Loading...
2010-153 -AO%i TOWN OFQ UEENSBURY Fw! 742 Bay Road,Queensbury,NY 12804-5902 (518) 761-8201 Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF COMPLIANCE Permit Number: P20100153 Date Issued: Tuesday, December 11, 2012 This is to certify that work requested to be done as shown by Permit Number P20100153 has been completed. Tax Map Number: 523400-239-015-0001-012-000-0000 Location: 10 CROOKED TREE Dr Owner: CROOKED TREE POINT LLC Applicant: BARRIE & MARK HANDELMAN TRUSTEES This structure may be occupied as a: Septic Alteration Residential By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Compliance DOES NOT relieve the (''3property owner of the responsibility for compliance with Site Plan, 4 Variance, or other issues and conditions as a result of approvals by the Director of Building&Code nforc� ent Planning Board or Zoning Board of Appeals. COMMONWEALTH ELECTRICAL INSPECTION SERVICE,INC. Main Office 176 Doe Run Road-Manheim,PA 17545 MUNICIPAL CERTIFICATE - ELECTRICAL APPROVAL Permit No....,u ma- Cert. N° 10244 Cut-in Card No. Owner t�� N 1"yD im Location ���L �. 1 t ` .3 tC fgr;l Installation Consisting of...2 5 . ' PP f (11-4/ . P nzv4-=13 Installed By C1/ e: Lic.No. The conditions following governed the issuance of this certificate,and any certificate previously issued is cancelled:- This certificate only covers the electrical equipment and installation conditions as of date. Upon the introduction of additional equipment or alterations,application shall be promptly made for inspection. Inspectors of this Company shall have the privilege of maki in ections at any time, and if its rules are violated,the Company shall have the right to r o this c icate. Date -3--/r INSPECTOR Member N.F.P.A..I.A.E.I. 10 (" Septic Inspection Report Office No. (518) 761-8256 Date Inspectionrauest received: Queensbury Building &Code Enforcement Arrive: �, am/p part: am/pm 742 Bay Rd., Queensbury, NY 12804 Inspectr s In ials: NAME: tka 41 CSC-IAk A-4/ PERMIT NO.: /C. LOCATION: �'j L INSPECT ON: CPI ( 10 RECHECK: Comments and/or diagram Soil Type: Sand/ Loam/ Clay Type of Water: Municipal/ Well Water Waterline separation distance ft. A/W � ! Wells ration distance epa d sta ce ft. Other wells: _ft. Well Casing Length 50' + / - Y N N/A Absorption Field: Total length ft. Length of each trench ft. Depth of trenches ft. Size of Stone Seepage Pits: Number Size: l0 CE r S x Stone Size: Piping Size Type Building to tank Tank to Distribution Box Distribution Box to Field/ Pit Opening Sealed: _Y N End Cap _Y_N Inlet/Outlet Pipes &Baffles _Y N Location/ Separations Foundation to tank ft. Foundation to absorption _ ft. Separation of Pits Conforms as per Plot Plan Y Engineer Report and As-Built Y N 6 1 t Cwe, . /46-A T SPR Location of System on Property: Front Rear Left Side Right Side Middle Front Middle Rear System Use Status: proved Partial Approved and needs to be re-inspected, please call the Building &Codes Office Disapproved Last revised 06/18/07 L:\Building&Codes Forms-OLD\Building&Codes\Inspection Forms\Septic Inspection Report.doc JO Septic Inspection Report Office No. (518) 761-8256 Date Inspecliio equest received: Queensbury Building &Code Enforcement Arrive: /�, g m/p ,Depart: am/pm 742 Bay Rd., Queensbury, NY 12804 Inspe " Initials: f��-�' NAME: i- At/t)D(.6*fN PERMIT NO.: Ze'/1/4D�� LOCATION: N-7-- 61 1-- INSPECT ON: 5` 21 !ID RECHECK: Comments and/or diagram Soil Type: Sand/ Loam/ Clay Type of Water: Municipal/ Well Water Waterline separation distance ft. Well separation distance ft. ,644 - G'YF-/Z--6 L ---C., Other wells: ft. Well Casing Length 50' + / - Y N N/A Absorption Field: Total length Ai /L . Length of each trench ' fr' pj j /1_1-- Depth L1--Depth of trenches ft. Size of Stone Seepage Pits: Number Size: x Stone Size: Piping Siz /it Type Building to tank �1 . ....10K 'f(-) ��COO&R �,F},� �l Tank to Distribution Box r>/ Distribution Box to Field / Pit 'o Opening Sealed: N End Cap —7Y N Inlet/Outlet Pipes &Baffles V_ N Location/ Separations Foundation to tank ft. Foundation to absorption ft. Separation of Pits _ _ ft. Conforms as per Plot Plan —Y N Engineer Report and As-Built Y N Location of System on Property: Front Rear Left Side Right Side Middle Front Middle Rear System Use Status: pproved Partial Approved and needs to be re-inspected, please call the Building &Codes Office Disapproved Last revised 06/18/07 L:\Building&Codes Forms-OLD\Building&Codes\Inspection Forms\Septic Inspection Report.doc Septic Inspection Report Office No. (518) 761-8256 Date Inspectior, uest received: Queensbury Building &Code Enforcement Arrive: i'L amry rt: am/pm 742 Bay Rd., Queensbury, NY 12804 Inspectdl's In • Is: l`�a t.1`J�LA - J.N.tcr NAME: PERMIT NO.: /® / LOCATION: 1-- INSPECT ON: .5 Z 5 1 l t> RECHECK: / Comments and/or diagram Soil Ty., • Loam/ 'ay PL.A.-0-,-,- Type of Wa er: Municipa Well Wa,- --) , Waterline separation distan.- ft. Well separation distance ft. Other wells: ft. Absorption Field: Total length /�/`C < /4 ____ F/4-<-- Length of each trench �, ft• Depth of trenches k ft. Size of Stone C�c_J -A) I y 4 , Seepage Pits: Number Size: x Stone Size: Piping Size Type Building to tank Tank to Distribution Box Distribution Box to Field/ Pit Opening Sealed: Y/ N/ Partial End Cap Inlet/Outlet Pipes&Baffles __--_Y_N Location/ Separations Foundation to tank ft. Foundation to absorption ft. Separation of Pits ft Conforms as per Plot Plan —Y 4/4 -dJ� 4,,,r- 646 . /W614 Engineer Report and As-Built Y // > r Location of System on Property: Front Rear Left Side Right Side Middle Front Middle Rear d 0-1-1'l 4 t•D _ System Use Status: proved Partial Approved and needs to be re-inspected, please call the Building &Codes Office Disapproved Last revised 021006 Last revised 1/6/05 f '100 N AA • 1` Happy Family ' p 91lJ �•4t /� ,r: It ry + f 41 l ? 4k. SITE LOCATION MAP SCALE: 1" = 2,000' REPLACEMENT WASTEWATER SYSTEM BASIS OF DESIGN REGULATORY AUTHORITY.- TOWN OF QUEENSBURY DESIGN STANDARDS: NEW YORK STATE DEPARTMENT OF HEALTH (70NYCRR APPENDIX 75-A), WASTEWATER TREATMENT STANDARDS - INDIVIDUAL HOUSEHOLD SYSTEM. TOWN OF QUEENSBURY ORDINANCE - CHAPTER 136: SEWERS AND SEWAGE DISPOSAL - PART 1, ON-SITE SEWAGE DISPOSAL SYSTEMS PROJECT OESCRIPTIONk THE EXISTING WASTEWATER SYSTEM SERVING THE HANDELMAN RESIDENCE ON RT. 9L /N THE TOWN OF QUEENSBURY /S 40± YEARS IN AGE AND IT IS THE APPLICANT'S INTENT TO REPLACE THE EXISTING SYSTEM WITH ONE THAT /S COMPLIANT WITH CURRENT STANDARDS. THIS PLAN PROPOSES A NEW REPLACEMENT WASTEWATER SYSTEM TO SERVE THE EXISTING HOUSE. THE PROPOSED SYSTEM WILL CONSIST OF A NEW SEPTIC TANK WITH EFFLUENT FILTER, A PUMP PIT WITH A DUPLEX PUMP ASSEMBLY AND AN ABSORPTION FIELD AREA USING ELJEN GSF TECHNOLOGY. SOILS ANALYSIS: DEEP TEST PITS WERE EXCAVATED AND OBSERVED BY DENNIS MacELROY, PE ON APRIL 1, 2070. SOILS INVESTIGATIONS IN THE AREA OF THE PROPOSED ABSORPTION FIELD FOUND A SANDY TO SILT LOAM TO A DEPTH OF ENCOUNTERING LEDGE AT 39" TO 61". THE PERCOLA TION RA TE OF THE EXISTING SAND Y/SIL TY LOAM SOIL /S IN THE 27 - 29 MINUTE/INCH DESIGN RANGE. WATER SUPPLY.' THE CURRENT WATER SUPPLY SERVING THIS LOT IS LAKE WATER DRAWN FROM LAKE GEORGE. THE PROPOSED WASTEWATER SYSTEM IS IN CONFORMANCE WITH THE SEPARATION DISTANCE TO ALL NEIGHBORING PROPERTIES' WATER SUPPLIES. PROJECTED FLOW RATE: THE EXISTING RESIDENCE IS A FOUR BEDROOM PRE -1980 STRUCTURE WITH UPGRADES TO PLUMBING FIXTURES (POST 1992). A DESIGN FLOW RATE OF 170 GALLONS PER BEDROOM OR 440 GALLONS PER DAY (gpd) HAS BEEN USED FOR THIS REPLACEMENT SYSTEM DESIGN. THIS FLOWRATE DOES NOT INCLUDE THE USE OF A GARBAGE GRINDER (NOR IS ONE RECOMMENDED) OR A HOT TUB/SPA. ADDITIONAL FLOW RATE MUST BE INCLUDED /N THE DESIGN SHOULD EITHER OF THESE COMPONENTS BE PART OF A NEW HOUSE DESIGN. SEPTIC TANK: THE REQUIRED CAPACITY FOR A FOUR BEDROOM FLOWRATE /S 1250 GALLONS. THE RECOMMENDED TANK FOR THIS SYSTEM IS A 1500 (MIN) GALLON PRECAST CONCRETE TANK WITH BAFFLE (TWO COMPARTMENTS) BY UTOPIA ENTERPRISES OR EQUAL AND AN EFFLUENT FILTER AT THE DISCHARGE OUTLET. THE FRAME AND COVER FOR THE TANK ACCESS OPENING SHALL BE POLYLOK PLASTIC COMPONENTS OR EQUAL (22" MIN.). EFFLUENT FILTER: AN EFFLUENT FILTER, POLYLOK PL -122 OR EQUAL, SHALL BE INSTALLED ON THE DISCHARGE OUTLET OF THE SEPTIC TANK. EFFLUENT PUMP PIT AND PUMP ASSEMBLY: SEPTIC TANK EFFLUENT SHALL FLOW TO A PRECAST CONCRETE PUMP PIT - 1000 GALLON (MIN.) , BY UTOPIA ENTERPRISES OR EQUAL, HOUSING A DUPLEX PUMP ASSEMBLY AND CONTROLS FOR TIMED DOSING OF THE EFFLUENT. THE EFFLUENT PUMPS SHALL BE GOULD MODEL 3885 OR EQUAL, CAPABLE OF 15 GPM AT A TDH OF 20 FEET (MIN). THE DISCHARGE PIPING WITHIN THE TANK SHALL INCLUDE A 'QUARTER TURN' VALVE TO SERVE AS A SELF -DRAINING DEVICE FOR THE FORCE MAIN. THE CONTROL PANEL WITH AUDIBLE ALARM AND REMOTE LIGHT SHALL BE LOCATED WITHIN MECHANICAL SPACE OF THE HOUSE (OR GARAGE). THE ALTERNATING PUMP CONTROLS, SJE RHOMBUS MODEL TD OR EQUAL SHALL INCLUDE A TIMED DOSE (3 TO 4 HOURS PER CYCLE) WHICH DELIVERS A DOSING VOLUME OF APPROXIMATELY 959" OF THE PIPING CAPACITY. THE 'TIMED CONTROLS' WILL BE SETUP AT THE TIME OF SYSTEM START-UP BY THE CONTRACTOR IN COORDINATION WITH THE DESIGN ENGINEER. THE CONTROLS SHALL INCLUDE A MINIMUM OF THREE FLOATS TO SERVE AS 'TIMER ENABLER, ALARM/LAG PUMP ENABLER AND TIMER OVER -RIDE'. THE ACCESS TO THE PUMP PIT SHALL BE POLYLOK PLASTIC COMPONENTS (22" MIN.) OR EQUAL. THE DUPLEX PUMP SYSTEM SHALL BE INSTALLED TO LINE UP WITH THE TANK ACCESS FOR EASE OF REMOVAL. THE PUMP PIT SHALL BE VENTED BACK TO THE HOUSE STACK. FORCE MAIN: THE FORCE MAIN PIPING SHALL BE 7 - " HDPE PIPE INSTALLED TO THE DISTRIBUTION BOX AT THE FIELD AREA. THE FORCE MAIN SHALL BE INSTALLED AT A POSITIVE GRADE TO ALLOW IT TO SELF -DRAIN BACK TO THE PUMP PIT. THE FORCE MAIN SHALL ENLARGE TO A 4" PVC PIPE AT LEAST 4' OUTSIDE THE D -BOX. DISTRIBUTION BOX: THE D -BOX SHALL BE A PRECAST CONCRETE BOX BY UTOPIA ENTERPRISES OR EQUAL. SPEED LEVELERS SHALL BE PROVIDED FOR USE IN EACH PIPE INVERT. THE INLET TO THE D -BOX SHALL BE A 4" PVC PIPE (4' MIN.) WHICH RECEIVES FLOW FROM THE FORCE MAIN PIPE. ABSORPTION FIELD: THE PROPOSED ABSORPTION FIELD SHALL BE A SHALLOW ABSORPTION BED CONFIGURATION USING ELJEN GSF, TYPE 'B' UNITS. THERE SHALL BE THREE LATERALS, EACH OF 44 LF, PROVIDING A TOTAL OF 132 LF FOR THE FOUR BEDROOM SYSTEM. SOME FILL SOIL (QUEENSBURY 'RED DIRT') SHALL BE USED AS NEEDED TO PROVIDE A LEVEL FOUNDATION FOR THE BED AREA. THE SURFACE OF THE NATIVE SOILS SHALL BE PREPARED BY REMOVING THE ORGANIC LAYER AND THEN PLOWED/TILLED FOR PLACEMENT OF THE FILL SOIL/CONCRETE SAND. THE AREA OF THE DISPOSAL FIELD SHALL BE APPROXIMATELY 75' X 46'. COVER MATERIAL WILL EXTEND AT 3 ON 1 SLOPES TO MATCH TO ORIGINAL GRADE. A DIVERSION SWALE SHALL BE CONSTRUCTED ON THE UPGRADIENT SIDE OF THE FIELD AREA TO DIRECT SURFACE RUNOFF AWAY FROM THE ABSORPTION SYSTEM. COGO JOB MAP REFERENCE: 7) MAP ENTITLED: "MAP MADE FOR MARK HANDELMAN" DATED JANUARY 30, 1996, LAST REVISED JUNE 11, 2003 AS PREPARED BY Van DUSEN & STEVES, LAND SURVEYORS. LEGEND: 344 DENOTES EXISTING TOPOGRAPHIC CONTOUR A.L.O. DENOTES APPROXIMATE LOCATION OF CONC. DENOTES CONCRETE I.P.F. DENOTES IRON PIPE FOUND I. R. F. DENOTES IRON ROD FOUND N/F DENO TES NOW OR FORMERL Y O. H. U. L. DENOTES OVERHEAD UTILITY LINES U. P. DENOTES UTILITY POLE I PER MAP NOR TM AS 1 REFERENCE No. 322 32k / -o BOOK 624 OF DEEDS AT PAGE 630 / Z 330 332 4" DIA. CONC. FILLED TILE '-_ 334 - - 288-95' � 336 — — - -- S20 •� ¢ " 338 1 5• HIG WALL 340 AREA = ASPHALT DRIVE 342 0.95 f ACRES -- N \ LANDS N/F OF JANE A. WAIT \ \ \ WALL & STEPS 0 i PUMP Y HOUSE U \ 0 O N L A K G E O R E G E CAMP l 9 EXISTING Ij \ BUILDING –� SEWER WALL ASPHALT DRIVE / WALL CUT AND REMOVE EXISTING ASPHALT REPAIR DRIVEWAY SURFACE W/ % PERMEABLE BLOCK PAVERS TO BE SELECTED BY OWNER. i � r PATIO �. Tp ASPHALT DRIVE �' ' � a n � ' 0 / NEW 1500 GAL. �/� i 1 f 0 /j / SEPTIC TANK W/ / TP � 1 X/ / EFFLUENT FILTER i �, / U / - - - - - - --- / \ NEW 1000 GAL O _ - - - - - - DIRT DRIVE _/ TP l NOTE: TEST PITS- TEST PITS WERE EXCA VA TED /N THE AREA OF THE �f EXISTING TREES AS NEEDED TO _ D[areltt BED AREA — 20'x46't DENNIS MACELROY, PE jol4nd" � 1L D—Box LOAMY SAND, ORANGISH BROWN Y ROOTS TO 27" I SANDY SILT, BROWN H f LEDGE W SITE T.P.# 2 0-3" ORGANIC MATERIAL, FOREST DUFF 3"-20" LOAMY SAND, ORANGISH BROWN, SOME FILL SAND, 'jFlaod; ROOTS TO 40 PZ �r /I r' fes; � Pium,� '_ Point f �•� T. P. #3 0-3" ORGANIC MATERIAL, FOREST DUFF 3"-18" DRIVEWAY STONE (1') FILL SAND, ROOTS 78"-39" SANDY SILT f '100 N AA • 1` Happy Family ' p 91lJ �•4t /� ,r: It ry + f 41 l ? 4k. SITE LOCATION MAP SCALE: 1" = 2,000' REPLACEMENT WASTEWATER SYSTEM BASIS OF DESIGN REGULATORY AUTHORITY.- TOWN OF QUEENSBURY DESIGN STANDARDS: NEW YORK STATE DEPARTMENT OF HEALTH (70NYCRR APPENDIX 75-A), WASTEWATER TREATMENT STANDARDS - INDIVIDUAL HOUSEHOLD SYSTEM. TOWN OF QUEENSBURY ORDINANCE - CHAPTER 136: SEWERS AND SEWAGE DISPOSAL - PART 1, ON-SITE SEWAGE DISPOSAL SYSTEMS PROJECT OESCRIPTIONk THE EXISTING WASTEWATER SYSTEM SERVING THE HANDELMAN RESIDENCE ON RT. 9L /N THE TOWN OF QUEENSBURY /S 40± YEARS IN AGE AND IT IS THE APPLICANT'S INTENT TO REPLACE THE EXISTING SYSTEM WITH ONE THAT /S COMPLIANT WITH CURRENT STANDARDS. THIS PLAN PROPOSES A NEW REPLACEMENT WASTEWATER SYSTEM TO SERVE THE EXISTING HOUSE. THE PROPOSED SYSTEM WILL CONSIST OF A NEW SEPTIC TANK WITH EFFLUENT FILTER, A PUMP PIT WITH A DUPLEX PUMP ASSEMBLY AND AN ABSORPTION FIELD AREA USING ELJEN GSF TECHNOLOGY. SOILS ANALYSIS: DEEP TEST PITS WERE EXCAVATED AND OBSERVED BY DENNIS MacELROY, PE ON APRIL 1, 2070. SOILS INVESTIGATIONS IN THE AREA OF THE PROPOSED ABSORPTION FIELD FOUND A SANDY TO SILT LOAM TO A DEPTH OF ENCOUNTERING LEDGE AT 39" TO 61". THE PERCOLA TION RA TE OF THE EXISTING SAND Y/SIL TY LOAM SOIL /S IN THE 27 - 29 MINUTE/INCH DESIGN RANGE. WATER SUPPLY.' THE CURRENT WATER SUPPLY SERVING THIS LOT IS LAKE WATER DRAWN FROM LAKE GEORGE. THE PROPOSED WASTEWATER SYSTEM IS IN CONFORMANCE WITH THE SEPARATION DISTANCE TO ALL NEIGHBORING PROPERTIES' WATER SUPPLIES. PROJECTED FLOW RATE: THE EXISTING RESIDENCE IS A FOUR BEDROOM PRE -1980 STRUCTURE WITH UPGRADES TO PLUMBING FIXTURES (POST 1992). A DESIGN FLOW RATE OF 170 GALLONS PER BEDROOM OR 440 GALLONS PER DAY (gpd) HAS BEEN USED FOR THIS REPLACEMENT SYSTEM DESIGN. THIS FLOWRATE DOES NOT INCLUDE THE USE OF A GARBAGE GRINDER (NOR IS ONE RECOMMENDED) OR A HOT TUB/SPA. ADDITIONAL FLOW RATE MUST BE INCLUDED /N THE DESIGN SHOULD EITHER OF THESE COMPONENTS BE PART OF A NEW HOUSE DESIGN. SEPTIC TANK: THE REQUIRED CAPACITY FOR A FOUR BEDROOM FLOWRATE /S 1250 GALLONS. THE RECOMMENDED TANK FOR THIS SYSTEM IS A 1500 (MIN) GALLON PRECAST CONCRETE TANK WITH BAFFLE (TWO COMPARTMENTS) BY UTOPIA ENTERPRISES OR EQUAL AND AN EFFLUENT FILTER AT THE DISCHARGE OUTLET. THE FRAME AND COVER FOR THE TANK ACCESS OPENING SHALL BE POLYLOK PLASTIC COMPONENTS OR EQUAL (22" MIN.). EFFLUENT FILTER: AN EFFLUENT FILTER, POLYLOK PL -122 OR EQUAL, SHALL BE INSTALLED ON THE DISCHARGE OUTLET OF THE SEPTIC TANK. EFFLUENT PUMP PIT AND PUMP ASSEMBLY: SEPTIC TANK EFFLUENT SHALL FLOW TO A PRECAST CONCRETE PUMP PIT - 1000 GALLON (MIN.) , BY UTOPIA ENTERPRISES OR EQUAL, HOUSING A DUPLEX PUMP ASSEMBLY AND CONTROLS FOR TIMED DOSING OF THE EFFLUENT. THE EFFLUENT PUMPS SHALL BE GOULD MODEL 3885 OR EQUAL, CAPABLE OF 15 GPM AT A TDH OF 20 FEET (MIN). THE DISCHARGE PIPING WITHIN THE TANK SHALL INCLUDE A 'QUARTER TURN' VALVE TO SERVE AS A SELF -DRAINING DEVICE FOR THE FORCE MAIN. THE CONTROL PANEL WITH AUDIBLE ALARM AND REMOTE LIGHT SHALL BE LOCATED WITHIN MECHANICAL SPACE OF THE HOUSE (OR GARAGE). THE ALTERNATING PUMP CONTROLS, SJE RHOMBUS MODEL TD OR EQUAL SHALL INCLUDE A TIMED DOSE (3 TO 4 HOURS PER CYCLE) WHICH DELIVERS A DOSING VOLUME OF APPROXIMATELY 959" OF THE PIPING CAPACITY. THE 'TIMED CONTROLS' WILL BE SETUP AT THE TIME OF SYSTEM START-UP BY THE CONTRACTOR IN COORDINATION WITH THE DESIGN ENGINEER. THE CONTROLS SHALL INCLUDE A MINIMUM OF THREE FLOATS TO SERVE AS 'TIMER ENABLER, ALARM/LAG PUMP ENABLER AND TIMER OVER -RIDE'. THE ACCESS TO THE PUMP PIT SHALL BE POLYLOK PLASTIC COMPONENTS (22" MIN.) OR EQUAL. THE DUPLEX PUMP SYSTEM SHALL BE INSTALLED TO LINE UP WITH THE TANK ACCESS FOR EASE OF REMOVAL. THE PUMP PIT SHALL BE VENTED BACK TO THE HOUSE STACK. FORCE MAIN: THE FORCE MAIN PIPING SHALL BE 7 - " HDPE PIPE INSTALLED TO THE DISTRIBUTION BOX AT THE FIELD AREA. THE FORCE MAIN SHALL BE INSTALLED AT A POSITIVE GRADE TO ALLOW IT TO SELF -DRAIN BACK TO THE PUMP PIT. THE FORCE MAIN SHALL ENLARGE TO A 4" PVC PIPE AT LEAST 4' OUTSIDE THE D -BOX. DISTRIBUTION BOX: THE D -BOX SHALL BE A PRECAST CONCRETE BOX BY UTOPIA ENTERPRISES OR EQUAL. SPEED LEVELERS SHALL BE PROVIDED FOR USE IN EACH PIPE INVERT. THE INLET TO THE D -BOX SHALL BE A 4" PVC PIPE (4' MIN.) WHICH RECEIVES FLOW FROM THE FORCE MAIN PIPE. ABSORPTION FIELD: THE PROPOSED ABSORPTION FIELD SHALL BE A SHALLOW ABSORPTION BED CONFIGURATION USING ELJEN GSF, TYPE 'B' UNITS. THERE SHALL BE THREE LATERALS, EACH OF 44 LF, PROVIDING A TOTAL OF 132 LF FOR THE FOUR BEDROOM SYSTEM. SOME FILL SOIL (QUEENSBURY 'RED DIRT') SHALL BE USED AS NEEDED TO PROVIDE A LEVEL FOUNDATION FOR THE BED AREA. THE SURFACE OF THE NATIVE SOILS SHALL BE PREPARED BY REMOVING THE ORGANIC LAYER AND THEN PLOWED/TILLED FOR PLACEMENT OF THE FILL SOIL/CONCRETE SAND. THE AREA OF THE DISPOSAL FIELD SHALL BE APPROXIMATELY 75' X 46'. COVER MATERIAL WILL EXTEND AT 3 ON 1 SLOPES TO MATCH TO ORIGINAL GRADE. A DIVERSION SWALE SHALL BE CONSTRUCTED ON THE UPGRADIENT SIDE OF THE FIELD AREA TO DIRECT SURFACE RUNOFF AWAY FROM THE ABSORPTION SYSTEM. COGO JOB MAP REFERENCE: 7) MAP ENTITLED: "MAP MADE FOR MARK HANDELMAN" DATED JANUARY 30, 1996, LAST REVISED JUNE 11, 2003 AS PREPARED BY Van DUSEN & STEVES, LAND SURVEYORS. LEGEND: 344 DENOTES EXISTING TOPOGRAPHIC CONTOUR A.L.O. DENOTES APPROXIMATE LOCATION OF CONC. DENOTES CONCRETE I.P.F. DENOTES IRON PIPE FOUND I. R. F. DENOTES IRON ROD FOUND N/F DENO TES NOW OR FORMERL Y O. H. U. L. DENOTES OVERHEAD UTILITY LINES U. P. DENOTES UTILITY POLE I PER MAP NOR TM AS 1 REFERENCE No. 322 32k / -o BOOK 624 OF DEEDS AT PAGE 630 / Z 330 332 4" DIA. CONC. FILLED TILE '-_ 334 - - 288-95' � 336 — — - -- S20 •� ¢ " 338 1 5• HIG WALL 340 AREA = ASPHALT DRIVE 342 0.95 f ACRES -- N \ LANDS N/F OF JANE A. WAIT \ \ \ WALL & STEPS 0 i PUMP Y HOUSE U \ 0 O N L A K G E O R E G E CAMP l 9 EXISTING Ij \ BUILDING –� SEWER WALL ASPHALT DRIVE / WALL CUT AND REMOVE EXISTING ASPHALT REPAIR DRIVEWAY SURFACE W/ % PERMEABLE BLOCK PAVERS TO BE SELECTED BY OWNER. i � r PATIO �. Tp ASPHALT DRIVE �' ' � a n � ' 0 / NEW 1500 GAL. �/� i 1 f 0 /j / SEPTIC TANK W/ / TP � 1 X/ / EFFLUENT FILTER i �, / U / - - - - - - --- / \ NEW 1000 GAL O _ - - - - - - DIRT DRIVE _/ TP l NOTE: TEST PITS- TEST PITS WERE EXCA VA TED /N THE AREA OF THE REMOVE EXISTING TREES AS NEEDED TO CREATE BED AREA — 20'x46't DENNIS MACELROY, PE T. P. # 1 0-6" � 1L D—Box LOAMY SAND, ORANGISH BROWN ROOTS TO 27" \ PUMP TANK W/ _ -� / #1 z DUPLEX PUMP ---- 1 / 70- \ ASSEMBLY \ t / ry0 \ A.L.O. EXISTING GARAGE '1 J/ �A) 1 SEPTIC AREA \ WELL- To - 4" DIA. CONC \ E�K TO FILLED TILE \\ 1-1/2- HDPE FORCEIN 4" PVC SLEEVE o%\�P// PR PERT UNE / o\ N \ \ 150'00 LANDS N/F OF SEEL YE WELL ADD FILL AT LOW END TO CREATE LEVEL BED NEW ABSORPTION FIELD AREA CONSISTING OF ELJEN GSF IN A BED CONFIGURATION. INSTALL 3 RUNS OF 44 LF EACH 132 LF TOTAL. �'A� L `"• I.R.F. 10-16-3 or observed, or ui h as houses, v c ^; (IP11t. I �' p s;ured th O q -1'L I W �, t�2 Z E f W W IU A z� cc D U) O E-1 �. CD L W � -J Z a� v 1 ?a u.C� 0 z W z a ti M � J V 1 1' Go O M ry y F- m Q �1 � � win Q �l W W Zo �Nw w F-4 z w O x Z �~ U1 W 0) W a Q W DZw L O li U. P. W/ GUY Er CD J � Q W /V1 E-4 p4 �D Q J p Z� C,2 ~va z Z J ' ce) 46 w W w�D cv Z W z 0E-� Uj O w z >Wz oo W O O ZO Z iY a N W o) w SOILS INVESTIGATION: TEST PITS- TEST PITS WERE EXCA VA TED /N THE AREA OF THE PROPOSED FIELD ON APRIL 1, 2010. REFER TO THE SITE PLAN FOR PIT LOCATIONS. THE FOLLOWING SOILS PROFILE WAS RECORDED: DATE: APRIL 7, 2010 RECORDED BY.- DENNIS MACELROY, PE T. P. # 1 0-6" ORGANIC MATERIAL, FOREST DUFF 6"-20" LOAMY SAND, ORANGISH BROWN ROOTS TO 27" 20"-61" SANDY SILT, BROWN 61"+ LEDGE W NO OBSERVATION OR EVIDENCE OF GROUNDWATER T.P.# 2 0-3" ORGANIC MATERIAL, FOREST DUFF 3"-20" LOAMY SAND, ORANGISH BROWN, SOME FILL SAND, ROOTS TO 40 20"-49" SANDY SILT, BROWN 49"+ LEDGE NO OBSERVATION OR EVIDENCE OF GROUNDWATER T. P. #3 0-3" ORGANIC MATERIAL, FOREST DUFF 3"-18" DRIVEWAY STONE (1') FILL SAND, ROOTS 78"-39" SANDY SILT 39 "+ LEDGE W [-4p) o NO OBSERVATION OR EVIDENCE OF GROUNDWATER PERCOLATION TESTS - TWO PERCOLATION TESTS WERE CONDUCTED WITHIN THE AREA OF THE ABSORPTION FIELD. THE FOLLOWING RESULTS WERE RECORDED. DATE: APRIL 7, 2010 CONDUCTED BY: DENNIS MACELROY, PE TEST # 1 - 21 MIN./INCH STABILIZED RATE TEST # 2 - 20 MIN./INCH STABILIZED RATE USE APPLICATION RATE FOR 21 -29 MIN./INCH DESIGN RATE m W H w a ° o o z J Q M (� o � W a V) W W o W [-4p) o a T ti (/1 O V L 0 V 1 L� w m ° o W N z J Q (� W W V) REPLACEMENT WASTEWATER SYSTEM: BASIS OF DESIGN REGULATORY AUTHORITY: TOWN OF QUEENSBURY DESIGN STANDARDS: NEW YORK STATE DEPARTMENT OF HEALTH (1ONYCRR APPENDIX 75-A), WASTEWATER TREATMENT STANDARDS - INDIVIDUAL HOUSEHOLD SYSTEM. TOWN OF QUEENSBURY ORDINANCE - CHAPTER 136: SEWERS AND SEWAGE DISPOSAL - PART 1, ON-SITE SEWAGE DISPOSAL SYSTEMS PROJECT DESCRIPTION: THE EXISTING WASTEWATER SYSTEM SERVING THE HANDELMAN RESIDENCE ON RT. 9L IN THE TOWN OF QUEENSBURY IS 40± YEARS IN AGE AND lT IS THE APPLICANT'S INTENT TO REPLACE THE EXISTING SYSTEM WITH ONE THAT IS COMPLIANT WITH CURRENT STANDARDS. THIS PLAN PROPOSES A NEW REPLACEMENT WASTEWATER SYSTEM TO SERVE THE EXISTING HOUSE. THE PROPOSED SYSTEM WILL CONSIST OF A NEW SEPTIC TANK WITH EFFLUENT FILTER, A PUMP PIT WITH A DUPLEX PUMP ASSEMBLY AND AN ABSORPTION FIELD AREA USING ELJEN GSF TECHNOLOGY. SOILS ANALYSIS: DEEP TEST PITS WERE EXCAVATED AND OBSERVED BY DENNIS MocELROY, .PE ON APRIL 1, 2010. SOILS INVESTIGATIONS IN THE AREA OF THE PROPOSED ABSORPTION FIELD FOUND A SANDY TO SILT LOAM TO A DEPTH OF ENCOUNTERING LEDGE AT 39" TO 67". THE PERCOLATION RATE OF THE EXISTING SANDY/SILTY LOAM SOIL /S IN THE 21 - 29 MINUTE/INCH DESIGN RANGE. WATER SUPPLY: THE CURRENT WATER SUPPLY SERVING THIS LOT 1S LAKE WATER DRAWN FROM LAKE GEORGE. THE PROPOSED WASTEWATER SYSTEM IS IN CONFORMANCE WITH THE SEPARATION DISTANCE TO ALL NEIGHBORING PROPERTIES' WATER SUPPLIES. PROJECTED FLOW RATE: THE EXISTING RESIDENCE IS A FOUR BEDROOM PRE -1980 STRUCTURE WITH UPGRADES TO PLUMBING FIXTURES (POST 1992). A DESIGN FLOW RATE OF 110 GALLONS PER BEDROOM OR 440 GALLONS PER DAY (gpd) HAS BEEN USED FOR THIS REPLACEMENT SYSTEM DESIGN. THIS FLOWRATE DOES NOT INCLUDE THE USE OF A GARBAGE GRINDER (NOR /S ONE RECOMMENDED) OR A HOT TUB/SPA. ADDITIONAL FLOW RATE MUST BE INCLUDED IN THE DESIGN SHOULD EITHER OF THESE COMPONENTS BE PART OF A NEW HOUSE DESIGN. SEPTIC TANK: THE REQUIRED CAPACITY FOR A FOUR BEDROOM FLOWRATE /S 1250 GALLONS. THE RECOMMENDED TANK FOR THIS SYSTEM /S A 1500 (MIN) GALLON PRECAST CONCRETE TANK WITH BAFFLE (TWO COMPARTMENTS) BY UTOPIA ENTERPRISES OR EQUAL AND AN EFFLUENT FILTER AT THE DISCHARGE OUTLET. THE FRAME AND COVER FOR THE TANK ACCESS OPENING SHALL BE POLYLOK PLASTIC COMPONENTS OR EQUAL (22" MIN.). EFFLUENT FILTER: AN EFFLUENT FILTER, POLYLOK PL -122 OR EQUAL, SHALL BE INSTALLED ON THE DISCHARGE OUTLET OF THE SEPTIC TANK. EFFLUENT PUMP PIT AND PUMP ASSEMBLY: SEPTIC TANK EFFLUENT SHALL FLOW TO A PRECAST CONCRETE PUMP PIT - 1000 GALLON (MIN.) BY UTOPIA ENTERPRISES OR EQUAL, HOUSING A DUPLEX PUMP ASSEMBLY AND CONTROLS FOR TIMED DOSING OF THE EFFLUENT. THE EFFLUENT PUMPS SHALL BE GOULD CAPABLE F 1 PM T A TDH OF FEET MIN MODEL 3885 OR EQUAL, BLE D 5 G A 20 EE ( ). THE DISCHARGE PIPING WITHIN THE TANK SHALL INCLUDE A 'QUARTER TURN' VALVE TO SERVE AS A SELF -DRAINING DEVICE FOR THE FORCE MAIN. THE CONTROL PANEL WITH AUDIBLE ALARM AND REMOTE LIGHT SHALL BE LOCATED WITHIN MECHANICAL SPACE OF THE HOUSE (OR GARAGE). THE ALTERNATING PUMP CONTROLS, SJE RHOMBUS MODEL TD OR EQUAL SHALL INCLUDE A TIMED DOSE (3 TO 4 HOURS PER CYCLE) WHICH DELIVERS A DOSING VOLUME OF APPROXIMATELY 95% OF THE PIPING CAPACITY. THE 'TIMED CONTROLS' WILL BE SETUP AT THE TIME OF SYSTEM START-UP BY THE CONTRACTOR IN COORDINATION WITH THE DESIGN ENGINEER. THE CONTROLS SHALL INCLUDE A MINIMUM OF THREE FLOATS TO SERVE AS 'TIMER ENABLER, ALARM/LAG PUMP ENABLER AND TIMER OVER -RIDE'. THE ACCESS TO THE PUMP P/T SHALL BE POLYLOK PLASTIC COMPONENTS (22" MIN.) OR EQUAL. THE DUPLEX PUMP SYSTEM SHALL BE INSTALLED TO LINE UP WITH THE TANK ACCESS FOR EASE OF REMOVAL. THE PUMP PIT SHALL BE VENTED BACK TO THE HOUSE STACK. FORCE MAIN: THE FORCE MAIN PIPING SHALL BE 1- HDPE PIPE INSTALLED TO THE DISTRIBUTION BOX AT THE FIELD AREA. THE FORCE MAIN SHALL BE INSTALLED AT A POSITIVE GRADE TO ALLOW IT TO SELF -DRAIN BACK TO THE PUMP PIT. THE FORCE MAIN SHALL ENLARGE TO A 4" PVC PIPE AT LEAST 4' OUTSIDE THE D -BOX. DISTRIBUTION BOX: THE D -BOX SHALL BE A PRECAST CONCRETE BOX BY UTOPIA ENTERPRISES OR EQUAL. SPEED LEVELERS SHALL BE PROVIDED FOR USE IN EACH PIPE INVERT THE INLET TO THE D -BOX SHALL BE A 4" PVC PIPE (4' MIN.) WHICH RECEIVES FLOW FROM THE FORCE MAIN PIPE. ABSORPTION FIELD: THE PROPOSED ABSORPTION FIELD SHALL BE A SHALLOW ABSORPTION BED CONFIGURATION USING ELJEN GSF, TYPE 'B' UNITS. THERE SHALL BE THREE LATERALS, EACH OF 44 LF, PROVIDING A TOTAL OF 132 LF FOR THE FOUR BEDROOM SYSTEM. SOME FILL SOIL (QUEENSBURY 'RED DIRT') SHALL BE USED AS NEEDED TO PROVIDE A LEVEL FOUNDATION FOR THE BED AREA. THE SURFACE OF THE NATIVE SOILS SHALL BE PREPARED BY REMOVING THE ORGANIC LAYER AND THEN PLOWED/TILLED FOR PLACEMENT OF THE FILL SOIL/CONCRETE SAND. THE AREA OF THE DISPOSAL FIELD SHALL BE APPROXIMATELY 15' x 46'. COVER MATERIAL WILL EXTEND AT 3 ON 1 SLOPES TO MATCH TO ORIGINAL GRADE. A DIVERSION SWALE SHALL BE CONSTRUCTED ON THE UPGRADIENT SIDE OF THE FIELD AREA TO DIRECT SURFACE RUNOFF AWAY FROM THE ABSORPTION SYSTEM. GENERAL SANITARY NOTES, 1. MAINTAIN 100' SEPARATION BETWEEN SEPTIC SYSTEM AND ANY WELL. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING WELLS PRIOR TO CONSTRUCTION. 2. MINIMUM SEPARATION BETWEEN SEPTIC TANK AND BUILDINGS SHALL BE 10 FEET. 3. MINIMUM SEPARATION BETWEEN EDGE OF BED AND BUILDINGS SHALL BE 15 FEET. 4. MINIMUM SEPARATION BETWEEN PROPERTY LINE AND EDGE OF BED OR TOE OF FILL (RAISED SYSTEMS) SHALL BE 10 FEET 5. MINIMUM SEPARATION BETWEEN WELL AND SEP77C TANK TO BE 50 FEET 6. ALL CONSTRUCTION TO BE IN COMPLIANCE WITH THE NEW YORK STATE SANITARY CODE. 7. REQUIRED INSPECTIONS (TO BE PERFORMED BY PROFESSIONAL ENGINEER): A) PRIOR TO PLACEMENT OF SEPTIC TANK OR COMMENCEMENT OF THE ABSORPTION FIELD CONSTRUCTION. B) DURING THE INSTALLATION OF ANY REQUIRED FILL MATERIAL. C) PRIOR TO BACKFILLING BED. D) FINAL INSPECTION UPON COMPLETION OF THE SYSTEM. 8. CONCRETE SAND SHALL BE A MEDIUM TO COARSE SAND WITH AN EFFECTIVE SIZE OF 0.25 TO 2.0 MM AND NO MORE THAN 59, PASSING A #200 SIEVE. 9. WHEN THE BED AREA HAS HAVE BEEN EXCAVATED, THE SIDES AND BOTTOM SHALL BE RAKED TO SCARIFY ANY SMEARED SOIL SURFACES. 10. CONSTRUCTION EQUIPMENT NOT NEEDED TO CONSTRUCT THE SYSTEM SHOULD BE KEPT OFF THE AREA TO BE UTILIZED FOR THE ABSORPTION FIELD SYSTEM TO PREVENT UNDESIRABLE COMPACTION OF THE SOILS. 11. EACH DISTRIBUTION LINE SHALL CONNECT INDIVIDUALLY TO THE DISTRIBUTION BOX AND EXIT AT THE SAME SLOPE FOR THE FIRST 5 FEET TO 10 FEET FROM THE BOX (1/8" PER FOOT). 12, THE DISTRIBUTION BOX SHALL BE SET LEVEL AND ARRANGED SO THAT EFFLUENT IS EVENLY DISTRIBUTED TO EACH DISTRIBUTION LINE. ADEQUATE PROVISIONS SHALL BE TAKEN TO ASSURE STABILITY AND PROVIDE ACCESS FOR INSPECTION OF THE DISTRIBUTION BOX. 13. THE PIPES CONNECTING THE DISTRIBUTION BOX TO THE DISTRIBUTION LINES SHALL BE TIGHT JOINT CONSTRUCTION LAID ON UNDISTURBED EARTH OR PROPERLY BEDDED THROUGHOUT ITS LENGTH. 14. THE SYSTEM DESIGN DOES NOT INCLUDE PROVISIONS FOR GARBAGE GRINDERS. IN THE EVENT THAT GARBAGE GRINDERS ARE TO BE INSTALLED, THE CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO SEP77C INSTALLATION FOR NECESSARY MODIFICATIONS. 15. FOOTING DRAINS, SUMP PUMPS OR WATER SOFTENER DISCHARGES SHALL NOT BE CONNECTED INTO THE SEPTIC SYSTEM. 15. CONTRACTOR TO COMPLY WITH ALL O.S.H.A. AND OTHER STATE AND LOCAL SAFETY REQUIREMENTS DURING CONSTRUCTION. 17. AS PER NEW YORK STATE INDUSTRIAL CODE 53: CALL 1-800-962-7962 TO LOCATE BURIED CABLES, OR OTHER UNDERGROUND UTILITIES, NO LESS THAN TWO, OR MORE THAN TEN WORKING DAYS, PRIOR TO DIGGING, DRILLING, EXCAVATING, DRIVING POSTS, ETC. 4" SOLID PVC PIPE DISTRIBUTION BOX (CONCRETE OR EQUAL) 1-1/2" HDPE FORCE MAIN FROM PUMP TANK. EXTEND AS NEEDED FOR PROPER CONNECTION TO NEW D -BOX FINISH GRADE III - Ill i7t 1I- I I I iv SEAL ALTIC - - -I I==I I= INLET 4" OR b 3' MIN.- I BLDG. SEWER I z SANITARY TEE~ °0 a 4" MIN. ALL JOINTS BELOW -/FULL o I il,�FFL LIQUIDLEVEL TO BE BITUMINOUS WATERTIGHT AND INTERIORLEAKAGE TESTED COAT I IE WITH PRIOR TO BACKFILLING KOP 300M O 4X18" MIN. OR EQUAL OPENING 44 LF PER RUN - 11 UNITS PER RUN ABSORPTION BED CONFIGURATION SCALE: 1" = 10' NOTE: LATERAL RUNS TO BE ANGLED AS NEEDED (SEE SITE PLAN) NO TE: I. PIPE JOINTS TO BE SEALED WITH TRANSITION FROM SIDR9 TO ASPHALTIC MATERIALS OR EQUIVALENT. 4" PVC SDR 26 AS REQUIRED CONTRACTOR TO INSTALL 2" STYROFOAM BLUE BOARD 2. INVERT ELEVATIONS OF ALL _HEAVY DUTY PLASTIC MANHOLE FRAME OVER TOP OF D -BOX OUTLET PIPES MUST BE EQUAL. AND COVER BY POLYLOK OR EQUAL 3. THE SLOPE OF OUTLET PIPES GRADE BETWEEN THE DISTRIBUTION BOX AND THE DISTRIBUTOR LATERALS =III_SHOULD BE l/8' PER FOOT. S EXTENSION PLASTIC RISERS z REMOVABLE COVER 2' I.D. AS PER EXTEND INSULATION 2' POLYLOK OR EQUAL -BEYOND TOP OF BOX (AS REQUIRED) LIN ALL DIRECTIONS OUTLET ••• r2"M/N LE WATER TIGHT JOINT (TYP.)) PARGE W/NON-SHRINK C40UT INVERT INSIDE & OUT INLET ELEV. �- SANITARY TEE W/ EFFLUENT FILTER CONTRACTOR TO USE SPEED LEVELERS POLYLOK PL -122 OR EQUAL O OUTLET AS SUPPL/ED BY FORT MILLER TO EQUALIZE FLOW. 6" TO 12" LAYER PEA GRAVEL OR SCRUSHED STONE SECTION VIEW BEDDING LAYER SEPTIC TANK (1500 GAL. HEAVY DUTY SEPTIC TANK) NOT TO SCALE UTOPIA OR EQUAL PULL -ROD GATE VALVE EXTENSION ROD - HIGH LEVEL "TIMER OVERRIDE' J m N "ALARM" LEVEL O O d O Lo :2 x 1-1/2" FNPT BRONZE GATE VALVE FLOW TO DISPOSAL FIELD 1-1/2• HDPE SDR -9 TUBING USE 'QUARTER TURN' DISCHARGE VALVE ON FORCE MAIN TO ALLOW FOR DRAIN -BACK. 1-1/2" FNPT STAINLESS STEEL TANK PIPE COUPLING - BT TOPP INDUSTRIES, INC. LOW LEVEL PUMP SHUT OFF HYDRAUDCALLY SEALED QUICK DISCONNECT FLANGE (1-1/2' FNPT) 1-1/2" FNPT BALL CHECK VALVE INSULATE FORCE MAIN 4' AND 4" PVC PIPE • ; ••" WHERE COVER IS LESS THAN 4' /2" MIN CLEAN SAND OR PEA GRAVEL FORCE MAIN CONNECTION TO D -BOX NOT TO SCALE FLEXIBLE ENTRY800T 36" W x48" L x7" H BY TOPP INDUSTRIES, RI IN . C 1.250" TO HOUSE POWER SUPPLY .750" & ALARM PANEL LESS THAN 1,000 GAL/DAY 7 CRUSHED STONE BACKFILL TO CE TO SEASONAL HIGH WATER IMPERVIOUS STRATA OR BEDROCK SPRINGLINE OF PIPE (TY -P.) 4" PVC AT 2% MIN. 29" MINIMUM OF COVER OVER DISTRIBUTION PIPE 1-1/2" G.I.P. 90' BEND TRENCH WIDTH 1-1/2 G.I.P. DISCHARGE PIPING MNPT I NIPPLES IN LENGTHS AS CT -III- AS POSSIBLE TO MAXIMIZE DISCHARGEPCOVEROAND CONCRETE SAND DEPTH DIRECTLY PERMIT REMOVAL OF PUMP THROUGH COVER OPENING NOTE: PUMP ASSEMBLY TO CONSIST OF TWO PUMPS PIPE ENDS ^`\ DUPLEX PUMP P I T TO BE CAPPED rl /1VV IL UF JFL1..IFICV FILL IVIF ILRIHL !0 NEEDED TO CREATE LEVEL BED FOUNDATION (--�ABSORPTION BED CROSS SECTION B -B' NOT TO SCALE F COGO JOB SUBMERSIBLE EFFLUENT PUMP: MODEL 3885 BY GOULDS PUMPS OR EQUAL. NOTES: 1. FIELD CUT TANK PIPE PENETRATIONS TO FIELD ADJUSTED ELEVATIONS WITH HOLE SAW ONLY. PIPE CONNECTIONS TO FORM A WATER TIGHT SEAL. 2. TANK VENT SHALL BE CONNECTED TO HOUSE STACK 3. PUMP CONTROL TO BE A DUPLEX 'TIMED DOSE' CONTROL ASSEMBLY LOCATED WITHIN HOUSE NOT TO SCALE TANK TO BE 1000 GALLON PRECAST CONCRETE TANK FILL SYSTEMS STANDARD NOTES, A. IN THOSE CASES WHERE TESTS FOR HIGH GROUNDWATER DETERMINATION AND SOIL PERCOLA77ON AS PROVIDED FOR IN THE APPENDIX INDICATE THAT THE QUALITY AND DEPTH OF NATURAL SOIL /S INADEQUATE FOR AN INSTALLATION, A FILL SYSTEM MAY BE UTILIZED, PROVIDED THE FOLLOWING SPECIFICA77ONS ARE MEL FINAL APPROVAL OF FILL SYSTEMS SHALL NOT BE GRANTED UNTIL THE FILL IS IN PLACE AND THE SYSTEM EVALUATED ACCORDING TO THE ADMINISTRATIVE PROVISIONS OF THIS ORDINANCE. B. THE DESIGN AND INSTALLA77ON OF A FILL SYSTEM SHALL COMPLY WITH THE FOLLOWING SPECIFICATIONS: 1) THERE MUST BE AT LEAST TWO (2) FEET OF NATURALLY OCCURRING SOIL (THREE (3) FEET WITHIN 1000 FT OF LAKE GEORGE) OVER AN IMPERVIOUS LAYER. 2) THE MAXIMUM ALLOWABLE EXISTING NATURAL GROUND SURFACE SLOPE FOR BUILT-UP SYSTEMS SHALL BE TEN (10) PERCENT. 3) WHEN PLACING FILL ON TOP OF EXIS77NG GRADE, ORGANIC DEBRIS, INCLUDING LEAVES, ROOTS, AND OTHER PLANT FORMS, SHALL BE REMOVED PRIOR TO THE PLACEMENT OF THE FILL AND THE NATURAL SOIL PLOWED OR SCARIFIED. 4) THE SOIL USED FOR FILL SHALL BE WELL GRADED LOAMY SAND, OR WELL GRADED LOAMY SANDY GRAVELS, AND SHOULD CONTAIN A MAXIMUM OF TWELVE (12) PERCENT SILTS OR CLAYS CONTAINING NO ORGANIC DEBRIS OR NO SOLID OBJECT LARGER THAN THREE (3) INCHES IN DIAMETER AND THE FILL SHALL BE ALLOWED TO STABILIZE NATURALLY FOR AT LEAST SIX (6) MONTHS OR BE MECHANICALLY COMPACTED. 5) SUFFICIENT FILL MUST BE INSTALLED TO ENSURE A MINIMUM OF THREE (3) FEET BETWEEN ANY TRENCH BOTTOM AND MAXIMUM HIGH SEASONAL GROUNDWATER. THIS SEPARATION MUST BE THREE (3) FEET WITHIN 1000 FEET OF LAKE GEORGE. 6) ONLY ARSORP77ON FIELDS SHALL BE USED AS THE LEACHING FACILITY IN FILL SYSTEMS. 7) A CHANNEL OR DIVERSION SYSTEM SHALL BE PLACED ABOUT THE FILL SYSTEM /N THE UP-SLOPE DIRECTION AND OF SUFFICIENT LENGTH TO DIVERT SURFACE AND SHEET WATER RUNOFF AROUND THE FILL SYSTEM. 8) THE TOP OF THE FILL OVER THE LEACHING FACILITY SHALL BE CROWNED OR SLOPED TO ALLOW NATURAL SURFACE RUNOFF, AND SEEDED. 9) SIDE SLOPES OF THE FILL SHALL BE GRADED TO A SLOPE NOT STEEPER THAN ONE (1) VERTICAL ON THREE (3) HORIZONTAL. ELJEN IN -DRAIN DIMENSION & SPECIFICATION SHEET 3 IN -DRAIN UNIT 36" W x48" L x7" H CORE WIDTH 1.250" CORE WIDTH .750" J FLOW LESS THAN 1,000 GAL/DAY CORE WIDTH 90% VOIDS / 50 GAL. CE TO SEASONAL HIGH WATER IMPERVIOUS STRATA OR BEDROCK 3' MINIMUM OF TRENCH 29" MINIMUM OF COVER OVER DISTRIBUTION PIPE 6" MINIMUM $9TC1Ad%VC- HOUSE 10 FEET MINIMUM WELL 100 FEET MINIMUM PROPERTY LINE 10 FEET MINIMUM ALL SETBACKS ARE MEASURED FROM THE EDGE OF CONCRETE SAND IN SITU SOIL INTERFACE BACKFILL 12" MINIMUM 6" CONCRETE SAND DIRECTLY BELOW SURROUNDING THE NEW YORK DEPARTMENT OF TRANSPORTA- SIDES OF THE IN -DRAIN UNITS FOR TION CONCRETE SAND SPECIFICATION ABSORPTION TRENCHES 703-07 DISTRIBUTION PIPE PERFORATED 4" DISTRIBUTION PIPE NON -PERFORATED 4" GEOTEXTILE COVER FABRIC TYPAR 3401 PROVIDE WITH THE IN -DRAIN UNITS THEY SHALL BE OVERLAPPED BY SIX INCHES AND FOLDED. TRENCH WIDTH 4' SPACING BETWEEN IN -DRAIN ROWS 4' ABSORPTION TRENCH (See figures 3, 5) 2' ABSORPTION BED CONCRETE SAND DEPTH DIRECTLY 6" MINIMUM BELOW IN -DRAIN UNITS CONCRETE SAND AT THE SIDE OF 6" ABSORPTION TRENCH IN -DRAINS 12" ABSORPTION BED ACCEPTABLE SOIL PERCOLATION RATE 1-60 MIN/IN ABSORPTION TRENCH 6" MESH SPACI G) 1-30 MIN/IN ABSORPTION BED ACCEPTABLE SOIL PERCOLATION RATE GRAVITY / PUMP / SIPHON ALL APPENDIX 75-A SEPARATION REQUIREMENTS ARE APPLICABLE 147-10. EROSION CONTROL MEASURES: A. TEMPORARY EROSION CONTROL SHALL BE PROVIDED FOR ALL DISTURBED AREAS IN ACCORDANCE WITH THE "NEW YORK STATE GUIDELINES FOR URBAN EROSION AND SEDIMENT CONTROL." THE TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY UNTIL PERMANENT CONTROL MEASURES ARE IN SERVICE. INFILTRATION DEVICES SHALL BE PROTECTED FROM SILTATION DURING THE PERIOD OF CONSTRUCTION AND UNTIL THE SITE IS SUCCESSFULLY REVEGETATED BY USE OF SILT SCREENS, INLET PROTECTION DEVICES, SEDIMENT DETENTION PONDS OR OTHER SUITABLE EROSION CONTROL MEASURES. B. STAGING OF CONSTRUCTION TO FACILITATE EROSION CONTROL SHALL BE REQUIRED. ONLY THOSE AREAS WHERE CONSTRUCTION IS ACTIVELY OCCURRING SHALL REMAIN OPEN AND UNVEGETATED. ALL AREAS THAT ARE NOT WITHIN AN ACTIVE CONSTRUCTION AREA SHALL BE MULCHED AND STABILIZED OR SHALL BE MULCHED AND REVEGETATED. AN "ACTIVE CONSTRUCTION AREA" IS DEFINED AS ON THAT HAS SEEN SUBSTANTIAL CONSTRUCTION WITHIN THE PAST SEVEN CALENDAR DAYS. MULCHING OR REVEGETATION FOR EROSION CONTROL SHALL BE COMPLETED WITHIN 10 DAYS FOLLOWING THE LAST SUBSTANTIAL CONSTRUCTION ACTIVITY. C. COMPLIANCE WITH THE FOLLOWING RESTRICTIONS SHALL BE REQUIRED: 1. NO VEGETATION SHALL BE FELLED INTO ANY LAKE, POND, RIVER, STREAM OR INTERMITTENT STREAM AND IF INADVERTENTLY FELLED INTO ONE OF THESE WATER BODIES, SHALL BE REMOVED IMMEDIATELY FROM THE WATER BODY. 2. WITHIN 500 FEET OF THE MEAN HIGH WATER MARK OF ANY LAKE, POND, RIVER, STREAM OR WETLAND NO LAND AREA, INCLUDING AREAS STOCKPILED W TH EARTHMAT RIALS, WHICH HAS BEEN CLEARED MAY BE MADE OR LEFT DEVOID OF GROWING VEGETATION FOR MORE THAN 24 HOURS WITHOUT A PROTECTIVE COVERING SECURELY PLACED OVER THE ENTIRE AREA AND/OR EROSION CONTROL MEASURES PROPERLY INSTALLED TO PREVENT SEDIMENTS FROM ENTERING THE WATER BODY. ACCEPTABLE PROTECTIVE COVERINGS INCLUDE NATURAL MULCH OF A DEPTH OF TWO INCHES, ROCK RIP -RAP, NONDEGRADABLE MATERIALS, SUCH AS PLASTIC OR CANVAS COVERINGS, AND IMPERVIOUS STRUCTURES. 3. ANY AREA OF LAND FROM WHICH THE NATURAL VEGETATIVE COVER HAS BEEN EITHER PARTIALLY OR WHOLLY CLEARED OR REMOVED BY DEVELOPMENT ACTIVITIES SHALL BE REVEGIETATED WITHIN 10 DAYS FROM THE SUBSTANTIAL COMPLETION OF SUCH CLEARING AND CONSTRUCTION. ACCEPTABLE REVEGETATION SHALL CONSIST OF THE FOLLOWING: a. RESEEDING WITH AN ANNUAL OR PERENNIAL COVER CROP ACCOMPANIED BY PLACEMENT OF STRAW MULCH OR ITS EQUIVALENT OF SUFFICIENT COVERAGE, BUT NOT LESS THAN 50% OF THE TOTAL DISTURBED AREA, TO CONTROL EROSION UNTIL SUCH TIME AS THE COVER CROP IS ESTABUSHED OVER 90% OF THE SEEDED AREA. b. REPLANTING WITH NATIVE WOODY AND HERBACEOUS VEGETATION ACCOMPANIED BY PLACEMENT OF STRAW MULCH OR ITS EQUIVALENT OF SUFFICIENT COVERAGE TO CONTROL EROSION UNTIL THE PLANTINGS ARE ESTABLISHED AND ARE CAPABLE OF CONTROLLING EROSION. C. ANY OTHER RECOGNIZED METHOD WHICH HAS BEEN REVIEWED AND APPROVED BY THE MUNICIPALITY AS SATISFYING THE INTENT OF THIS REQUIREMENT. 4. ANY AREA OF REVEGETATION MUST EXHIBIT SURVIVAL OF A MINIMUM OF 75% OF THE COVER CROP THROUGHOUT THE YEAR IMMEDIATELY FOLLOWING REVEGETATION, REVEGETATION MUST BE REPEATED IN SUCCESSIVE YEARS UNTIL THE MINIMUM 75% SURVIVAL FOR ONE YEAR IS ACHIEVED. 5. GROUND -CLEARING OR GRADING ACTIVITIES WHICH OCCUR DURING THE PERIOD OF OCTOBER 15 TO APRIL 15, DURING WHICH GERMINATION OF VEGETATION TYPICALLY WILL NOT TAKE PLACE, SHALL BE REQUIRED TO INCORPORATE EXTRA MEASURES DURING REVEGETATION IN ORDER TO REDUCE EROSION AND MAINTAIN WATER QUALITY. THESE EXTRA MEASURES INCLUDE, BUT ARE NOT LIMITED T0, THE USE OF SCREEN MESH, EXTRA MULCH AND SILTATION FENCES. WOVEN WIRE FENCE (14 1/2 GA. MIN -MAX. 6" MESH SPACING) WITH FILTER CLOTH OVER EMBED FILTER CLOTH MIN. 6" INTO GROUND -36" MIN. FENCE POST 20" MIN. UNDISTURBED GRADE Q, F� PERSPECTIVE VIEW SILT FENCE DETAIL NOT TO SCALE W W IN. SECTION U CONSTRUCTION NOTES FOR FABRICATED SILT FENCE 1. WOVEN WARE FENCE TO BE FASTENED SECURELY TO FENCE POSTS POSTS: STEEL EITHER "T" OR "U" WITH WIRE TES OR STAPLES. TYPE OR 2" HARDWOOD 2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE " FENCE WITH TIES SPACES EVERY 24" AT TOP AND MID SECTION. FENCE: WOVEN WIRE, 14 1/2 GA. 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER 6" MAX. MESH OPENING THEY SHALL BE OVERLAPPED BY SIX INCHES AND FOLDED. A 4. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL FILTER CLOTH: FILTER X. REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE. MIRAFl 100X, STABILINKA V) W T140N OR APPROVED EQUAL. F � PREFABRICATED UNIT: GEOFAB, ENVIROFENCE, OR APPROVED EQUAL. 1 j i WOVEN WIRE FENCE IN. 14 1/2 GAUGE, /MAX. 6" MESH SPACI G) 10' MAX- CENTER TO CENTER / 36" MIN, FENCE POSTS, _® A DRIVEN MIN. 16" INTO GROUND. Q, F� PERSPECTIVE VIEW SILT FENCE DETAIL NOT TO SCALE W W A 11��zzz111 xo O �-I CC)° W ~ O o ZZ ni I � " w A z� >a td 0 G� V) W F � 0. J �i o 1 j i W Z z _M ; E-4_ A E-1 c o `I/ 1 U1 � of �m W � • W �o ^ W NI �� aZ Y. W ■ QI WI ~y W W OZ I 01 H o � EDD J � I Q;�I W P1 z 1 `• •' w w to ■ � cr Z w ; W. W A O I 0��I E -I U Z 5; w : Z p l �W W ° ° W o) I J A 11��zzz111 T/^/ V S CC)° W ~ O o ni I � E-4 I z Y O JJ A E-1 LL O o L W A of �m W Ld V 12 LdO 7 V) Q