Loading...
2011-495 TOWN OF QUEENSBURY F 742 BayRoad,Queensbury,NY 12804-5902 (518) 761-8201 ��� Q rY, Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF COMPLIANCE Permit Number: P20110495 Date Issued: Wednesday, April 17, 2013 This is to certify that work requested to be done as shown by Permit Number P20110495 has been completed. Tax Map Number: 523400-226-019-0002-017-000-0000 Location: 2 SUNSET Ln Owner: FRANCIS & MARJORIE DILLON TRUST JR Applicant: FRANCIS & MARJORIE DILLON TRUST JR This structure may be occupied as a: Septic Alteration Residential By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Compliance DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building& t'de ES,s rcement Planning Board or Zoning Board of Appeals. 1 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Fif.r441 Community Development-Building&Codes (518)761-8256 BUILDING PERMIT Permit Number: P20110495 Application Number: a20110495 Tax Map No: 523400-226-019-0002-017-000-0000 Permission is hereby granted to: FRANCIS &MARJORIE DILLON TRUST JR For property located at 2 SUNSET Ln in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: FRANCIS &MARJORIE DILLON TI 2 SUNSET Ln Septic Alteration Residential QUEENSBURY,NY 12804-0000 Total value Contractor or Builder's Name/Address Electrical Inspection Agency Plans&Specifications 2011-495 septic alteration residential $40.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,October 04,2012 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the T o Queensbury; !Tuesday, October 04,2011 SIGNED BYz / r t.Y} _ for the Town of Queensbury. Director of Building&Co e Enforcement , Revised 4/14/2010 OFe SE ONLY • .—rtes 0- � TAX tv1A NO. PERMIT NO. � f ERMl7 FEE � - • APPROVALS: ZONING TOWN CLERK APPLICATION FOR SEPTIC DISPOSAL SYSTEM PERMIT: A PERMIT MUST BE OBTAINED BEFORE WORK BEGINS. APPLICATION IS SUBJECT TO REVIEW BEFORE ISSUANCE OF A VALID PERMIT. OWNER: (k t ( CI L 0i ��I crt, INSTALLER: [ CI, / ei T 2 i h rc5'Y ADDRESS: )- ,Ai Se P ( Az C ADDRESS: a (A. t.._! r (a d."tedw 1 Y (------,)6,,, PHONE NOS. 5 c f)— / ' 7 ? -2 , yl PHONE NOS. , y .2Y J LOCATION OF INSTALLATION: -11: 5 t %t- SC /f [ UtiL «< RESIDENCE INFORMATION: NO.OF COMPUTATION YEAR BUILT BEDR,pO,MS X (Gallons per bedroom) TOTAL DAILY FLOW GARBAGE GRINIa R 1980 or older lam[ X 150 = INSTALLED? �N 1981-1991 a" X 130 = SPA OR HOT ft_ 1992-present ' X 110 = ' V INSTALLED PARCEL INFORMATION: ✓ TOPOGRAPHY: FLAT ROX STEEP SLOPE %SLOP y� ✓ SOIL NATURE: SAND LOAM ec CLAY OTHER/ 1 ✓ GROUNDWATER: AT WHAT DEPTH? 5 ) ✓ BEDROCK/IMPERVIOUS MATERIAL AT WHAT DEPTH? ✓ DOMESTIC WATER SUPLY: MUNICIPAL WE , (If well:water supply from any septic syste absorption is: ft) ✓ PERCOLATION TEST: RATE IS 0 PER MIINUTE PER INCH[mpg (Test to be completed by a licensed professional engineer or architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION: All individual sewage disposal systems must be designed by a licensed professional engineer or architect(unless installed in a Planning Board approved subdivision). TANK SIZE: I(9r�0 GALLON(MIN.SI7 IS 1,000 GAL.)Add 250 gallons to the size of the septic tank for each garbage grinder,spa or whirlpool tub. SYSTEM TYPE: -...../ ) o ABSORPTION FIELD(WITH NO.2 STONE) Total length).O0 ft. Each trench cam. X S U o SEEPAGE PIT(S)(WITH NO.3 STONE) How many? X11/4– Size? i(/A o ALTERNATIVE SYSTEM Bed or other type? o HOLDING TANK SYSTEM Total required capacity? Tank size? Number of tanks? NOTE: ALARM SYSTEM AND ASSOCIATED ELECTRICAL WORK MUST BE INSPECTED BY A TOWN APPROVED ELECTRICAL INSPECTION AGENCY. PLEASE REVIEW LIST PROVIDED. For your protection,please note that pursuant to Section 136-29 of the Code of the Town of Queensbury,any permit or approval granted which is based upon or is granted in reliance upon any material misrepresentation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void. I have read the regulations with respect to this application and agree to abide by these and all requirements of the Town of Queensbury QUESTIONS? CALL 761-8256 OR EMAIL Sanitary w Disposal Ordinance. // codesftueensburv.net �\ ! / 0(3 6 o f/ VISIT OUR WEBSITE FOR MORE INFORMATION 'bee Date www.queensburvnet Signature of Person Response Town of Queensbury* Community Development Office*742 Bay Road, Queensbury NY 12804 Septic Inspection Report Office No. (518) 761-8256 Date Inspection abo - • •: Queensbury Building &Code Enforcement Arrive: .7: 27o= i , ►-part: 2.2...3C_arr imp 742 Bay Rd., Queensbury, NY 12804 Inspector's Initia NAME: t l_L • RM1T NO.: 1 1 —4 diS LOCATION: 4 E INSPECT ON: 14—16-- 3 RECHECK: Comments and/or diagram Soil Type: Sand/ Loam/Clay Type of Water: Municipal/Well Water Waterline separation distance ft. Well separation distance ft. Other wells: ft. Well Casing Length 50' +/ - Y N N/A [150'to well required if NO] Absorption Field: Total length ft. Length of each trench ft. Depth of trenches ft. Size of Stone Seepage Pits: Number Size: x Stone Size: Piping Size Type Building to tank Tank to Distribution Box Distribution Box to Field/ Pit Opening Sealed: Y_N End Cap Y_N Inlet/Outlet Pipes&Baffles _,.Y_�_..N Manholes 12"or less below grade _Y N [provide extension collar if Yes] Y T N Location/ Separations Foundation to tank ft. Foundation to absorption ft. r Separation of Pits ft. AS Lir Conforms as per Plot Plan ' �^N Engineer Report and As-Built . T _ N ETU Maintenance Contract _Y_ N provided Location of System on Property: Front R r Left Side Right Side Middle Front Middle Rear stem U S t s: Approved Partial Approved and needs to be re-inspected, please call the Building &Codes Office Disapproved L:\Pam Whiting\2010\Building Codes Forms\Inspection Forms\Septic Inspection Report_03 29 10.doc ( 2oo) )- c 14,/edhe. ". Septic Inspection Report Office No. (518)761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive: am/pm Depart: am/pm 742 Bay Rd., QueensburyNY 12804 Inspector's Initials: 1 17� Cit • NAME: 1)11m 1, PERMIT NO.: — LOCATION: 2.‘ `ti&gel Li, , INSPECT ON: - RECHECK: Comments and/or diagram Soil Type: Sand/(l / Type of Water: Municipal/Well Water Waterline separation distance ft. Well separation distance ft. Other wells: ft. Well Casing Length 50' +/- Y N N/A [150'to well required if NO] Absorption Field: Total length elL�-D ft. Length of each trench Ltd ft. Depth of trenches ft. Size of Stone : '-Z Seepage Pits: Number Size: x Stone Size: Piping Size Type Lo�� k Building to tank Tank to Distribution Box ickk Se-kk- T---C) Distribution Box to Field/ Pit `` Se,bk 20 —1)4312- -- Opening - )4Opening Sealed: ,_N End Ca• W N Inlet/Outlet Pipes&Baffles Y N Manholes 12"or less below grade _Y_N �� ��?� �°� Y [provide extension collar if Yes] Y N Location/Separations Foundation to tank ft. Foundation to absorption _ '7 ft. Separation of Pits _ ,T Pr-All Conforms as per Plot Plan C `___ D t" 14 •— EngineepAegfert and As-Built Y N ETU Maintenance Contract �Y N provided Location of System on Property: Front Rear Left Side Right Side Middle Front Middle Rear em - .t r: Approved ,+ Partial Approved and needs to be re-inspected, please call the Building&Codes Office Disapproved L:\Pam Whiting\2010\Building Codes Forms\Inspectlon Fornis\SepUc Inspection Report_03 29 10.doc RUCINSKI HALL ARCHITECTURE ��`'� Ronald Richard Rucinski ,01 Ethan Peter Hall �,���G 627 Maple Avenue �%)C, Saratoga Springs NY 12866 P Voice 518 580 1905 Fax 518 584 5012 Email ephall@nycap.rr.com Septic Install for Dillon Residence 13 Apr 2013 John O'Brien —Town of Queensbury Building Department APR 1 r� 2013 742 Bay Road Queensbury NY 12804 Re: Septic Installation for Dillon Residence—2 Sunset Lane John, At the above referenced project location I observed the installation of the sewage disposal system including the septic tank, distribution box and tile field laterals prior to back fill. All items appear to be installed in accordance with the construction documents and are acceptable to this office. If there are any additional questions please call to discuss. Regards, Ap 0 / �% • • an Peter Hall Architectit- f .. r 7 0 �3tn• �E YF+" G Y:lvan Bell Septic(IBS)\Dillion Septic"Letter 12 Apr 2013.doc I Y / \ .. EXISTING - i 1,000 GAL \. EXISTING TILE SEPTIC TANK \ FIELD (2 LATERALS) TO BE REMOVED \ [ �TP-1 \ PT -1 EXISTING D -BC \ TO BE REMOVE — WATER VALVE �c 0 O! ' O � J co EX1S11NG \ (� CViCTIAI!' EXISTING PLOT PLAN NO SCALE 0 25 50 75 100 GRAPHIC SCALE TEST PIT INFORMATION TEST PIT INFORMATION TAKEN 1 JUNE 2011 BY ETHAN P. HALL - RUCINSKI HALL ARCHITECTURE WITNESS BY IVAN BELL - IBS SEPTIC TP -1 0-6" TOPSOIL 6-55" DARK BROWN LOAMY SOIL, SOME GRAVEL MOIST ® 55" NO MOTTLING AND NO ROOT SYSTEM RESIDENCE IS SEASONAL AND IS CONNECTED TO THE ASSEMBLY POINT LAKE WATER SUPPLY SYSTEMA PERCOLATION TEST INFORMATION PERCOLATION TEST INFORMATION TAKEN 1 JUNE 2011 BY ETHAN P. HALL - RUCINSKI HALL ARCHITECTURE PT -1 o 1 PERFORMED AT 20" / LOCATED IN THE WEST SIDE OF THE PROPERTY 0 / TEST 18 min. 30 sec Y / \ .. EXISTING - i 1,000 GAL \. EXISTING TILE SEPTIC TANK \ FIELD (2 LATERALS) TO BE REMOVED \ [ �TP-1 \ PT -1 EXISTING D -BC \ TO BE REMOVE — WATER VALVE �c 0 O! ' O � J co EX1S11NG \ (� CViCTIAI!' EXISTING PLOT PLAN NO SCALE 0 25 50 75 100 GRAPHIC SCALE TEST PIT INFORMATION TEST PIT INFORMATION TAKEN 1 JUNE 2011 BY ETHAN P. HALL - RUCINSKI HALL ARCHITECTURE WITNESS BY IVAN BELL - IBS SEPTIC TP -1 0-6" TOPSOIL 6-55" DARK BROWN LOAMY SOIL, SOME GRAVEL MOIST ® 55" NO MOTTLING AND NO ROOT SYSTEM RESIDENCE IS SEASONAL AND IS CONNECTED TO THE ASSEMBLY POINT LAKE WATER SUPPLY SYSTEMA PERCOLATION TEST INFORMATION PERCOLATION TEST INFORMATION TAKEN 1 JUNE 2011 BY ETHAN P. HALL - RUCINSKI HALL ARCHITECTURE PT -1 o PERFORMED AT 20" BELOW GRADE LOCATED IN THE WEST SIDE OF THE PROPERTY 0 1 st TEST 18 min. 30 sec 2nd TEST 18 min. 50 sec 3rd TEST 19 min. 40 sec 4th TEST 20 min. 10 sec. FOR SEWAGE DISPOSAL DESIGN USE 20 MIN. SOIL. \ V / / / / / / / / 0� C 0J 0 CL CD EXISTING \ �\ 1,000 GAL \. SEPTIC TANK EXISTING TO REMAIN r-V1cTIKIr' NEW SEWAGE \ DISPOSAL TILE FIELD \ (4 LATERALS AT 50'-0") \ — WATER VALVE ENSE UPANE S PROPOSED PLOT PLAN NO SCALE 0 25 50 75 GRAPHIC SCALE 100 SEPTIC SYSTEM DESIGN DESIGN FLOW - EXISTING 2 BEDROOM HOUSE WITH STANDARD WATER SAVING FIXTURES AT 110 gpd PER BEDROOM = 220 gpd EXISTING SEPTIC TANK - 1,000 gal TANK TO BE REUSED FOR REBUILT SYSTEM ABSORPTION FIELD - 21 - 30 MIN. PERC. RATE - APPLICATION RATE 0.6 gal/day/sq. ft. - 220 gpd DIVIDED BY 0.6 gal/day/sq. ft. = 367 sq. ft. OF TRENCH REQ'D. AT 2' WIDTH PER LATERAL. USE 4 LATERALS AT 50' = 400 sq. ft. OF APPLICATION AREA. DUE TO THE SOIL CONDITIONS OF THE SITE IT IS PROPOSED TO INSTALL A DUPLEX EFFLUENT PUMP WITH ALTERNATING DISCHARGE TO SEPARATE IDENTICAL TILE FIELDS TO ALLOW FOR EACH FIELD TO HAVE LONGER RECOVERY TIME. "I have seen or observed, or believe I saw evidence of, all objects such as houses, wells, trees, fences, etc., shown on this document. I also represent that I have personallymeas red the di sta ces set #yrth on th di " ff —'V54 TAT UR E DATTEr TOWN OF OL BUILDING & ( Reviewed BY: _. /d INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM WARREN COUNTY TAX MAP INFORMATION AND NOT FROM ACTUAL TOPOGRAPHIC SURVEY No.1 DESCRIPTION I DATE REVISIONS WORK IS TO BE AS SHOWN & NOTED AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, TRADE ASSOCIATION PUBLISHED RECOMMENDATIONS AND GENERALLY ACCEPTED LOCAL CONSTRUCTION INDUSTRY PRACTICES. $—I 4� o �Wy LL Q , 3 D 00 0 O z U=0z W a o w C� �0:2 N Z �.� o a N v 0 2 C Z o ¢J� NU 0 a� o� Q azo 3 J ( gFo 'J x N 00 p � W U F � it 0 Q a ., 4-1 Z o o- O OZ W 7 a a) a p uj U J, O F tY Lil o= ) c o� T� 0o- 'Y �/ / C a In LO 5 D z °' U ZN Z`� In pp ap C r "a a Z tY �a a.a stn Cl- - U a`1 U C a M CIS F- < C s ^ a U 0 P o N a x o a E W W to cn > LL- w WORK IS TO BE AS SHOWN & NOTED AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, TRADE ASSOCIATION PUBLISHED RECOMMENDATIONS AND GENERALLY ACCEPTED LOCAL CONSTRUCTION INDUSTRY PRACTICES. $—I 4� 0000 00 O C� N Z �.� o C Q CY 0 88 cy � Q a ., 4-1 � M—I CIS ;~ � � O W N N CAD FILE NAME ACAD\IBS\OM TT\SEPTI C— PLAN SCALE AS NOTED DRAWN BY DRAWING TITLE SEWAGE DISPOSAL PLANS & CALCULATIONS DRAWING No. C-1 MIN. SLOPE 1/4" PER FOOT SEPTIC TANK BY FORT MILLER OR EQUAL PROVIDE 3" SAND OR --~ PEA GRAVEL UNDER TANK SEPTIC TANK DETAIL N.T.S. PER APPENDIX 75-A TANKS SHALL HAVE INLET AND OUTLET BAFFLES, SANITARY TEES OR OTHER DEVICES TO PREVENT THE PASSAGE OF FLOATING SOLIDS AND TO MINIMIZE DISTURBANCE OF SETTLED SLUDGE AND FLOATING SCUM BY SEWAGE ENTERING AND LEAVING THE TANK. OUTLET DESIGNS SUCH AS GAS DEFLECTION BAFFLES ARE STRONGLY RECOMMENDED IN ALL TANKS. INLET AND OUTLET BAFFLES SHALL EXTEND A MINIMUM OF 12 INCHES AND 14 INCHES RESPECTIVELY, BELOW THE LIQUID LEVEL IN TANKS WITH A LIQUID DEPTH OF LESS THAN 40 INCHES, AND 16 AND 18 INCHES RESPECTIVELY, IN TANKS WITH LIQUID DEPTH OF 40 INCHES OR GREATER. THE DISTANCE BETWEEN TiE OUTLET BAFFLE AND THE OUTLET SHALL NOT EXCEED SIX INCHES. BAFFLES SHALL BE CONSTRUCTED OF A DURABLE MATERIAL NOT SUBJECT TO CORROSION, DECAY OR CRACKING. 2" MAX. APPROXIMATE- LINE PPROXIMATE-LINE OF EXIST. GRADE It 1. ALL UNITS SHALL COMPLY WITH THE REQUIREMENTS OF THE NEW YORK STATE DEPARTMENT OF HEALTH AND SHALL BE PRECAST CONCRETE AS MANUFACTURED BY FORT MILLER OR EQUIVALENT. 2. ALL STRUCTURES TO BE PLACED ON FIRM, COMPACT SAND OR GRAVEL FOUNDATION. WHEREVER EXISTING FOUNDATION CONDITIONS ARE UNSUITABLE, CRUSHED STONE SHALL BE PLACED AS NECESSARY TO ACHIEVE A STABLE FOUNDATION. 3. SEPTIC TANKS INSTALLED IN TRAFFIC AREAS SHALL BE EXTRA HEAVY CONSTRUCTION DESIGNED FOR H-20 WHEEL LOADING. 2'-0" 4'-0" 2'-0" 15% MAXIMUM CROSS SLOPE ON SLOPED SITES OVERFILL TO ALLOW FOR SETTLEMENT N z_ 6'-0' _j N MAXIMUM SEASONAL HIGH GROUNDWATER ELEVATION STANDARD ABSORPTION TRENCH SECTION N.T.S. APPROXIMATE EXISTING GRADE 18" MAX. ... . „WEE�, �- I—IIS►- � 1111= 2" MAX. �`' ll SLOPE nn( )�c)9 - 6 oGb0 00O V4" PERFORATED PVC LATERAL, SLOPE 1/16"-1/32" PER FT. NOTES: 1. END OF ALL DISTRIBUTOR PIPES MUST BE PLUGGED UNLESS INTERCONNECTED. 2. ALL LATERALS TO BE OF EQUAL LENGTH. UNTREATED BUILDING PAPER, OR GEOTEXTILE. 4" PERFORATED LATERAL LABELED AS FULLY MEETING ASTM STANDARDS FOR USE IN SEPTIC SYSTEMS. 3/4" TO 1 1/2" WASHED CRUSHED STONE (MAXIMUM DEPTH OF CRUSHED STONE SHALL NOT EXCEED 30") (THERE SHALL BE NO SUBSTITUTION OF TRENCH WITH LEACHING CHAMBERS UNLESS APPROVED BY NYS DOH) STANDARD ABSORPTION TRENCH PROFILE N.T.S. 6" MIN. SEWAGE DISPOSAL SYSTEM NOTES THERE SHALL BE NO CHANGE ON THESE PLANS IN ADVANCE OF OR DURING CONSTRUCTION, WITHOUT PRIOR APPROVAL OF THE DESIGN PROFESSIONAL OR THE TOWN BUILDING INSPECTOR. DESIGN, CONSTRUCTION, MATERIAL STANDARDS AND INSPECTION REQUIREMENTS SHALL COMPLY WITH THE LATEST EDITION(S) OF THE NEW YORK STATE DEPARTMENT OF HEALTH WASTEWATER TREATMENT STANDARDS — INDIVIDUAL HOUSEHOLD SYSTEMS APPENDIX 75—A. SEPTIC TANK TO BE SET ON A LAYER OF COMPACTED PEA STONE OR WASHED GRAVEL. SEPTIC TANK TO HAVE SCH 40 PVC "T" AT INLET AND OUTLET. — INLET 12" BELOW FLOW LINE, 6" ABOVE FLOW LINE — OUTLET 14" BELOW FLOW LINE, 6" ABOVE FLOW LINE 3" AIR SPACE ABOVE "T" TO TOP OF TANK NO ROOF, FOOTING, FLOOR, COOLING WATER, BACKWASH DRAINS, ETC., SHALL BE CONNECTED TO THE SEWAGE SYSTEM. NO SUMP PUMP, CONDENSATE, WATER SOFTENER, SPAS, OR HOT TUBS SHALL BE DRAINED INTO THE SYSTEM. THERE SHALL ossa NO CONSTRUCTION OF SEPTIC SYSTEMS WITHIN 100' OF A CLASSIFIED BODY OF WATER. HOUSE TO SEPTIC TANK: 4"0 PVC SCHEDULE 40 WITH TIGHT JOINTS, MINIMUM SLOPE 1/4- PER FOOT. SEPTIC TANK TO DISTRIBUTION BOX: 4"0 PVC SDR 26 WITH TIGHT JOINTS, MINIMUM PITCH 1/8" PER FOOT. SANITARY DISPOSAL FIELD: 4*0 PERFORATED PLASTIC PIPE MAXIMUM SLOPE 1/16- PER FOOT, CAP ALL ENDS. THE BEST DESIGNED AND INSTALLED SEPTIC SYSTEM WILL EVENTUALLY FAIL TO FUNCTION PROPERLY WITHOUT PERIODIC MAINTENANCE. INADEQUATE SEPTIC TANK MAINTENANCE CAN RESULT IN CLOGGING OF THE TANK AND SEWAGE BACKUP INTO THE HOME AND/OR SEWAGE OVERFLOW ONTO THE GROUND SURFACE. FAILURE TO PERIODICALLY CLEAN A SEPTIC TANK COMMONLY RESULTS IN CLOGGING OF SOIL SURROUNDING THE ABSORPTION FILED BY OVERFLOWING SOLIDS NOT REMOVED BY THE SEPTIC TANK. THIS DESIGN IS INTENDED TO PROVIDE SUBSURFACE SEWAGE DISPOSAL ONLY FOR THE LOT IT IS SHOWN ON. NO ADDITIONS INVOLVING LIVING OR SLEEPING AREAS MAY BE ADDED TO THIS BUILDING WITHOUT THE APPROVAL OF THE BOARD OF HEALTH, TOWN OF QUEENSBURY AND REDESIGN OF THE SUBSURFACE DISPOSAL SYSTEM. THE SEAL AND SIGNATURE ON THIS PLAN SPECIFICALLY EXCLUDES CERTIFICATION FOR FUTURE EXPANSION OR REPLACEMENT. DWELLING IS TO HAVE WATER SAVING FIXTURES, INCLUDING BUT NO LIMITED TO: LESS THAN 2 GPM SHOWER HEADS, LOW WATER USE TOILETS, SINK FLOW RESTRICTORS. OBSERVE WATER CONSERVATION PRACTICES. SEPTIC TANK SHALL BE INSPECTED ANNUALLY TO DETERMINE SCUM AND SLUDGE ACCUMULATION BY THE HOMEOWNER OR A QUALIFIED SEWAGE HAULER. THE AMOUNT OF BUILD—UP NOTED AT EACH INSPECTION SHOULD BE RECORDED AND MAINTAINED BY THE HOMEOWNER. THE TANK SHALL BE PUMPED WHENEVER THE BOTTOM OF THE SCUM LAYER IS WITHIN 3" OF THE BOTTOM OF THE OUTLET BAFFLE OR SANITARY "T". THE PUMP—OUT CLEARANCES ALSO APPLY TO ANY CHAMBER IN MULTI—COMPARTMENT TANKS OR TO TANKS IN SERIES. MOST TANKS SHOULD BE PUMPED OUT EVERY TWO TO THREE YEARS. WHEN SEPTIC TANK IS PUMPED, THE SEPTIC TANK, BAFFLES/TEES, HOUSE SEWER CONNECTION AND OUTLET SHALL BE INSPECTED. BAFFLES/TEES THAT HAVE DETERIORATED AND NO LONGER PERFORM AS DESIGNED SHALL BE REPLACED. CRACKED OR BROKEN LINES MUST BE REPAIRED OR REPLACED. ANY COMPANY EMPLOYED TO CLEAN AND SERVICE THE SEPTIC TANK MUST BE A DEC PERMITTED SEPTAGE HAULER. SEPTIC TANKS SHOULD NOT BE WASHED OR DISINFECTED AFTER BEING PUMPED OUT. SEPTIC TANK ADDITIVES SHALL NOT BE USED IN THE SEPTIC SYSTEM. ADDITIVES ARE UNNECESSARY FOR THE PROPER OPERATION OF DISPOSAL SYSTEMS AND MAY CAUSE THE SLUDGE AND SCUM IN THE SEPTIC TANK TO BE DISCHARGED INTO THE ABSORPTION FIELD, RESULTING IN PREMATURE FAILURE. DO NOT DISPOSE OF EXCESS GREASE OR FAT INTO THE SEPTIC SYSTEM. DO NOT POUR OR DUMP ABNORMAL AMOUNTS OF CLEANING CHEMICALS OR CLEANERS INTO SINKS OR TOILETS. WHENEVER SEPTIC TANKS ARE TO BE ABANDONED IN THE EVENT OF PUBLIC SEWERS ARE INSTALLED TO HANDLE HOUSEHOLD WASTES, THE TANKS SHOULD BE REMOVED OR PUMPED OUT AND FILLED WITH SOIL TO PREVENT FUTURE CAVE—IN. NO VEHICULAR TRAFFIC OR PARKING SHALL BE ALLOWED ON ANY PORTION OF THE ABSORPTION FIELD OR THE SEWAGE DISPOSAL SYSTEM. FINAL GRADE SHOULD BE GRADED SO AS TO DIVERT ANY RUN—OFF AWAY FROM THE ABSORPTION FIELD. GRADING NOTES BEFORE ANY CLEARING OR GRUBBING OF THE SITE IS INITIATED, AND DURING EARTHWORK PHASES, SEDIMENT TRAPS SHALL BE CONSTRUCTED IN ALL STORM SWALES AND DITCHES. AFTER EVERY STORM EACH SEDIMENT TRAP SHALL BE INSPECTED BY THE CONTRACTOR FOR FAILURES OR CLOGGING. ANY FAILURE OR CLOGGING SHALL BE IMMEDIATELY CORRECTED. ALL BARE—EARTH AREAS SHALL BE SEEDED AND MULCHED AS SOON AS IS REASON— ABLY POSSIBLE TO PREVENT EROSION, AND EVERY BARE—EARTH AREA SHALL BE SEEDED AND MULCHED BY OCTOBER 1ST. TEMPORARY RAPIDLY GROWING COVER CROPS, SUCH AS RYE GRASS AND MILLET MAY BE USED FOR TEMPORARY SURFACE SMALL BENCHES AND TEMPORARY INTERCEPTOR DITCHES, INCORPORATING SEDIMENT TRAPS, SHALL BE CONSTRUCTED WHERE LONG SLOPES ARE STRIPPED OF COVER GRASSES, OR WHERE FILL AREAS ARE EXTENSIVE. NEW SWALES AND UNLINED DITCHES SHALL INCORPORATE MATTING OR NETTING OVER SEED AND MULCH WHEN THE INVERT SLOPE EXCEEDS 2% ALL SWALES AND UNLINED DITCHES SHALL BE SEEDED WITH REED—CANARY GRASS FOR FOUR (4) FEET EITHER SIDE OF THE SWALE OR DITCH CENTERLINE, AT A RATE OF 25 POUNDS PER ACRE. AFTER JUNE, ALL SEEDING SHALL ALSO BE IMMEDIATELY MULCHED. '• • '• • • •' • ► •i• :1 FINAL GRADING SHALL BE DONE TO ACCOMPLISH POSITIVE DRAINAGE AWAY FROM BUILDING AT 6" IN 10' MINIMUM SLOPE. No.1 DESCRIPTION I REVISIONS DATE RECOMMEND ALL ACCESS o CONCRETE OR STONE �W LL & CLEANOUT OPENINGS @v MARKER ABOVE ALL APPROXIMATE BE RAISED TO 6' BELOW BURIED COVERS FINISH GRADE FINISH GRADE. �INISHED RECOMMENDED. Li Li co INLET BAFFLE 12" MIN. OVER OVER W ALL STRUCTURES F w Z Q z #1 DISTRIBUTION BOX 0nOw LLI BYFORT MILLER OR —3" 4� EQUAL LICIUID LEVEL TO D -BOX FROM SEPTIC -- 2" PVC ''� aJV) TANK TANK 0 0 0 a MIN. SLOPE �oo 3 1/8" PER FOOT iv ° °° ALL OUTLET INVERTS INLET & OUTLET J ;� 0°°° PEA --f TO BESET AT EXACTLY THE SAME jE BAFFLES GRAVEL ELEVATION. n- Z x V % (USE OF SPEED LEVELERS Il Z REQUIRED) C3 O O Y C �, O, T M �p � �= j.` Q 0000006 to Lo o 0z>- S z DISTRIBUTION BOX MINIMUM 2x WIDTH N.T.S. T) F) °ami MAXIMUM 4x WIDTH (� vo SEPTIC TANK DETAIL N.T.S. PER APPENDIX 75-A TANKS SHALL HAVE INLET AND OUTLET BAFFLES, SANITARY TEES OR OTHER DEVICES TO PREVENT THE PASSAGE OF FLOATING SOLIDS AND TO MINIMIZE DISTURBANCE OF SETTLED SLUDGE AND FLOATING SCUM BY SEWAGE ENTERING AND LEAVING THE TANK. OUTLET DESIGNS SUCH AS GAS DEFLECTION BAFFLES ARE STRONGLY RECOMMENDED IN ALL TANKS. INLET AND OUTLET BAFFLES SHALL EXTEND A MINIMUM OF 12 INCHES AND 14 INCHES RESPECTIVELY, BELOW THE LIQUID LEVEL IN TANKS WITH A LIQUID DEPTH OF LESS THAN 40 INCHES, AND 16 AND 18 INCHES RESPECTIVELY, IN TANKS WITH LIQUID DEPTH OF 40 INCHES OR GREATER. THE DISTANCE BETWEEN TiE OUTLET BAFFLE AND THE OUTLET SHALL NOT EXCEED SIX INCHES. BAFFLES SHALL BE CONSTRUCTED OF A DURABLE MATERIAL NOT SUBJECT TO CORROSION, DECAY OR CRACKING. 2" MAX. APPROXIMATE- LINE PPROXIMATE-LINE OF EXIST. GRADE It 1. ALL UNITS SHALL COMPLY WITH THE REQUIREMENTS OF THE NEW YORK STATE DEPARTMENT OF HEALTH AND SHALL BE PRECAST CONCRETE AS MANUFACTURED BY FORT MILLER OR EQUIVALENT. 2. ALL STRUCTURES TO BE PLACED ON FIRM, COMPACT SAND OR GRAVEL FOUNDATION. WHEREVER EXISTING FOUNDATION CONDITIONS ARE UNSUITABLE, CRUSHED STONE SHALL BE PLACED AS NECESSARY TO ACHIEVE A STABLE FOUNDATION. 3. SEPTIC TANKS INSTALLED IN TRAFFIC AREAS SHALL BE EXTRA HEAVY CONSTRUCTION DESIGNED FOR H-20 WHEEL LOADING. 2'-0" 4'-0" 2'-0" 15% MAXIMUM CROSS SLOPE ON SLOPED SITES OVERFILL TO ALLOW FOR SETTLEMENT N z_ 6'-0' _j N MAXIMUM SEASONAL HIGH GROUNDWATER ELEVATION STANDARD ABSORPTION TRENCH SECTION N.T.S. APPROXIMATE EXISTING GRADE 18" MAX. ... . „WEE�, �- I—IIS►- � 1111= 2" MAX. �`' ll SLOPE nn( )�c)9 - 6 oGb0 00O V4" PERFORATED PVC LATERAL, SLOPE 1/16"-1/32" PER FT. NOTES: 1. END OF ALL DISTRIBUTOR PIPES MUST BE PLUGGED UNLESS INTERCONNECTED. 2. ALL LATERALS TO BE OF EQUAL LENGTH. UNTREATED BUILDING PAPER, OR GEOTEXTILE. 4" PERFORATED LATERAL LABELED AS FULLY MEETING ASTM STANDARDS FOR USE IN SEPTIC SYSTEMS. 3/4" TO 1 1/2" WASHED CRUSHED STONE (MAXIMUM DEPTH OF CRUSHED STONE SHALL NOT EXCEED 30") (THERE SHALL BE NO SUBSTITUTION OF TRENCH WITH LEACHING CHAMBERS UNLESS APPROVED BY NYS DOH) STANDARD ABSORPTION TRENCH PROFILE N.T.S. 6" MIN. SEWAGE DISPOSAL SYSTEM NOTES THERE SHALL BE NO CHANGE ON THESE PLANS IN ADVANCE OF OR DURING CONSTRUCTION, WITHOUT PRIOR APPROVAL OF THE DESIGN PROFESSIONAL OR THE TOWN BUILDING INSPECTOR. DESIGN, CONSTRUCTION, MATERIAL STANDARDS AND INSPECTION REQUIREMENTS SHALL COMPLY WITH THE LATEST EDITION(S) OF THE NEW YORK STATE DEPARTMENT OF HEALTH WASTEWATER TREATMENT STANDARDS — INDIVIDUAL HOUSEHOLD SYSTEMS APPENDIX 75—A. SEPTIC TANK TO BE SET ON A LAYER OF COMPACTED PEA STONE OR WASHED GRAVEL. SEPTIC TANK TO HAVE SCH 40 PVC "T" AT INLET AND OUTLET. — INLET 12" BELOW FLOW LINE, 6" ABOVE FLOW LINE — OUTLET 14" BELOW FLOW LINE, 6" ABOVE FLOW LINE 3" AIR SPACE ABOVE "T" TO TOP OF TANK NO ROOF, FOOTING, FLOOR, COOLING WATER, BACKWASH DRAINS, ETC., SHALL BE CONNECTED TO THE SEWAGE SYSTEM. NO SUMP PUMP, CONDENSATE, WATER SOFTENER, SPAS, OR HOT TUBS SHALL BE DRAINED INTO THE SYSTEM. THERE SHALL ossa NO CONSTRUCTION OF SEPTIC SYSTEMS WITHIN 100' OF A CLASSIFIED BODY OF WATER. HOUSE TO SEPTIC TANK: 4"0 PVC SCHEDULE 40 WITH TIGHT JOINTS, MINIMUM SLOPE 1/4- PER FOOT. SEPTIC TANK TO DISTRIBUTION BOX: 4"0 PVC SDR 26 WITH TIGHT JOINTS, MINIMUM PITCH 1/8" PER FOOT. SANITARY DISPOSAL FIELD: 4*0 PERFORATED PLASTIC PIPE MAXIMUM SLOPE 1/16- PER FOOT, CAP ALL ENDS. THE BEST DESIGNED AND INSTALLED SEPTIC SYSTEM WILL EVENTUALLY FAIL TO FUNCTION PROPERLY WITHOUT PERIODIC MAINTENANCE. INADEQUATE SEPTIC TANK MAINTENANCE CAN RESULT IN CLOGGING OF THE TANK AND SEWAGE BACKUP INTO THE HOME AND/OR SEWAGE OVERFLOW ONTO THE GROUND SURFACE. FAILURE TO PERIODICALLY CLEAN A SEPTIC TANK COMMONLY RESULTS IN CLOGGING OF SOIL SURROUNDING THE ABSORPTION FILED BY OVERFLOWING SOLIDS NOT REMOVED BY THE SEPTIC TANK. THIS DESIGN IS INTENDED TO PROVIDE SUBSURFACE SEWAGE DISPOSAL ONLY FOR THE LOT IT IS SHOWN ON. NO ADDITIONS INVOLVING LIVING OR SLEEPING AREAS MAY BE ADDED TO THIS BUILDING WITHOUT THE APPROVAL OF THE BOARD OF HEALTH, TOWN OF QUEENSBURY AND REDESIGN OF THE SUBSURFACE DISPOSAL SYSTEM. THE SEAL AND SIGNATURE ON THIS PLAN SPECIFICALLY EXCLUDES CERTIFICATION FOR FUTURE EXPANSION OR REPLACEMENT. DWELLING IS TO HAVE WATER SAVING FIXTURES, INCLUDING BUT NO LIMITED TO: LESS THAN 2 GPM SHOWER HEADS, LOW WATER USE TOILETS, SINK FLOW RESTRICTORS. OBSERVE WATER CONSERVATION PRACTICES. SEPTIC TANK SHALL BE INSPECTED ANNUALLY TO DETERMINE SCUM AND SLUDGE ACCUMULATION BY THE HOMEOWNER OR A QUALIFIED SEWAGE HAULER. THE AMOUNT OF BUILD—UP NOTED AT EACH INSPECTION SHOULD BE RECORDED AND MAINTAINED BY THE HOMEOWNER. THE TANK SHALL BE PUMPED WHENEVER THE BOTTOM OF THE SCUM LAYER IS WITHIN 3" OF THE BOTTOM OF THE OUTLET BAFFLE OR SANITARY "T". THE PUMP—OUT CLEARANCES ALSO APPLY TO ANY CHAMBER IN MULTI—COMPARTMENT TANKS OR TO TANKS IN SERIES. MOST TANKS SHOULD BE PUMPED OUT EVERY TWO TO THREE YEARS. WHEN SEPTIC TANK IS PUMPED, THE SEPTIC TANK, BAFFLES/TEES, HOUSE SEWER CONNECTION AND OUTLET SHALL BE INSPECTED. BAFFLES/TEES THAT HAVE DETERIORATED AND NO LONGER PERFORM AS DESIGNED SHALL BE REPLACED. CRACKED OR BROKEN LINES MUST BE REPAIRED OR REPLACED. ANY COMPANY EMPLOYED TO CLEAN AND SERVICE THE SEPTIC TANK MUST BE A DEC PERMITTED SEPTAGE HAULER. SEPTIC TANKS SHOULD NOT BE WASHED OR DISINFECTED AFTER BEING PUMPED OUT. SEPTIC TANK ADDITIVES SHALL NOT BE USED IN THE SEPTIC SYSTEM. ADDITIVES ARE UNNECESSARY FOR THE PROPER OPERATION OF DISPOSAL SYSTEMS AND MAY CAUSE THE SLUDGE AND SCUM IN THE SEPTIC TANK TO BE DISCHARGED INTO THE ABSORPTION FIELD, RESULTING IN PREMATURE FAILURE. DO NOT DISPOSE OF EXCESS GREASE OR FAT INTO THE SEPTIC SYSTEM. DO NOT POUR OR DUMP ABNORMAL AMOUNTS OF CLEANING CHEMICALS OR CLEANERS INTO SINKS OR TOILETS. WHENEVER SEPTIC TANKS ARE TO BE ABANDONED IN THE EVENT OF PUBLIC SEWERS ARE INSTALLED TO HANDLE HOUSEHOLD WASTES, THE TANKS SHOULD BE REMOVED OR PUMPED OUT AND FILLED WITH SOIL TO PREVENT FUTURE CAVE—IN. NO VEHICULAR TRAFFIC OR PARKING SHALL BE ALLOWED ON ANY PORTION OF THE ABSORPTION FIELD OR THE SEWAGE DISPOSAL SYSTEM. FINAL GRADE SHOULD BE GRADED SO AS TO DIVERT ANY RUN—OFF AWAY FROM THE ABSORPTION FIELD. GRADING NOTES BEFORE ANY CLEARING OR GRUBBING OF THE SITE IS INITIATED, AND DURING EARTHWORK PHASES, SEDIMENT TRAPS SHALL BE CONSTRUCTED IN ALL STORM SWALES AND DITCHES. AFTER EVERY STORM EACH SEDIMENT TRAP SHALL BE INSPECTED BY THE CONTRACTOR FOR FAILURES OR CLOGGING. ANY FAILURE OR CLOGGING SHALL BE IMMEDIATELY CORRECTED. ALL BARE—EARTH AREAS SHALL BE SEEDED AND MULCHED AS SOON AS IS REASON— ABLY POSSIBLE TO PREVENT EROSION, AND EVERY BARE—EARTH AREA SHALL BE SEEDED AND MULCHED BY OCTOBER 1ST. TEMPORARY RAPIDLY GROWING COVER CROPS, SUCH AS RYE GRASS AND MILLET MAY BE USED FOR TEMPORARY SURFACE SMALL BENCHES AND TEMPORARY INTERCEPTOR DITCHES, INCORPORATING SEDIMENT TRAPS, SHALL BE CONSTRUCTED WHERE LONG SLOPES ARE STRIPPED OF COVER GRASSES, OR WHERE FILL AREAS ARE EXTENSIVE. NEW SWALES AND UNLINED DITCHES SHALL INCORPORATE MATTING OR NETTING OVER SEED AND MULCH WHEN THE INVERT SLOPE EXCEEDS 2% ALL SWALES AND UNLINED DITCHES SHALL BE SEEDED WITH REED—CANARY GRASS FOR FOUR (4) FEET EITHER SIDE OF THE SWALE OR DITCH CENTERLINE, AT A RATE OF 25 POUNDS PER ACRE. AFTER JUNE, ALL SEEDING SHALL ALSO BE IMMEDIATELY MULCHED. '• • '• • • •' • ► •i• :1 FINAL GRADING SHALL BE DONE TO ACCOMPLISH POSITIVE DRAINAGE AWAY FROM BUILDING AT 6" IN 10' MINIMUM SLOPE. No.1 DESCRIPTION I REVISIONS DATE WORK IS TO BE AS SHOWN & NOTED AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, TRADE ASSOCIATION PUBLISHED RECOMMENDATIONS AND GENERALLY ACCEPTED LOCAL CONSTRUCTION INDUSTRY PRACTICES. ;__q�- o �W LL 1 @v Q 3 N W UW I— z zI- Q U ==Z U - W F w Z Q z 0nOw LLI a Z v 4� Z z U U aJV) �L! a Q �oo 3 J _jFo J ;� 00 N F 0 W W � w 0 .0 p �L ma o V % LON � oa O w p z� Z as Ln F Y C �, O, T w �= j.` Q 0000006 to Lo o 0z>- S z cn ao 00 s a Z Q, T) F) °ami NlH (� vo a< � W �Xv o 10U) W_ W_ E""j >�w WORK IS TO BE AS SHOWN & NOTED AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, TRADE ASSOCIATION PUBLISHED RECOMMENDATIONS AND GENERALLY ACCEPTED LOCAL CONSTRUCTION INDUSTRY PRACTICES. ;__q�- 0000 1 0000 4� Z Ln Ln •� ^ �L! aQ .0 O O --- N � W CC3 E""j a� u (I) � � O N N CAD FILE NAME ACAD\IBS\OVI TT\SEP TIC- PLAN SCALE AS NOTED DRAWN BY DRAWING TITLE SEWAGE DISPOSAL DETAILS & NOTES DRAWING No. C-2