2015-344 TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5904 (5I8)761-8201
Community Development-Building&Codes (518)761-8256
CERTIFICATE OF COMPLIANCE
Permit Number: P20150344-42190 Date Issued: Monday,November 14, 2016
This is to certify that work requested to be done as shown by Permit Number P20150344-42190
has been completed.
Tax Map Number: 290.14-1-2
Location: 16 SUMMIT LN
Owner: Dennis Sweenor
Applicant: Dennis Sweenor
This structure may be occupied as a: Shed 160 s.f.
By Order of Town Board
TOWN OF QUEENSBURY
Issuance of this Certificate of Compliance DOES NOT relieve the (7 )j
G�ivJtf'// yJ
&�
property owner of the responsibility for compliance with Site Plan,
�VJ
Variance,or other issues and conditions as a result of approvals by the
Planning Board or Zoning Board of Appeals. Director of Building&Code Enforc mens
TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201
FON
Community Development- Building& Codes (518) 761-8256
BUILDING PERMIT
Permit Number: P20150344 Application Number: A20150344
Tax Map No: 523400-290-014-0001-002-000-0000
Permission is hereby granted to: DENNIS SWEENOR
For property located at: 16 SUMMIT Ln
in the Town of Queensbury,to construct or place
at the above location in accordance with application together with plot plans and other information hereto filed
and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning
Ordinance. Type of Construction Value
Owner Address: DENNIS SWEENOR Shed/Storage Sheds $800.00
16 SUMMIT Ln Total Value
QUEENSBURY,NY 12804-0000 $800.00
Contractor or Builder's Name /Address Electrical Inspection Agency
Plans&Specifications
BP 2015-344
10 ft. by 16 ft. storage shed
$40.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Sunday,August 07,2016
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the Town of nsbury; rid• , •f • 07,2015
SIGNED BY for the Town of Queensbury.
Director of Building&Code Enforcement
Office Use Only
ACCESSORY STRUCTURE APPLICATION Received
DATE a �ij a v/S Tax Map ID c?--9(1, /4-
Permit No.
TAX MAP ID ()sic. I -1 a- '
t' �,3 A- Permit Fee
ZONING ( i A"%�
Rec Fee
HISTORIC SITE Yes No /- j Approvals
SUBDIVISION NAME �, L! - l(, Su.6d 1 I/1
MECEOVE
APPLICANT `j.,J t7 t+ a� OWNER rt
ADDRESS / ... . I - v. ADDRESS ! 0 4 2015
G.4.i �) �/' �.l Gi" . . 1.
BUILDING&CODES
PHONE 5tc7' Zier ,- PHONE
CONTRACTOR7t1°P4' 77�CZ COST OF CONS TRUCTION(ESTIMATED): $ UGCJ.
ADDRESS: BUILDING ADDRESS: /C1/ /r/I l d�
PHONE:
CONTACT PERSON FOR BUILDING&CODES COMPLIANCE PHONE
TYPE OF CONSTRUCTION
Check all that apply Please indicate measurements as required below
Boathouse 151 floor sq.ft. 2nd floor sq.ft. Total sq.ft. Height
Boathouse with Sundeck
Deck
Detached Garage(#of cars_)
Dock Dennis Sweenor BP 2015-344 Pole Barn 16 Summit Lane
Porch-open storage shed
""Pofcb,—3 season,Covered,Enclosed
&e ;r la,vsf
Other Accessory Structure(s)
""Considered floor area&must comply with FAR(floor area ratio)requirements if located in the WR zone
DECLARATION: I acknowledge no construction activities shall be commenced prior to issuance of a valid permit. I certify that the
application, plans and supporting materials are a true&complete statement description of the work proposed,that all work will be
performed in accordance with the NY State Building Codes, local building laws and ordinances; and in conformance with local
zoning regulations. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of
occupancy. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly
constructed facilities prior to issuance of a certificate of occupancy.
✓I have read and agree to the above: Print Name: t7Date: t5
Signature: " Date:
1
Town of Queensbury Building&Codes Accessory Structure Application July 2014
a
qtr
.V
ff
lz
FRONT / RIGHT ELEVATION
_E READ ALL
4? UCTIONS BEFOA
i"EMBLING YOUR
1�EDPACKAt_117f f
'K.d"A 9—YJU 0 0
1. Choose a level area to bui(d shed on, IF such an area is riot
available excavate as required until level, IF shed is erected ollrectl,y on
the ground, (ay black plastic down First, 1Finstalling on blocking, blocks
rnust go the entire length of sides and center of shed perpendicular
to trusses,
2, SEE DRAWING # I
Cut the two 2x4xl2' -treated -to exactly 12'-0' for rim joist,
Layout rim joist @ 24' O/C. Remember, ends of rim joist should be flush
with outside face or both end -trusses,
Position shed trusses @ 24' O/C, standing them erect and supporting
them with -temporary bracing,
- -Nail, rim Joist to each truss taking_care-to fo((ow 24' O/C layout accurate(y,
3. SEE DRAWING # 2 & 43
Cut at( panels B, C, D, E, F -) - G, H, 1, J, & K as shown in drawing 4 2. Ll
Position panels A, D, & F, 0, s shown in drawing # 3, Nail, -to both sides of end
-trusses and at the BOTTOM ONLY of the center four trusses, Keep the top edge 7
of panels f(ush with outside Faces of end trusses,
Before 'riaitlrig panels -to the center four -trusses (ayout the panels
to Follow the 24' O/C -truss spacing. Finish nall,ing panels maintaining vertical,
(a (i -g n m -e rit -o F- --t r;u s s e s 2x4xI2
RIM JOIST
4. 'SEE DRAWING _# 3 # 4 4 8 & # It
InstaR 2x4x8 temporary support drawing # 11. Cut and remove verticoJ upright of center
two trusses drawing # 11 Cut and install 2x4x5'-10 3/16' jack studs, and
2--2xGx5'-9 3/4' door header drawing # 4, Remove -temporary support For use
later, Temporarily tack in place panels C-, K, & J as shown in drawing # 3, )-race and cut
door outline drawing # 8. Install C, K, & i panels permantel,y, Maintain vertical alignment
4
and f(ush "with- outside face. of --end -tr-us.ses-,,
5, SEE DRAWING il 5 -
Cut 3/4' floor sheathing as shown in drawing.
Lay panels F1, F2, F5, & F6 on floor of -trusses and m c� r k location of
veirtical, -truss wall stud, Allow 1/16' extra on each side of stud For, easy instaUation.
Make cutouts with electric jig saw or, hand saw, Position all f(oor, panels over loot -tom
cord of trusses and nail all panels in place, ;r -
J. SEE IJMHWII\IU fJ J Cx ff 0
Install roof.' sheathing panels A, E, 6, H, & I as shown In drawing #3, Top panet edges
must meet peak of -truss,, and ends of panels must be Flush with outside edge of truss.
DO UPPER SID17 OF ROOF FIRST Now, repeat procedure on tower sections of roof,
-Be. sure -to maintain 24' O/C spacing.
Cut arid install studs For, gable ends of trusses as shown in drawing 46.
6, SEE DRAWING ft 7-
Temporari(y tack A, & B wall sheathing panels to enols of storage shed truss,
Trace the outline or end trusses as shown in drawing 147,
Remove yvaU sheathin'9 panels and cut panels atbng traced lines. Nail, panels into ptace.
Use scrap material, to fill in overhang and peak area as nee-ded.
7SJ:_F' TIDA\./TNIr_,S R q If 10
Cut and nail, waferboard soffit strips, P, 1x4 -trim into place as shown on drawings
1/door if, : 1 11 i + I- A C L-1 + V); n and ed �D c r� -P
REAR LEFT ELEVATION
TRUSS SPACING GUIDl(2x4KW, �
RIM JOIST
B 13'
4' L 4'
7 PCS, 'A' REQ.. 2 PCS. '13' REG.
7/-/
SCRAP
F--
96'x48'
07
DOOR
V) d
I OUTLM
W
CD
J
Q_
_J _J
D Ll [I R
[I U I A
L
_T 11 X
E D
e Curtis Lumber Co., Inc. Ql,�)l,y supplies the materials and a suggested
" e. Because
method of constructing for a sorage bul[ding":we -,coQ,. not warrant the finished
.' U s. t
II
(y)
CUT PND REMOVE
VERTICAL UPRIGHT
IN DASHED AREA
P
7/16' WAFERBOARD SOFFIT
FOR DDDROPENING
RIPPED FROM SCRAP
US
ON2 CENTER TRUSSES.
INSTALCL JA SRI'IIM
3 3/4'
AND 2X6 DOOR HEADER
Reference (ocal, byi(ding codes or
individual, product- specifications to dete'rmin , e
F2
J 'I'I
Lo
CUII
'I
ID
E
MATERIALS NEEDED
iI
I1
the appropriate materials -to meett
your particutar needs,
48'x48'
96'x48'
STOCK PACKAGE
2
2'
21
2'
N Ad L
S C H E RULE
7 ea.
10' Shed Trusses
6
pc,
10' Drip
Edge
8D Comrqon
' thing
FI,00r Shea-
15 pc,
7/16'x4x8 Waferboard
3
Pr,
4' LT Hinge
6D Ga(yanlzed—
-WaR, RooP.Sheathlng,
4 pc
3/4'x4x8 My score
I
ea,
3 112' Saf ety Hasp.
& IX4 Trim
2 pc.
2x4x12/ Treated
2
ea,
I (h. I'
ed Roo -Ping
Galvanized
-
Nal�s
16D Ga�vanlzed
2x4 Treated Rlrq Board
2 p c,
2x4x121 jack studs
2
ea,
I (b. 8D
Common Nails
8 p c,
2x4x8' gab(e end studs
3
ea,
IA6, 6D
Ga[vanlzed Box Nai[s,
I pic,
2x6x12 door �-ieader
2
(b,
16D Ga�vanlzed Box Nal[s
188 LF
1x4 I -rim Board (6-14/,5-12/,2-10/,3-8/)
I
ea,
Mas -ter
P a d o ck
5 Bd(,
Roofing Shingles
I
ea
S W 22, 2., 6
-window}
Shed Options: Ask Salesperson for details on
available
options.
REAR LEFT ELEVATION
TRUSS SPACING GUIDl(2x4KW, �
RIM JOIST
B 13'
4' L 4'
7 PCS, 'A' REQ.. 2 PCS. '13' REG.
7/-/
SCRAP
L_
�D
4' L 4/ 4/ 4' 4 4
J
1 PC, 'C','K' REQ. 1 PC. 'F', 2 PC. 'D' REQ.. I PC. -15% & -E' REQ. I PC, -H- REQ.. 2 PCS. 'J' REQ.. 1 PC. 'I' RED..
F ND
21 2' 2' 2' I 2' .. 2'
2X4X12' TREATED RIM BOARD
#k9, 0< #I0. e ep trim us I VV e _-D U \-A
rough opening, Apply 1x4 trim to door panels cut from the J pane(s in step #4,• 1,0'x,/SALTBOX SHED FRONT WALL
Be sure -to bend nails over on -the inside of the doors. DOOR OPENING LAYOUT
8, SEE DRAWING # 9
Position door, panels in opening and install hinges and, hasp,
Apply drip edge to entire roof edge with roofing nails.
Apply roof shingles per package instructions. Install windows in each gable end.
Paint and stain as desired,
U
CL
M
[I P T I❑E N A L
nT-111 CUTTING SCHEDULE
t211 3-6 3/4' 1 'r 5 1/4'
A
\,D
SCRAP /-,E
4 4'_
2 PCS, 'A' REQ.. I PC. '13 & E' REQ..
NOTE: IF USING T -I I I SHEATHING
BESURE 7Y) PAIN7'OR S7ALV
ALL EDGES AND FACE OF
SHEATHING BEFORE INSTALLING.
T-111 SHEATHING PROCEDURE
C
DIDI
M
F
4 PCS. 'C' RED.. 2 PCS. 'Dff RED,, 3 PCS. 'F' REQ_
REFER TO DRAWING It 7 FOR T-111
SHEATHING CUTTING DETAIL ON 'C & D'
E
E
F--
96'x48'
07
DOOR
V) d
I OUTLM
W
CD
J
Q_
_J _J
(y)
II
(y)
CUT PND REMOVE
VERTICAL UPRIGHT
IN DASHED AREA
7/16' WAFERBOARD SOFFIT
FOR DDDROPENING
RIPPED FROM SCRAP
US
ON2 CENTER TRUSSES.
INSTALCL JA SRI'IIM
3 3/4'
AND 2X6 DOOR HEADER
F1
F2
J 'I'I
Lo
CUII
'I
ID
E
1
iI
I1
L_
�D
4' L 4/ 4/ 4' 4 4
J
1 PC, 'C','K' REQ. 1 PC. 'F', 2 PC. 'D' REQ.. I PC. -15% & -E' REQ. I PC, -H- REQ.. 2 PCS. 'J' REQ.. 1 PC. 'I' RED..
F ND
21 2' 2' 2' I 2' .. 2'
2X4X12' TREATED RIM BOARD
#k9, 0< #I0. e ep trim us I VV e _-D U \-A
rough opening, Apply 1x4 trim to door panels cut from the J pane(s in step #4,• 1,0'x,/SALTBOX SHED FRONT WALL
Be sure -to bend nails over on -the inside of the doors. DOOR OPENING LAYOUT
8, SEE DRAWING # 9
Position door, panels in opening and install hinges and, hasp,
Apply drip edge to entire roof edge with roofing nails.
Apply roof shingles per package instructions. Install windows in each gable end.
Paint and stain as desired,
U
CL
M
[I P T I❑E N A L
nT-111 CUTTING SCHEDULE
t211 3-6 3/4' 1 'r 5 1/4'
A
\,D
SCRAP /-,E
4 4'_
2 PCS, 'A' REQ.. I PC. '13 & E' REQ..
NOTE: IF USING T -I I I SHEATHING
BESURE 7Y) PAIN7'OR S7ALV
ALL EDGES AND FACE OF
SHEATHING BEFORE INSTALLING.
T-111 SHEATHING PROCEDURE
C
DIDI
M
F
4 PCS. 'C' RED.. 2 PCS. 'Dff RED,, 3 PCS. 'F' REQ_
REFER TO DRAWING It 7 FOR T-111
SHEATHING CUTTING DETAIL ON 'C & D'
E
E
F
SALTBOX SHED GABLE WALL
STUD LAYOUT
F--
96'x48'
04 "N -
48'x481,
DOOR
V) d
I OUTLM
FILL IW AS
�3 NEEDED TYPICAL—
PL ACES
CD
J
Q_
_J _J
(y)
II
CUT PND REMOVE
VERTICAL UPRIGHT
IN DASHED AREA
7/16' WAFERBOARD SOFFIT
FOR DDDROPENING
RIPPED FROM SCRAP
US
ON2 CENTER TRUSSES.
INSTALCL JA SRI'IIM
3 3/4'
AND 2X6 DOOR HEADER
F1
F2
J 'I'I
D
CUII
'I
ID
1
iI
I1
48'x48'
96'x48'
2
2'
21
2'
2'
I1
F
SALTBOX SHED GABLE WALL
STUD LAYOUT
SW2226 WINDOW
EXACT LOCATION
PER OWNER
F--
- - - - -
DOOR
I OUTLM
SW2226 WINDOW
EXACT LOCATION
PER OWNER
SPIED TRUSS
IX4 FASCIA
II
II
II
II
LL
INSTALL 2x4x8TEMPORARY
SUPPORT. REMOVE FOR REUSE
AFTER DOOR HEADER jTT
AND JACK STUDS ARE
SECURELY IN PLACE.
TRUSS CUTTING DETAIL
FOR DOOR OPENING
EVE DETAIL
10'x 2' SALTBOX SHED FRONT WALL 10'x1"' SALTBOX SHED FRONT WALL
TOWN (,--)F QUEENSBURY
TOWN OF QUEENSBURY
@-rQ nF--PT. BU11-DING DEPARTMENT
BUILDING & C0 ` ,D - ,
Based on Our limited examination, compliance
Reviewed Bwith our comments shall not be construed as
indicating the plans and
fifli mmnlinnnn with tho ijiltiinri (n
()APTIONAL ITEMV0
flAiJ6 04 201
1, SUBSTITUTE IX4 TRIM WITH 11 PCS. - 18' KLEER PVC 1 I
TO VV OF EISSU
2SUBS --- ,
_I_T_U'_1_'E 7/1.6/ WAFERBOARD WALL SHEATHING QUILDINCCODES
1
WITH T-111 WALL. SIDING, (DEDUCT 10 PICS, 0 F—VAt AF E _UB I❑�]A R D
FROM MATERIAL LIST ABOVE & ADD JI PCS, I -3z
Dennis Sweenor BP 2015
16 Summit Lane
storage shed
16
10X lit [I U TD U U H
_0
SALTBIIX SHED PACKAGE
Approved
S 0, 2: VARIES Drawn BY: SIRF
NR
Date � 5/5/06 J c -
No:
Tltle: CONSTRUCTION PLANS Page i
I N
T I'S U M B C Il)
L U R,
SPIED TRUSS
IX4 FASCIA
(y)
II
CUT PND REMOVE
VERTICAL UPRIGHT
IN DASHED AREA
7/16' WAFERBOARD SOFFIT
FOR DDDROPENING
RIPPED FROM SCRAP
US
ON2 CENTER TRUSSES.
INSTALCL JA SRI'IIM
3 3/4'
AND 2X6 DOOR HEADER
II
II
II
II
LL
INSTALL 2x4x8TEMPORARY
SUPPORT. REMOVE FOR REUSE
AFTER DOOR HEADER jTT
AND JACK STUDS ARE
SECURELY IN PLACE.
TRUSS CUTTING DETAIL
FOR DOOR OPENING
EVE DETAIL
10'x 2' SALTBOX SHED FRONT WALL 10'x1"' SALTBOX SHED FRONT WALL
TOWN (,--)F QUEENSBURY
TOWN OF QUEENSBURY
@-rQ nF--PT. BU11-DING DEPARTMENT
BUILDING & C0 ` ,D - ,
Based on Our limited examination, compliance
Reviewed Bwith our comments shall not be construed as
indicating the plans and
fifli mmnlinnnn with tho ijiltiinri (n
()APTIONAL ITEMV0
flAiJ6 04 201
1, SUBSTITUTE IX4 TRIM WITH 11 PCS. - 18' KLEER PVC 1 I
TO VV OF EISSU
2SUBS --- ,
_I_T_U'_1_'E 7/1.6/ WAFERBOARD WALL SHEATHING QUILDINCCODES
1
WITH T-111 WALL. SIDING, (DEDUCT 10 PICS, 0 F—VAt AF E _UB I❑�]A R D
FROM MATERIAL LIST ABOVE & ADD JI PCS, I -3z
Dennis Sweenor BP 2015
16 Summit Lane
storage shed
16
10X lit [I U TD U U H
_0
SALTBIIX SHED PACKAGE
Approved
S 0, 2: VARIES Drawn BY: SIRF
NR
Date � 5/5/06 J c -
No:
Tltle: CONSTRUCTION PLANS Page i
I N
T I'S U M B C Il)
L U R,