2014-04-21 - Mtg 17 REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 897
REGULAR TOWN BOARD MEETING MTG#17
APRIL 21, 2014 BOH RES #9-11
7:00 P.M. RES # 133-147
BOARD MEMBERS PRESENT
SUPERVISOR JOHN STROUGH
COUNCILMAN ANTHONY METIVIER
COUNCILMAN BRIAN CLEMENTS
COUNCILMAN DOUG IRISH
COUNCILMAN WILLIAM VANNESS
TOWN COUNSEL
MARK SCHACHNER
PRESS: Glens Falls Post Star, LOOK TV
SUPERVISOR STROUGH CALLED MEETING TO ORDER...
PLEDGE OF ALLEGIANCE LED BY COUNCILMAN DOUG IRISH
RESOLUTION CALLING FOR QUEENSBURY BOARD OF HEALTH
RESOLUTION NO.: 133, 2014
INTRODUCED BY: Mr. Anthony Metivier
WHO MOVED ITS ADOPTION
SECONDED BY: Mr. Brian Clements
RESOLVED, that the Queensbury Town Board hereby adjourn from Regular Session and
enter as the Queensbury Board of Health.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES: Mr. Metivier, Mr. Clements, Mr. Irish, Mr. VanNess, Mr. Strough
NOES: None
ABSENT: None
QUEENSBURY BOARD OF HEALTH
PUBLIC HEARING ON SEWAGE DISPOSAL VARIANCE APPLICATION OF
STEPHEN O'LEARY
PUBLICATION DATE: APRIL 11, 2014
CARL B. SCHODER, PE - SCHODER RIVERS ASSOCIATES PRESENT
CARL SCHODER-My name is Carl Schoder, I am with Schoder Rivers Associates, I am
representing the applicant, the O'Learys in this matter. Basically we are here for you to request
several variances in order to build a replacement, a septic system on an existing site. If I may, I
would like to give you a bit of project background and why we are all sitting here. Recently the
O'Learys purchased this property which is a small lot, approximately a third of an acre in size.
Basically half of the property has an existing plus or minus, a thousand square foot, footprint
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 898
cabin. It has an existing non-conforming septic system which basically has a seepage pit of sorts
down low and what is or was a leach field at the higher end of the site where we're proposing to
actually work. The house as it stands is an existing non-conforming structure, with respect to
zoning; it's too close to the setbacks, lake wise, sideline setbacks, etcetera. What the owner
wishes to do as an overall project, again, if I can give you the big picture background, is to
improve this property by improving the house. Basically, currently the first floor of the house
was deteriorated, close to rock;joists were rotting out, that sort of thing. So they want to do
some work inside the house. They also want to improve the septic system to bring it to a system
that will function well from now for quite a while. They are not intending to work outside of the
footprint of this existing property or existing building. One thing that will be needed in doing
this project and actually interestingly it has to do with septic system, proximity of the bedrock, is
that they anticipate raising the house approximately three feet (3'). The reason for that is to be
able to allow for enough grade outside to bury a septic tank and a pump tank without pumping
into bedrock. The neighbors are quite close; the concept of removing rock by blast is not
something very desirable. Needless to say with a third of an acre on a quite site limited, as far as
area to be able to work, we've tried to design a system into this that will accommodate their
needs and work with the site as best as possible and maintain setbacks from the lake to the extent
that we could. The new system will be a three (3), it will be for a, I forgot if I mention it but the
existing house is a three (3) bedroom, the new system will be also for a three (3)bedroom. They
are not anticipating increasing design flows to this whatsoever. When we first started this
project, the first step of course in any septic system design is try and figure, figure out where you
have soil. I had initially headed to a concept where we would possibly be able to get way back
to the backside of this property, it was the first thing that I would have liked to have done.
SUPERVISOR STROUGH-Right, so now you're reading my mind.
MR. SCHODER-Well that was the first hole that was dug for that matter, directly in front of the
... and when the backhoe teeth go in and hit bedrock at about eight inches (8"), seven inches (7)
or so, you realize you're in trouble. Then you look down that way and find that there's wetland
flagging all over the place that would be well within that back area. Well, didn't need the
wetland flagging, won't have any soil to work with so I kind of abandoned that idea and decided
that we would look elsewhere. I did want to maintain a hundred foot (100') separation to the
lake, if at all possible. So, we dug two (2) additional test pits. I got to follow the mic with me, I
dug two (2) additional test pits then to try and see if there were some usable soil in these areas
which is back behind what is currently, I don't know if you folks had the opportunity to be at the
site?
SUPERVISOR STROUGH-Yes, I was.
MR. SCHODER-Okay, there's currently in this area a stone and timber retaining wall, the timber
wall is kind of leaning over and that kind of thing, back behind that where the grade is up high,
okay, I dug a hole at this location. I dug a hole at that location. (referred to drawing/diagram)
Interestingly, there's bedrock that creeps out right along this boundary which is shown on the
drawing. I was pleased to find that at test pit one (1), I had basically forty-four inches (44") of
soil to bedrock which was a good deal. I also hit a remnant of an old septic system in there
which I think was part of what that original thing that was installed down here and trying to
pump up the hill was for. When I hit test pit two (2), it was still reasonable but not highly
favorably. At test pit number two (2)we had bedrock about three feet (3'). Now as you would
know we're within, what is it, a thousand feet (1,000') of the lake; therefore we need three feet
(3') of separation to bedrock from the bottom of the system. So, I knew we had some problems
but it was a heck of a lot better than the eight inches (8") we found on the other side of the
driveway so we pursued this. In pursuing it and also because the site is so space limited, we first
started looking at options like either an Eljen or a Presby, recognizing there was no way for a
three (3)bedroom, that were going to be able to get an conventional system in. By the way, we
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 899
did perk it and the perk rates reasonable, again about four (4) minutes per inch stabilized perk
rate at test pit number two (2) and number one (1)was six (6) minutes per inch. So, reasonable
soil but none the less, footprint wise, we simply do not have the area. So we looked at either a
Presby or an Eljen and decided on a Presby. Is everyone familiar with what Presby systems are?
SUPERVISOR STROUGH-I am now.
MR. SCHODER-Okay, you looked that up.
COUNCILMAN VANNESS-I am not.
MR. SCHODER-Alright, let me backtrack for a second. Matter of fact, we have got a, kind of a
handy working drawing for it. The Presby system is termed, under the Department of Health as
a, let me get this right, media-wrapped corrugated pipe sand lined treatment system. What that
mouthful means is twelve inch (12") diameter pipes, I am going to show you a cross section in a
second (referred to drawing/diagram), what that means to us, this is a cross section of the system.
These twelve inch (12") diameter pipes are installed at a certain spacing, one foot eight (1'8) is
the spacing and at that configuration in a matrix of sand. Now the sand that's used is a very
specific sand, that if you can think of mason sand for building, that's affectively what it is. The
important thing about a Presby is, is it uses an aeration method that lets this, let's air come in
contact with the waste as it's trying to be treated in the leach field. And the way that's done, and
let me flip you back again, a vent will be installed and the vent has a high vent which is about
thirteen feet (13') off the ground and a low vent which is about three feet (3') off the ground.
The reason for the two (2) vents and the difference in heights is a chimney affect. Air comes in
the bottom, goes out the top just as a conventional chimney. What happens is, at the end of the
system, you dump in, basically like, you can almost think of conventional systems, come into
each one of these pipes, at least in the configuration we've chosen, the other end of the pipes is
tied together by a header and that header is a vent header which goes over and again, goes to the
low intake. There's also a vent supplied at the distribution box end of this system which goes to
the high vent, hence the chimney, hence airflow is constantly going through. If you ask me what
time it is, I'll tell you how they made the watch. Did I cover a Presby far enough? Engineers,
sorry.
SUPERVISOR STROUGH-Yes, and you also have to be a certified person to be able to install
this and you say in your notes that will be the case.
MR. SCHODER-The Town of Queensbury actually has some Presbys in it, I have designed a
couple but yes that will be the case, it has to be the case. When this system is built, the owners
hired us to design but we don't, we just design. We will be out inspecting this and at the end of
this, this will be designed and built in accordance with what we want. For that matter, the notes
on the drawings specifically require that any builder that puts in a Presby is certified by Presby to
do this. If not, you void the warranty of the system; it would be self-defeating to do that anyway.
But I guess what I am trying to tell you is that there's two (2) sets of assurances here. First off,
you've got a certified installer, second off, you will have the design engineer doing the review as
the system is constructed. Alright to build this, we have and again, we wouldn't be here if we
didn't need variances. There are three (3) variances affectively that we are requiring or
requesting in order to do this. We started with, probably easier one first and that is down near
the building. If you see down near the building on your drawing, there's a heavy line drawn
between the septic tank and pump tank and the building itself. Because of distance to the
property line on the side, I can't get, I have no other location to put these tanks then where they
are. Because of the height of bedrock, again, I am going to need to fill up over the tanks which
was the reason to put, to raise the house up. To mitigate any sort of potential effect of say a leak
in a tank, I am not too worried about the pump pit but septic tanks can leak, what we are
proposing is putting a permeable barrier in there between the house and the septic tank and that
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 900
would be a piece of Hypalon roofing which we've used very successfully in the past, extended
down to bedrock, extended past the tanks a certain distance, and you have a membrane that will
keep the waste from heading toward the building. That's one (1). Two (2), what I am trying not
to do here is build a big mound, I have very little yard for these folks. So in building what we
have to build here, I can maintain a separation to bedrock by test pit two (2) of in excess of three
feet (3') which is again from the bottom of the sand bed. But where test pit number two (2) is,
which is on the backside of this, the driveway side of it, if you will, what we're requesting is a
variance from three foot (3'), from approximately two foot six (2'6) to three foot (3'). Now,
remember the type of waste that you have going into the ground here is a fairly polished waste,
it's got an aerated type of a system above it, fairly hi-tech. I would submit that certainly we were
complying with the Department of Health standards, there's something over and above the DOH
standards which I recognize which is a three foot (3') requirement. But none the less, I think that
the use of this type of a specialized system would service some mitigation to that six inches (6")
that we're asking for.
COUNCILMAN VANNESS-That's actually number three (3), correct?
MR. SCHODER-That's, I think probably in the order of sequence, yea. Sorry about that, I am
flying off the top of my head here.
COUNCILMAN VANNESS-No problem.
SUPERVISOR STROUGH-Did you consider bringing in extra fill?
MR. SCHODER-That is what we will do.
SUPERVISOR STROUGH-So that you don't even need the six inch (6") variance.
MR. SCHODER-I probably could but I've got to push everything up another six inches (6") and
it's only in that one corner and I'm going after a variance anyway and it really isn't going to, like
eighty percent (80%), ninety percent (90%) of this field is going to be three feet (3') plus so it
seemed to me to try and keep the grade down because I am trying not to have them have a big
hump up from their driveway and then back down into the retaining walls. I am trying to make
that a little bit of a usable area, at least for a lawn, that's the rationale there.
SUPERVISOR STROUGH-Okay, well while we are on that mound which isn't that high above
the surface and it's currently the area that seems to be used for parking.
MR. SCHODER-No, not in the area that we are looking.
SUPERVISOR STROUGH-Well that's where everyone was parking when I was there. Now,
how are we going to prevent that? That's my question.
MR. SCHODER-I can put stones there, I can put a fence, I can put anything we want because the
last thing that I want is somebody in that field.
SUPERVISOR STROUGH-Okay, that's right.
MR. SCHODER-That's a given. Actually, you will have in the finished product an upslope of
about a foot, okay, that will come up to the top of this. We can certainly put something in there,
again, landscaping stones, plantings because we're well away from the field. You don't want to
put plantings on these fields but you could put some shrubs out and prevent exactly that, that's a
good suggestion actually. Third variance, third variance is sideline setback and again, this comes
into the issue of having a very narrow site. As this drawing is proposed right now, we had said
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 901
zero setback because basically the sand filter portion of it sits right on the ten foot (10') setback
line, you can see on our drawing. Now, to get to that point and because we have to bring in fill
to raise this, there will be a down slope that will go to where a retaining wall tails back out to
natural grade. We had set that retaining wall approximately a foot back from the property line
but suffice it to say, by the time you get through everything it seemed to me that it was
reasonable to say that that is a zero setback. Earlier today, we met, I met with the neighbor or
the son of the neighbor, Joe Roulier and we discussed this and he has some concerns relative to
making sure that drainage stays on this property. What we had come to a consensus on and I
think that Joe will be speaking in a little while about this but what we had come to a consensus
on is that we would propose to move that wall and the leach field, everything except for the steps
that are shown going out here, towards the steps another two feet (2') so that we have a total of
three feet (3') from the property line to the toe of wall. And what I will do because currently
grade goes up towards his property anyway, I will just continue that slope down so that any
water that goes around this wall, would flow in that area. Now as far as additional water is
concerned, I took a look at original grading and where the break in grade was and I took a look at
where the break in grade would be with this plan, the difference is approximately three hundred
and fifty square feet (350') of additional grassed area. From an additional water point of view,
you're talking about extremely small amount of runoff. However, that said, there is existing
runoff and in pulling that wall back to three feet (3') off the property line, it allows me to make a
ditch. The second thing that we had discussed...
SUPERVISOR STROUGH-Does the plans show that?
MR. SCHODER-It does not and I would offer that I'd like to update those plans and if you folks
can see your way clear to making that a condition on approval or whatever we need to do, that's
up to you but what I would show would be that, I would take that wall and literally slide it three
feet (3') down the drawing to the south to get us our separation. Second point is that, Joe had
brought up that I think is a good point, currently drainage from this area, as I say, well, currently
drainage from this area goes out along the Swale, following my finger, cuts in around that phone
pole, cuts down the grade here and eventually meanders over onto the neighboring property. He
has concerns about that. We can address those concerns quite easily. If we create along the
property line, in some areas a bit of a berm,just enough to keep the water back over onto our
property and in other areas possibly swale that out a little bit instead of a berm, we can direct that
water which is currently going off to Lake George here, here fifteen (15), twenty feet (20') away.
But keep it off of the neighbor's property. It's a very easy thing to do, it requires very little
work. A grass swale will do the job quite nicely and that's what we would propose adding to
address Mr. Roulier's concerns, and I butcher the name again I am sorry. In a nutshell, that's
why we're here.
SUPERVISOR STROUGH-Okay, thank you. Does the board have any questions?
COUNCILMAN VANNESS-There's a lot of corrections obviously that are going to be, I mean,
from what we have sitting in front of us and what we've had for a week now, a week and a half
we've looked at the map, and again, I apologize that I didn't get out there to see it but I would
like to go out and if possible meet someone out there, a representative of it to have them show
me what they're going to do. I know the last time we talked about one like this, we actually went
out and looked at it and we talked in the next workshop and basically went through it the next
workshop. But I would feel more comfortable going out and personally taking a look at this,
having someone explain to me what they're doing out there and what the corrections are going to
be that you're going to make if that's possible.
SUPERVISOR STROUGH-Well we will see what the will of the board is Bill.
COUNCILMAN VANNESS-Okay.
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 902
SUPERVISOR STROUGH-I certainly have heard you and let's see what the public has to say
and see how the board feels.
COUNCILMAN VANNESS-Okay.
SUPERVISOR STROUGH-Anything else, any other questions on behalf of the board at this
time? Thank you Mr. Schoder.
MR. SCHODER-My pleasure.
SUPERVISOR STROUGH-If you want to have a seat in the audience please, I will ask if
members of the audience would like to come forward and speak to this application for a
variance, a septic variance. Joe?
MR. JOE ROULIER-My name is Joe Roulier, I am here representing myself because I am a
neighbor up there but more importantly my father who is the adjoining neighbor to the proposed
septic system. When I, I am going to address the sideline requirement from ten (10)to zero (0)
but after my meeting today with Mr. Schoder, we agreed that the toe of the mound would be a
three feet (3') and after we had discussed the swale that could be incorporated into that area and
the proposed drainage from that area, I feel very comfortable that the system can be adequately
installed in that particular area. My biggest concern was that it did represent a significant relief
from the requirement from ten feet (10') down to zero (0)but and I know that the original
proposal as it stood in a normal rainfall, would never be a significant problem in that area. But
as I pointed out to him, that in the last three (3) years we've had some significant downpours as a
result of the hurricanes up the coast and my biggest fear was that because of this mound system
in that area, that there would be a substantial amount of water, not only put onto my father's
property but ultimately going up against the foundation of his home. So, after our meeting
today, I feel that the three feet (3'), I know it's still a substantial amount of relief from the
variance or the ordinance, okay, but it does give us some room that if, in addition to the Swale,
we needed to address possibly some other type of berming or other improvement that may, that
could be unforeseen at this particular point, it gives us some room to work with down the road.
As I stand right now, I am very, very comfortable with the proposal. I think it's an outstanding
system that will be installed in that area compared to what essentially was a nonexistence septic
system for a multiple of years. I think it will be beneficial to my neighbor who is making
significant improvements to the property over the long run. I don't think it's going to have any
detrimental effect on my father's property or if somebody purchases my father's property down
the road and for these reasons, I think that the board should give it serious consideration and
ultimate approval for this variance. With that being said, I would only ask of Mr. Strough since
he is the only one up there, would it be possible that I could hear your comments while we can
still have a public opportunity to comment on them.
SUPERVISOR STROUGH-You mean my comments on this?
MR. ROULIER-Yes.
SUPERVISOR STROUGH-Most of them, he answered. The residing concerns that I had I was
asking while he was deliberating. You know, first of all, my first question was, why can't he
move it over next to the shed, further away from the lake, further away from the neighbors,
everything else. He responded that, and I suspected that because I see the big rock out croppings
there that he only had about eight inches (8") to the rock out cropping there. Okay so then we're
back at the current location which does seem to be an area used for parking but after I expressed
that concern, he also said that he wouldn't, you know prevent parking with some kind of
landscaping there and the parking would be over towards the shed from now on. And my other
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 903
questions, I have my whole list here and he did, you know, I asked him, while wouldn't he add
another six inches (6")to the sand bed and just not require that variance and he responded that,
that six inch (6") variance is only for one small corner of the system and the system is a very
efficient system and I did look it up. It's highly regarded as a very efficient workable system.
You know, Maine, Massachusetts, New Hampshire, they like this system and the more I read
about it, the more I liked it too.
MR. ROULIER-So, you're comfortable with it?
SUPERVISOR STROUGH-Yes, I am very comfortable with it. I was going to ask the number
of bedrooms after they rebuilt it; he answered that by saying the same as it is now, three (3)
bedrooms. I also wanted to know why the setback from the property line and the slope, you
know, could we have done better there but he answered that and also added that at least one (1),
maybe two (2) swales would be added to these plans, wanting to abate your concerns about
running water, not going on your property or your father's property, as the case might be.
MR. ROULIER-Right.
SUPERVISOR STROUGH-After reviewing it, those were my questions I had written down.
And I did go out and do a site visit and so I see this as probably the best that one could do given
the situation up there and I was very gratified to see that the AES Presby system, the aerated
system is a good one and he decided to go with that rather than conventional system which made
me feel better.
MR. ROULIER-Well I will tell you, we kicked around a couple of different scenarios while he
was up there today, possibly moving the laterals, extending them but after we got done with the
conversation and we talked about the swales that we could incorporate into that area and the,
really the state of the art technology of this particular system, I as my father's representative and
as a neighbor, I feel totally confident that it will be more than satisfactorily for the area and for
the lake. So, I don't think this board should, at this point, have any issues or any questions and
quite honestly I think it should go,just approve it, okay.
SUPERVISOR STROUGH-Okay, thank you Joe.
MR. ROULIER-Thank you very much gentlemen.
MR. HAROLD GORDON-Good evening, my name is Harold Gordon, my wife Donna and I are
the neighbors immediately adjacent on the south and there's really very little more I'd like to add
then Mr. Roulier had to say to you. We had a bad situation beforehand with the septic system
that exists and not only is that going to be addressed by this and not only is the one issue that Mr.
Roulier raised on his side going to be addressed as far as the drainage is concerned but this
system appears to be truly state of the art and topnotch. So, we hope again, as he said, that the
board will act as quickly as possible because the sooner it gets addressed, the better and I want to
complement our new neighbors on really putting in a very fine system and being very
considerate of their neighbors.
SUPERVISOR STROUGH-Thank you Mr. Gordon.
MR. GORDON-Thank you.
SUPERVISOR STROUGH-Any other member of the public wish to speak to this application?
Seeing none, let's go back to Town Board discussions. Now, here we are, we're with a plan
that's pretty satisfactory however, it just needs three (3) conditions, adding two (2) swales along
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 904
the retaining walls and some type of landscaping to prevent parking. Now, after your due
consideration, do you still feel that we can accomplish something tonight?
COUNCILMAN VANNESS-Yea, after listening to the neighbors, I mean on both sides, the
neighbors coming up here and being satisfied, that was one of main concerns other than the, you
know, somehow making it to the lake. I think they have been addressed and as long as were
guaranteed that these issues are going to be addressed and they will be included in the map when
it's handed in.
SUPERVISOR STROUGH-So what we'll ask is, then Mr. Schoder to volunteer description,
Town Counsel, if you will, try and amend the resolution appropriately as we proceed here in a
minute and then see how you feel.
MR. SCHODER-Quick comment.
SUPERVISOR STROUGH-Yes.
MR. SCHODER-This project is going to go in front of the Planning Board and the ZBA for the
area variance. We will be rolling out obviously the updated map with the modifications as
proposed here so if you're looking for a back-check on exactly what had happened, or what we
are proposing as a final if you will, that's what will be in front of the Planning Board in
accordance with what your minutes will note as a conditional approval.
SUPERVISOR STROUGH-Okay. There's three things that I think need addressing by you.
One is, as Joe's concern, Joe Roulier's concern is the swale along the retaining wall. Can you
give us an engineer's description using fairly precise terms of exactly what you are proposing?
MR. SCHODER-Along the retaining wall will be a swale that will direct drainage...
SUPERVISOR STROUGH-Now is that the retaining wall on the east side?
MR. SCHODER-I'm sorry, I will be very specific. The retaining wall at question on the north
boundary, at the north property line which will be relocated from the one foot (1') setback right
now to the three foot (3') setback, will have along its face on the wall running east to west, will
have a slope that will come down toward the face and then probably the last foot, come back up
to the wall such that the swale is created, low point of the swale being approximately six inches
(6") from the wall. I'm sorry, twelve inches (12") from the wall. I will continue the existing
slope from the neighbor's property down to that point and then back up to the wall. Now that
pitch is downhill currently, I am going to follow obviously the property line grade. I am not
proposing grading across the property, pick up that grade and bring it in.
SUPERVISOR STROUGH-Now how far above grade after you create this swale will be the
retaining wall? Six inches (6")?
MR. SCHODER-It will vary. The retaining wall will vary to nominally about four inches (4") at
the shallow end which is the west end of the wall to a height of approximately three feet (3') as it
wraps around the corner by that phone pole, then will get substantially higher in the north south
direction but the swale will only be on the east west area.
SUPERVISOR STROUGH-Yea, so the swale is going to... now the retaining wall curves?
MR. SCHODER-Right sir.
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 905
SUPERVISOR STROUGH-And it curves like this and your swale is going to follow that curve
and empty out on the south side?
MR. SCHODER-I will show you on a map.
SUPERVISOR STROUGH-Okay, you can show me on that map so counsel can see as well.
Can you see okay Mark?
TOWN COUNSEL SCHACHNER-Yea but I am not the important one, you guys are.
MR. SCHODER-Alright, this is the end approximately of the existing wall and remember the
wall will move over two feet (2').
COUNCILMAN CLEMENTS-The wall will move over two feet (2')?
MR. SCHODER-Two feet (2'), a total of three (3). It's currently a foot away from the property
line, it will be a total of three (3) altogether.
COUNCILMAN CLEMENTS-Okay.
SUPERVISOR STROUGH-Okay so you're going to move the retaining wall three feet (3') from
the north property line to the face of the retaining wall?
MR. SCHODER-Correct sir.
SUPERVISOR STROUGH-Okay.
MR. SCHODER-The swale will continue down then along the face of that wall, the wall height
will vary from about four inches (4") to, it drops off very quickly around this curve, so it's kind
of hard to really say that okay but it will, at the point before it starts to drop, about two and a
half, three feet (2'/2' -3') high then grade starts to drop off. What I would likely and the swale
will follow, again along the face of that wall, where the swale starts, where the wall starts to
drop, I will probably riprap that area to prevent any erosion, with probably a round riprap type of
an affair and allow the wall or allow the drainage to continue as shown up past the lower wall,
recognizing that there is a grade that's dropping from the neighbors in that location.
SUPERVISOR STROUGH-Okay.
MR. SCHODER-I'll continue that down now such that a berm or a shallow Swale, I haven't
designed it yet but berm or shallow swale will be created approximately along the property line
all the way down to where we pass the end of the existing house and down to where we come to
a point near the lake right where the grade starts to drop off to the lake to intercept any water and
to collect and discharge any water instead of allowing it to flow onto the northern property line.
SUPERVISOR STROUGH-Alright, well, because we want to be specific about these plans, let's
call that a berm.
MR. SCHODER-We can call it, yea, a berm is fine but I'd like to reserve the ability to do a bit of
a cut because I am trying not to dump water, or dump earth on the neighbor's property, I've only
got ten feet (10')to work with and I can't put the swale all the way over to the guy's house. Do
you see how narrow it is right here?
SUPERVISOR STROUGH-Yes.
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 906
MR. SCHODER-Okay, we're talking about something that's a distance of probably nine feet
(9').
SUPERVISOR STROUGH-Now...
MR. SCHODER-If I had a one foot (1') high berm with a one (1) on two (2) side slope, that's
two (2), four(4), that's five feet (5'), six feet (6') roughly, you'll have nine feet (9')that I am
chewing up.
SUPERVISOR STROUGH-Can you add some more riprap before it goes into the lake?
MR. SCHODER-I most certainly can.
SUPERVISOR STROUGH-Alright so then we'll call it, it's more likely to be a swale then?
MR. SCHODER-At that location, it's more likely to be a Swale, that's correct. And again, I am
assuming Planning Board will look at that pretty closely.
SUPERVISOR STROUGH-So let me review what I understand, okay.
MR. SCHODER-Yes sir.
SUPERVISOR STROUGH-That the retaining walls location running parallel and alongside the
northern boundary line of Mr. O'Leary's property, will be moved an additional two feet (2') so
that it will be a total of three feet (3') from Mr. O'Leary's property line, the property line that he
has in common with Mr. Roulier. And that a swale will be added between the retaining wall and
the property line to direct storm water towards the lake, at least down to the retaining wall that is
closer to the lake, the lower retaining wall. Then an additional Swale, oh, and riprap will be
added at the point...
MR. SCHODER-Between the walls.
SUPERVISIOR STROUGH-Between the walls.
MR. SCHODER-The area between the walls.
SUPERVISOR STROUGH-Between walls, riprap will be added between the upper and the
lower retaining walls.
MR. SCHODER-Correct sir.
SUPERVISOR STROUGH-And then there will be a swale that runs parallel and alongside the
common property line towards the lake.
MR. SCHODER-Correct.
SUPERVISOR STROUGH-Where approximately ten feet (10') from the lake will be another
body of riprap to try and prevent any first flushes from going directly into the lake.
MR. SCHODER-Probably more than ten feet (10')but yes, at least ten feet (10') say as a
minimum.
SUPERVISOR STROUGH-At least ten feet (10'). Well, I don't want it to be too excessive. I
would like the water to be trapped and not too much of a drain directly into the lake.
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 907
MR. SCHODER-I agree with you and I would think that I would probably push it a little bit
further back than simply ten (10)to give us a little more leeway there.
SUPERVISOR STROUGH-So between ten (10) and fifteen (15)?
MR. SCHODER-Yea, ten (10) and twenty (20), somewhere in that area I would think.
SUPERVISOR STROUGH-Well twenty feet (20') leaves...
MR. SCHODER-That doesn't leave much does it? The house is right there.
SUPERVISOR STROUGH-No.
MR. SCHODER-Say ten (10)to fifteen (15).
SUPERVISOR STROUGH-Okay. So, Mark, can you read me what you have?
ATTORNEY MARK SCHACHNER-Yes but you're not going to like it. What I wrote was,
relocate the retaining wall and add swales to facilitate drainage and landscaping to prevent
parking on top of system as described by applicant's agent Carl Schoder, PE at the Town Board
meeting.
MR. SCHODER-Exactly.
ATTORNEY SCHACHNER-Because I can't pretend to write all of that stuff
SUPERVISOR STROUGH-Okay.
ATTORNEY SCHACHNER-I mean, for what it's worth...
COUNCILMAN VANNESS-Its part of the record so we've got it on....
ATTORNEY SCHACHNER-I am not being fastidious, that's why I said that.
COUNCILMAN VANNESS-No, right.
SUPERVISOR STROUGH-Alright, so, this part of it, you can do word for word?
TOWN CLERK BARBER-Its part of the public hearing, yes.
SUPERVISOR STROUGH-So, we have the public ...
TOWN CLERK BARBER-You haven't closed it, so it will be word for word, correct.
SUPERVISOR STROUGH-Yea, and thank you for reminding me of the landscaped area. Now,
I call it a landscaped area because I don't care if you put rocks there or bushes there,just as long
as you make it clear that cars can't park on this system because you and I both know that's not
good.
MR. SCHODER-I have to be quite honest with you. Normally I would have had something
there. When you brought the question up, you know those little lights that pop in the back of
your head, you go, oops. I should have had some stones or should have some landscaping shown
in that location so that's an error on my part. You can't win them all.
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 908
SUPERVISOR STROUGH-Alright, how does the board feel about the application with the
conditions that we're imposing on them?
COUNCILMAN CLEMENTS-I feel alright with the conditions but I almost think that I'd like to
see the plans with the entirety on it.
SUPERVISOR STROUGH-Okay, there's one.
COUNCILMAN CLEMENTS-They're going to do that for the Planning Board anyway, right?
MR. SCHODER-It will delay me to your next meeting is what the only issue would be. We are
trying to get this built.
COUNCILMAN VANNESS-And I think one of the important things on the delay is, is that one
of the things that kind of turned me a little bit is, one of the neighbors came up and mentioned
that there had been problems with this system before so I think the longer we delay it, the more
problem were going to continue to have with it. So I mean that was one of my concerns that
when the neighbor came up and said there were issues with it.
SUPERVISOR STROUGH-And the other thing is, I am pretty sure that Joe, he lives there, he
knows what was just stated and agreed upon tonight and if it varies from that, he'll come back to
us.
MR. SCHODER-Again, we'll be inspected this as well.
COUNCILMAN CLEMENTS-Do you mind if I attend the Planning Board meeting?
MR. SCHODER-I would love it if you did.
COUNCILMAN CLEMENTS-I'll be there.
MR. SCHODER-Gentlemen, rest assured it will be exactly as what we just spoke about.
SUPERVISOR STROUGH-Tony?
COUNCILMAN METIVIER-I am fine.
SUPERVISOR STROUGH-Okay. Joe, do you want to say something?
MR. ROULIER-When you're talking about the berm down towards the lake, I think this is where
Carl was talking about, referring to this particular area... I would just throw this out to the board
as a suggestion, okay. This is a very narrow area. First of all, the runoff that we're talking about
probably, let's go on to say an A typical storm, okay, I don't expect quite honestly that we're
going to, we're not going to be developing a stream in any way or fashion down through the
Swale, it's only in the event of a hurricane, or something like that. I think to be perfectly honest
with you, to incorporate riprap down in this particular area because quite honestly, what it would
do, would be in effect, prevent anyone from walking from one property over to the other because
you would have to cross a swale that's now incorporated or filled with stone. I would suggest to
Carl that if there is a Swale, there's ornamental grasses up there or some type of natural
landscaping.
SUPERVISOR STROUGH-Well, Joe, if I have my way, I would put, I would make all of you
along the shore, put a buffer on that shore in according with 179-8-040.
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 909
MR. ROULIER-And you're not going to get an argument from me.
SUPERVISOR STROUGH-Okay.
MR. ROULIER-But I think that instead of using riprap in that particular area, to incorporate
some type, because I know that in the Town of Queensbury right now, different ornamental
grasses or some type of natural greenery, it would be more favorable right there because we're
really only looking at selective periods of time where we might actually have a flow of water.
So rather than impede the walking area from one piece of property to another and it's quite
narrow in that area,just have it so that there's more greenery in that area that essentially, it will
work the same way as the riprap.
SUPERVISOR STROUGH-Why don't I just define it and let the Planning Board deal with it as a
permeable buffer area?
COUNCILMAN VANNESS-That will work.
MR. ROULIER-I will go with that.
MR. SCHODER-Actually your point is very well taken. You're going to get more cleaning
down there with a well-made riprap swale with almost a level bar that allows the water to come
down that Swale, have grassed area and have it simply spill over that grassed area ...
SUPERVISOR STROUGH-You don't want me to start talking about grass?
MR. SCHODER-No, no, I am not talking about a manicured grass area. I am talking about
something, actually I may be, I may be talking about placing sod because it catches quicker.
SUPERVISOR STROUGH-Well, and you're allowed to do that but the thing about it is, I'd
rather have the first fifteen (15), between the shoreline and upland, a buffer, a permeable buffer
of natural vegetation, no invasive species, etcetera.
MR. SCHODER-But still grass is of the types of vegetation that will filter that water.
SUPERVISOR STROUGH-Alright, so we'll define that the termination near the shoreline of the
lake will be some kind of permeable buffer.
MR. SCHODER-Perfect.
MR. ROULIER-Mr. Strough, if you were here backed up to that particular piece of property and
you walked down to that particular location, that entire area actually from, there's a large tree
right here but that entire area from my father's property almost probably ten (10)to twelve feet
(12') over, is that type of vegetation already.
MR. SCHODER-That's true.
MR. ROULIER-So, there's no runoff just going directly right into the lake. I think you'll be
very satisfied in another two weeks when it greens up, if you saw that.
COUNCILMAN VANNESS-So it basically sits there and absorbs thru the soil already.
MR. ROULIER-Already, yes.
MR. SCHODER-What I don't want to do when I get down near the shore because the slope
steepens, is make a ditch. What I wanted to do is get down to that location, fifteen feet (15')
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 910
from shore and spill out naturally over the soils that are there. If I had my ideal case because
frankly, I won't be disturbing the soil on the shore of the lake less potential for erosion, as Mr.
Roulier just noted, is indeed a vegetated area with natural vegetation. I am simply spilling into
this, it's going to be the cleansing that you're going to wind up getting for your runoff that's
coming down through here, the erosion potential will be nil. There's very little quantity of water
that we're talking about in the first place here, it's not streams, it's very, very as you have noted,
infrequent event that you would consider having anything .... noticeable water.
SUPERVISOR STROUGH-Well we like to plan for the worst case scenario.
MR. SCHODER-Absolutely but I don't want to make it an erodible area.
SUPERVISOR STROUGH-Okay.
MR. ROULIER-Thank you very much.
SUPERVISOR STROUGH-Alright, thank you Joe. Alright so, we're going to have a motion
soon on Resolution 1.1 approving Steven O'Leary's application for sanitary sewage disposal
variance with the conditions as stated in this meeting but I will go over them again. Moving the
retaining wall so that it is three feet (3') from the property line and a swale be added between the
property line and the retaining wall directing storm water towards the lower, towards a
permeable filter area that will be located between the retaining walls and another swale directing
the water towards the lake with another permeable buffer prior to its entering the lake.
MR. SCHODER-The area between the two (2) retaining walls because of the steepness of it, it
does indeed need to be riprap, you may as well say that.
SUPERVISOR STROUGH-Okay, riprap between the two (2) retaining walls. The other item
will be a landscaping that makes it clear that this will not be serving as a parking area. Well,
with that said, I will close the public hearing.
PUBLIC HEARING CLOSED
7:50 P.M.
ATTORNEY SCHACHER-I have two comments. The first one is, I am thinking you want to
change the last word of number three (3), from setback to separation because I think that's a
vertical separation requirement, not a setback requirement. Are we changing item two (2) from
zero feet (0')to three feet (3')?
COUNCILMAN VANNESS-Correct.
ATTORNEY SCHACHNER-So, I would suggest doing that as well.
RESOLUTION APPROVING STEPHEN O'LEARY'S APPLICATION FOR
SANITARY SEWAGE DISPOSAL VARIANCES
RESOLUTION NO.: BOH 9,2014
INTRODUCED BY: Mr. Anthony Metivier
WHO MOVED ITS ADOPTION
SECONDED BY: Mr.William VanNess
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 911
WHEREAS, Stephen O'Leary filed an application for variances from provisions of the
Town of Queensbury On-Site Sewage Disposal Ordinance, Chapter 136 to install a new on-site
replacement wastewater treatment system as follows:
1. Septic tank to be 2' from the dwelling instead of the required 10' setback;
2. Fill system to be 3' from the property line instead of the required 10' setback; and
3. Vertical separation distance from bottom of wastewater treatment sand bed to
bedrock within 1,000' of Lake George, to be 2.5' instead of the required 3'
separation;
on property located at 77 Brayton Lane in the Town of Queensbury, and
WHEREAS, the Town Clerk's Office published the Notice of Public Hearing in the Town's
official newspaper and the Local Board of Health duly conducted a public hearing concerning the
variance requests on Monday, April 21St, 2014, and
WHEREAS, the Town Clerk's Office has advised that it duly notified all property owners
within 500 feet of the subject property,
NOW, THEREFORE, BE IT
RESOLVED, that
1. due to the nature of the variances, the Local Board of Health determines that the
variances would not be materially detrimental to the purposes and objectives of this
Ordinance or other adjoining properties nor otherwise conflict with the purpose and
objectives of any Town plan or policy; and
2. the Local Board of Health finds that the granting of the variances is necessary for the
reasonable use of the land and is the minimum variances which would alleviate the
specific unnecessary hardship found by the Local Board of Health to affect the
applicant; and
BE IT FURTHER,
RESOLVED, that the Local Board of Health hereby approves the application of Stephen
O'Leary for variances from the Sewage Disposal Ordinance to install a new on-site replacement
wastewater treatment system as follows:
1. Septic tank to be 2' from the dwelling instead of the required 10' setback;
2. Fill system to be 3' from the property line in lieu of the required 10' setback;
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 912
3. Vertical separation distance from bottom of wastewater treatment sand bed to
bedrock within 1,000' of Lake George, to be 2.5' instead of the required 3'
separation;
4. Relocate retaining wall and create permeable drainage area as described by
applicant's engineer Carl Schoder, P.E., at the Town Board meeting on April 21St
2014; and
5. Install landscaping to prevent parking on top of system;
on property located at 77 Brayton Lane in the Town of Queensbury and bearing Tax Map No.:
239.12-2-87.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Clements, Mr. Irish, Mr. VanNess, Mr. Strough, Mr. Metivier
NOES None
ABSENT: None
RESOLUTION SETTING PUBLIC HEARING ON SEWAGE DISPOSAL
VARIANCE APPLICATION OF CHRIS ABELE
RESOLUTION NO.: BOH 10,2014
INTRODUCED BY: Anthony Metivier
WHO MOVED ITS ADOPTION
SECONDED BY: Mr. Brian Clements
WHEREAS, the Queensbury Town Board serves as the Town's Local Board of Health and
is authorized by Town Code Chapter 136 to issue variances from the Town's On-Site Sewage
Disposal Ordinance, and
WHEREAS, Chris Abele has applied to the Local Board of Health for variances from
Chapter 136 to install a new wastewater system as follows:
1. Disposal field to be located 76' from Lake George instead of the required 100'
setback;
2. Wastewater components (modules, disposal field and piping) to be located less than
the required 10' setback from the property line;
3. Disposal field to be located 5' from the northerly property line instead of the
required 10' setback; and
4. Modules and piping to be located 3' from the westerly (roadside) property line
instead of the required 10' setback;
on property located at 102 Rockhurst Road in the Town of Queensbury,
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 913
NOW, THEREFORE, BE IT
RESOLVED, that the Town of Queensbury's Local Board of Health will hold a public
hearing on Monday, May 5th, 2014 at 7:00 p.m. at the Queensbury Activities Center, 742 Bay Road,
Queensbury, to consider Chris Abele's sewage disposal variance application concerning property
located at 102 Rockhurst Road, Queensbury (Tax Map No.: 227.9-1-12) and at that time all
interested persons will be heard, and
BE IT FURTHER,
RESOLVED, that the Local Board of Health authorizes and directs the Queensbury Town
Clerk to publish the Notice of Public Hearing presented at this meeting and send a copy of the
Notice to neighbors located within 500' of Mr. Abele's property as required by law.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Irish, Mr. VanNess, Mr. Strough, Mr. Metivier, Mr. Clements
NOES None
ABSENT: None
RESOLUTION ADJOURNING BOARD OF HEALTH
RESOLUTION NO.: BOH 11,2014
INTRODUCED BY: Mr. Brian Clements
WHO MOVED ITS ADOPTION
SECONDED BY: Mr. Doug Irish
RESOLVED, that the Queensbury Board of Health hereby adjourns and enters as the Town
Board of the Town of Queensbury.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES: Mr. VanNess, Mr. Strough, Mr. Metivier, Mr. Clements, Mr. Irish
NOES: None
ABSENT: None
PRIVILEGE OF THE FLOOR
7:55 P.M.
MR. JOHN SALVADOR North Queensbury resident-Referred to resolution 3.7, `Resolution and
Final Order Approving Route 9 Sanitary Sewer District Extension No. 2' and spoke to the Town
Board regarding the Planning Board's SEQRA review and issuance of a Negative Declaration.
Referred to resolution 3.11, `Resolution Appointing Members to Town Ethics Board and read
statement into the record. (on file in the Town Clerk's Office)
MR. ROBERT SCHULZ referred to resolution 3.11, `Resolution Appointing Members to Town
Ethics Board' and questioned whether any of the appointees are elected officials, appointed
officials or public employees?
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 914
SUPERVISOR STROUGH-No sir, not that we know of, we made sure they weren't.
MR. SCHULZ-Requested that the Town Board not approve the resolution tonight, stating that it
would be violating the statute and also the Constitution for the State of New York.
MR. GEORGE WINTERS, 4 John Clendon Road, Queensbury-Referred to the Main Street
meeting and questioned whether the Town Board had come to any decisions regarding same.
Referred to the meeting held with Smart Streets and noted that the last person that spoke, half of
what he spoke of did not apply to the Town of Queensbury like what he said about the average
person not wanting their driver's license until they're thirty (30).
SUPERVISOR STROUGH-He was saying as a nation, an average trend. We will be having
another public meeting on this and see if we can't come to a consensus.
RESOLUTIONS
Councilman Irish briefly left meeting room and returned during the vote.
RESOLUTION AUTHORIZING AGREEMENT BETWEEN TOWN OF
QUEENSBURY AND FAMILY YMCA OF THE GLENS FALLS AREA
RESOLUTION NO.: 134, 2014
INTRODUCED BY: Mr. Anthony Metivier
WHO MOVED FOR ITS ADOPTION
SECONDED BY: Mr.William VanNess
WHEREAS, the Town of Queensbury wishes to enter into an agreement with the Family
YMCA of the Glens Falls Area to support the YMCA's provision of its summer day camp
experience to 25 children, and
WHEREAS, a proposed Agreement has been presented at this meeting,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby approves of the Agreement between
the Town and the Family YMCA of the Glens Falls Area to support the YMCA's provision of its
summer day camp experience to 25 children, with funding for the Agreement not exceeding the sum
of$6,000 and authorizes and directs the Town Supervisor to execute the Agreement, with funding
to be paid for from Account No.: 001-8989-4414.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Strough, Mr. Metivier, Mr. Clements, Mr. VanNess
NOES None
ABSENT: None
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 915
ABSTAIN: Mr. Irish
RESOLUTION ACCEPTING RESPONSE AND CORRECTIVE ACTION
PLAN IN RESPONSE TO AUDIT OF TOWN JUSTICE COURT
RESOLUTION NO.: 135,2014
INTRODUCED BY: Mr.William VanNess
WHO MOVED ITS ADOPTION
SECONDED BY: Mr. Doug Irish
WHEREAS, the New York State Comptroller's Office recently completed Audit No.: S9-
14-02 concerning the Town of Queensbury's Justice Court, and
WHEREAS, in accordance with New York State General Municipal Law §35, the Town
Board agrees with the recommendations of the Audit and wishes to accept a Corrective Action Plan
in response to such Audit and recommendation as set forth in the Town Supervisor's April 8th 2014
letter presented at this meeting,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby accepts, authorizes and ratifies the
Supervisor's Response and Corrective Action Plan in response to the New York State Comptroller's
Office Audit No.: S9-14-02 as described in the preambles of this Resolution, and
BE IT FURTHER,
RESOLVED, that the Town Board further authorizes and directs the Town Supervisor,
Town Clerk, Town Justices and/or Town Budget Officer to take such other and further action as
may be necessary to effectuate the terms of this Resolution.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Metivier, Mr. Clements, Mr. Irish, Mr. VanNess, Mr. Strough
NOES None
ABSENT: None
RESOLUTION AUTHORIZING ENGAGEMENT OF SERVICES OF
BUSINESS AUTOMATION SERVICES, INC. -
INTERNET TAX PROPOSAL
RESOLUTION NO.: 136,2014
INTRODUCED BY: Mr.William VanNess
WHO MOVED FOR ITS ADOPTION
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 916
SECONDED BY: Mr. Doug Irish
WHEREAS, the Town of Queensbury's Tax Receiver has recommended that the Town
Board engage the services of Business Automation Services, Inc., relating to an internet tax system
whereby the general public will be able to view updated tax bills and payment history online and/or
make tax payments via credit cards and/or eChecks (ACH) to be received by the Queensbury Tax
Receiver, and
WHEREAS, Town Counsel has reviewed the proposed system and has determined that it is
in accordance with the Town's internal procurement policies and procedures, and
WHEREAS, the Town Board believes it to be in the public interest to authorize such
services,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby approves and authorizes the
engagement of the services of Business Automation Services, Inc., relating to an internet tax system
whereby the general public will be able to view updated tax bills and payment history online and/or
make tax payments via credit cards and/or eChecks (ACH) to be received by the Queensbury Tax
Receiver, and
BE IT FURTHER,
RESOLVED, that the Town Board authorizes and directs the Town Clerk and/or Town
Supervisor to execute any documents necessary to effectuate this Resolution including the execution
of contracts with subsidiaries or related entities of Business Automation Services, Inc., and
BE IT FURTHER,
RESOLVED, that the Town Board further authorizes and directs the Town Supervisor to
execute any needed Agreement in form acceptable to the Town Supervisor, Tax Receiver and/or
Town Counsel, and authorizes and directs the Town Supervisor, Tax Receiver and/or Town
Counsel to take such other and further action necessary to effectuate the terms of this Resolution.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Clements, Mr. Irish, Mr. VanNess, Mr. Strough, Mr. Metivier
NOES None
ABSENT: None
RESOLUTION AUTHORIZING RAGNAR EVENTS, LLC TO CONDUCT
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 917
RAGNAR RELAY ADIRONDACKS 200 MILE OVERNIGHT RUNNING
RELAY RACE PARTIALLY WITHIN TOWN OF QUEENSBURY
RESOLUTION NO.: 137,2014
INTRODUCED BY: Mr. Doug Irish
WHO MOVED ITS ADOPTION
SECONDED BY: Mr. Brian Clements
WHEREAS, Ragnar Events, LLC has requested permission to conduct a 200 mile overnight
running relay race partially within the Town of Queensbury as follows:
SPONSOR: Ragnar Events, LLC
EVENT: Ragnar Relay Adirondacks 200 mile overnight running
Relay Race from Saratoga Springs to Lake Placid, NY
(January 29t1i 2014 letter describing the event presented at
this meeting)
DATE: September 26th-27th 2014
TIME: Approximately 12:30 p.m. on Friday, September 26th 2013 —
approximately 1:30 a.m. on Saturday, September 27th 2013
PLACE: Runners will be on the Warren County Bikeway from Glens
Falls until Ash Drive, Queensbury, where they will take a
left and follow Glen Lake Road to meet the next runner in
the parking lot of the Warren County Municipal Center.
Next runner will run back down Glen Lake Road where they
will rejoin the bikeway and continue on it until the end at
Million Dollar Beach, Major Exchange Point #12, Lake
George
and
WHEREAS, the applicant shall be responsible to obtain any other municipal agency's
approval(s) as may be necessary for their event,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby acknowledges receipt of proof of
insurance from Ragnar Events, LLC to conduct its Ragnar Relay Adirondacks 200 mile overnight
running Relay Race to be held on September 26th — 27t1i 2014 partially within the Town of
Queensbury as generally described in the January 29t1i 2014 letter presented at this meeting, and
BE IT FURTHER,
RESOLVED, that the Town Board approves this event subject to approval by the Town
Highway Superintendent which approval may be revoked due to concern for road conditions at any
time up to the date and time of the event as well as other municipal agency's approval(s) as may be
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 918
required.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Irish, Mr. VanNess, Mr. Strough, Mr. Metivier, Mr. Clements
NOES None
ABSENT: None
RESOLUTION AUTHORIZING SALARY AND GRADE CHANGES
FOR EMPLOYEES IN TOWN CLERK AND TAX RECEIVER OFFICES,
PROMOTING IRMA HAMBLIN TO IST DEPUTY RECEIVER OF TAXES
AND ASSESSMENT POSITION, AND ELIMINATING SECOND DEPUTY
RECEIVER OF TAXES AND ASSESSMENTS POSITION
RESOLUTION NO.: 138,2014
INTRODUCED BY: Mr. Anthony Metivier
WHO MOVED FOR ITS ADOPTION
SECONDED BY: Mr. Brian Clements
WHEREAS, the Town of Queensbury's Town Clerk and Tax Receiver (Town Clerk) has
recommended the promotion of Irma Hamblin, currently the Town's 2nd Deputy Receiver of Taxes
and Assessments, to the vacant 1St Deputy Receiver of Taxes and Assessments position, as a result
of the restructuring of the Town Clerk and Tax Receiver offices, and
WHERES, the Town Clerk has further recommended certain salary and grade increases for
employees within her offices related to such restructuring, and
WHEREAS, the Town Board wishes to authorize such requested promotion and salary and
grade increases, contingent upon the elimination of the currently established 2nd Deputy Receiver of
Taxes and Assessments position,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby authorizes and directs the promotion
of Irma Hamblin to the 1St Deputy Receiver of Taxes and Assessments position and the elimination
of the 2nd Deputy Receiver of Taxes and Assessments position previously established by Town
Board Resolution No.: 73,2003, and
BE IT FURTHER,
RESOLVED, that the Town Board further authorizes and directs the Town Clerk and Tax
Receiver's recommendations for salary and grade increases for employees within the Town Clerk
and Tax Receiver Offices effective as of April 28t1i 2014 prorated to their weekly rate going
forward, with such new salaries and grade levels to be as follows:
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 919
EMPLOYEE TITLE GRADE LEVEL SALARY
Karen O'Brien 0 Deputy Town Clerk 7 $54,000
R. Rose Mellon 2nd Deputy Town Clerk 6 $42,900
Irma Hamblin 0 Deputy Receiver of Taxes
and Assessments 5 $43,400
Kim Moulton Records Clerk 5 $40,900
and
BE IT FURTHER
RESOLVED, that the Town Board hereby authorizes and directs the Town Supervisor,
Town Clerk/Tax Receiver and/or Budget Officer to complete any forms and take any action
necessary to effectuate all terms of this Resolution.
Duly adopted this 21St day of April, 2014 by the following vote:
AYES Mr. VanNess, Mr. Strough, Mr. Metivier, Mr. Clements, Mr. Irish
NOES None
ABSENT: None
RESOLUTION AND FINAL ORDER APPROVING ROUTE 9 SANITARY
SEWER DISTRICT EXTENSION NO. 2 TO SERVE PROPOSED SWEET
ROAD CONSERVATION SUBDIVISION
RESOLUTION NO.: 139,2014
INTRODUCED BY: Mr.William VanNess
WHO MOVED ITS ADOPTION
SECONDED BY: Mr.Anthony Metivier
WHEREAS, the Town of Queensbury wishes to extend the Route 9 Sanitary Sewer
District to serve the proposed 29-lot Sweet Road Conservation Subdivision (Subdivision) in
accordance with New York Town Law Article 12-A, and
WHEREAS, a Map, Plan and Report (Map, Plan and Report) has been prepared by
VISION Engineering, LLC, concerning the proposed sewer district extension to connect the
proposed Subdivision to the existing Route 9 Sanitary Sewer District sanitary sewer main along
Sweet Road, as more specifically set forth and described in the Map, Plan and Report, and
WHEREAS, the Map, Plan and Report has been filed in the Queensbury Town Clerk's
Office and is available for public inspection, and
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 920
WHEREAS, the Map, Plan and Report delineates the boundaries of the proposed Sewer
District extension, a general plan of the proposed system, a report of the proposed method of
operation, all outlets and the terminus and course of each proposed main sewer or drain together
with the location and a general description of all sewage disposal plants, pumping stations and
other public works, if any, and is consistent with, so far as possible, any comprehensive plan for
sewers developed and maintained pursuant to General Municipal Law §99-f, and
WHEREAS, the Queensbury Planning Board, as the Lead Agency, performed the State
Environmental Quality Review Act (SEQRA) review for the Subdivision which included the
proposed sewer district extension and issued a Negative Declaration, and
WHEREAS, the estimated annual cost to the "typical property" has been filed with the
Town Clerk and is made a part of the Map, Plan and Report, and
WHEREAS, on February 10, 2014, subsequent to the filing of the Map, Plan and Report
with the Town Clerk, the Town Board adopted an Order (Public Hearing Order) reciting (a) the
boundaries of the proposed Sewer District; (b) the proposed improvements; (c) the maximum
amount proposed to be expended for the improvements; (d) the estimated cost of hook-up fees (if
any) and the cost of the Sewer District to the typical property and the typical one or two family
home (if not the typical property); (e)the proposed method of financing to be employed; (f)the fact
that a Map, Plan and Report describing the improvements is on file in the Town Clerk's Office; and
(g)the time and place of a public hearing on the proposed Sewer District, and
WHEREAS, copies of the Public Hearing Order were duly published and posted and were
filed with the Office of the State Comptroller, all as required by law, and
WHEREAS, prior to publication of the Public Hearing Order, a detailed explanation of how
the estimated cost of hook-up fees (if any) and the cost of the Sewer District to the typical property
and typical one or two family home (if not the typical property) were computed was filed with the
Town Clerk for public inspection as part of the Map, Plan and Report, and
WHEREAS, a public hearing on the proposed Sewer District was duly held on February 24,
2014 and the Town Board has considered the evidence given together with other information, and
WHEREAS, on February 24, 2014 the Town Board adopted a Resolution determining that
(a) the Order scheduling the Public Hearing was published and posted as required by law and was
otherwise sufficient, (b) all of the property and property owners within the proposed Route 9
Sanitary Sewer District Extension No. 2 would be benefited thereby, (c) all of the property and
property owners benefited are included within the boundaries of the proposed Route 9 Sanitary
Sewer District Extension No. 2 and(d) it is in the public interest to establish, authorize, and approve
the Route 9 Sanitary Sewer District Extension No. 2 as described in the Map, Plan and Report on
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 921
file with the Queensbury Town Clerk with the boundaries and benefited properties of the Sewer
District Extension to be as described in the Map, Plan and Report, subject to permissive referendum
in the manner provided in Town Law Article 7 and subject to certain conditions specified in the
Resolution, and
WHEREAS, the Town Clerk duly posted and published the notice required for resolutions
subject to permissive referendum and no petition for referendum was filed within 30 days after the
date of the Resolution, and the Town Clerk has caused a certificate to that effect to be filed in the
office of the County Clerk, and
WHEREAS, the permission of the State Comptroller is not required pursuant to Town Law
Section 209-f, and
WHEREAS, the Town Board wishes to establish the proposed Route 9 Sanitary Sewer
District Extension No. 2 as detailed in the Map, Plan and Report in accordance with Town Law
Article 12-A,
NOW, THEREFORE, IT IS HEREBY
ORDERED, that the Town of Queensbury Route 9 Sanitary Sewer District Extension No.
2 - Sweet Road Conservation Subdivision be established as described in the Plan having extension
boundaries as detailed in the metes and bounds description from the Town's Public Hearing Order
dated February 19, 2014 and attached hereto as Schedule A and the improvements described in the
Plan be constructed and the service within the District be provided upon the required funds being
made available or provided for, and it is
FURTHER ORDERED, that the Town Clerk is hereby authorized and directed to cause a
certified copy of this Order to be duly recorded in the office of the Clerk of Warren County and to
be filed in the office of the State Department of Audit and Control in the time and manner required
by law, and it is
FURTHER ORDERED, that the Town Board authorizes and directs the Town Supervisor,
Town Clerk and Town Counsel to take all other actions necessary to effectuate the terms of this
Resolution.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Strough, Mr. Metivier, Mr. Clements, Mr. Irish, Mr. VanNess
NOES None
ABSENT: None
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 922
RESOLUTION AUTHORIZING HIRING OF DENNIS DICKINSON, III
AND ANDREW FLEURY AS TEMPORARY, SEASONAL LABORERS
IN TOWN HIGHWAY DEPARTMENT
RESOLUTION NO.: 140,2014
INTRODUCED BY: Mr. Brian Clements
WHO MOVED FOR ITS ADOPTION
SECONDED BY: Mr.William VanNess
WHEREAS, the Town Highway Superintendent has requested Town Board authorization to
hire two (2)temporary, seasonal Laborers to work for the Town's Highway Department,
WHEREAS, funds for such positions have been budgeted for in the Town Budget, and
WHEREAS, the Highway Superintendent has advised the Town Board that such temporary,
seasonal Laborers are Dennis Dickinson, III and Andrew Fleury,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby authorizes and directs the hiring of
Dennis Dickinson, III and Andrew Fleury to work as temporary, seasonal Laborers for the Town
Highway Department commencing on or about May 2"d 2014 and concluding on or about
November 21St, 2014, subject to the Town successfully completing pre-employment physicals and
background checks as reasonably necessary to judge fitness for the duties for which hired, and
drug and/or alcohol screenings, and
BE IT FURTHER,
RESOLVED, that such temporary, seasonal Laborer shall be paid $10.00 per hour as set
forth in Town Board Resolution No.: 462,2013 to be paid from the appropriate payroll account, and
BE IT FURTHER,
RESOLVED, that the Town Board further authorizes and directs the Highway
Superintendent, Town Budget Officer and/or Town Supervisor to complete any forms and take any
action necessary to effectuate the terms of this Resolution.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Metivier, Mr. Clements, Mr. Irish, Mr. VanNess, Mr. Strough
NOES None
ABSENT: None
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 923
RESOLUTION AUTHORIZING WAIVER OF 30 DAY NOTIFICATION
REQUIRED BY NEW YORK STATE LIQUOR AUTHORITY
IN CONNECTION WITH RED LOBSTER HOSPITALITY, LLC
RESOLUTION NO.: 141,2014
INTRODUCED BY: Mr. Anthony Metivier
WHO MOVED ITS ADOPTION
SECONDED BY: Mr. Brian Clements
WHEREAS, Red Lobster will be transferring its liquor licenses from its current corporate
entity licensee to a new subsidiary entity, "Red Lobster Hospitality, LLC" and therefore has applied
for a liquor license to reflect such licensee name change and has requested that the Town of
Queensbury waive the 30-day notification required by the New York State Liquor Authority (NYS)
in an effort to expedite the issuance of its liquor license, and
WHEREAS, the Town Board wishes to waive the 30 day notification period before Red
Lobster Hospitality, LLC's liquor license is issued,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby authorizes and directs the Town
Clerk to notify the applicant, Red Lobster Hospitality, LLC, to then notify the New York State
Liquor Authority that the Town waives the 30 day notification period before the liquor license is
issued to Red Lobster Hospitality, LLC and that the Town Board has no objection to such license,
and
BE IT FURTHER,
RESOLVED, that the Town Board further authorizes and directs the Town Supervisor,
and/or Town Clerk to sign any needed documentation and take any actions necessary to effectuate
the terms of this Resolution.
Duly adopted this 21St day of April, 2014 by the following vote:
AYES Mr. Clements, Mr. Irish, Mr. VanNess, Mr. Strough, Mr. Metivier
NOES None
ABSENT: None
RESOLUTION SETTING HEARING ON LAKE GEORGE CAMPSITES,
LLC'S APPLICATION FOR VARIANCE/WAIVER REQUEST FROM
SANITARY SEWER CONNECTION REQUIREMENT CONCERNING
PROPERTY LOCATED AT 1053 STATE ROUTE 9
RESOLUTION NO.: 142,2014
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 924
INTRODUCED BY: Mr. Doug Irish
WHO MOVED ITS ADOPTION
SECONDED BY: Mr.William VanNess
WHEREAS, the Queensbury Town Board is authorized by Town Code Chapter 136 to issue
variances from §136-44 "Connection to sewers required" which requires Town property owners
situated within a sewer district and located within 250' of a public sanitary sewer of the sewer
district to connect to the public sewer facilities within one(1)year from the date of notice, and
WHEREAS, Lake George Campsites, LLC (Applicant) has applied to the Town Board for a
variance/waiver from §136-44 to connect its property located at 1053 State Route 9 to the Town of
Queensbury's Route 9 Sewer District, in Phases according to five(5)year schedule as more fully set
forth in the application presented at this meeting, as the property's on-site septic system remains in
full compliance with all Town and State regulations,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board will hold a hearing on Monday, May 5th
2014 at 7:00 p.m. at the Queensbury Activities Center, 742 Bay Road, Queensbury, to consider
Lake George Campsites, LLC's sewer connection variance/waiver application concerning its
property located at 1053 State Route 9, Queensbury (Tax Map No.: 295.12-1-6), and
BE IT FURTHER,
RESOLVED, that the Town Board authorizes and directs the Queensbury Town Clerk to
send the Notice of Hearing presented at this meeting to the Applicant required by law.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Irish, Mr. VanNess, Mr. Strough, Mr. Metivier, Mr. Clements
NOES None
ABSENT: None
Consensus of the Town Board to pull resolution 3.11
RESOLUTION AUTHORIZING OUT OF DISTRICT AGREEMENT FOR
PROVISION OF WATER SERVICES BETWEEN TOWN OF
QUEENSBURY AND LARRY CLUTE
RESOLUTION NO.: 143,2014
INTRODUCED BY: Mr. Anthony Metivier
WHO MOVED ITS ADOPTION
SECONDED BY: Mr. Doug Irish
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 925
WHEREAS, the Town of Queensbury established and created the Queensbury Consolidated
Water District (Water District) and the Queensbury Water Treatment Plant, and
WHEREAS, Town resident Larry Clute has requested water service from the Water District
for his two lots located on Hidden Hills Drive in the Town of Queensbury(Tax Map No.'s: 302.13-
1-15 and 302.13-1-16) although the properties are located directly adjacent and outside of the Water
District, and
WHEREAS, the Town of Queensbury's past practice is to grant water service to residents
outside of the Water District until the next time that the Water District is extended, at which time the
residents' properties may become part of the Consolidated Water District, and
WHEREAS, the Water Superintendent has recommended that the Town Board authorize an
Agreement for the supply of water to Mr. Clute in accordance with Town Law §198(3)(b),
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby authorizes the supply of water from
the Queensbury Consolidated Water District's Water Treatment Plant to Larry Clute for two lots
located on Hidden Hills Drive in the Town of Queensbury (Tax Map No.'s: 302.13-1-15 and
302.13-1-16) contingent upon Mr. Clute signing an Out-of-District Agreement, such Agreement to
be in form approved by the Town Water Superintendent and/or Town Counsel, and taps being
installed, and
BE IT FURTHER,
RESOLVED, that the Town Board further authorizes the Water Superintendent to make all
necessary arrangements, including collecting the $100 capital buy-in fees from the resident and
executing and delivering the Agreement and documents for the supply of water in accordance with
Town Law §198(3)(b), to effectuate the terms of this Resolution and connections authorized
herein.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. VanNess, Mr. Strough, Mr. Metivier, Mr. Clements, Mr. Irish
NOES None
ABSENT: None
BEFORE VOTE
TOWN ATTORNEY SCHACHNER-Noted, in third whereas where it says, at which time the
residents' properties will become part of the Consolidated Water District; I would suggest changing
will to may.
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 926
Councilman Metivier who made motion and Councilman Irish who seconded the motion, both
agreed to amendment. (vote take)
RESOLUTION TO AMEND 2014 BUDGET
RESOLUTION NO.: 144,2014
INTRODUCED BY: Mr. Doug Irish
WHO MOVED ITS ADOPTION
SECONDED BY: Mr.William VanNess
WHEREAS, the following Budget Amendment Requests have been duly initiated and
justified and are deemed compliant with Town operating procedures and accounting practices by the
Town Budget Officer,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby authorizes and directs the Town's
Accounting Office to take all action necessary to amend the 2014 Town Budget as follows:
2014
From To
Code Appropriation Code Appropriation $
Increase Revenue
004-0000- 2680 Insurance Recovery 11,558.21
Increase Appropriation
004- 130-4110 Repairs 11,558.21
001-1990-1010 Wages 001-1355-1020 Assessor's O/T $ 4,000
001-1990-1010 Wages 001- 010-8061 Health Ins.Buy out $ 1,10
Duly adopted 21St day of April, 2014, by the following vote:
AYES Mr. Strough, Mr. Metivier, Mr. Clements, Mr. Irish, Mr. VanNess
NOES None
AB SENT : None
RESOLUTION APPROVING AUDIT OF BILLS-
WARRANT OF APRIL 22ND, 2014
RESOLUTION NO.: 145,2014
INTRODUCED BY: Mr. Doug Irish
WHO MOVED ITS ADOPTION
SECONDED BY: Mr. Brian Clements
WHEREAS, the Queensbury Town Board wishes to approve an audit of bills presented as a
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 927
Warrant with a run date of April 3rd, 2014 and a payment date of April 8th 2014,
NOW, THEREFORE, BE IT
RESOLVED, that the Queensbury Town Board hereby approves the Warrant with a run
date of April 17t1i 2014 and a payment date of April 22nd 2014 totaling $317,408.55, and
BE IT FURTHER,
RESOLVED, that the Town Board further authorizes and directs the Town Supervisor
and/or Town Budget Officer to take such other and further action as may be necessary to effectuate
the terms of this Resolution.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES Mr. Metivier, Mr. Clements, Mr. Irish, Mr. VanNess, Mr. Strough
NOES None
ABSENT: None
RESOLUTION AWARDING THE CONSTRUCTION CONTRACT FOR
THE AVIATION ROAD/DIXON ROAD/FARR LANE INTERSECTION
IMPROVEMENT PROJECT
TOWN OF QUEENSBURY,
WARREN COUNTY, P.I.N. 1759.06
RESOLUTION NO.: 1469 2014
INTRODUCED BY: Mr. Doug Irish
WHO MOVED ITS ADOPTION
SECONDED BY: Mr.Anthony Metivier
WHEREAS, by Resolution No.: 232, 2012, the Queensbury Town Board authorized and
approved the Aviation Road/Dixon Road/Farr Lane Intersection Improvements Project in the Town
of Queensbury(The Town), Warren County, P.I.N. 1759.06 (the Project), and
WHEREAS, by Resolution No.: 89, 2014, the Town Board reaffirmed the Project and
authorized and directed the Town Supervisor and/or Town Budget Officer to pay in the first
instance 100% of the federal and non-federal share of the cost of Design, Right-of-Way (ROW)
Incidentals, ROW Acquisition and Construction phases for the Project or portions thereof, and
WHEREAS, by Resolution No. 105, 2014 the Queensbury Town Board authorized the
Town Budget Officer to advertise for bids, and
WHEREAS, General Municipal Law § 103 requires that the Town advertise for bids and
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 928
award the bid to the lowest responsible bidder meeting New York State statutory requirements
and the requirements set forth in the Town's bidding documents, and
WHEREAS, in compliance with General Municipal Law § 103 and New York State
Department of Transportation (NYSDOT) Federal-Aid Project requirements, the Town of
Queensbury advertised the project in the Post-Star and in the New York State Contract Reporter,
and
WHEREAS, the Town Budget Officer received and opened four (4) bids on Wednesday,
April 16, 2014, 2:00 PM with the apparent lowest responsible bidder being Rifenburg
Construction, Inc., 159 Brick Church Road, Troy, NY 12180 for the sum of$1,114,967.00; and
WHEREAS, the Town's Engineering consultant, Creighton Manning Engineering LLP,
has reviewed the apparent low bidder's proposal to ensure completeness and conformance to
State and Federal requirements and provided a recommendation that the Town award the
contract to Rifenburg Construction, Inc., contingent upon NYSDOT and Federal Highway
Administration (FHWA) concurrence with the award; now, therefore be it
RESOLVED, that the Town of Queensbury Supervisor is hereby authorized to award the
Aviation Road/Dixon Road/Farr Lane Intersection Improvement Project construction contract to
Rifenburg Construction Inc., for the total price of$1,114,967.00 contingent upon NYSDOT and
FHWA concurrence with the award; and
BE IT FURTHER,
RESOLVED, that, upon concurrence by NYSDOT and FHWA, the Town Budget Officer
be and hereby is authorized to pay Rifenburg Construction Inc., the sum of$1,114,967.00 in the
manner detailed in the bidding documents and upon approval and acceptance by the Senior
Planner; and
BE IT FURTHER,
RESOLVED, that expenses for this project shall be paid for from the Aviation
Road/Dixon/Farr Lane Intersection Improvement Project Grant Fund#192, and
BE IT FURTHER,
RESOLVED, that the Town Board further authorizes and directs the Town Supervisor to
execute the Agreement in a form acceptable to the Town Supervisor and Town Counsel, and any
necessary forms or agreements related to this Project and further authorizes and directs the Town
Supervisor, Senior Planner and/or Town Budget Officer to take all action necessary to effectuate the
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 929
terms of this Resolution.
Duly adopted this 21 st day of April, 2014, by the following vote:
AYES: Mr. Clements, Mr. Irish, Mr. VanNess, Mr. Strough, Mr. Metivier
NOES: None
ABSENT: None
CORRESPONDENCE—None
TOWN BOARD DISCUSSIONS
COUNCILMAN VANNESS (WARD IV)
• We concluded our meetings at the West Glens Falls Firehouse for our Smart Growth and
our Main Street Corridor. I think they went very well; there was a lot of information that
was exchanged throughout the course of the meetings. I look forward to some discussion
here with the Town Board in the very near future to take a look at some zoning changes and
hopefully get things moving down there on that Main Street corridor.
COUNCL,MAN IRISH(WARD III)
• I would like again to thank the West Glens Falls fire Department for allowing us to have the
event down there. It was a great venue, we had a great turnout as Bill stated. Thank you to
Stu Baker, Senior Planner for putting it together and putting the grant together for the town.
• I would like to remind everybody that we'll start to see a lot more people out bicycling now,
it's getting nice out. The sides of the roads are still full of sand and pretty torn up. So I
would just like to caution you to be careful, there's going to be a lot of people in the road on
their bikes.
COUNCILMAN CLEMENTS (WARD II)
• Announced that there's going to be a meeting on May 1St from 6 to 8 p.m. at the Crandall
Library downstairs held by Warren County Supervisors, it's regarding the sale of
Westmount Facility to Specialty Care Group.
• Announced that the Queensbury South Vision Plan public workshop will be held on April
29th from 7 to 9 p.m. at the South Queensbury Volunteer Fire Department on 409 Dix
Avenue, Queensbury. This will be the second public workshop to discuss economic and
community revitalization opportunities within the South Queensbury neighborhood. The
purpose of the public workshop is to solicit input on the long term vision for the study area
and to present the opportunities and ideas for the redevelopment of the Hercules, Ciba-
Geigy site. Residents, business owners and all other interested parties are welcomed and
strongly encouraged to attend this important community event.
COUNCILMAN METIVIER(WARD I)-Nothing to report
SUPERVISOR STROUGH
• Announced that Saturday, April 26th from 9 a.m. to 1 p.m., the Warren County Soil and
Water Conservation District is putting on a Conservation Celebration Education Outreach
Event at Hovey Pond Park.
• Received monthly report from our Fire Marshall Mike Palmer and he's been inspecting
Hobby Lobby, Davidson Brothers new brewery, Jerry Brown's expansion, the outlets of
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 930
Lake George and their expansion, Morris Products and McDonalds on Dix, Northway Plaza,
OTB, Sweet Frogs, Adirondack Truck Repair and several projects at the Great Escape. He
did forty-three (43) commercial inspections, four sixty-one(461) commercial re-inspections,
eighteen (18) lifeline inspections, three (3) solid fuel equipment inspections and three
hundred seventeen(317) phone calls. Reminder to everyone, change your carbon monoxide
detectors every five (5) years and smoke detectors every ten(10) years. He also noted, don't
throw paints, stains and other maintenance products into the garbage, they need to be taken
care of in a safe way. I have suggested to the county that we have a countywide hazardous
waste day. DEC has warning out there regarding outdoor burning, it's dry right now.
Certainly you can have that grill fire for cooking but the other outdoor burning is prohibited.
There's been a rash of fires, one on Quaker Road today, two on West Mountain.
• Would like to thank our firemen and women who are out there volunteering to protect us.
Fortunately we have enough of these people who are willing to do this and I can't give them
enough thanks for volunteering and going out there and doing what they do for us.
• Announced residential lawn and yard pickup and noted the following: they need to be
placed in biodegradable bags for leaves, grass clippings, pine needles and left on the
roadside, not in the street; place tree limbs which are not to exceed eight feet (8') or four
inches (4") on the roadside, not in the street; place materials at the roadside the weekend
before the scheduled pickup. Do not mix topsoil, rocks, sand, stones because we put this
through grinders and chippers. Announced the following pickup dates:
Ward 4, May 5th- 16t"' with yard waste out by May 4th
Ward 3, May 19th-23rd with yard waste out by May 18th
Ward 1 &2, May 27th—3 01h with yard waste out by May 26th
• Main Street Corridor meetings were excellent, they lead to a lot of discussion, it opened
some minds to new ideas, it allowed others to see other's ideas and I think it will lead to
some very positive productive changes and I think it will help assure some good
development along Main Street.
COUNCILMAN IRISH-In reference to Brian's announcement regarding the meeting at Crandall
Library, I want to thank you John for your vote on the nursing home. I think it's important and
there's a lot of questions that people are starting to have in the public that have been asked in private
over the past couple of years so I wanted to thank you for voting on that. I know you and I have had
some discussion about concerns and I think it was the right thing to do.
SUPERVISOR STROUGH-I do have some concerns and Chairman Kevin Geraghty called me
today and I expressed to him my concerns and I had questions and he said he would get answers to
me so if they are satisfactory, maybe we can go forward, we'll see. Thank you for that Doug.
Thanked Look TV and the sponsors of the Queensbury Town Board.
RESOLUTION ADJOURNING BOARD MEETING
RESOLUTION NO.: 147,2014
INTRODUCED BY: Mr. Brian Clements
MOVED ITS ADOPTION
SECONDED BY: Mr.William VanNess
RESOLVED, that the Town Board of the Town of Queensbury hereby adjourns it's Regular
Town Board Meeting.
Duly adopted this 21St day of April, 2014, by the following vote:
AYES: Mr. Irish, Mr. VanNess, Mr. Strough, Mr. Metivier, Mr. VanNess
NOES: None
REGULAR TOWN BOARD MEETING 04-21-2014 MTG#17 931
NONE: None
RESPECTFULLY SUBMITTED,
CAROLINE H. BARBER
TOWN CLERK
TOWN OF QUEENSBURY