Loading...
Meyer-letterDennis L. Dickinson, LS/PE "" Devin T. Dickinson DICK S SCIIN— SURVEYORS- ENGINEERS* LAND CONSULTANTS 7 Iroquois Street P.O. Box 388 Lake George, New York 12645 18 May 2015 Mr. Craig Brown Zoning Administrator Town of Queensbury 742 Bay Road Queensbury, New York 12804 RE: James & Joan Meyer SP28-2015 Dear Craig: (TEL) 5 18-GG8-4474 (PAX) 5 1 8-GG8-4474 I have reviewed the letter from Sean Doty, PE regarding the review of the above referenced project. I have spoken with Sean Doty, PE and have the following comments: 1. The proposed project increases impervious surface area by less than 1000 square feet and therefore does not require a stormwater management plan. However, we have designed stormwater controls to treat runoff from a portion of the existing and proposed impervious surfaces. 2. Does not apply. 3. Does not apply. 4. Does not apply. 5. There are no wells within 100' of the proposed septic leaching bed or stormwater controls that treat driveway runoff. If you have any questions or would like to discuss this further, please do not hesitate to contact my office. Sincerely, Devin T. Dickinson