Loading...
2012-087 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 tops Community Development- Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20120087 Application Number: A20120087 Tax Map No: 523400-227-017-0001-016-000-0000 Permission is hereby granted to: INWALD ENTERPRISES, LLC For property located at: 38 GUNN Ln in the Town of Queensbury, to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: INWALD ENTERPRISES, LLC PO BOX 73 Boathouse $40,000.00 CLEVERDALE,NY 12820-0000 Total Value $40,000.00 Contractor or Builder's Name /Address Electrical Inspection Agency Plans&Specifications 2012-087 693 sq ft boathouse with sundeck $75.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday, March 21, 2013 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town ue sbu 4we, es;'. u arch 21, 2012 SIGNED BY \ for the Town of Queensbury. Director of Building&Code Enforcement TOWN OF QUEENSBURY virs 742 Bay Road,Queensbury,NY 12804-5902 (518) 761-8201 Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: P20120087 Date Issued: Monday, June 18, 2012 This is to certify that work requested to be done as shown by Permit Number P20120087 has been completed. Location: 38 GUNN Ln Tax Map Number: 523400-227-017-0001-016-000-0000 Owner: INWALD ENTERPRISES, LLC Applicant: INWALD ENTERPRISES, LLC This structure may be occupied as a: Boathouse By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the property (DJ 4 ,45t owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Planning Board Director of Building&Code Enforcement or Zoning Board of Appeals. j / ZCE USE ONLY • f� TAX M P NO. / 2 PERMIT NO. 'O L5 FEE PAID / � ;�jf BLDG. &CODES APPROVAL WA • • ACCESSORY STRUCTURE BUILDING PERMIT APPLICATI.7.7 OF QUEENSBURY Use this application for any structure other than the Principal Structure (houlgtortrr1405216i'e00ffed to: garage, shed, greenhouse, dock, deck, etc. Refer to Informational Brochure No. 3 entitled Accessory Struc u - Sheds/Fences. A PERMIT MUST BE OBTAINED BEFORE WORK BEGINS.APPLICATION IS SUBJECT TO REVIEW BEFORE ISSUANCE OF A VALID PERMIT.NO INSPECTIONS WILL BE MADE UNTIL THE APPLICANT HAS RECEIVED A VALID BUILDING PERMIT. OWNER: c�3 f INSTALLER/BUILD R: ` Z <k ' ADDRESS: C,,)L) ADDRESS: ; eJJ �1- .C _ ?- --O PHONE NOS. -- �`c o (.0:5-PHONE NOS. 4 c -ES LOCATION OF PROPERTY: '� Cm.)(1n �� SUBDIVISION NAME: ) OK- LOCATION OF PROPOSED CONSTRUCTION AND/OR INSTALLATION: �-'R.)(\1 \ � Q ESTIMATED COST OF CONSTRUCTION: $ Li-0)0°C) ANY OTHER ACCESSORY STRUCTURES ON PROPERTY? /i //_ 1� IF YES,PLEASE LIST: 4 v /- 6) c/-3)a !, CONTACT PERSON FOR BUILDING&CODES COMPLIANCE: (*j.-, PHONE: { / -y - 7-S 7-V 0 3 PROPOSED CONSTRUCTION 1ST FLOOR 2N°FLOOR TOTAL PROPOSED HEIGHT D SQ.FT. SQ.FT. SQ.FT. FT.&IN. - OPEN PORCH DECK 3 SEASON,COVERED OR ENCLOSED PORCH* BOATHOUSE 11 BOATHOUSE WITH SUNDECK — C DOCK SHED POLE BARN DETACHED GARAGE(NO.OF CARS: ) OTHER ACCESSORY STRUCTURE: *CONSIDERED FLOOR AREA&MUST COMPLY WITH FAR[FLOOR AREA RATIO]REQUIREMENTS IF THE STRUCTURE IS LOCATED IN THE WATERFRONT RESIDENTIAL ZONE. To the best of my knowledge, the statements contained in the application, together with the plans and specifications submitted, are a true and complete statement of all proposed work to be done on the described premises and that all provisions of the Building Codes, the Zoning Ordinance, and all other laws pertaining to the proposed work shall be complied with, whether specified or noted, and that such work is authorized by the owner. Further, it is understood that I/we shall submit prior to a Certificati Compliance being issued, as requested by the Zoning Administrator or Direct n �j rV ;' ( t e Built Survey by a licensed surveyor, drawn to scale showing actual location of 4h 27L ((�� U'� VVV I have read and agree to the above. I Signed / A �,v�,�± Dated: . CM �W C ` re/a Name/Title(Printed) �h`p,(\ / sgiAe rea-dA i° pidced -u-e,4) . 6(og-3197 -€ CASHIER'S DEPARTMENT - TOWN OF QUEENSBURY BUILDING &CODES ' ✓ Code No. Title Fee Fee Reason for Refund Staff Collected Refunded Initials 01-51570 (210) Demolition Permit 01-52122 (211) Sewer Variance 01-52555 (212) Building Permit 01-52555 (212) Sign Permit 01-52555 (212) Septic Permit 01-52655 (230) Miscellaneous PLANNING &ZONING 01-52110 (220)j Zoning Fees 01-52115 (221) Planning Fees 01-52115 (221) Site Plan Review 01-52115 (221) Subdivision 01-380 (222) Technical Assistance Invoice # 01-52655 (223) Miscellaneous 01-52002-0061 Recreation (224) Assessments FIRE MARSHAL 01-51560 (190) Public Safety 01-52655 (230) Minor Sales NAME &ADDRESS OF CUSTOMER PROJECT NAME/ NUMBER ✓ OFFICE USE ONLY Cash Check # Total Fee Total Fee Collected J Refunded Town Clerk/ Date Deputy's Signature Prepared by: O Building &Codes O Planning O Zoning O Fire Marshal Original (Town Clerk) Canary (Town Clerk) Pink (Customer) Gold (Return to Dept. checked above) STATE OF NEW YORK r a LAKE GEORGE PARK COMMISSION _ ; PO Box 749, 75 Fort George Rd �1:- 1 r Lake George NY 12845 ' ! n tel (518) 668-9347 fax (518) 668-5001 �— zle. www.lgpc.state_ny.us infoelgpc.state.ny.us Bruce E. Young Molly Gallagher Chair Acting Executive Director MEETING NOTICE December 06, 2011 Meeting Date: December 20, 2011 10:00 AM Contact: Molly Gallagher Location: Holiday Inn, Rt 9 Lake George Site Inspections: December 16, 2011 10:00 AM (as needed) The Project Review Committee of the Lake George Park Commission will convene this month as a "committee of the whole" . The projects listed below are scheduled for review at this meeting. Project Review matters are generally first on the agenda of the meeting. Anyone wishing to comment on an application may do so. However, it should be noted that decisions of the Commission are required to be based upon the written record. Commenters in support of or in opposition to an application are encouraged to avail themselves of the opportunity to submit written comments during the public comment period afforded. PROJECTS Salim Amersi Town of Lake George Operate a Class A Marina offering up to 10 seasonal berthing spaces. Remove two existing wharfs and construct three 40' long, 40' wide, U-shaped wharfs, one pile supported and two floating. Sharon Davies, Et Al Town of Queensbury Modify existing U-shaped dock to increase one pier's length by 2', width by 5.5', boathouse length by 5' and boathouse height by 3'8" in accordance with plans attached. A variance is required. Stewart Jones Town of Bolton Construct an open-sided peaked roof boatcover in accordance with plans attached David &Traci Jersen Town of Fort Ann Construction of a single family home with erosion and stormwater controls as shown on the plans attached Sag bolt Ltd Town of Bolton Remove four existing docks and expand most northern existing dock to 7' wide, 50' long in accordance with plans attached Inwald Enterpises Llc Town of Queensbury Construct a new boatcover/sundeck on '3 n existing wharf in accordance with plans attached cc: Commissioners, Applicants, Interested Parties, M. Affredou, LGA, DEC, APA, Post Star, Towns, Lake George Waterkeeper c STATE OF NEW YORK ` I LAKE GEORGE PARK COMMISSION PO Box 749, 75 Fort George Rd � ►- - ' Lake George NY 12845 tel (518) 668-9347 fax (518)668-5001 RECEIVED E'YC6_45t0'A3�' www.lgpc.state.ny.us info @Igpc.state.ny,us Bruce E. Young MAR .0 i ed12 Chair March 05, 2012 TOWN OF QUEENSBURY PLANNINC OFFICE Robin Inwald Inwald Enterpises LIc P 0 Box 73 Cleverdale, NY 12820 Permit#5234-30-11 Wharf Construction Parcel #227.17-1-16 Town of Queensbury Dear Ms. Inwald: Enclosed is your permit which was issued in accordance with the applicable provisions of the Park Commission's rules and regulations (6 NYCRR 645 & 646) and the Environmental Conservation Law. Please review the general and special conditions included in the permit; these are intended to minimize any environmental disturbance associated with the authorized activity. Please note that it is the responsibility of the permittee and the permittee's agent to comply with all permit conditions. Further, the permit is valid only for the activity expressly authorized. Work beyond the scope of the permit shall be considered as work without a permit. The notice enclosed with the permit must be displayed in a conspicuous place near the project site during the entire period of construction and must be suitable protected from the elements. Any failure to comply with the terms of the permit may be treated as a violation of the Environmental Conservation Law. Questions regarding this permit should be directed to the undersigned. Should your plans change, you must contact this office to determine whether a modification to the permit is required prior to initiating construction. Please note the expiration date of the permit. If further time is required to complete the project, you must request renewal of the permit prior to this date. Your interest in maintaining the environmental quality of Lake George is greatly appreciated by the Commission. Sincere! , , 1 Molly G-allagh r cc: Law Enforcement Deputy Permit Administrator Town of Queensbury Peter Loyola • . LGPC Permit Number State of New York Effective Date 5234-30-11 DM LAKE GEORGE PARK COMMISSION 03/05/2012 qA ,x Modification or Renewal Date Type of Permit Expiration Date ® New FXC[E114RS - 03/05/2013 ❑ Renewal PERMIT ❑ Modification Under the Environmental Conservation Law ® Variance X Article 43, Title 1, 6NYCRR 646-1.1 Article 15, Title 5, 6NYCRR 608.5 Construction and Modification of Wharfs Excavation and Placement of Fill in Navigable Waters Article 43, Title 1, 6NYCRR 646-1.1 Article 43, Title 1, 6NYCRR 646-1.2 Placement of Moorings Operation and Modification of Class A Marinas Article 43, Title.1, 6NYCRR 646-1.4 Article 43, Title 1, 6NYCRR 646-1.4 Recreational Use- New Recreational Use-Parasail Article 43, Title 1, 6NYCRR 646-1.4 Article 43, Title 1, 6NYCRR 646-1.4 Recreational Use- Seaplanes Recreational Use -Tour Boat Article 43, Title 1, Section 43-0117 Operation of ferries Article 43, Title 1, 6NYCRR 646-4 and certain other boats, barges and vessels restricted. Stormwater Management 6 NYCRR Part 608 Water Quality Certification Permit Issued to Telephone Number Inwald Enterpises LIc 917-757-9062 Address of Permittee PO Box 73 Cleverdale, NY 12820 Contact Person (if not permittee) Telephone Number Robin Inwald SAME Facility Name Private Lakefront County Warren Town Queensbury Parcel # 227.17-1-16 AUTHORIZED ACTIVITY Construct a new boatcover/sundeck on an existing wharf in accordance with plans attached as Schedule A and made part of this permit. By the acceptance of this permit, the permittee agrees that the permit is contingent up)n strict compliance with the Environmental Conservation Law, the Navigation Law, all applicable regulatio'is, and the General and Special Conditions included as part of this permit. Deputy Permit Administrator: Molly Gallagher Lake George Park Commission, PO Box 749, Lake George NY 12845, 518-668-9347 Authorized Signature n Date 7.7 � 3 _ ' Page 1 of 5 • • GENERAL CONDITIONS 1, All activities authorized by this permit must be in strict 10. The permittee has accepted expressly, by the conformance with the plans attached as Schedule A and execution of the application, the full legal responsibility of made part of this permit. Modifications to the project all damages, direct or indirect, or whatever nature, and by require prior approval in writing from the Commission. whomever suffered, arising out of the project described herein and has agreed to indemnify and save harmless 2. The perrnittee and any contractor, project engineer, or the State from suits, actions, damages and costs of every other person responsible for the overall supervision of this name and description resulting from the said project. project shall read, understand and comply with this permit, including all special conditions to prevent environmental 11. The State of New York shall in no case be liable for degradation. any damage or injury to the structure or work herein authorized which may be caused by or result from future Inspections operations undertaken by the State for the conservation or 3. The Commission and/or the Department of improvement of navigation, or for other purposes, and no Environmental Conservation (the Department) may claim or right to compensation shall accrue from any such conduct such on-site surveys, investigations, damage. examinations, and evaluations from time-to-time as it deems necessary to ensure compliance with the terms 12. Regulatory fees are due April 1 of each year for and conditions of this permit. docks,wharfs and moorings. 4. A copy of this permit must be available at all times at 13. Wharfs and moorings authorized herein may be used the project site during performance of the authorized for marina purposes only in conjunction with a valid Class activities. Failure to produce a copy of the permit upon A marina permit or Class B registration issued by the request by a Commission or a Department representative Commission. is a violation of this permit. Environmental Protection Permit Modifications& Renewals 14. Disturbance to the bed and banks of Lake George 5. The permittee is responsible for keeping the permit shall be kept to the minimum necessary to complete the active by submitting a renewal application, including any project. forms, fees or supplemental information which may be required by the Commission, no later than 30 days prior to 1-5: All necessary precautions shall be taken to preclude the expiration of this permit. contamination of any wetland or waterway by suspended solids, sediment, fuels, solvents, lubricants, epoxy 6. Any change or modification in any of the activities coatings, paint, concrete, leachate or any other authorized by this permit is subject to prior review and environmentally deleterious materials associated with the approval by the Commission. Any modification of this project. permit granted by the Commission must be in writing and attached hereto. 16. Heavy equipment, including bulldozers, backhoes, payloaders, etc., shall not be driven in the water. 7. The perrnittee is responsible for obtaining any other permits, approvals, land easements, and rights-of-way 17. Any material dredged in the prosecution of the work which may be required for this activity. herein permitted shall be removed evenly,without leaving large refuse piles, ridges across the bed of a waterway or Other Legal Obligations of Permittee floodplain or deep holes that may have a tendency to 8. Granting of this permit does not relieve the permittee cause damage to navigable channels or to the banks of a of the responsibility of obtaining any other permission, waterway. consent, permit, or approval from the US Army Corps of Engineers, US Coast Guard, NYS Office of General 18. Any debris or excess materials from construction of Services, NYS Department of Environmental this project shall be immediately and completely removed Conservation, NYS Department of Health, Adirondack:,--7n from the bed and banks of all water areas to ar Park Agency, or local government which may be required. appropriate upland area for disposal. • 9. This permit shall not bE • onstrued as conveying to the 19. There shall be no unreasonable interferenc.. with permittee any right to trespass upon the lands or interfere navigation by the work herein authorized. with the riparian rights of others in order to perform the permitted work or as authorizing the impairment of any 20. Wood treated with Creosote, Pentachlorophenol or rights, title or interest in real or personal property held or CCA(Chromated Copper Arsenate) is prohibited for vested in a person not a party to the permit. in-water and above-water use. LGPC Permit#: 5234-30-11 Page 2 of 5 GENERAL CONDITIONS 21. If upon the expiration or revocation of this permit, the 30. No rocks for use in construction are to come from the project hereby authorized has not been completed, the lake bed. permittee shall, without expense to the State, and to such extent and in such time and manner as the Commission The following specifications apply to the construction or or the Department may require, remove all or any portion replacement of rock-filled cribs. Existing cribs may be of the uncompleted structure or fill and restore the site to repaired. its former condition. No claim shall be made against the State of New York on account of any such removal or 31. The size of any individual crib shall not exceed 8 feet alteration. by 12 feet. 22. If future operations by the State of New York require 32. Spacing between cribs shall not be less than 8 feet. A an alteration in the position or the structure or work herein minimum of 6 feet of open water shall be maintained authorized, or if, in the opinion of the Commission or the between the shoreline and the first crib to allow for free Department, it shall cause unreasonable obstruction to circulation of water. the free navigation of said waters or flood flows or endanger the health, safety or welfare of the people of the 33. Completed cribs shall be of the"open-sided"type State, or cause loss or destruction of the natural construction and provide for at least 40% unboarded resources of the State, the owner may be ordered by the water contact area to the rock fill. Commission or the Department to remove or alter the structural work, obstructions, or hazards caused thereby 34. If granted under 6NYCRR Part 608, the Lake George without expense to the State. Park Commission hereby certifies that the subject project will not contravene effluent limitations or other limitations Wharf Construction Specifications or standards under Sections 301, 302, 303, 306 and 307 The following conditions apply to all newly constructed of the Clean Water Act of 1977 (PL 95-217) provided that wharfs which have not received a variance from any of all of the conditions listed herein are met. these limits: Moorings 23. The location of the mean low water mark must be 35. Moorings must meet the following minimum field verified prior to construction. In no case shall any specifications: the buoy shall be all white with a one inch part of the wharf extend further than 40'from the mean blue strip placed horizontally around the circumference low water mark. above the water line and a one inch strip of reflector tape placed around the upper part of the buoy; at least one 24. The maximum surface area of any dock or wharf shall cubic foot of buoy is to be above the waterline. be seven hundred square feet, including any walkway. The following conditions apply to all new moorings which 25. The maximum width of any pier shall be eight feet and have not received a variance from any of these limits: the minimum width of any pier shall be two feet. 36. Moorings shall be placed so that vessels moored to 26. The maximum width of any dock or wharf, including them, at the full swing of their mooring or anchor line, will all lateral projections,,shall be forty feet. be no closer than twenty feet to the projection of the property lines extended into the lake along the axis of the 27. No structure shall be constructed on a dock, wharf or property lines as they intersect the lake, or a line extended mooring which exceeds sixteen feet in height above the at a right angle to the mean high-water mark,whichever mean high water mark and which is not in compliance results in the greater setback. with local zoning. 37. Moorings shall not be placed so that the full swing of 28. Every dock or wharf constructed shall have a the vessel extends more than one hundred feet offshore minimum setback of twenty feet from the adjacent ; rrom the mean high-water mark, property line extended into the lake on the same axis the property line runs onshore where it meets the lake or at a right angle to the mean high-water mark, whichew-2r results in the greater setback. Crib Work 29. Stone used for filling shall be clean (not contain any material than can pass through a No. 8 sieve). The stone shall not be less than six(6) inches in diameter. LGPC Permit#: 5234-30-11 Page 3 of 5