74920-2024_11_20-Foundation LetterNovember 20, 2024
Mark Smith
Code Enforcement Officer
Town of Queensbury
742 Bay Road
Queensbury, NY 12804
RE: 1471 Route 9 Site Plan: Self -Storage Foundation Construction Field Change
Dear Mr. Smith:
Afield change in the construction of the foundation for the self -storage structure associated with
the 1471 Route 9 Site Plan has been completed. The field change is a modification of the plans
entitled "Colin Lansing Lake George, NY" by Trachte Building Systems, Inc. dated July 31, 2024,
and signed by Shaughn P. Dean, PE. Sheet B1.0, detail 1 and detail 2 outlines a slab thickness of
4". The field change increases the slab thickness from 4" to 6". The vapor barrier and welded
wire fabric are also included in the 6" slab. Detail 2 outlines an 8" thick pad to be placed at the
locations where the roof supports come in contact with the slab. The field change also includes
the reduction of the pad thickness from 8" to 6".
If additional information is required, please contact our office at your earliest convenience.