Loading...
74920-2024_11_20-Foundation LetterNovember 20, 2024 Mark Smith Code Enforcement Officer Town of Queensbury 742 Bay Road Queensbury, NY 12804 RE: 1471 Route 9 Site Plan: Self -Storage Foundation Construction Field Change Dear Mr. Smith: Afield change in the construction of the foundation for the self -storage structure associated with the 1471 Route 9 Site Plan has been completed. The field change is a modification of the plans entitled "Colin Lansing Lake George, NY" by Trachte Building Systems, Inc. dated July 31, 2024, and signed by Shaughn P. Dean, PE. Sheet B1.0, detail 1 and detail 2 outlines a slab thickness of 4". The field change increases the slab thickness from 4" to 6". The vapor barrier and welded wire fabric are also included in the 6" slab. Detail 2 outlines an 8" thick pad to be placed at the locations where the roof supports come in contact with the slab. The field change also includes the reduction of the pad thickness from 8" to 6". If additional information is required, please contact our office at your earliest convenience. Thank you. Sincerely, LANSING ENGINEERING, RC Yates ott Lansing, PE, CPESC, CPSWQ or NEW)10, pOTT '7 ,'(3f ?