Loading...
2015-267 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518)761-8256 CERTIFICATE OF COMPLIANCE Permit Number: P20150267-42063 Date Issued: Wednesday, January 11, 2017 This is to certify that work requested to be done as shown by Permit Number P20150267-42063 has been completed. Tax Map Number: 302.14-1-69 Location: 28 PERSHING RD Owner: Jeffrey Bittman,Blossom Bittman Applicant: Blossom Bittman This structure may be occupied as a: Residential Septic Alteration By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Compliance DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance,or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 FOO Community Development-Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20150267 Application Number: A20150267 Tax Map No: 523400-302-014-0001-069-000-0000 Permission is hereby granted to: BLOSSOM BITTMAN LE For property located at: 28 PERSHING Rd in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: BLOSSOM BITTMAN LE Septic Alteration Residential JEFFREY BITTMAN, TRUSTEE Total Value 28 PERSHING Rd QUEENSBURY,NY 12804 Contractor or Builder's Name /Address Electrical Inspection Agency IBS SEPTIC & DRAIN ATTN: IVAN BELL 2 LOWER WARREN St OUEENSBURY.NY 12804 Plans&Specifications 2015-267 Residential Septic Alteration $40.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,June 30,2016 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the To n of eens ry4 , une 30, 2015 SIGNED BY for the Town of Queensbury. Director of Building&Code Enforcement Revised 4/14/2010 OFFICE USE ONLY ' u y JUt I �; Cjj�� TAX MAP NO. PERMIT NO.IFj '2..1,01- PERMIT FEE 10 f O�VN OF QUEENSBURY APPROVALS: ZONING TOWN CLERK RI IP 'rrtrro e,,,-..-_, APPLICATION FOR SEPTIC DISPOSAL SYSTEM PERMIT: A PERMIT MUST BE OBTAINED BEFORE WORK BEGINS_ APPLICATION IS SUBJECT TO REVIEW BEFORE ISSUANCE OFA VALID PERMIT. OWNER: B + q/�y-. INSTALLER: .jB 5 -ryt`C ADDRESS: 2 -eh 5 ►c' 1 0 r• ADDRESS: .1 _♦ ' (' f ' a , • PHONE NOS. )ti."-Cil-7 PHONE NOS_ - _C/S V 9 LOCATION OF INSTALLATION: RESIDENCE INFORMATION: NO.OF COMPUTATION YEAR BUILT BEDROOMS X (Gallons per bedroom) = TOTAL DAILY FLOW _ GARBAGE GRINIT 1980 or older X 150 = (J.F ' INSTALLED? IN 1981 -1991 X 130 = b ' SPA OR HOT n/ ,X. � INSTAI I FD? 1U 1992-present � X 110 = I PARCEL INFORMATION: ,( \t ✓ TOPOGRAPHY: FLAT ROLL! STEEP SLOPE( 'r\ %SLOPE \V ✓ SOIL NATURE: SAND LOAM !\; CLAY I t 1 OTHER _R_ -' GROUNDWATER: AT WHAT DEPTH? L{Ii \t /' ••( BEDROCK/IMPERVIOUS MATERIAL.: AT W�DEPTH? :U IV ✓ DOMESTIC WATER SUPLY: MUNICIPAL WELL (If well:water supply from any septic system absorption is: ft) ✓ PERCOLATION TEST: RATE IS d i i r\-S PER MIINUTE PER INCH[mpil (Test to be completed by a licensed professional engineer or architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION: All individual sewage disposal systems must be designed by a licensed professional engineer or architect(unless installed in a Planning Board approved subdivision). TANK SIZE: non(j GALLON(MIN.SIZE IS 1,000 GAL)Add 250 gallons to the size of the septic tank for e l5 - ^j t each garbage grinder,spa or whirlpool tub. t SYSTEM E: f ABSORPTION FIELD(WITH NO.2 STONE) Total length 1.;') ft Each trench 0 X_ o SEEPAGE PITS (WITH NO. STONE) How many? 1 'm �� PIT(S) 1V � Size? ❑ALTERNATIVE SYSTEM Bed or other type? iv \t'\ ❑HOLDING TANK SYSTEM Total required capacity? j \' Tank size? I r1 Number of tanks? NOTE: ALARM SYSTEM AND ASSOCIATED ELECTRICAL WORK MUST BE INSPECTED BY A TOWN APPROVED ELECTRICAL INSPECTION AGENCY. PLEASE REVIEW LIST PROVIDED. For your protection,please note that pursuant to Section 136-29 of the Code of the Town of Queensbury,any permit or approval granted which is based upon or is granted in reliance upon any material misrepresentation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void. I have read the regulations with respect to this application and agree to abide by these and irements of the Town of Queensbury QUESTIONS? CALL 761-8256 OR EMAIL Sanitary Sewage D' I Ordinance. 7— codes(aclueensbury.net 6-11-V-) VISIT OUR WEBSITE FOR MORE INFORMATION Signatur o e on Responsible Date www.queensburv.net Town of Queensbury` Community Development Office*742 Bay Road, Queensbury NY 12804 RUCINSKI HALL ARCHITECTURE Ronald Richard Rucinski Ethan Peter Hall �5� C 627 Maple Ave Saratoga Springs NY 12866 Voice 518 580 1905 r-� Fax 518 584 5012 Email ephall@nycap.rr.com 2 r� I� Bittman Septic—As-Built D LS �` Q I` 22 May 2015 D John O'Brien —Town of Queensbury Building Department 742 Bay Road TOWN OF QUEENSBURY Queensbury NY 12804 BUILDING& CODES Re: Replacement of existing Septic System At the above referenced project location this office observed the installation of the sewage disposal field prior to back fill. The attached as-built plans represent the modifications made by the installer in the field due to site conditions. These modifications have been noted and are acceptable to this office. If there are any questions please contact our office to discuss. Regards, 44;� Ethan Peter Hall Architect UL \\RHA-Macad\Ivan Bell Septic(IBS)\Biamnn SepticTetter22 May2015.doc 1 L-0 SRON Noma OLLd3S ONV Ntlld 311S � In.n•w q em�-�Y am�wV AKi 6t`'Ca .xx.Kw Y. NVdl 10 Id 9NLLSIX3 NUEVROW-M Ism 4<n..wuY��u w nl o-.ta w.mo.wro x 4v.u.mmw,Iaa�.nr a .o.amn mmm� x.roa iu run y.wmu...�.w u®.vom ama wu.uum nrK.•Mw.n�mm.m�>iw„ m.•eom w.aw w...mn nwn•m —_ __ a m 3 �n..m.Y...,mwm..n>ow.,Kw...n...wl>um.. - ---^• Ir°-•�' I• —^ I € � ��+ a �..n,.-��m'.`ae § I "• � '�.I'I d.�,.w.. j .m.w.eKw.K.Y......m...ma..n....mn o-.w -.-. -- —• � F�En � I..wYm.,.n,,..n..-_--._-__ uv.w K. nom.y'".-,.�'..n""'... ,o..ma... °•.wa:TR"�aw.""i i' ersn � ' a � aN3�3: "'�''„�°'°�.n.nY, .wn,.wm,.. �.,....,<�m..�,...w�•�„m.�.�A��; 4Fl,w.i..,.wm.,M..rt n uumm a a nn.Yn � SM6N3Y .n'Y 1I M.i M.K..14a MSM Yyyys 4um.�� NN.n®.n m.pum.wu.a..w.ofn.Nr v u•+oMwiw NM'W mx�mw JEE J �mYnY J� �ivww}4ix q�an1WN� Pb�q�pwla�YpO�YO�uA • P.6m wIKn �A.E Id�T6 n�M �•Y..w �.a�iu.��^ .W.iY.O n Kw�uam�..as .w.on oam ui�c�i NIDJTM`��.4i�•]u6MA 4M.V-T•w ,tw Ww.m Tu mrvw on maaL SON c � 'S46A�86i1N9?;1983F35 }E f 4�� Z-� S3LON S SlIVAO OILd3S oa awn 44 e �auwo.�na�v�.cm�nwo.m ssv..s X6G-l7bIIifHla0d a w am � � i ap ♦.oar.uw. s v:w yn n f warn S mow. .on.a,.on 1 } ]J .cam f a i GENERAL SANITARY NOTES: THE BEST DESIGNED AND INSTALLED SEPTIC TANK SYSTEM WILL EVEN IUALLY FAIL WHEN SEPTIC TANK IS PUMPED, THE SEPTIC TANK, BAFFLES/TEES HOUSE SEWER CONNECTION AND TANK TO FUNCTION PROPERLY WITHOUT PERIODIC MAINTENANCE. OUTLET PIPE SHALL BE INSPECTED. BAFFLES/TEES THAT HAVE DETERIORATED AND NO LONGER PERFORM AS DESIGNED MUST BE REPLACED. CRACKED OR BROKEN LINES MUST BE REPAIRED OR REPLACED. INADEQUATE SEPTIC TANK MAINTENANCE CAN RESULT IN CLOGGING OF THE TANK AND SEWAGE BACKUP INTO HOME AND/OR SEWAGE OVERFLOW ONTO GROUND SURFACE. FAILURE TO PERIODICALLY CLEAN SEPTIC TANK COMMONLY RESULTS IN CLOGGING OF SOIL SURROU14DING THE ABSORPTION FIELD BY OVERFLOWING SOLIDS NOT REMOVED BY SEPTIC TANK. THIS DESIGN IS INTENDED TO PROVIDE SUBSURFACE SEWAGE DISPOSAL FOR THIS LOT ONLY. NO ADDITIONS INVOLVING LIVING OR SLEEPING AREAS MAY BE ADDED TO 1111S HOUSE WITHOUT THE APPROVAL OF THE BOARD OF HEALTH AND REDESIGN OF THE SUBSURFACE DISPOSAL SYSTEM. THE SEAL AND SIGNATURE ON THIS PLAN SPECIFICALLY EXCLUDES CERTIFICATION FOR EXPANSION OR REPLACEMENT. NO GARBAGE GRINDERS ALLOWED UNLESS INSTALLED AS INITIAL CONSTRUCTION OF THE HOUSE, AND THE SEPTIC TANK SIZE IS INCREASED BY A MINIMUM OF 250 GALLONS NO SUMP PUMP, CONDENSATION LINES WATER SOFTENER, SPAS, HOT TUBS OR WHIRLPOOLS SHALL BE DRAINED INTO SYSTEM. OBSERVE WATER CONSERVATIVE PRACTICES. SEPTIC TANKS SHALL BE INSPECTED ANNUALLY TO DETERMINE SCUM AND SLUDGE ACCUMULA11ON BY THE HOMEOWNER OR A QUALIFIED SEPTAGE HAULER. THE AMOUNT OF BUILD UP NOTED AT EACH INSPECTION SHALL BE RECORDED AND MAINTAINED IN A RECORD BOOK. THE TANK SHALL BE PUMPED WHENEVER THE BOTTOM OF THE SCUM LAYER IS WITHIN THREE INCHED OF THE BOTTOM OF THE OUTLET BAFFLE OR SANITARY TEE. MOST TANKS SHOULD BE PUMPED EVERY TWO OR THREE YEARS ANY COMPANY EMPLOYED TO CLEAN AND SERVICE THE SEPTIC TANK AND SYSTEM MUST BE A D.E.C. PERMITTED SEPTAGE HAULER. SEPTIC TANKS SHOULD NOT BE WASHED OR DISINFECTED AFTER BEING PUMPED OUT. SEPTIC TANK ADDITIVES SHALL NOT BE USED IN THE SEPTIC SYSTEM. ADDITIVES ARE UNNECESSARY FOR THE PROPER OPERATION OF 1HE HOUSEHOLD SYSTEMS AND MAY CAUSE THE SLUDGE AND SCUM IN THE SEPTIC TANK TO BE DISCHARGED INTO THE ABSORPTION FIELD RESULTING IN PREMATURE FAILURE. DO NOT DISPOSE OF EXCESS HOUSEHOLD GREASE AND FAT DOWN THE DRAINS WHENEVER SEP11C TANKS ARE TO BE ABANDONED (I.E.WHEN PUBLIC SEWERS ARE INSTALLED TO HANDLE HOUSEHOLD WASTES) THE TANKS SHALL BE REMOVED OR PUMPED OUT AND REFILLED WITH SOIL TO PREVENT FUTURE CAVE-INS. DO NOT POUR OR DUMP EXCESS CHEMICAL CLEANERS IN THE SINKS OR TOILETS. NO VEHICULAR PARKING OR TRAFFIC SHALL BE ALLOWED ON ANY PORTION OF SEWAGE DISPOSAL AREA DO NOT DISCHARGE ROOF DRAINS ONTO GROUND NEAR SEPTIC SYSTEM OR ALLOW THE DISCHARGE FROM ROOF DRAINS TO GO OVER THE LEACH FIELD THE SUBSURFACE DISPOSAL FIELD IS DESIGNED FOR DOMESTIC WASTE WATER ONLY THE SEPTIC FIELD IS DESIGNED BASED ON THE PROJECTED FLOW RATES ANY USE OF THE BUILDINGS THAT HAS A GREATER DISCHARGE OF WASTEWATER FLOE THAN DESIGNED WILL REQUIRE REDESIGN OF THE SUBSURFACE DISPOSAL SYSTEM. I EXISTING TREE 2 TP-� I TO BE REMOVED 1 I 1 I 1 EXISTING PLOT PLAN NTS CONSTRUCTION NOTES: SEPTIC TANK TO BE SET LEVEL ON 6" LAYER OF COMPACTED GRAVEL OR STONE SEPTIC TANK TO HAVE SCH 40 PVC "T" AN INLET AND OUTLET. INLET 12" BELOW FLOW LINE 6" ABOVE FLOE LINE OUTLT T 14" BELOW FLOW LINE 6" ABOVE FLOW LINE 3" AIR SPACE ABOVE "T'S" TO TOP OF TANK NO ROOF, FOOTING, FLOOR, COOLING WATER, BACKWASH DRAINS, ETC„ SHALL BE CONNECTED TO THE SEWAGE SYSTEM THERE SHALL BE NO CONSTRUCTION OF SANITARY FACILITIES (SEPTIC SYSTEMS) WITHIN 100' OF A CLASSIFIED BODY OF WATER. HOUSE: 10 SEPTIC TANK 4" PVC SCHEDULE 40 PIPE WITH TIGHT JOINTS MINIMUM SLOPE = 1/4" PER FOOT SEPTIC 'TANK TO DISTRITBUTION BOX - 4" PVC SCHEDULE 40 PIPE TIGHT JOINTS, MIN. SLOPE 1/8" PER FOOT. SANITARY DISPOSAL FIELD 4" PERFORATED PLASTIC PIPE MEETING ASTM STANDARDS FOR USE IN SEPTIC SYSTEMS, MAX SLOPE = 1/16" PER FOOT. CAP ALL ENDS. DISTRIBUTION BOX SHALL BE NEW YORK STATE HEALTH DEPARTMENT APPROVED AND SHALL BE SET BY WATER LEVEL OR OTHER APPROVED METHODS. FILL 10 BE CLEAN SANDY LOAM. PERCOLATION RATE IN PLACE TO BE NO LESS THAN 1" IN 5 MINUTES NOR MORE THAN 1" IN 20 MINUTES. -—w w w _-w w W __w w .._--w�- ��_.-� w w — w _ w --- w - - - ----------- I I ---�-_ } - - ----- -- I I 1 1 E 1 I E 1 12`0" 16' MN II 1 I 20'_0 �r 1 1 1 1 l 1 1 1 1 1 1 1 I 1 1 1 O I I 1 O_ I i 1 1 I —BOX I 1 1 I i II 1 I I 11 I O. 1 1 1 I 1 —0' i i 1 ' 1 I 1 I 1 I j 1 1 I 1 I I 1 1 I 1 i 1 1 1 � I 1 I I 1 1 1 1 I 1 I 1 1 1 I I 1 --------------- I I I I I - - _JJ i -- L_ .-..--- - -- CONTRACTOR TO CLEAN AND INSPECT THE EXISTING TANK TO DETERMINE THE CONDITION OF EXISTING TANK. AS A MINIMUM A NEW OUTLET "T" BAFFLE WITH REMOVABLE SCREEN SHALL BE INSTALLED ON THE OUTLET PIPE FROM THE SEPTIC TANK. _PROPOSED PI__0T PLAN NTS LEGEND — - - — - — PROPERLY LINE (APPROXIMATE) ---------------- PROPERTY LINE SETBACKS —w —w --w —W WATER SERVICE -E/P EDGE OF PAVEMENT Gi- NERAL NOTES THERE ARE NO WELLS EXISTING WITHIN 100 FEET OF THE BOUNDARY OF THIS LOT EXCEPT AS SHOWN. THERE SHALL BE NO DEVIATION FROM THESE PLANS DURING CONSTRUCTION WITHOUT PRIOR APPROVAL OF THE ARCHITECT, THE DEPARTMENT OF HEALTH, AND THE TOWN OF QUEENSBURY BUILDING DEPARTMENT. THE MATERIALS AND SPECIFICATIONS NOTED ON THE PLANS MUST BE UTILIZED UNLESS ALTERNATES ARE ACCEPTED AND APPROVED IN WRITING BY THE ARCHITECT FOLLOW ALL MA.NUFACIURERS INSTRUCTIONS FOR COMPONENT INSTALLATION UNLESS OTHERWISE DIRECTED BY THE ARCHITECT. INSPECTIONS OF SANITARY FACILITY CONSTRUCTION SHALL BE CONDUCTED BY THE ARCHITECT PRIOR TO BACK FILLING PIPES, TANKS, WELL SEALS ETC. NO ROOF, FLOOR, FOOTING, COOLING WATER, BACK WASH DRAINS ETC, SHALL BE CONNECTED TO THE SEWAGE TREATMENT SYSTEM AND ALL DISCHARGES SHALL BE DIRECTED AWAY FROM TREATMENT AREA. NO VEHICULAR PARKING OR TRAFFIC SHALL BE ALLOWED ON ANY PORTION OF THE SEWAGE TREATMENT SYSTEM CONTRACTOR IS REQUESTED TO INSTALL SAFETY FENCE AROUND THE PER;MEIER OF THE SEP11C AREA TO ELIMINATE TRAFFIC OR PARKING IN THIS AREA. UPON COMPLETION OF THE INSTALLATION OF THE SANITARY SYSTEM, AND INSPECTION BY THE ARCHITECT, AN AS -BUILT PLAN SHALL BE PREPARED BY THE ARCHITECT A CERTIFICATION OF THE INSTALLATION ALONG WITH THE AS -BUILT PLAN SHALL BE SUBMITTED 10 THE TOWN OF QUEENSBURY BUILDING DEPARTMENT PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. SYS1-EM DESIGN PARAMETERS DESIGN FLOW:_ 3 BEDROOM HOUSE 0 130 GPD/BR = 390 GPU. ASSIDMED PMC. RATE OF FILL: 1" IN 10 MINUTES MAX. PER SPECIFICATIONS DFUISzN_AFP1.LQAAI1QN__R& E;_ USING A DESIGN RATE OF 1" IN 10 MINUTES, THE APPLICATION RATE IS 0.9 GPD/SF OF TRENCH TOTAL TRENCH LENGTH = 390 GPD/0.9 GPD/SF/2 FT. TRENCH WIDTH = 217 L.F. TRENCH SYSTEM DESIGN: 6 LATERALS AT 40 L.F. EACH (MIN.) FOR PIPE AND STONE (STANDARD TRENCHES) A TOTAL OF 240 L.F. OF TRENCH SEPTIC SYSTEM DESIGN USING THE F'LOV,,' DATA FROM ABOVE, AND SPECIFYING THE FILL MATERIAL TO BE BETWEEN 1" IN 5 MINUTES AND 1" IN 10 MINUTE IN PLACE PERCOLATION RATE, AN APPLICATION RATE OF 1" IN 10 MINUTES OR 0.9 GALLONS PER DAY PER SQUARE FOOT OF TRENCH IS CHOSEN. CONSTRUCTION INSPECTION NOTES: THE ARCHITECT SHALL OBSERVE SYSTEM INSTALLATION; CERTIFY THAT THE CONSTRUCTION FOLLOWED THE APPROVED PLAN; FURNISH AN "AS -BUILT" PLAN TO THE TOWN OF QUEENSBURY. PERIODIC OBSERVATION OF SANITARY FACILITY CONSTRUCTION SHALL GENERAL NOTE INFORMATION SHOWN ON 11115 DRAWING IS TAKEN FROM A TAX MAP PROVIDED BY WARREN COUNTY AND NOT FROM ACTUAL TOPOGRAPHIC SURVEY THE ARCHITECT LEGEND — - - — - — PROPERLY LINE (APPROXIMATE) ---------------- PROPERTY LINE SETBACKS —w —w --w —W WATER SERVICE -E/P EDGE OF PAVEMENT Gi- NERAL NOTES THERE ARE NO WELLS EXISTING WITHIN 100 FEET OF THE BOUNDARY OF THIS LOT EXCEPT AS SHOWN. THERE SHALL BE NO DEVIATION FROM THESE PLANS DURING CONSTRUCTION WITHOUT PRIOR APPROVAL OF THE ARCHITECT, THE DEPARTMENT OF HEALTH, AND THE TOWN OF QUEENSBURY BUILDING DEPARTMENT. THE MATERIALS AND SPECIFICATIONS NOTED ON THE PLANS MUST BE UTILIZED UNLESS ALTERNATES ARE ACCEPTED AND APPROVED IN WRITING BY THE ARCHITECT FOLLOW ALL MA.NUFACIURERS INSTRUCTIONS FOR COMPONENT INSTALLATION UNLESS OTHERWISE DIRECTED BY THE ARCHITECT. INSPECTIONS OF SANITARY FACILITY CONSTRUCTION SHALL BE CONDUCTED BY THE ARCHITECT PRIOR TO BACK FILLING PIPES, TANKS, WELL SEALS ETC. NO ROOF, FLOOR, FOOTING, COOLING WATER, BACK WASH DRAINS ETC, SHALL BE CONNECTED TO THE SEWAGE TREATMENT SYSTEM AND ALL DISCHARGES SHALL BE DIRECTED AWAY FROM TREATMENT AREA. NO VEHICULAR PARKING OR TRAFFIC SHALL BE ALLOWED ON ANY PORTION OF THE SEWAGE TREATMENT SYSTEM CONTRACTOR IS REQUESTED TO INSTALL SAFETY FENCE AROUND THE PER;MEIER OF THE SEP11C AREA TO ELIMINATE TRAFFIC OR PARKING IN THIS AREA. UPON COMPLETION OF THE INSTALLATION OF THE SANITARY SYSTEM, AND INSPECTION BY THE ARCHITECT, AN AS -BUILT PLAN SHALL BE PREPARED BY THE ARCHITECT A CERTIFICATION OF THE INSTALLATION ALONG WITH THE AS -BUILT PLAN SHALL BE SUBMITTED 10 THE TOWN OF QUEENSBURY BUILDING DEPARTMENT PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. SYS1-EM DESIGN PARAMETERS DESIGN FLOW:_ 3 BEDROOM HOUSE 0 130 GPD/BR = 390 GPU. ASSIDMED PMC. RATE OF FILL: 1" IN 10 MINUTES MAX. PER SPECIFICATIONS DFUISzN_AFP1.LQAAI1QN__R& E;_ USING A DESIGN RATE OF 1" IN 10 MINUTES, THE APPLICATION RATE IS 0.9 GPD/SF OF TRENCH TOTAL TRENCH LENGTH = 390 GPD/0.9 GPD/SF/2 FT. TRENCH WIDTH = 217 L.F. TRENCH SYSTEM DESIGN: 6 LATERALS AT 40 L.F. EACH (MIN.) FOR PIPE AND STONE (STANDARD TRENCHES) A TOTAL OF 240 L.F. OF TRENCH SEPTIC SYSTEM DESIGN USING THE F'LOV,,' DATA FROM ABOVE, AND SPECIFYING THE FILL MATERIAL TO BE BETWEEN 1" IN 5 MINUTES AND 1" IN 10 MINUTE IN PLACE PERCOLATION RATE, AN APPLICATION RATE OF 1" IN 10 MINUTES OR 0.9 GALLONS PER DAY PER SQUARE FOOT OF TRENCH IS CHOSEN. CONSTRUCTION INSPECTION NOTES: THE ARCHITECT SHALL OBSERVE SYSTEM INSTALLATION; CERTIFY THAT THE CONSTRUCTION FOLLOWED THE APPROVED PLAN; FURNISH AN "AS -BUILT" PLAN TO THE TOWN OF QUEENSBURY. PERIODIC OBSERVATION OF SANITARY FACILITY CONSTRUCTION SHALL BE CONDUCTED BY THE ARCHITECT I 0 1. PRIOR TO SITE DEVELOPMENT 2. AFTER SITE PREPARATION, PRIOR TO FILL PLACEMENT (SYSTEMS IN FILL ONLY) 3. DURING PERCOLATION TESTING OF THE STABALIZED FILL (SYSTEM IN FILL ONLY) 4. PRIOR TO BACKFILLING PIPES, TANKS PITS WELL SEALS ETC. 5. AFTER FINAL GRADING AND SEEDING zfv< TEST PIT INFORMATION FILE COPY TEST PIT INFORMATION TAKEN MAY 15, 2015 BY ETHAN P HALL RUCINSKI HALL ARCHITECTURE TP -1 TP -2 0-4" TOPSOIL 0-9" TOPSOIL 4-15" DARK BROWN SAND 9-16" LIGHT BROWN SAND 15-21" LIGHT BROWN SAND 16-34" DK BROWN TOPSOIL (ORIGINAL GRADE) 21-28" TOPSOIL (ORIGINAL GRADE) 34-40" REDDISH BROWN SAND - MOIST 28-42" REDDISH BROWN SAND - MOIST ROOTS TO 43" ROOTS TO 35" MOTTLING ® 48" MOTTLING 0 37" THE RESULT OF THE TEST PITS SHOWS THAT THE CURRENT SEPTIC DISPOSAL SYSTEM IS CONSTRUCTED IN CLEAN IMPORTED FILL THAT WAS PLACED ABOVE AN EXISTING TOPSOIL LAYER. THE REMEDY FOR THE NEW SYSTEM IS TO REMOVE THE EXISTING SYSTEM AND THE ORIGINAL TOPSOIL LAYER, THEN IMPORT CLEAN SEPTIC FILL MATERIAL TO CONSTRUCT THE NEW SEPTIC DISPOSAL SYSTEM. 11� 2015 �JJ 7C LAIC QUL E�y,URY BUILL'!NC 44 TOWN OF QUE BUILDING & < Reviewed By: Date: WORK IS TO BE AS SHOWN & NOTED AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, TRADE ASSOCIATION PUBLISHED RECOMMENDATIONS AND GENERALLY ACCEPTED LOCAL CONSTRUCTION INDUSTRY PRACTICES. I 0 Q 3 N w > } 1-- zfv< t?c U <� W a o z F_ O w rj) Q i z 0 w o zZw V O U 4JN d!)ct 0 QU O i' i 1 4 .. J F o J Y ro D w V F w K �> y N V ¢ O al cl N V F W YP=0 VD �T 0't NN- <�� oz> O >.` Q a in in - » z U a) NCO La Q 2 ¢ O O z N N N U Ua a Q <q U 0 C L 0 �. O x= o o F o" No o a E X w cD In > 1� w WORK IS TO BE AS SHOWN & NOTED AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, TRADE ASSOCIATION PUBLISHED RECOMMENDATIONS AND GENERALLY ACCEPTED LOCAL CONSTRUCTION INDUSTRY PRACTICES. CAD FILE NAME ACAD\I8S\BITTMAN\C-1 SITEPLAN SCALE AS NOTED DRAWN BY DRAWING TITLE SITE PLAN AND SEPTIC DESIGN NOTES DRAWING No. C-1 I 0 � N t?c p 03 rj) Q i sn d!)ct i' 4 .. N -1 Q �> rQ�,i V ) al cl U VD �T 1—LI cV CAD FILE NAME ACAD\I8S\BITTMAN\C-1 SITEPLAN SCALE AS NOTED DRAWN BY DRAWING TITLE SITE PLAN AND SEPTIC DESIGN NOTES DRAWING No. C-1 MIN. SLOPE 1/4" PER FOOT SEPTIC TANK BY FORT MILLER OR EQUAL PROVIDE 3" SAND OR PEA GRAVEL UNDER TANK APPROXIMATE FINISH GRADE LIQUID LEVEL INLET & OUTLET BAFFLES CL Z o�� cy (0 o MINIMUM 2x WIDTH - MAXIMUM 4x WIDTH RECOMRIEND ALL ACCESS & CLEANOUT OPENINGS BE RAISED 10 6" BELOW FINISH GRADE. SEPTIC TANK DETAIL N. T.S. PER APPENDIX 75-A TANKS SHALL HAVE INLET AND OUTLET BAFFLES, SANITARY TEES OR OTHER DEVICES TO PREVENT THE PASSAGE OF FLOATING SOLIDS AND TO MINIMIZE DISTURBANCE OF SETTLED SLUDGE AND FLOATING SCUM BY SEWAGE ENTERING AND LEAVING THE TANK. OUTLET DESIGNS SUCH AS GAS DEFLECTION BAFFLES ARE STRONGLY RECOMMENDED IN ALL TANKS. INLET AND OUTLET BAFFLES SHALL EXTEND A MINIMUM OF 12 INCHES AND 14 INCHES RESPECTIVELY, BELOW THE LIQUID LEVEL IN TANKS WITH A LIQUID DEPTH OF LESS THAN 40 INCHES, AND 16 AND 18 INCHES RESPECTIVELY, IN TANKS WITH LIQUID DEPTH OF 40 INCHES OR GREATER. THE DISTANCE BETWEEN THE OUTLET BAFFLE AND THE OUTLET SHALL NOT EXCEED SIX INCHES. BAFFLES SHALL BE CONSTRUCTED OF A DURABLE MATERIAL NOT SUBJECT TO CORROSION, DECAY OR CRACKING. INLET FROM EFFLUENT - TANK PVC TO EFFLUENT TANK SLOPE PER FOOT ro 9,-n" 41-01, 91—n„ 1. ALL UNITS SHALL COMPLY WITH THE REQUIREMENTS OF THE NEW YORK STATE DEPARTMENT OF HEALTH AND SHALL BE PRECAST CONCRETE AS MANUFACTURED BY FORT MILLER OR EQUIVALENT. 2. ALL STRUCTURES TO BE PLACED ON FIRM, COMPACT SAND OR GRAVEL FOUNDATION. WHEREVER EXISTING FOUNDATION CONDITIONS ARE UNSUITABLE, CRUSHED STONE SHALL BE PLACED AS NECESSARY TO ACHIEVE A STABLE FOUNDATION. 3. SEPTIC TANKS INSTALLED IN TRAFFIC AREAS SHALT_ BE EXTRA HEAVY CONSTRUCTION DESIGNED FOR H-20 WHEEL LOADING. CONCRETE OR STONE MARKER ABOVE ALL BURIED COVES RECOMMENDED. ABSORPTION TRENCH SECTION N.T.S. SII—_ BARRIER MATERIAL ,- 6"MAX. 12" MIN. 12" MIN. OVER OVER ALL STRUCTURES #1 DISTR!BUT10N BOX BY FORT MILLER OR EQUAL it;®® 24" MIN. NI $8S� BALL OUTLET INVERTS k-OOT� ° TO BE SET AT PEA---/ EXACTLY THE SAME GRAVEL ELEVATION. (USE OF SPEED LEVELERS REQUIRED) DISTRIBU-PION BOX N.T.S. SLOPE 2" MIN. \-4" PERFORATED PVC LATERAL, SLOPE 1/16"-1/32" PER FT. TRENCH BOTTOM SEASONAL HIGH _ GROUND WATER -�I-IQ ii 11 �I ll�II ,II=I-�I ABSORPTION TRENCH PROFILE N. T. S. NOTES: 1. DO NOT INSTALL TRENCH IN WET SOIL 2. RAKE SIDES AND BOTTOM OF TRENCH PRIOR TO PLACING GRAVEL OR STONE. 3. END OF ALL DISTRIBUTOR PIPES MUST BE PLUGGED UNLESS INTERCONNECTED. 4. SLOPE DISTRIBUTOR PIPE ® 1/16"-1/32" PER FT, Lam. REPLACEMENT SOIL DESIGN CRITERIA THIS SITE WILL REQUIRE THE DESIGN AND INSTITUTION OF AN AMSTERDAM MOUND SYSIEN FOR SEWAGE DISPOSAL. THE DESIGN IS BASED ON THE CONDITIONS FOUND AT 111E SITE, WITH VIRTUALLY ZERO PERCOLATION IN THE TOP FOOT ON INSITU MATERIAL. THE FINAL MATERIAL FOR 1111S SITE MUST HAVE A STABILIZED PERCOLATION RATE OF 1" IN 5 MINUTES TO 1" IN 10 MINUTES THE SOURCE OF FILL MATERIAL MUST BE PROVIDED 1'0 IIIE ARCHITECT PRIOR TO IMPORTING THE MATERIAL ONTO THE SITE. AT LEAST ONE PERCOLATION TEST SHALL BE CONDUCTED IN THE INSITU FILL MATERIAL AT INE BORROW PIT l0 GIVE AN INDICATION OF THE EVENTUAL STABILIZED PERCOLATION RATE, AND THEREFORE ACCEPTANCE OF THE FILL MATERIAL THE FILL MUST BE PLACED IN ACCORDANCE WITH THE FILL CONSTRUCTION NOTES BELOW, AND STABILIZED. THE FILL SHALL BE PLACED IN MAXIMUM LIFTS OF 6" AND MECHANICALLY COMPACTED USING TRACK TYPE MACHINES (I.E. BULLDOZER OR FRONT END LOADER) WITH DOWNWARD BLADE/BUCKET PRESSURE, OR BY USING A STEEL WHEELED ROLLER. MECHANICAL COMPACTION SHALL BE ACCOMPLISHED TO THE APPROXIMATE DENSITY OF THE UNDISIURBED BORROW PIT SOIL. UPON STABILIZATION OF THE FILL, AND PRIOR TO INSTALLING THE ABSORPTION TRENCHES A MINIMUM OF 2 PERCOLATION TESTS IN THE STABILIZED FILL MATERIAL. IF 1HE RATE OF THE SLOWEST PERCOLATION TEST IS WITHIN THE TOLERANCES SPECIFIED UPON COMPLETION OF THE INSTALLATION OF THE ABSORPTION TRENCHES, AND PRIOR TO BACK FILLING THE CONTRACTOR MUST NOTIFY THE ARCHITECT THAT THE INSTALLATION IS COMPLETED THE ARCHITECT WILL TTIE14 PERFORM AN INSPECTION OF THE INSTALLATION, AND TAKE TIES FOR AS -BUILT DRAWINGS. UPON ACCEPTANCE BY THE ARCHITECT, THE CONTRACTOR SHALL BACK FILL THE TRENCHES AND THEN APPLY THE TOPSOIL TO THE SYSTEM AS DESCRIBED BELOW SEEDING BY HAND OR HYDROSEED MIXTURE MUST BE PERFORMED WITHIN 5 BUSINESS DAYS OF THE COMPLETION OF THE TOPSOIL, AND THE AREA MULCHED. REPLACEMENT SOIL CONSTRUCTION NOTES: PREPARATION OF THE SITE ON WHICH THE FILL IS TO BE LOCATED AND PLACEMENT OF FILL ON THE SITE ARE CRITICAL TO PROPER OPERATION OF THE ABSORPTION SYSTEM. CARE MUST BE TAKEN TO ASSURE THAT CONSTRUCTION TECHNIQUES DO NOT COMPROMISE THE INTEGRITY OF THE SYSTEM. HEAVY CONSTRUCTION EQUIPMENT MUST NOT BE ALLOWED WITHIN THE AREA OF THE SYSTEM. ALL TREES AND STUMPS SHALL BE CUT AT GRADE AND REMOVED. OTHER VEGETATION (I.E. BRUSH, VINES, WEEDS,GRASS) SHALL BE CUT AS CLOSE TO GRADE AS POSSIBLE AND REMOVED. ALL LEAVES LIMBS AND BOULDERS ABOVE GRADE SHALL ALSO BE REMOVED. ROOT STRUCTURE BELOW GRADE SHOULD NOT BE REMOVED ROTOTILLING OR SCARIFICATION WITH CONSTRUCTION EQUIPMENT IS NOT RECOMMENDED. THF UNDERLYING SOIL SHALL BE UNDISTURBED, THE SURFACE MAY BE PLOWED WITH AT LEAtiT A TWO BOTTOM PLOW, WITH THE FURROW TURNED UPSLOPE. AFTER THE SITE HAS BEEN CLEARED AND PLOWED, ALL TRAFFIC SHALL BE EXCLUDED FILL MATERIAL CAN BE DEPOSITED ON THE SITE WITH A FRONT END LOADER OR PUSHED FROM THE SIDE, PREFERABLY THE UPSLOPE SIDE USING A TRACK TYPE MACHINE WITH AT LEAST 6 INCHES OF FILL BE14EATH THE TRACKS. AT NO TIME SHALL RUTS BE MADE IN THE PLOWED AREA. FILL SHOULD PLACED ON THE SITE IMMEDIATELY AFTER IT IS PREPARED TO AVOID UNDESIRABLE CHANGES TO THE NATIVE SOIL ( I.E. TRAFFIC COMPACTION OR EROSION ETC.) THE FILL SHALL BE STABILIZED AS DESCRIBED UNDER DESIGN CRITERIA ABOVE. AFTER STABILIZATION THE ABSORPTION TRENCH SYSTEM SHALL BE CONSTRUCTED AS NOTED IN THE DESIGN CRITERIA. AFTER THE ABSORPTION TRENCHES HAVE BEEN CONSIRUCIED INSPECTED AND BACK FILLED THE ENTIRE SURFACE AREA OF THE ABSORPTION SYSTEM INCLUDING TAPERS SHALL BE COVERED WITH A MINIMUM OF 6" OF TOPSOIL MOUNDED TO ENHANCE RUNOFF AS SHOWN ON THE GRADING PLAN, AND SEEDED TO GRASS WITH HAY MULCH APPLIED AS WELL. DIVERSION DITCHES AS INDICATED ON THE GRADING PLAN SHALL BE CONSTRUCTED UPHILL FROM THE ABSORPTION SYSTEM TO PREVENT GROUND WATER FROM INTERFERING WITH THE ABSORPTION SYSTEM OPERATION OR SURFACE RUNOFF FROM ENTERING THE FILL. ui o 'a Q 3 N � O z F Q r-- U=Z V W Z K F oaz v w �ws 03 O �z d z V T Zoo U< 0 Ci 0 "U 0 Q 3 0 hoz 00 E w U F- N N w 0 E C U z i 0 4) D X0 0 Z 0 ~> `/ n y L V T F K W Q w F Do moo(S�j o - oz} V CI a t >. c ,nom- � sz Z p a0 W a a <z rc 11 2 0 tU 1n N U a c 00 o �a a = L n 0 = U 0 0 o N U x o o E afw (0W >ww WORK IS TO BE AS SHOWN & NOTED AND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, TRADE ASSOCIATION PUBLISHED RECOMMENDATIONS AND GENERALLY ACCEPTED LOCAL CONSTRUCTION INDUSTRY PRACTICES. CAD FILE NAME ACAD\IBS\BITTMAN\C-1 SITEPLAN SCALE AS NOTED DRAWN BY DRAWING TITLE SEPTIC DETAILS 3c NOTES DRAWING No. C-2 00 � O � O 03 O �z 0 Ci "U d CC3 N V CI 00 N O N CAD FILE NAME ACAD\IBS\BITTMAN\C-1 SITEPLAN SCALE AS NOTED DRAWN BY DRAWING TITLE SEPTIC DETAILS 3c NOTES DRAWING No. C-2