Loading...
TAB Report - IRS QueensburyNortheastern Air Quality, Inc. P.O. Box 3271 Albany, New York 12203 (518) 857-3641 HVAC SYSTEMS TESTING: Project:IRS Queensbury Location:Queensbury, New York Architect:- Engineer:- Piping:- Sheet Metal:Alltek Energy Systems, Inc. Waterford, New York Date:October 16, 2024 Prepared by:Robert Kelley RKelley@NortheasternAirQuality.com Air Balance Report CERTIFICATION PROJECT: ADDRESS: TESTING AND BALANCING FIRM: CERTIFIED BY:DATE:10/16/2024 SIGNATURE: Robert V. Kelley IRS Queensbury Queensbury, New York THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGNED QUANTITIES WHICH EXCEEDS NEBB TOLERANCES ARE NOTED THROUGHOUT THIS REPORT. THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB ''PROCEDURAL STANDARDS FOR TESTING AND BALANCING OF ENVIRONMENTAL SYSTEM'' AND THE PROJECT SPECIFICATIONS. Northeastern Air Quality, Inc. #3159 Page 2 Northeastern Air Quality, Inc. P.O. Box 3271, Albany, NY 12203-0271 (518) 857-3641 PROJECT: THE FOLLOWING IS A LIST OF STANDARD ABBREVIATIONS WHICH MAY APPEAR IN THIS REPORT: MEANING MEANING A AMPS or AMPERAGE NL NOT LISTED ACH AIR CHANGES PER HOUR NOM NOMINAL AD ACCESS DOOR NOM EFFY NOMINAL EFFICIENCY ADJ ADJUSTABLE NR NOT REQUIRED Ak KINETIC (EFFECTIVE FREE) AREA NS NOT SPECIFIED BG BLAST GATE OBD OPPOSED BLADE DAMPER BHP BRAKE HORSEPOWER OED OPEN END DUCT CALC CALCULATED PF POWER FACTOR CALIBR CALIBRATION or CALIBRATED PH PHASE CD CEILING DIFFUSER Ps STATIC PRESSURE CF CUBIC FEET Pt TOTAL PRESSURE CFM CUBIC FEET PER MINUTE Pv VELOCITY PRESSURE cL CENTERLINE RG RETURN GRILLE CLG CEILING RPM REVOLUTIONS PER MINUTE CR CEILING REGISTER RR RETURN REGISTER CS CIRCUIT SETTER SBD SINGLE BLADE DAMPER CSD CEILING SUPPLY DIFFUSER SD SMOKE CONTROL DAMPER DD DIRECT DRIVE SF SERVICE FACTOR DDC DIRECT DIGITAL CONTROL SMC SHEET METAL CONTRACTOR DISC DISCONNECT SWITCH SPS STATIC PRESSURE SENSOR DISCH DISCHARGE SR SUPPLY REGISTER DPR DAMPER TC TEMPERATURE CONTROL DR PRESSURE DIFFERENTIAL TCC TEMPERATURE CONTROL CONTRACTOR EC END CAP TCD TEMPERATURE CONTROL DAMPER ER EXHAUST REGISTER TP THERMALLY PROTECTED FL BHP BRAKE HORSEPOWER @ FULL LOAD AMPS TRAV DUCT TRAVERSE FLA FULL LOAD AMPS V VOLTS or VOLTAGE FTR FINNED TUBE RADIATION VAR VARIABLE GPM GALLONS PER MINUTE VBD V-BELT DRIVE HP HORSEPOWER VD VOLUME DAMPER LD LINEAR DIFFUSER VEL VELOCITY LF LINEAR FEET (NOMINAL)W WATTS or WATTAGE NA NOT ACCESSIBLE WG WALL GRILLE ND NO DAMPER WMS WIRE MESH SCREEN NDRG NON-DUCTED RETURN GRILLE WR WALL REGISTER NG NO GAUGE ZD ZONE DAMPER NI NOT INSTALLED NIC NOT IN CONTRACT ABBREVIATIONS IRS Queensbury ABBREVIATION ABBREVIATION Page 3 Northeastern Air Quality, Inc. P.O. Box 3271, Albany, NY 12203-0271 (518) 857-3641 10/11/2024 MOTOR NAME-RPM PLATE VOLTS HERTZ 115 60 DATA EXT. STATIC PRESSURE VOLTS AMPS BHP (calc.) F.L.A.ACTUAL 0.41 T1 10.7 0.4 T2 (3 Ph only) T3 (3 Ph only) T2 - T3 (3 Ph only) T1 - T3 (3 Ph only) FAN RPM -- TOTAL CFM - FAN 1200 - CALCULATED (P.F. x NOM EFFY) * MOTOR SHEAVE STARTER HEATER ELEMENTS 0.72 P.F.NOM EFFY T1 - T2 115 115 0.72 NL OUTSIDE AIR CFM NL 187 -- TOTAL DISCHARGE NL 0.18 NL BELTS SYSTEM:F-1 LOCATION:Storage MODEL:GF9S080B12DH11G SERIAL NUMBER:W0A5A464192 SERVICE:IRS Office MANUFACTURER:Coleman PROJECT:IRS Queensbury TESTED BY:T.Waldorf DATE: AIR MOVEMENT EQUIPMENT TEST SHEET ACTUAL STYLE FRAME -48 DATE TESTED:10/11/2024 MANUFACTURER Genteq 1 FL AMPS S.F.10.7 1.00 HP 1/2 1175 PHASE SHEAVE cL DISTANCE FAN SHEAVE Direct Drive - Direct Drive Direct Drive Direct Drive TOTAL CFM - OUTLETS 1200 1036 RETURN AIR CFM 1200 1036 TEST DATA DESIGN ACTUAL DESIGN INLET NL -0.54 REMARKS: * NOTE: If P.F. or NOM EFFY are NL, (P.F. x NOM EFFY) = 746Hp/(VAX), where X = 1 if 1 Ph, and 1.73 if 3 Ph Page 4 Northeastern Air Quality, Inc.GRILLE, REGISTER & DIFFUSER REPORT P.O. Box 3271, Albany, NY 12203-0271 PROJECT: (518) 857-3641 TESTED BY:DATE: REMARKS:1) Low flow with damper 100% open DESIGN INITIAL INTERMEDIATE FINAL % OF NO.LOCATION SIZE MODEL Ak VEL CFM VEL CFM VEL CFM VEL CFM DES DATE REMARKS F-1 1 Interview CD-2 110 Hood 165 Hood 110 Hood 110 100%10/11/24 2 Open Office CD-2 250 Hood 205 Hood 235 Hood 235 94%10/11/24 3 Conference CD-2 110 Hood 186 Hood 105 Hood 105 95%10/11/24 4 Open Office CD-2 250 Hood 131 Hood 175 Hood 175 70%10/11/24 1 5 Storage CD-1 80 Hood 91 Hood 86 Hood 86 108%10/11/24 6 Open Office CD-2 250 Hood 205 Hood 225 Hood 225 90%10/11/24 7 Vestibule CD-2 150 Hood 90 Hood 100 Hood 100 67%10/11/24 1 Total 1,200 1,073 1,036 1,036 86%10/11/24 Return 8 Entry NL Hood 187 Hood 187 -10/11/24 9 Open Office RG-2 980 Hood 608 Hood 608 62%10/11/24 10 Interview RG-1 110 Hood 120 Hood 120 109%10/11/24 11 Conference RG-1 110 Hood 121 Hood 121 110%10/11/24 Total 1,200 1,036 1,036 86%10/11/24 T. Waldorf 10/16/2024 IRS Queensbury Page 5 SYSTEM DIAGRAM IRS Queensbury Page 6