TAB Report - IRS QueensburyNortheastern Air Quality, Inc.
P.O. Box 3271
Albany, New York 12203
(518) 857-3641
HVAC SYSTEMS TESTING:
Project:IRS Queensbury
Location:Queensbury, New York
Architect:-
Engineer:-
Piping:-
Sheet Metal:Alltek Energy Systems, Inc.
Waterford, New York
Date:October 16, 2024
Prepared by:Robert Kelley
RKelley@NortheasternAirQuality.com
Air Balance Report
CERTIFICATION
PROJECT:
ADDRESS:
TESTING AND BALANCING FIRM:
CERTIFIED BY:DATE:10/16/2024
SIGNATURE:
Robert V. Kelley
IRS Queensbury
Queensbury, New York
THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM
PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD
PROCEDURES. ANY VARIANCES FROM DESIGNED QUANTITIES WHICH EXCEEDS NEBB
TOLERANCES ARE NOTED THROUGHOUT THIS REPORT.
THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL
ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB ''PROCEDURAL
STANDARDS FOR TESTING AND BALANCING OF ENVIRONMENTAL SYSTEM'' AND THE
PROJECT SPECIFICATIONS.
Northeastern Air Quality, Inc. #3159
Page 2
Northeastern Air Quality, Inc.
P.O. Box 3271, Albany, NY 12203-0271
(518) 857-3641 PROJECT:
THE FOLLOWING IS A LIST OF STANDARD ABBREVIATIONS WHICH MAY APPEAR IN THIS REPORT:
MEANING MEANING
A AMPS or AMPERAGE NL NOT LISTED
ACH AIR CHANGES PER HOUR NOM NOMINAL
AD ACCESS DOOR NOM EFFY NOMINAL EFFICIENCY
ADJ ADJUSTABLE NR NOT REQUIRED
Ak KINETIC (EFFECTIVE FREE) AREA NS NOT SPECIFIED
BG BLAST GATE OBD OPPOSED BLADE DAMPER
BHP BRAKE HORSEPOWER OED OPEN END DUCT
CALC CALCULATED PF POWER FACTOR
CALIBR CALIBRATION or CALIBRATED PH PHASE
CD CEILING DIFFUSER Ps STATIC PRESSURE
CF CUBIC FEET Pt TOTAL PRESSURE
CFM CUBIC FEET PER MINUTE Pv VELOCITY PRESSURE
cL CENTERLINE RG RETURN GRILLE
CLG CEILING RPM REVOLUTIONS PER MINUTE
CR CEILING REGISTER RR RETURN REGISTER
CS CIRCUIT SETTER SBD SINGLE BLADE DAMPER
CSD CEILING SUPPLY DIFFUSER SD SMOKE CONTROL DAMPER
DD DIRECT DRIVE SF SERVICE FACTOR
DDC DIRECT DIGITAL CONTROL SMC SHEET METAL CONTRACTOR
DISC DISCONNECT SWITCH SPS STATIC PRESSURE SENSOR
DISCH DISCHARGE SR SUPPLY REGISTER
DPR DAMPER TC TEMPERATURE CONTROL
DR PRESSURE DIFFERENTIAL TCC TEMPERATURE CONTROL CONTRACTOR
EC END CAP TCD TEMPERATURE CONTROL DAMPER
ER EXHAUST REGISTER TP THERMALLY PROTECTED
FL BHP BRAKE HORSEPOWER @ FULL LOAD AMPS TRAV DUCT TRAVERSE
FLA FULL LOAD AMPS V VOLTS or VOLTAGE
FTR FINNED TUBE RADIATION VAR VARIABLE
GPM GALLONS PER MINUTE VBD V-BELT DRIVE
HP HORSEPOWER VD VOLUME DAMPER
LD LINEAR DIFFUSER VEL VELOCITY
LF LINEAR FEET (NOMINAL)W WATTS or WATTAGE
NA NOT ACCESSIBLE WG WALL GRILLE
ND NO DAMPER WMS WIRE MESH SCREEN
NDRG NON-DUCTED RETURN GRILLE WR WALL REGISTER
NG NO GAUGE ZD ZONE DAMPER
NI NOT INSTALLED
NIC NOT IN CONTRACT
ABBREVIATIONS
IRS Queensbury
ABBREVIATION ABBREVIATION
Page 3
Northeastern Air Quality, Inc.
P.O. Box 3271, Albany, NY 12203-0271
(518) 857-3641
10/11/2024
MOTOR
NAME-RPM
PLATE VOLTS HERTZ 115 60
DATA
EXT.
STATIC
PRESSURE
VOLTS
AMPS
BHP (calc.)
F.L.A.ACTUAL 0.41
T1 10.7 0.4
T2 (3 Ph only)
T3 (3 Ph only)
T2 - T3 (3 Ph only)
T1 - T3 (3 Ph only)
FAN RPM --
TOTAL CFM - FAN 1200 -
CALCULATED (P.F. x NOM EFFY) *
MOTOR SHEAVE
STARTER HEATER ELEMENTS
0.72
P.F.NOM EFFY
T1 - T2 115 115
0.72
NL
OUTSIDE AIR CFM NL 187
--
TOTAL
DISCHARGE NL 0.18 NL
BELTS
SYSTEM:F-1
LOCATION:Storage
MODEL:GF9S080B12DH11G
SERIAL NUMBER:W0A5A464192
SERVICE:IRS Office
MANUFACTURER:Coleman
PROJECT:IRS Queensbury
TESTED BY:T.Waldorf DATE:
AIR MOVEMENT EQUIPMENT TEST SHEET
ACTUAL
STYLE FRAME -48
DATE TESTED:10/11/2024
MANUFACTURER Genteq
1
FL AMPS S.F.10.7 1.00
HP 1/2 1175
PHASE
SHEAVE cL DISTANCE
FAN SHEAVE Direct Drive
-
Direct Drive
Direct Drive
Direct Drive
TOTAL CFM - OUTLETS 1200 1036
RETURN AIR CFM 1200 1036
TEST DATA DESIGN ACTUAL DESIGN
INLET NL -0.54
REMARKS:
* NOTE: If P.F. or NOM EFFY are NL,
(P.F. x NOM EFFY) = 746Hp/(VAX),
where X = 1 if 1 Ph, and 1.73 if 3 Ph
Page 4
Northeastern Air Quality, Inc.GRILLE, REGISTER & DIFFUSER REPORT
P.O. Box 3271, Albany, NY 12203-0271 PROJECT:
(518) 857-3641 TESTED BY:DATE:
REMARKS:1) Low flow with damper 100% open
DESIGN INITIAL INTERMEDIATE FINAL % OF
NO.LOCATION SIZE MODEL Ak VEL CFM VEL CFM VEL CFM VEL CFM DES DATE REMARKS
F-1
1 Interview CD-2 110 Hood 165 Hood 110 Hood 110 100%10/11/24
2 Open Office CD-2 250 Hood 205 Hood 235 Hood 235 94%10/11/24
3 Conference CD-2 110 Hood 186 Hood 105 Hood 105 95%10/11/24
4 Open Office CD-2 250 Hood 131 Hood 175 Hood 175 70%10/11/24 1
5 Storage CD-1 80 Hood 91 Hood 86 Hood 86 108%10/11/24
6 Open Office CD-2 250 Hood 205 Hood 225 Hood 225 90%10/11/24
7 Vestibule CD-2 150 Hood 90 Hood 100 Hood 100 67%10/11/24 1
Total 1,200 1,073 1,036 1,036 86%10/11/24
Return
8 Entry NL Hood 187 Hood 187 -10/11/24
9 Open Office RG-2 980 Hood 608 Hood 608 62%10/11/24
10 Interview RG-1 110 Hood 120 Hood 120 109%10/11/24
11 Conference RG-1 110 Hood 121 Hood 121 110%10/11/24
Total 1,200 1,036 1,036 86%10/11/24
T. Waldorf 10/16/2024
IRS Queensbury
Page 5
SYSTEM DIAGRAM
IRS Queensbury
Page 6