFIRM IN -SITU SOIL PERCOLATION RATE MEETS THE REQUIRED
ENTRY 1/8" PER FOOT MIN SLOPE
R CAST o "' SPECIFICATIONS. 2 RECORD DRAWING 1010212024
1000 GAL P E LEAD PUMP ON
CONCRETE SEP17C TANK VOLUME OF DOSE PUMP STATION NOTES
• 9"SEE NOTE = 30 GALLONS = 2.25" 2" SCH-40 PVC OR SEAL ALL TANK OPENINGS WATERTIGHT. 1 UE FO SE C ER T R VIS F 2 FLO D AN EP ATl N 0 0
MINIMUM 2X'WIDTH PUMP OFF (IF UTOPIA 500 GAL. TANK) GALVANIZED PIPING INSIDE WET
MAXIMUM 4X WIDTH WELL THROUGH WALL PROVIDE AND INSTALL UL LISTED PACKAGED PUMP CONTROL PANEL WITH VISUAL 0 ISSUED FOR SEPTIC PERMIT 1110512018
• ` 16" MIN. AND AUDIBLE ALARM. INSTALL DUPLEX ALTERNATING, DEMAND DOSE CONTROL
• . GATE VALVE
Revisions
_ I LOCATION.
N o. o n s PANEL INSIDE HOUSE IN ACCESSIBLE LO D
d -'•; . v'. - 4. , ..: • ...I " : REDUCING TEE POINTED DOWNWARD INSTALL POWER & CONTROL WIRING TO CONTROLLER WITH ALARM IN HOUSE IN
WI7H 2 BALL VALVE THROTTLED TO ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS AND NATIONAL ELECTRIC WASTEWATER PLAN
$EPTIC TANK NOTES ALLOW TRICKLE DRAIN BACK INTO
BALL CHECK VALVE CODE N.E.C.) REQUIREMENTS
"ILL UNITS SHALL COMPLY WITH THE REQUIREMENTS OF THE NEW YORK STATE WETWE�L D' prepared for.
bEPARTMENT OF HEALTH AND SHALL BE OF PRECAST CONCRETE AS MANUFACTURED g
m r 'CONTROL AND FLOAT LEVELS TO BE INSTALLED TO 30 GALLON DOSE..
3Y UTOPIA ENTERPRISES OR EQUIVALENT. EFRUENi PUMP
.PUMP � New'York Robert McDonald
- At UNION
p UNION LOCATE SUCH THAT TO BE GOULDS MODEL 3885, WE05H 230V, SINGLE PHASE, 20 GPM PUMP
• STRUCTURES SHALL BE PLACED ON FIRM, COMPACT SAND OR GRAVEL BASE. 0 Call Before You Dig
I _U AND PUMP 5 FT TDH. 28 Cob Drive
HERE EXISTING _ SOIL CONDI7)ONS ARE UNSUITABLE, CRUSHED STONE SHALL BE CAN BE DISCONNECTED � Wait The Required Time Y
ACED AS NECESSARY TO ACHIEVE A STABLE BASE.
PUMP 4
THOUT TANK ENTRY EXISTING ELECTRICAL SERVICE PRIOR TO PURCHASING PUMP. p Confirm Utility Response n Of UeenSbU Warren County,NY
500 GAL PRECAST CONCRETE REMOVED WI AT 1� Tow Q ►Y�
F11 ® Respect The MarksST BE SEATED M N BUTYL SEALANT. JOINTS BELOW THE LIQUID LEVEL MP TANKl J�NTS MU PUMP
Dig With Care Date: 10/29/2018
VERIFY
800 962 79 62 Drawn: TRC Checked: GTH Scale: NOTED
BEFORE �� BE UST M B ACKf �IIING. wrrw.digsafe eon+ 169 Haviland Road iES hl^e�ork.
PSafelyW<o�ee�sb�ry, NY 12804291398-01-S1
_ one
■ 0307 Ph745518 ��
• -0308 Fax
IDES OF
Pin 518 745
El CABLE
�N S _ � Hutchins Engineering
g
SEPTIC Hu W NE D_
NS1Ail CONC�� ... Aim PIIIIT1141 11 qTF[ CABLE AN