Loading...
1992-698 O TUC ENT--SHED OUTLINE ALONC Ile 18X96 IS Ir3X96 TRACE NTRf a40F OUTLINE A�:ONGPANEfS I ��� D �I 1 r FILLI E E 6 Est. 189Q As.NEEoto F F I H G G H 1 I.. G H s 10'WIDE SHED REAR 10'WIDE SHED FRONT K 10, OUTDOOR STORAGE SHED B. Rip two 48"x 96"panels lengthwise to make two 30"door panels"G"and two 18"side pan cis"H".See drawings 9&9A. EhISESUr QUE el pp F Temporarily tack panels"H"and"I"in place. Long edge of panel"H"should be Bush with the inside edge of the longer stud. -il' OtfN OF QUERECEIVED The open edges of the shed corners will be covered later by I"x 4"trim. Trace roof outline along all panels,remove and cut.Nail all four pieces into place. Cut.the 30"x.96"panels to 30"x 79"for door panels"G". Temporarily tack into place the two 30"x 17'pieces left over to be marked for panels)"at the peak. Bottom edge of panels)"should be aligned 1" OCT 3 0 1992 above the bottom edge of the horizontal truss brace so that door tops will overlap truss brace to form a door stop.Trace the roof profile along both panels,remove and cut. Nail back Into place. Do not attach doors yet. G CODE UE.PT 9.Using galvanized box nails,nail I"x 4"trim boards under eaves.Apply to make fascia board at a9 side roof edges, front and rear roof edges,shed corners and around the door opening. Keep I"x 4"trim flush with all panel edges. See drawings#10 and#I I for guide. 10. Apply I"z.4"to door panels"G"as per drawing#10. Keep edges of i"x 4"Bush with edges of door panel. Be sure to bend nail ends over on inside of doors. #10 #I I 1 x 4 EAVE TRIM HERE MATERIALS NEEDED 10'SHED FRONT ' 10'SHED REAR I I. Position doors in opening and install hinges and hasp. 7 EACH 10'SHED TRUSS 7 BNDLS. SHINGLES 11 Apply drip edge to entire roof edge with roofing nails. 14 EACH 4 X 8-7/16"WAFERBOARD 3 PRS. 4"TEE HINGE 13. Apply roof shingles to roof as per package instructions. 4 PC. 4 X 8-3/4"CDX PLYSCORE I EACH 3 1/2" SAFETY HASP 14. Paint or stain as desired. 2 PC. 2 X 4- It DRY DIMENSION 1 EACH 5 lb..6D GALVANIZED BOX NAILS Because Curtis Lumber Co.,Inc,only supplies the fnA> rials and a suggested method of constructine a 2 PC. 2 X 4- 12".40 TREATED I EACH S lb. I" GALVANIZED ROOFING NAILS yard barn or storage shed,we can in no way FPC. 2 X 4-8'DRY DIMENSION I EACH I lb.813 COMMON NAILS warrant the finished product Materials for the 188 LFT. I X 4 TRIM BOARD I EACH I lb. I6D GALVANIZED BOX NAILS project are selected by the customer on an 6 EACH 10' GALVANIZED DRIP EDGE individual basis,and may not indeed be suitable for the intended end-use. Please reference local building codes or individual product specifications to WITH 9 CONVENIENT LOCATIONS: determine the appropriate materials to meet your Ballston Spa Schuylerville Warrensburg Schodack Delmar Hoosick Fails Amsterdam Glens Falls Stigeon Lake.A particular needs. R167 Sarsloga St Raw Saeei M.9620 110isse5l RL22 17EQea0Er to RL9 8855111 695,3242 623-3281 471J503 439.9968 liner Re 4"20 Sauh nqn M7404 Not Responsible for Typographical Errors 1-SW724-WOOD.Glans Faes Nealoe Free I.No.527.1711 MaldsySapneay S4MI*,FrWay W7391 I-MB354MMT Me Tmtlwits Monday.FnCay MmdaY-Sak aWrrla uday Mpgay.Sy 730sm5Fn 73D-$3onm morgat-Sasaday M042PSRhrtlaY 192-Ml as."N 9/91 lam-7 em 7asn-5Fn 7am.Slm" Friday Spa"" 130 am-S rm 70m.Sam Mordsy-Sahsday 7]DasitSpm 5#1,04100—Spm Frdqunl 1d10 Friday up TO ssd 100 73o&e5pm Fw"-100 lin d*Yumele0 7m51)n 1O'X IT SHED ASSEMBLY INSTRUCTIONS NOTE:W MEASUREMENT FROM TRUSS OUTSIDE FACE TOCENTERUNE ON INTENOR TRUSSES 4.Cut plywood sheathing panels for floor as shown F5. 24"X 96" F6 24"X 48" 24" I' in drawing#S.To mark cutouts for truss studs,lay 1. Choose a flat,level surface to erect shed. If put • • floor panels"I'V and"FT'in place against trusses on one directly on ground,lay black plastic down first If side of the shed floor. Mark for stud cutouts allowing about installing on blocking,blocking must go entire length of I/16"extra on each side of cut for installation clearance. F3 F4 sides and down center of shed perpendicular to trusses Follow same procedure for panels"FS"and"Flo"on opposite to support floor. ENQ side. Make cutouts and position floor pieces in place with 48"X 48" 48"X 96" i #I TRUSS 21 24" 24" 24" 24" 24" g joints staggered as shown. Nail all six pieces in place. S - _ TRUSS SPACING ELEVATION SIDE ELEVATION TRUS #5 FI (F2 2. Cut,if necessary,the two 2 x 4 x 12'treated studs to S. Cut four panel pieces 48"x 48"for panels"D"as shown In 48"X 96" 48"X 48" exactly 12'. Position trusses with painted edges all on the drawing#2. Position panels"C"and"D"on the upper portion of same side and stand them erect by supporting with the roof as In drawings#3 and#4 with the top panel edges meeting temporary bracing. Position the 2 x 4 x 12 treated studs 2X4 X 12 RIM JOIST the truss peak and the end edges flush with the end truss outside 1 24" ( 24" { 24" 1 24" 1 24" 1 24" along the truss bottom side corners to serve as rim joists. faces. Nail in place. Repeat for the opposite upper roof side with y6 Mark rim joists for 24"centers as shown in drawing#1. the long panel on the other end of the shed.Position the remaining Ends of rim joists should be flush with faces of the front and panels"C"and"D'on the lower roof sous to stagger the joints 10'x 12'SHED FL©OR l AYOUT rear trusses. Nail rim joists to each truss, with the upper roof panels as shown.Line up trusses and panel USE 3/4"PLYSCORE ends as above and nail. Repeat for the opposite side. 3.Cut side panels"A!'and"B"to dimensions shown on drawing#2. Position panels as in drawings#3 and#4 and nail to both sides of the two end trusses and at the BOTTOM ONLY of the center five trusses.Keep top edge of panels against truss soffit and panel ends flush with outside faces of end trusses. Before nailing panels to the sides of center Ave trusses,measure and mark on the panels at the top edge the correct spacing to match the bottom spacing. Maintain this exact spacing while nailing in order to keep proper vertical alignment of trusses. #2 CUTTIFVG SCHEDULE 96"-- < ---96" 3) "S 31 c 48"' C'-4PIECES 321/2 A-2PIECES 32I/2" B B 48" E-2 PIECES _ G-2 PIECES 15 1/2" F-2 PIECES SCRAP E-48"—>K—48"---> k-48"—>K--48"—> is 96" g2 -2' 2 I 18 i 2 TO C 12"T C1. 4$" D D 48" D :D ] 18 1 SCRAP10'WIDE SHED REAR WALL 10'WIDE SHED FRQNT WALL H TD '- 6. Install studs In rear truss as shown in drawing#6. For 60"door opening,install studs in front wall � D � as shown in drawing W. r G 7. Mark a vertical centerline along the center stud installed in the rear wall(drawing#8).Temporarily tack two B E G i 48"x 96"panels(to be cut for panels"E")in place with long edges meeting at centerline and the bottom edge positioned along the truss bottom member to match the side panels.Trace cutting patterns of the truss roof A B A line on the panels as shown. Before removing,tack the two 15 1/2"x 96"pieces(leftover from cutting panels"A") in position to serve as panels"F". Trace roof and wall outlines as shown. Remove all panels,cut as marked and nag into position. fill in with scrap piece cut to size as necessary at the point of the truss overhang. / SHED REAR �~ SHED FRONT