Loading...
blower door Envelope Leakage Test ,=T- F C Testing Company: Technician: THE ENERGY CONSERVATORY Name: LoCascio Energy Solutions Name: Anthony LoCascio Address: 20 Ogden Rd. Credentials: HERS Rater#4242961 Queensbury ,, NEW YORK 12804 Phone: 5188573144 Email: tony@locascioenergysolutions.com www.locascioenergysolutions.com Building Information: Customer Information: Project ID: 29 Grand View Name: Schermerhorn Construction Address: Grand View Dr Address: Queensbury ,, NY 12804 Geo-Tag Data: Latitude: 43.358516 Longitude: -73.645995 Tim estam p: 2024-10-16 12:21:50 Measured Leakage: 1,749.4 CFM50 Test ID: gv Purpose of Test: Envelope (RESNET 1 Pt) Measured ACH50: 1.63 Effective Leakage Area: 96.2 in Building Volume: 64,305.0 ft3 Enclosure Surface Area: 7,593.0 ft2 Coefficient (C): 137.6 Exponent (n): 0.650 (assumed) Test Standard: RESNET 380 One-Point Test Mode: Depressurize Test Characteristics: Indoor Temp: 67 °F Outdoor Temp: 51 °F Altitude: 352.0 ft Time Average Period: 10 seconds Test Date and Time: 2024-10-16 12:22:45 10% Adjustment Applied: No 2000 , Depressuirize c� 11000 900 c�a 800 700 600 500 co 400 300 4 5 6 7 8 9110 20 30 40 50 60 Building Pressure(Pa) Envelope Leakage Test Test Readings: Target (Pa) Bldg_(Pa) Adj Bldg (Pa) Fan (Pa) Flow (cfm) Config Baseline -0.3 -50.0 -50.9 -50.6 -101.6 1,809.0 Ring A Test Equipment: Flow Device: Model 3 110V Fan Serial #: 3173 Custom Fan Calibration Date: 2023-02-28 Pressure Gauge: DG1000 Serial #: 3172 Calibration Date: 2023-11-20 Deviations from Standard: • None Comments: None Report by TEC Auto Test 1.10.0 (238), ©2024 The Energy Conservatory, Inc. Page 2 of 2