Loading...
Staff Notes Packet for 1-19-2016 PB Meeting STAFF NOTES PLANNING BOARD JANUARY 19 , 2016 t c!m ry Planning Board Agenda First Regular McOfin.-: Ttwsday,is17uary 19,201 iS I`l`iac 7-- I 1 parr ueensWry Activities Center@ 142 Bay Read Approval of Minutes Date-,_Nowmber 20,2015&N ovtniber 27,2015 lann niz Board Rmommendations Applicant(q) BURNETT_FAMF Application Tye Subdivision 9-2015 TRUST Preliminary&Final Stag £ wner(s) Same as applicant SEQRTpt-, Unlisted Agent(s) Stafford Cam� McNal l Int i f 2� s Dation I i Andrew DriveZoning Classificition W P, Ward Ward 1 Tax ID No, 239.1.8-I-12 Ordinance Reference Chapter -183 Cmc Retemee AV 51-M BIS 04-67-7 (2 Warren Co. Refcrra l n/ desks) Public Hear NIS for recommendation APS; E , Other L P ,t l ProjeV Desgiption. Subdivision. Applicant proposes subdivision of a 1.32 acre parcel into two Ids of 2U339 sq. .& 28,754 ft. u ivislot vill place existing louses on gfate parcels. Pursuant to pier -183 offly Zoning Ordinance u ivisa t of land A -ill be subject to Planning Board mview and approval, Variants. Relief ruq"Qd. fern list size, 101 widEh, road tae length, ph sical fronta��, �t�r front e ash s l reniren�crsts �f thez nt. i'la�riing l oa Ali provide a recommendation to the Zoning Board of A poab, Applicata TEWAR '' _ HC} ApplIcation ApplicationType Site Plan 59-2015 CORP. Owner Sa dri Realty Inc- SE4QR Inc- SType Unlisted gent -qChuck Iviarghall Lot size 0-72 Aures T ati 1 133 Sate Route 9 Zoning Classification CI -------- Ward l Tai Ili No. Ordinance RO rence 179-3-040 Cross Reference AV PZ-00 18-2015$SV PZ- Warpap Co. Referral Noveanber2015 20-2015 Public Hearitia Not required for Othu Ref-iTal YSOT recommendation Project Description., Site Plan: Applicpmposes demolition of existing gos service 5tation1convenience store and replace with a new 3.997 sq_ ft. t aW-q Shop with three self-serve multi-product diTerisers un dQr a 1,500 sq. fl, canopy P=1tl) Pursuant to Chapter 179-3-040 of the ming Ordinance. Ntw co ve ionce gore with. fu wl shall be subject to Planning Board review and apprijiM. Variance. r Variance for tis and permeability. ANo sign variance for setbacL Plnnnsn3 Boal shal f provide a recommendation to the Zoning,Board of Appeals. Applicant(s) CELLCO PARTNERSHIP ppli t-lon'rype SP P7--W38-2015 D/B/A VERIZON WIRELESS Owner(s) Ran Sesselrtlan SEQRType Unlisted Agent(s) YoungiSca i er LLC Lot s c 11, i acres Location 373 lit. 149 Zoning Cl sificatio� Tt-3 ward Ward I Tax ID No. 27&-1-20rdinaucc Reference 179-5-130(c) Crom Referrenc, AV P 004582015 warren Co, Referral January 2016 Public Hearin- Fda for recd mnemdati m 'L0j t t sc ti . Applicant proposes 199' lattice Lower fbr cell tourer, The pro*t will occur on 100'x 100` area ofa 11,81 a r p rc l: ro t i iel zdes tilizin an existir€g gravel drive to access the pmjW area. The site rrently has residential ase and an e isting2 7 -ft,tall radio tower. Pursuant to 1t"r 179-5-13 (e)of the Zoning Ordinance Telecommunications Towers shall be subject to Planning 13-aard review and approval. ar nee- Relief requested for use variance Where a telecommunicatiom tower is nat as allowed use. Planning Board shall pTovi e a rccnrnmien ation to the ming Board of pals. Applicant(s) ROBERT& TRfSHA Application Type Ski PZ-0040-20 13 END O wner s cmc as applicant SEQRrypc Type It Agent(s) Dennis l -teEdroy, PE Lot size 1.05 yes(combined) Location 8& Id eaters Edge Road titin Clas�,irJC2ti4Z)n IN'R Ward brad I Tax ID No. 2- 2-77.17-1-30 Ordinance Rcfbreucc 147-1, 179-3-040,, 179-4-050 Cross Refewnce _ AV PZ-0047-20 15, 4- WwTen Cu, Referral January 2016 001 game&Septic- se e arae AV& SP's Public Hearing rtla for re Mmendation AICA,SEA,_Other AFA,CEA J'ro cot e si tion. Applicant probes demolition of udtiple buildings on two parcels to construct a single family home with footprint of 4633 sq. ,,7042 sq. d. floor ata ratio, Pmim ct incdt€fes disturbance of 35,855 sq. ft., Major sorm kyawr a-site plan nevi . Purrwart to Crept 147-11 of the Zoning Ordinance,distarbaricc in the Labe George Basin wall be subject to Planning Board rev mm and approval. Variance. lkelief requested for height, fruptagc on a public road, sterni water management Within 100 ft_of a veer body, Planning Board shall provide a re mmendation to t Zoning ��d of Appeals. . _... _............ .... pp Applicant(s) CATHY I Application TypeSP PZ-0041-2015 HODGKINS owntEr s Same as applicam SEQPType y e li rrt s Dennis NlacElroy, PE Lot size s Al acre Location -19 Lake 'ark- 7-cmi'Ing Class irat3o WIC Ward Ward 1 'F ID iNo- X26-19-1= d ordiminve Rce mn � = 179-6-060 179- 0 Cross Refbr"Ce AVPZ-0 9-2015 WaTTeu Co, Referral Jauoaty2016 Public Hearing m4t for mcornrnendation AP&CEA, Other APA,CEA Prolect DesedWion- Applicant prope -q construction of a simile family Igo e of-2,927 �ro��ct ir€cltrdes d��.nolition sof I-081 s . .footprint,Project mill iluda newsmarm mater,n Ptic, vr plantingsand rndirin sits_ Project occurs within 50 ft, of 15%slopes and lard surfacing within 50 ft- of share_ Pjest includes rctniXigara�"e IVerC Only one i� allowed and two are proposed, Pu tiant to Chapter 179-6-060 and 179-&050 of tht Zoning Ordinance,work- within 15%slwe and the hard surfacln?within 50 feet of the shoreline slra[l be sUb*_t to planning Lard review and approval. Variance; Relief requested for sec-ond garage. Planning Board shall provide a reeommendalion to the Zoning Board of Appeal,-,- Old Old Business: ppiicatzn TeApplicants fit : SUR PUD SP 57=2015 PARTNERS.- Ener s) Same as applicant SEQR TNV Type I eg.declaration .... ..... .. . ... __ . ..._.__ IW20 c i0:127e,'20115) Matthew Fuller,EsqLot size '24-050 acres _. . ... ......... ..._.. ...._ ..__. . _. .._...._. ocation SE Corner of lav&Mind Zoninglassifrcation PUD Rock Roads Ward Wird 4 _. ..... - - `fax ID No. 89.1.9-1-23 through 5 Ordinance R.6=B.ee 179-1.2 PUD ...._. . ....... . ... ._. . . . _._.___... ._ __... . _._ . . _ ..._ _. .._ .. _ _ _. . ..._._ ..�.. .._ __. . . . ... Cross Reference SUB]3-99,F NXI� r-1 1, Warren Co-Ret`Mal October 7 15 1-11 s P62-11 Public Hearing December 15,2015 APA,CEA.Other NWL Stmarn Overlay antra" I ,2016 _... _ . ..._ ._.. _........ Pr j ct i s .ion; Site PIarE. Applicant proposes ziPlanned Unit it v l xr er t(PUD) r sistin of office,,business retail and rr [ti-tamiil aye The proposed nixed t*e density is for 14 residential mits and 56,180sq ft.ofconrrner ial space. Activities also include land disturbance for iri-staftion of a parking areas,parking garage, sidewalks and drive arew along with associated i 1 ftstructure and utilities for the project, €3r-sant to Chapter 179.12 PUD of the Zoning Ordinance.Planned Unit Developments are subject it) Planning Board review and approval_ New usiiie : Applicant(s) TOM BARRE . Application Type SP PZ-0028-2015 Own,-r S Ton Barb R T'� In1.3 t 1 exits Ethan P- Dail--Rucins i Lot size 1,37 a ss Hall Architecture Location 462 Corinth Road ZoningClassi cati i CLI 'ark Ward 4 Tax ID ado- Orip e Ref�rcnce1��-3-044 Cross Ref=nce SP 44-2012-SP 25-2013, WanTil CO, l cferra] January,22i iti PZ 28-20 15 Public:Hearing ,January 19.2016 Prriie ppli4�zt proposes to oonstruct a phased storage facility where first phase with 2 east and 46 mi two facilities_ The 8ecund phase r€pu-,ed for two 36 un its each. Clearing mom than an acre, Phms f6r office area and first ama units to be s for Bounce Around business. Pursuant to Chapter 179-3-040 of the Zomng Ordinance, new storage facility shall be subject to Fl r€ rtg Board review and approval, -Any further bus iness hick may be properly light bel`bre the Board— Revi5 ersimi: U5120115 11:€0 Minutes of November n November 28th Draft Resolution — grant/deny minutes approval Subdivision 8-2015 Preliminary and Final @ 1 Andrew Drive No Public Hearing Craft Resolution Planning Board recommendation to the Zoning Board ofAppl ` awn of Queenshury Planning Board Community Development D partnic t Staff Notes ept -tuber 15 & 22.2015, November 17&19.20 1 .Jaiivary 19 & 26. 2016 f i Subdivision 8-2015 Burnett Rmifly TnvsY 11 Andrews Dti Watertiont Residential e IN'1 SEQR Type Unlisted 1 1atetial Review. Cover letter, preliminary & final stage applications, long EAP. deed, map Parcel History F 51-2015 lots lm than`? ac and side setbacks for existing structures P : 2 docks-700 sq, ft. each 3 i Re nested Action 1-19: Recommendation to the Zoning Board of Appeals concerning the relief r aestcd in the variance application as well as the potential i rnpacts of this pr j ect ou the neighborhood and surrounding co n nity 1-26: Subdivision of land requires Plaiming Beard review and approval Resolutions 1. 1-1 : Ply recommendation mandation to ZBA 1-26, 'aiver from Sketch plan review 1-26, EER decision—long forth 1-26: Preliminary Final Stag;decision 's Project Desedption Subdivision- Applicant proposes subdivision of a 132 acre parcel into two lets of 28,639 sq- ft- & 2x.754 sq= f ubdi�i i.on IM 11 place existing hooses on separate parcels. Pursuant to Chapter -183 of the Zoning Ordinance Subdivision of land shall be subject to Planning Board review and appmval. Variances. Relief requested from minimum road frontage. water frontage and lot width, minimum lot size, minim-urn property l ine selbacks of the WR zone and physic-al road f ntage access r fret .e- ts. Staff Cowmtnts Th applicant proposes a Unv lot subdivision of a 1.32 acre parol Located in the waterfront residential zone. Tot- pr je,(;t is l caW on Andrew Drive and currently has two dwellings on the parol. The division will place each horne on its olom parcel. The reel property infor ation on the parce,l. indicates the cottage is the south property and the cabin is located on the north parcel. s Sketch Plan review The applicant has requested a waiver from sketch. i Preliminary RevI w: Preli MInary plat subdivision lot layout shoes the two lots arraugement. Layout purrs — Shows the existing ditio s on to site including two existing building. The applicant as supplied inforination noting thea are two septic systems on the site and a hand drawn map shows the approximate locations Construction &,tails, Landscape plans, Clearing plan, and Grading and e-rosion plans are not applicable as no physical change to the site is proposed. TTtt,� subdivision is for the clients of a trust. The Environmental report — the applicant has completed a Long Environmental assessment review. The project is located in the Adirondack Park and the applicant has been conununicating with the agency to complete the permit proccs , Statement of intent—deed provided. The applicant has explained the deed inel des reference to two parcels as at one time the proptmr iva t-wo l t8. Stonrwater management—there are no known swm ater management practices on the site, Fees—per application. Waivers—no jai-vers have been requested Phial Review- Final plat—subdivision line proposes two leas. Stade> o nty agemy—Planning and Zoning Board and Adirondack are, the only agency for three lot proposed subdivision. Other plans reports —the applicant has supplied inf rrrnation noting there are two sceptic systenis on the site and a hand dra-sk map shoes the approximate loczti ns. Protected open space— opt proposed. Mature of Variance The project as proposed requires relief from lot size -where 2 ac is required and Mo lots of 29,639 sq. it. 28,754 sq. ft are proposed, lot wift and road f unta e where 150 It is regained and 87 ft is proposed for each, water frontad wheTe 150 ft is proposed and for Lot A 96 ft and Lot B 91 ft is proposed, and side setback where Q ft is required and Lot A is 5.19 ft ft and Lot B pat-to is 2-8 ft anti porch is 62 ft (side setbacks address maintenance issues on loth parcels.). Relief is Aw requested for Lot A tl t does wt have physical. access to the road %where an existirngg driveway is to intai ed to access both parcel. SUMMary The Planning Board is to provide a recommendation to the.ZDning Board of Appeals als irn reference to the creation of hva parcels that require relief from lot size, lot Width, road frontage, %eater frontage, and gide setback, f To%vm of Que-ensbury Plamiing Board RESOLUTION -PlanninE Baard Recommendation to Zoning Board of Appeals t- Area Variance 5 1- I for Burne tt Famil Frust Tax Map ID 239.18-1-12 1 Property Address: I I Andrew Drive The applicant Im submitted an application for the follo-Mng: Slabdivision: Applicam pr possubdikrision of a 1.32 acre parcel -Iii-to two lots of 2&639 sq. ft. & 28,754 sq. ft. Subdivision will place ex.Mng houses on separate parcels- Pursuant to Chapter A-183 of the Zoning Ordinance Subdivision of land shall be subject to Plartning Board review and approval. Variances: Relief i-equested from lot size, lot vidtl-L road frontage, at r ftonlagge and setback requirements of the WR zone. Planning Board shall provide a rornmendation to the Zoning Board of Appeals. The Town of Queensbury Zkmien g Ordinance, per Section 179-M70 J 2 b. rt-quirts the Planning Board to provide re a written I .cornmenda-tion to tht, Zoning Board of App is for projects that require both Zoning Board of Appeals &Planning Board approval, The, Plaimin-& Board has briefly reviewed and discussed this application, the relief request in the varix I aict- application as well as the potential impacts of this project on the neighborh(W and surroLinding core nunity, and found that- MOTION TO MAKE A RECOMMENDATION ON BEHALF OF THE PLANNING BOARD TO THE ZONING BOARD OF APPEALS FOR AREA VARIANCE NO. 51-2015 BURNS 'T FAMILY TRUST, hotrod by who moved its adoption. seconded by ; and a) The Planning Board, based on a limited review., has not identified any significant adverse impacts that cannot be mitigated with current project proposal - OR b) The Planning Board. based on a limited review.,has identified the following areas of concern- Duly adopted this 19" day of Janaary- 2016, by the ftillowing vote: Ar : NOES: Stafford Cane &McNIally 19-761.2-20 Fax, �18-74-5-41437 ! 7412 Bay Ram[,Qkieimsbury12804 www.q acenshury,net Site Plan 5 -2015 Stewart's Shops Corp. @ 1433 State Route No Public Hearing Draft Resolution Planning Board recommendation to the Zoning Board of Appeals Town of Queensbury Planning Board Community Dmefopment Department Staff Notes January 1 ,2 1 r Site Plan: 59-2015TEW T' .SHOPS CORP. 1433 State Rte 9, Commer6al Intensive Zone f SPQR TSV f Jr list Material l e ie-w; application. site plan shee T-1 -t to -9, star water report, lighting sheets Parcel History- Air 60-2015; SV 61-2015 t Rqquestc Action i Recommendation to the Zoning lard of Appeals for relief for setbacks. permeability and Signa'-e. Resolutions L 1-19; PBrecommendationtoZBA 2. 1-2 : SEQRA decision 0 -26: PB decision s Pro i ct Description Applicant proposes demolition of existing gas service s tioolconvrnience story and replace with a -new, 33.897 sq. ft. tevmrt's Shop with gree self-serve multi-product dispensers under a 1,500 sq. fL canopy. Pursuant to haps 1 gal4f thnigrdiarrce. e v} crrieetre -with fuel shall ubject to I'iaair Board review and approval. Staff Commients Site plan overall-The applicant proposes to demolish the exi sting SUNOCO of 2,066 sq ft and fuel canopy of 1,342 sq ft. The applicant intends to construct a new 3,897 sq ft Stewart's conve-nierice. store ith a 1,500 sq ft fuel canopy. Site laoutand anilityplan-the new building will be located on the south Wiest area of the proper and the canopy �ilf be Ideated to the north side of the property- The plan shows the prgj t to include 29 parking spaces, relocated curb cut, outdoor eati ,- areas, sidewalk access to the Lake George Outlets Fest, and loeation of fuel canopy. The plans also included a truck routing plan where fuel and dell verlr l' e are shown- Gradand drainage plan-the applicant has indicated the existing storinwater Man flymnt-tv ll he replaced with six catch basins and 3 new drywel s. The proposal also incl des working vdth NYSDOT to utilize the state drainage system for overflow. ' Se irnew and erasiDn ea ntr 1-tee ceding plans show, the elevation at 527 to 528 with existing and proposed site condition a nd s, ap a =The landscaping 111cl des 4 red imples on the south side of the prop"' area. The plans also shoe perennial and shrub plantings along the front and Tiorth borders- Site lig Ji an Plans c m tly show light poles at 25 ft in height and i fonnati n is requesl�--d to elari if if the light fixture height wind beat 20 ft. Code allows for a 20 ft fere height. &gn a e -the applicant has supplied signage inforrnatio ori sheet T-I. The free standing sign is proposed to be ft and Oil from the north property line and 5 ft from the east property ling:. The applicant is seeking relief free sign code wherelloe-d is 60 sq ft Reestanding at a 25 ft setback. The flee standing,is intemally illu inate-d �ith scroll price numbers. The a li rit also probes wall sign t 21 s ft inn where a 3 sqIt I a]Io-wed. lev tions the applicant bas provided the elevations showing the building helgbt to be 23 _1- fi. The exterior is to be hardie board vMb cobble stone color, a stone veneer wrap on The l av rlion of the building, white trim_ The Board may consider and discuss design standard- as identified in the code for this area to have a tro - Adimndack theme. Excerpt ...Design Standards—.§ 379-7=0omnicreial Intensive(C.1)and CiDn mereial l odierme (CM) Zones. .It is the commu-nitv's community'sdesire to insist on Adirondac -thfnned designs with more creative paTkin� design and lan scapiri- so that the building, parking.,and landscaping visually share space. Or example, parking lot lighting should be as-iti e-the ed similar to the existing sidewalk pedestrian I.1. trig. 4 Excerpt ...Design Standards.... 179-7-050 Comw rclaI intensive(CI)and Commercial Moderate fCM) € Zones 4 2 Route 9 North District. a Timber-frame structures, tb u'q= and ingenious natural expressions of materials. creating a cottage/cabin feel that blends into the natural scenery. b Meticulous craps a sbip and innovative,use of materials are essential components. c 'anal tinisbe large vdndows, use of natural exterior elements in the interim, great rooms, and massive stone fireplaces are common.elements of this style. (d) .May include the following: [I I Steep roof pitches. [21 age roof overhangs. [ Natural finished materi s such as twig ornamentation, notched Ices and natural lark, split %pr ice branches arranged irk sunburst and diamond patterns. Exposed stnteture, post brackets. coinple ,naturalistic railing and baluster design, large windows. stone chimney and building elements. [5] Lg or split ig buildings, Floor plana-the floor dans sho the internal Ia cut of the proposed sure. The area closest to the Lake George 'est Outlets is to be refrigeration, aloe a portion of the cast and north wall to include booths, and other details for € is lay, stota e and cashier. Nature of the Variance The applicant requests relief from the building side setback of 10 ft proposed hiz�rc a 20 ft min is required, rear setback of 21 fl is proposed and a 25 setback is required and the fuel canopy where a 75 ft frc)nt tback- is required where 23 ft is proposed- The applicant rcquest permeability relief =hers .33 % is recltired and 1 i % is proposed. The applicant also requests relief for the location of the pnAmed sign and �. er�i" -all sir . summary The PB is to provide a recommendation to the ZBA iri regards to the applicants revues€ for location of the building, fuel camopy and signage. Please note tie a p icani has provided revised plans show the rernoval 4of aparking apace near the rear of the Irl for better deliveiT and refuse removal traffic- The €a plic ani has also updatedupdaled the signage informatfo ere the sign has been redur e it?size to a 58 sq.sq.ft,sign were rr setback qf 25 ft is required and 5fr and 6fz are ro xe I addition ike ma nber of signs mere se e re is requested to have two wall signs can the del canolT i eipal U COPY January 1 x, 20,6 Mr. Cram Bro-wn. Administrator Town o F Q ueen sbi,qy p I a nina Beard 742 Bay Road Queensbury- me York 1-1804 January 2016 Planning Board Applications Dearr iu: My P-orri ments regarding the agenda for th e January-,2016 ?1ann. in g 13 card A pp i tions. 1433 SR 9—Stewart's- As per o t, a backwater vale needs to be iiistali d on the wastewater collection 11-Insince it is upstream of a pump-station- Sincerely, hristopher T. H i-rinorto Up ring dent Tt Cc- Scott Buthard, %VD E.n-In erifl-, Department File THE worth Co un try offi ce ���wn- 375 Bay Road,Queensbiiry, NY 12804 COMPANIES P' (518)812-0513 F-. (5181812-2205 www-cha-zenompariies.com Hudsun Va 4ey office (8451454-3990 Land Surveyoor Ca P i�a.I District 04,fice 1519) 273-0055 PlannL-rs Enviromrtenul Profi-'Sslam� Lan=ane AFrhft2cU November 12, 2015 Mr. Craig Brown Zoning Ad ministrato r and Code Comp]ia nce Officer Town of Queensbury 742 Bay Road Queensbury, Klew YiDrk 12804 Delivered via email only, CraigBeguee-nsburv.net Re: Stem `s Shops Corp.Site Plan Review Town of QueensbuFy, Warren CounM [Vew York Chazen Project#91300.3-1 Queensbury Ref. No:SPS -2015 Dear Mr. Brown, The Chazen Companies (Chazen) has received a submission package from your office for the above project. The Applicant intends to redevelop an existing gas station No a new gas station. Submitted in formatfa an includes the follovkng: a Plans and Details, prepared by Stewarts Shops,dated August 4, 2015; iff Stormwater Report for Property Redevelopment by kDtt E. Kitchner, P-E., dated October 2-3, 2015, and, IF A Site Plan Application with supporting documentation. Your office has requested that we limit our review to the design of star water mariagernent and erosion and sediment control items as it relates to compliance to loca[, state or relevant cGdes and regulations. used upon our review of the information provided, Chaz en offers the following comments for the Town's consideration- Site Flan: 1. The proposed site 'improvements disturb approximately 31,479 square feet (actual disturbance figure not provided, based on total lot size) of land and will not be subject to NYSDEC Phase H Storm rater Regulations. Comments related to the stormwater plan and report are presented below. 2. It does not appear that a ay soil testing was performed on site to confirm the percolation rate used in the drywall design provided in the Stormwater Report or that them is adequate separation to seasonal high groundwater. The Applicant should per-form onsite infiltration testing as well to confirm the assumptions used in the design Chazen Err .eft Lard Sarvapnq 9 Landscape�uFv co-,ap-c- O€azen Env korffrenWSffvftv�Inc, Tho Chazns, Im Taco Br Queanst y 4C .lrfs 5hap5 Sim WQr1 REVtmw Nm.ber12,2a3s Rage 2 3. A detail for the construction of the proposed drywell has not leen provided. The Applicant shall provide a detail, which is consistent the stormwater sizing calculations provided ire the Ston water Report,ori the plans_ . It appears that the ' Hour Infiltration Capacity' has been incorrectly calculated, The void volare wfthin the stone envelope has been used rather that the surface area (typically the bottom area)over which sto rmwater wiH be infiltrated.The i filtratlon rate Used was expressed In terms of 1n hour rather than feWhou r such that the units of the rate are consistent with the other teras used in the equation. Please reprise the calculation accordingly. S, The Applicant does not depict any erosion and sedirrient controls on the site layout plan. The Applicant should revise the plans to include these features and provide details for each practice. 6. The Applicant proposes to connect the star water control systems to the existing Mate drainage 5ystern associated v4th Route 9, It is noted that this connection will require the Applicant to obtain a Highway Work Permit from the NYSDOT, Conclusions and Recommendations It is our opinion that the applicant shou Id provide clarification. for the above iterrns and incorporate the ehan es in s;tj bsequent pian su bmissions, If you have any questions regarding the above, phase do not h esiftate to me at(5181824-1926. Sean K Doty, P.E.,LEFD AP, Associate Manager, Municipal Engineering Services cc: Para Whiting,Town Planning Office Administrator(via email) Laura Moor,Town Lancs Use Planner(via a a.il) File 5_1§'341`ms's i�J`i�1�3.u�-Yam a� �s�assy£y9i�&5.�1-�3'.��15 4te�.•aats���:�`.53'-i�X2°]15-St��'` Gs�'i�IsYi-1�1L.Ix� Town of Queensbury Planning Board RUSOLUTION—Planning Board Recommendation to Zoai-rig Board of Appeals Area Variance 60-2015 for Stewart's Shops Co3-p, Tax IMap ID 289.00-1-5 /Propt-i-ty Address- 14-3-3 State Roto 9 1 Zoning: CI The applicant has submitted an application for the folImAing: Applicant proposes dcniolition of existing it� gas service station/conven-lence stow and replace with a new 1,897 sq. ft. Stewart's Shop with three sr'lf-se'rve, multi-productdi&pensers v -3-040 of the Zoning und . ler a 1.500 sq. ft. canopy (6 pumps). Pursuant to Chapter 179 Ordinance- New couvpnience store with fel shall be guklect to Planning Board Teview and approval. Varian": Area Variance for setbacks and permeability. Also Si R variance for size,and set back. Tht Town of Que-ensbury Zoning Ordirm , per Section 179-9-070 12 b. requires the Planning Board to provide a written recommendation to the Zoning Board of Appe�ds for projects that require both 7-0-ning Board of Appeals & Planning Board approval; The Planning Board has briefly reviewed and discussed this application, the -relief request in the variance applicatiou as well as the potential impacts of this prk&a an the neighborhood and surromiding con-Imunity, and found that: MOTION TO MAKE A RECOMMENDATION ON BEHALF OF THE PLANNING ROARD TO THE, ZONING BOARD OF APPEALS FOR AREA VARIANWE NO. 60-2015 Stc,"art's Soy 9m. introduced by who moved its adoption, seconded by—;and a) The Planning Board. based on a limited review, has not Identified any significant adverse impacts that cannot be mitisated with current project proposal - OR b.) The Planning Bouxd, based on a limited review, has identified the following areas corn cer : I) Duh, adopter this 19" day of January, 2016,by the following vote: AYES: NOES: Phone, 519-74�-44-'7i742B-,ivRozi.ktQttcci7�sbtirv.N.Y 12,8304 1.i"vw.queen shury.net Site Plea P -0038-2015 Cellco Partnership d/ Verizon Wireless @ 373 Route 149 No Public Hearing Draft Resolution Planning Board recommendation to the Zoning Board of Appeals Town of Queensbu-ry Planning Rosa ommur'ity Drvelopnient Department taf Notes OW January 19,2016 SitePlan: PZ-0033 8-2015 ell o Partnership DBA Verizon Wirelew.'373 Slate Route 149/ Rural Residential c -1 -), . E hype enlisted Material Review: Application. bound notebook with EAF, FCC licenses, radio frequency analysis. structural analysis, safety report. Asual source. view-shed, letter for future- awe, and dravdn s Parcel f-fistory. UV PZ-0045-2015 045-2015 Rqgucsfed Action Rer,om mendati n to the Zoning Board of Appeals concerning the relief r'equt�- epi i-n the use variance application as well as the potential irripacts(if this project on the neighborhood and surrounding e-orn unity i F Resolutions L 1-19-1& PB rico rnendation to ZBA 3 Pr!Q jed Description Applicant proposes 199' lattice tower for cell tower. The project wrill occur on 100' x 100' area of ars 11.81 acre parcel. Project includes utiliz"rl ant,-xisting gravel drive to aces the project area. The site cur ntly has residential use and a istiar ? ft, tall radii ter. Pursuant t Chapter 179-5-130(c) ofthe araira Ordinance Telecommunications To-wTrs shall be subject to Planning Board re-view} and approval. Planning Board shall provide a rf €mincndation to the Zoning ward of Appeals. Staff'Comments The applicant proposes to utillw a 10,000 sq ft area to insiail a 199 ft lattice cellular tower and associated equipment. The area to be feme in will be 75 ft X75 ft and -Mll be accessed by ars existing drive path €n the site. The site also contains a home and existing 297 ft radio tower. The site is a new cell tower and issubject to a -variance for utility usage. The application provides details of reviewing the existing radio tower for ' share use. Sits location-The propose cell tower is to be looted at 7-3 Mate Route 149 and is accessed from an existing gravel road. The gravel road -is share a(ees f r an e isting residential dwelling and a 297 ft radio tower. Site utility ply-Tbe pians show the underground -utility power connection to be riled from the existing trarisfrnmer at the i-adia ter. ediment card erosion control -The plans show silt fencing near the area of disturbance Nxith stabilized r constr ruction er tr r cad and timits ofclearing. Landscape pian, star water-no changes are proposed for lan.d,;taping oT storaiwater ma aggement for the property or the cell site. Site lighting plan-there i o pTopa e light-ITIg for the site or for the tower Site details-The plans identify a 7 X75 are to fenced i -with a Eft high chain link with barbed wire. h equipment area to be, irrstalled is not enclosed Lomat will be a pole barn Iii-c structure that is about 9ft tali. The applicant has paovided a visual analysis and W coverage reaps. Elevations-the plans shoe the elevation of the 199 ft tower with the autennas and equipment area €3 NATURE OF VARIANCE The applicant requests a use varum. ce for placement of a cell tower in area that does not allow towers. File o it ria is spocific for t l z -is this includes providingn -necessity. r ilnr reasons for the tower, and die extent of burden on the community. SUMMARY The Planning Board is to provide a recommendation to the ZBA in regards to the applicants rtquest for placement of a cell tower In area that does not allow towers I i i i s THE North Country Office Chazen 375 Bay Road,Queensbury,NY 12904 P.(518)812-0513 R (518)912-2205 COMPANIES wmyxhazencompanles.carn FI Hudson Valley Office (945)454-1980 Land surveCapital Dis'trict Office (518)273-0055 yius Planners ErMronmnlal Profesls January 8,2016 On Mr, Craig Brown ZoningAdministr Administer ator and p"nce Off icer Town of Queembu ry 742 Ba y Read Queens bury, New York 12SD4 Delivered via email only. Craig ueensbu rV.net Re: Cellco dba Verizon Wireleorrawater MGnagemen t Review Town of Queenshufy, Warm-n Caunty, New Yoj* Chazen Projea#-9160.01 Queensbary Ref#PZ0038-2015 Rear Mr.Brown: The Chagen Compnies (Chazenj has received a submission package from your office for the above referenced project. The applicant intends to construct a new telecommunications tower and auxiliary facilities within a 75' x 75' fenced area at 373 State Route 149. Submitted information includes the following: Applicamon document by mulfipfi,- entities TectDnic Engineering, dated December 4, 2015,which included the follow-Ing items: o Zoning Site Plans titled, `G[en Lake PN: 20130924878 LC- 27139r, by Tectonic .Engineering,dated fourth revision November 11, 2015; o Site P[an Application; o Full EAF Your office has requested that we limit our review to the design of stormwater system[. as it relates to complia nee to local, state or relevant codes and regu lat bris. Based u pan our reviewchazen offers the following cum me nts for the Town's cons ideration- Storm water Management&Erosion and Sediment Nitrol: 1. The project proposes to disturb an area of 11,749 square feet of land (Acc.ording to the Site Plan Appikationj and wfll riot be subject to NYSDEC Phase 11 Stormwater ReguhTtions. Cbmments; relating to the 5u.b.mitted docu.roents are offered below. 2. It does not appear that a-disturbance limit is shown on the site plans.The Applicant should show the extents crf d Murba nce in order to confirm the 11,749 square feet of land d istu rbanm stated in tsite Plan Application. Chazen B7gineed7g Land SumS Londxape AMW=tum Q),O-P-a Chazen Eff v1Ry?meMW Sues.hV. The?Ch +r clom ,hr- -odba vu-moa vvlr6ess Pagp2 It does not appear that existing and proposes contours are depicted on the site plans_ The Applicant shall include pertinent grading information on the site plans, so that eAsti g and proposed drainage patterm,can be discerned. it does not appear that stormwater controls are sho n on the site plans.The Applica rpt shCUd dernonstrate how stormwater r nef# Will be managed to prevent impacts downstreern of the proposed pad site. to the evert the P[a nning Board or Town staff have any questions or require additional infor ation, phase dry not hesitate to contact meat(518)824-1926- Sincerely, #-1926.Sincerely, Sean M Doty, P,E.,l_EED AP,CMS4S Principal Manager, Muni-cipal Engineering Services cc: Sunny Sweet,Torn Planning Offke Administrator la email Laura Mmre,Town Land Use Planner(via e-mail) File r+.?rse�ii§erS 11ea�u_� �- 4 �6 313 - N Town of Qu"nsbury planning, Board RESOLUTION -Planning Board Recommendation to Zoning Board of Appeals Aria Variance PZ-00,9-2015 for Cell co Partnership d/b/a Verizon W ireless- Tax Map ID: 278.4-20/ Property Address. 373 Route 1491 Zoning. RR-3A The applicant has submitted an application for the following: Applicant propu199' lattice, toNver for cell tower. The project wi 11 occur on I OW x 100' area of an I I. I acre parcel. Proj ect incl udutilizing an existing gravel drive to access the project area. The site cumntly has residential use and an txisting 297 ft. tall radio tower- PuTsuant to Cbapter. 179-5-130(c) of the Zoning Ordinance Telcrmnuaications Towers shall N, subject to Plannin,, Board review and approval. Variance: Relief requested for use variance where a telecommunications tower is not an allowed use. Planning Board shall provide a recommendation to the7o ' Mag Board of Appeak The Town of Queensbury Zoning Ordinanct-, per Section 179-9-070 J 2 b. requires the Platming Board to provide a written recommendation to the Zoning Board of Appeals for projects that rtquire both Zo 'ng Board of Appeals & Plan-ni-n-Board approval; 0 They Planning Board has briefly reviewed and discussed this application, the relief request in the variance application as well as the potential impacts of this project (in the neigbborhood and sumundin g cot=. unity, and found that: MOTIONN TO MAKE A RECOMMENDATION ON BEHALF OF THE PLANNING BOARD TO THE ZONING BOARD OF APPEALS FOR AREA VARIANCE NO. PZ-004-5-2015 EL :t N PARTERSHIP Wblu VFAIZON WIRELESS: Introduced by who moved its adoption, semided by : and a) The Planning Board, based on a limited review., has not identified any Significant adverse impacts that cannot be mitigated %eith current project proposal - OR b) The Plarmi ng Board., ba&-,d on a limited mview. has identified the fol lowing areas o f concern- I) Duty adopted this 19"day of JaTivary,2016, by the,following vow: AYES- NOE& Phow-1 519.77 61.8221 0 rax; 5 18.7451-447. 742 Bay Road,Queori-bary. INN 12 9(9 Uctitsbury.ni[ Site Plan P -0040-2015 Robert & Trisha End 10 Waters Edge Road No Public Hearing Draft Resolution Punning Board Recommendation to the Zoning Board of Appeals Town of Queensbury Planning BoArd iCommunity l e cicpr ent 1 epatiment Staff Notes January 19, 2GI6 Site plan: PZ-0040-210 1 0113 T & TIUSHA ENDY 8&10 Waters Edge Roane Waterfront ResidentU WR S 1 : Type 11 Material RAtt ; application.narrative, elevations, site plan sheets -I to - a and stormwater Parcel Histor : AV PZ-0047-2015. " -2001 garage & septic; several other garage AV & p`s Requested Action Recommendation to the Zoning Board of Appeals for relict' for height, frontage on a public road and storm water managrment within 100 ft. of a eater body. k Resolutions 1. P.BR recommendation to Zolling Board Project Dcripticn Applicant pr demolition of mltiple buildings n two parI to mart a sirl a ilk he 1th footprint ., 70421 s€1. & floor area ratio. Project includes disturbance of ., major storm dater—site plan reN-1i�- . Pursuant to Chapter 147-11 of the,Zuni Ordinance, d isturbance in the Lake George Basin shall be subject to Planning Board review and approvaJ. staff Comments L ation--` he P eet is l ated on Waters Edge Drive off of Seelye Read on Lake George. The 3 Arrangement-The project includes the demolition of existing residences and me ging two parcels. Site Design- The project involves construction of a ft (footprint) sikgie family dwelling. Additional site Nv rk includes pen-neable paver driveway, rain gardens: new, on site wastewater system, shoreline plantings jand riprag seawall sections. Building — The new hotnn is to have two floors and to have a floor arca of 7,042 s€1 tt and compliant less than %n The floor pias sbows maswr bedroom, great room, dining roam, enclosed porch area, and garage o main floor. The second floor is proposed to have additional bedroarns, r c area and bathrooms- ite conditions-The site currently exists as two parcels with multiple structures that are to rerno ed. his also -includes removal of a shoreline home and septic systems. The property is to be graded for the placement of a single family structure, stormwater measures, a new septic system and other site improvements. Landscape plan—plans show additional shoreline plantings Site fighting plan—residential lighting is to be installed Elevations—the site photos shows the existing and proposed roo inn and structs appearance. .NATURE OF VARIANCE The applica't requests relief from height, frontage on a public road and stonTi -vater°management within 100 ft. of a water Body. SUMMARY The Planning Board is to prmide a recommendation to the ZBA in regards to the applicants r nest for area vaname relief. 3 FIE Orth Country Office Cbaq 375 Bay Road,Queensbury, Ny 12804 � P; (518)812-0513 _ (518) 812-2205 COMPANIES €ngi€avl Elver s0-n'sa 11 ev 0 N45)454-3980 Land Surveyws Ca iia D; Uri i Dir rICe 15181273-0055 K mners Envi€Qnrnentar F€ e i als Lamdscave ArcWtects January 12, 2016 E-MAILEID Craig Brown Zoning dmi.nistrator and Code Compliance Officer Toren of Queensbury 742 Bay Road ueensburry,New York 12,9D Delivered via email only.§FaI&8@queensburynet RE. Robert and Trfs, End Town of Queensbury, Warren County, �w York W aren Pro ect#91600.02 Queensbury Ref.No.,PZW401-2015 Dear lir. Brown: The Chazen Companies ( hazer) has received a submiss€on pac"ge from your office for the above referenced project,The Applicant intends to construct a single-family dwelling and drivew".Submitted information includes the following: Site Plans titled "Robert and Trisha Endo, prepared by Environmental Design Partnership, ice., dated December 11,2015; Stormy-tater Contm] Report, prepared by Environmental Design Partnership, LLP., dated November 2015; Project narrat-we letter, prepared by Environmental Design Partnership, LLP, dated December 11, 2015; Architecture Plans by Balzer+Tuck, dated Decernber 11,2015;acrd Asha plan review application. Your office hay requested that we lirnit our review to the design of stormwater management and erosion and sediment control items as it dates to compliance a to local, state or relevant codes and regulattons. Based upon our review of the information provided, Chaaen offers the following COmment5 for the Town's conside rat€ n_ Storm ater Management&Erosion''and Sediment Controk I_ The proposed site development disturr s less than 1 acre of land and will not be subject to NYSDEC Pba I] Stormwater Re ulatrons, However, this project falls within the Lae George watershed and will be subject to the stormwater management req unirerrients set forth in scion Chazffn EragkeeAng, Land 3trnyng S L ds ArahuvaCo... 41,P1,C- Chazan Sf?vffwyftnfaI Inc. The Chszen Cotes,Inc. Towm of Queensbury RobeFt and Trisha Erni January;2,2116 2 147-11 of the Town corse, for projects within the Lake Georgia Park. The project proposes to disturb over 15,000 square feet and is considered a `"major" project. . Section 147-11-1(3)(c)[31 of the town code States that infiltration devices shall be designed such that the bottom of the system will be a. minimum of two feet awe the a&oral high groundwater level to be realized following dr lopmen-L It appears that the Applicant bas performed test pits but the results are not shown on the plans or in the stormwater control report.The Applicant shall provide the results. . It appears that the construction of the seawall will cl*turb the banks of Labe urge, which may require permitsfrom the ALOE, DEC, LGPC,and/or APA- . Section 1 7-11 t 3 c)[4] of the Town code stags that "infiltration devices for major projects shall be located a minimum of 100 feet from Labe George and any do n- ra€lient drinking water supply, lake, river, protected stream, water well, pond, wetland, a separation of more than 100 feet may be required in cases where contamination of the water supply is bible acre to highly permeable sails, shallow groundwoter aro simlh:rr situations. The separation distance shall be a mi-nimum of-513 feet from up-gradient water supplies. Designs small mitigate adverse effects that groundwater recharge will have on adjacent wells, eater supplies, Wastewater treatment systems, buildings, roadways, pro rues and stormwoter control measure., tormwater recharge are-as shall be located a minimum of 100 feet from the subsurface treatment system of wastewater treatment system unless it is demo rstroted that a lesser separation will not adversely gffect the functioning of such lurch fields,' The foil€ ring practices do net appear to conform to Sections 147-11 i (3)(c)[41- a It appears that the permeable pavers are located within 100 feet of the wastewater treatment 5yste - The Applicant should demonstrate that the permeable pavers lo-cated less than 100 feet fro n the [each field will not affect the leach fi let. it appears that Rain Garden ,#2,and #3 are located within 1DO feet of Lake George. it appears that the Applicant is seeking a variance for horizontal setbacks to storrn ater infiltration devices, The Applicant shall provide justification for the setback relief of the proposed storm water infiltrations practices from Lake George. It is noted that thts office recognizes that the prapcsed plans reduces the total impervious area of the combined parcels ,when compared to existing conditions. Further, it provides facilities for storm titer management, where no facilities appear to have p ri)uMexisted unider the: existing condition 1. W hen viewed in those terms,the proposed plans carp be considered asp improvement in regard to starm ater management over that of the existing site. While rooted,justification for the proposed locations are still requested. 5. The Applicant shall ensure neighboring d rinking water supplies, if applicable, conform to Sections 1 7-11(t)(3)(c) 4I of the Town code. The Applicant shall determine where, if any, nei h rin WeN exist. 6, Areas shaven to have permeab4e pavers appear as though they may be used for construction vehicles to access the site. The construction vehicles may compact the subsoil, thus limiting :y4',i .91 }31�c-sem Teti €`i��caiss ung 91 �-Pa#5 i -nom xr.J h%s?! J,-:.stv :€Rev- ;.,GlL.re.'k�'Y`)%am..02-ffs6ert NW TriAM rf,d_Fgiti-c2 iz-U.dc Town 4gf 0- eT,s WrV Jaav i 32,2016 Fagn 3 infiltration ander the permeable passers. As such,soil restoration may be needed to tie-compact the subsoil such that infiltrat€on may be restored, The Applicant small depict this requirement on the plans and in the construction notes. 7, The Applicant shall ensure the specific erosion control measures prescribe[Sector 147-11-J are included In the erosion control notes I Le, 147-11-1(3)(10 and f c)). Conclusions and Recommenclation.s It is our opinion that the applicant should provide clarification for the above items and incorporate the than es in subsequent plan submissinns- If you have any questions rega r€lingthe above, please do not hesitate to contact rte at(515)824-192E Sincerely, ,5-,-� M -7�� Sean _Doty, P.E_ LEED AP Principal lltianaer,Mricipal Enineerirgr Ices cf; Sunny Sweet,Town Planning COce Administrator(iia email) Laura Moore,Town Land Use Planner Asia email) File Pt3UiE 9 1`r `v91d4.00-1 *aD-!:;15,uthert and rmKa sm sl r am N;gr&- Rahs a�qd Tr—hzli6ft�- IZJI -x. Town of Queensbury Planning Board �SOLUTION -Planning Board Recommendation to honing Board of Appeals -Area Variance P7-0047-2015 for Rohert & Trisha End Tax Map ID: 7-17-1-a1 . 227.1 7-1- Property Address.,- 8 & 10 Waters edge Road/ Zouing,; IATR 0 The applicant has submitted an application for the fbll =i g: Apcant proposes demolition of multiple buildings on two parcels to construct a single family home with footprint of 4633 sq. fL. 7042 sq. ft. floor ffl-ca ratio. Project includes disturbance of 35,855 sq. ft.. major stomivater - site plan review. Pursuant to Chapter 147-11 of the Zoning Ordinance, disturbance in the Lake George Basin rhall be subject to Planning Board review and approval. Variance: Relief requested for height, frontap on a public road, stormwater managernent within 100 .ft- of a water body. Plaaning- Board shall provide a recommendation to the Zoning Board of Appeals- The Town of Queensbury Zoning Ordinance, per Section 179-9-070 J 2 b. requires the Plaiming Board to provide a �witten recommendation to the Zonin P Board of Appeals for projects that require both Zoning Board of Appeals & Planning Board approval; The Planning Pard has brilefly reviewed and discussed this applicafton, the relief TN. uest in the varimce application as well as the pottmfial itnpacts of this project on the n6ghborbood and surrounding comniu-nity, and found that: MOTION TO MAKE A RECOMMENDATJON ON BEHALF OF THE PLANNING BOARD TO THF ZONING BOARD OF APPFALS FOR AREA VARIANCE NO. P47-2015 ROBERT & TRI HA END;. lntroduecd by who moved its adoption, seconded by _., and a) The Planrling B=d, based on a limited review. has not identified any significant advee impacts that cannot be mitigated Nvith current project proposal - OR b) The Planning Baard, based on a limited­fevilew, has identified the fullm&ing areas of concern: I) Duly adopted this 19'h day of January, 2016 by the followin vott- AYES- NOES, Site Plan PZ-0041-2015 John & Cathy Hodgkins 218 Lake Parkway No Public Hearing Draft Resolution Planning Board recommendation to the Zoning Board Town of QuecnsbuiT Planning Board Community Development Department Staff Notes f Jamar;£ 19, 2016 Site Pla... P -�1- t15 J014 TH HODU iIS f 218 Lake Parkway W —Waterfront Residential F r EQR: Type II Material Review: application, narrative- st rmwater details, elevation, Poor plan, & survey Parcel History. AV PZ-0049"2015 seed garage Re Action x. 6 Recarnmend4fiou to the Zoning Board of Appeals for relied`fog srtd garage. i Resolutions 1, PBR recommendation to Zoning Board i Prosect Ike-seri do Applicant proposes construction of a single family home of 1927 sq, ft_ Project includes dernolition of 1,081 - ft. footprint- prosect will include new storm water, nes septi e pl antings and grading on site, project f OMETS within 50& of 15% slopes and bares surfacing within 50 ft. of shore. Project includes retains ars �xi ting garage w=here only one is allowed and two are proposed. Pursuant to Chapter 179-6-060 and 179-6-05 0 of the onfii- rddinanci-_, work within 15% slope and the hard surfacing within 50 feet of the shoreline shall E subject to Planning Board review and approval. f Staff Comments. Location-T epro e t is Iocat d on Lake Parkwav off ofAssembly point an Uke eorg_e, Arrangement- The project includes the demolition of an existing single family home to construct a single family home Nvith an attached garage. In addition the applicant proposes to maintain ars existing 583 sq ft. detached Prae Site Design- The project involves construction of a 2927 sq ft(footprint) single family dwelling. Add.1fional. site work includes a rain garden and dr wells and a new on site wastewater system Building— The new horrne is to have three floors dth a total floor are of 5 t927 sq ft that enmpfiant at 22%. The lower Ievel ll Dave rec area and storage; nnain floor will have areas lior dining- great room and roaster dre om send floor 1A I have additional bedrooms_ SiW wudition -The lot vAll be graded to accommodate the placement of the housc where hero are 15%slopes, The septic system will he plate on the other side cifthe.read —on a separate parol. Rain Edens and drymdIs are to be installed to assist with storrnwater manapent on the site Landscape plan- the plans Aow the location of existing shoreline vegetation and the location of the proposed rain gardens Elevations, Flog plans—these dans are included in the review with the height a.t 26.8 ft I A ' -RE OF VARIANCE { The applicant requests relief for maintai an existing garage as a second garage on the site. SUMMARY The Nanning €yard is to provide a recommendation to the ZBA in mga.Td.s to the applicants request for a second garage. THE North Country office w375 Bay Road,Queensbury, NY 12804 P: (518)812-0513 F. (518) 812-2205 COMPAN 1 ES www.chazenrompaniescom Huid so n V�dlzq Office (845)454-3980 Land Surv�ynrs ('ZI P-I a U1 5t r I f--r 0i i C e (5181 27�40-55 Envirerw"ntal PTofmiionals Landwaoe ArrbitiNts EMAILED January 13,2016 Mr. Craig Brown Zotying Administrator and Code Com pl ia nce Officer Town of Queensbury 742 Bay Read Qu eensbury, New York 12804 Delivered via email only-_C ,E2o:Z B P Q upens E r%(,net Re: John&Cothy Hodgkins Tawn of Queerisbury. Wurren County, New York Chazen Project#9100X3 Queensbary Ref. No-,PZ 1-2015 Dear Mr. Brown: Tice Chazen Companies (Chazen) has re-celved a submission package from your office for the above referencEd project.Tice Applicant intends to construct a single-family dwe III ng and driveway.Subm itted information includes the following: * Site Plans titled "John & Cathy Hodgkins ., prepared by Environmental Design Partnership, LLP., dated December 11,2015; * Stormwater Narrative, prepared by Environmental Design Partnership, LLP., dated December 2015; Project narrative letter, prepared by Environmental Design Partnership, LLP, dated December 11,2015; • Arch itecture Plans by Richard E- Dolan, dated De cem be-02 2015;and A site plan review application. Your office has requested that we limit our review to the design of stormwater management and erosion and siadirrient control items as it relates to comp"rice to local, state or relevant codes and regulations. used upon our review of the information provided,Chazen offer's the fol lowing comments for the Town's consideration- Stormwater Martagernent& Erosion and Sediment Control: 1. The proposed site development disturbs less than I acre of land and will not be subject to. NYSDEC Phase 11 Stour water Regulations. However, this project fall within the Lake George watershed and will be subject to the stofTnwater management requirements set forth in section 147-11 af the Town code, for projects within the Lake George Park The project proposes to Chazen En ening, Liond Sanvaywg&Lwidscape Archelectum Ca,D.P.C. Chown crmnnmrita�swmes The Ch8zen GgVisi krc lahn.3n€:cat hy Hodp!€in5 nary 33.20115 Page 2 dimurb ap roximatuly 11,600 square feet according to the project na ative. Projects that include a total site dlsturNrice fess than 15,000 square feet are classified as "minor' projects, However, it appears that this project contains slopes greater than 15 as measured IDD fit frown the lake elevation 32W) to the center of the pro posed house [1 F 337.Owj. According to 147-11Ej2 a j� projects with 'An area with a slope of 15 or greater when meas red in any direction over a distance 49f 100 feet from the center of the proposed building site' may be classified as a "major" project, if the Town Stormwater M a nagemerit Off ice r(S M. 0)sees fit. We rote for the purses of our review,we have treated the project as a minor project, and if the Terri SMO determines that the project should be classified a5 a 'major project,the project will require further technical review by our office- 2, Section 147-13-J(3)(b) or the Town code states, 'For land with slopes greater than 15 or within 500 feet of the mea n high water marls of any laloe, pond, riser,strew or wetland, no land area, including areas stockpiled with earthen materials, which has Beer€ cleared may be made or left devoid of grow-Ing vegetation for more than 24 hogs without a protective covering securely places( over the entire area and/car erosion control measures properly imtalled.� The Applicant shall include this note in the site plans: -1. The site plans depict the drywells to have an inside diameter of 4 feet, however the dry well detail depicts a 6 feet inside diameter;the Applicant to clarify. Conclusions and Recommendations It is our opinion that the applicant should provide clarification for the above items and incorporate the shames in subsequent plan submissions. if you have any questions regarding the above, please do not hesitate to contact pie at(518)824-192& Sincerely, Sean M. Doty, P.E,,LEED A Principal Manager, Municipal Engineering Services - Sunny Sweet,Torg Planning Mice AdrninKtrator(via email) ta tura Moore,Town Land Use Planner jvia entail) File IC TO"fi"41Mi416«OW-7r.. Jufm.F. a`:'rpl -Ql SW: 018? i- 1juL A To"qi of Queensbury Planning Board RESOLUTION -Phuming Board Recommendation to Zoning and of Appeals Area Variance 1?7-0049-2015 for John & Cathy Hodgkins Tax Map ID- 226.19-1-84/Property Address: 218 Lake Parkway/Zoning: WR The applicant has submitted an application for the fbllowing. Applicant proposes construction of a sinLle farnily home of 2,927 sq. ft. Project includes demolition of 1,081 q- ft. footprint, project will include ne-,v storm water, new septic, new plantings and guading on site, Project occurs within 50 ft. of 15% slopes and hud surfacing ,,- within 50 ft of Aor�. Prcect includes retaining an existing garage whem only one is allowed and tvm are proposed. Pursuant to Chapter 179-6-060 and 179-6-050 of the Zouing Ordinance. work witbin. 15% slope and the hard suffacing lAithin 50 feet of the shoreline shall be subject to Plaming Board Tevi� and approval. Variance: Relief requ"ted for second garage. Planning Board shall provide a recommendation to the Zoning Board of Appeals. The Tuv m of Quomsbunyy Zo-a-Ing Ordinance, per Section 179-9-070 J 2 b. -requires the Plaraiing Board to Provide a written recommendation to the Zoning B-oaTd of Appeals for projects that require both Zoning Board of Appis &Planning Board approval; The Planning Board has briefly reviewed and discusses this appli"tion. the relief request in thie variance application as well as the potential impacts of this project on the neighborhood and surrounding conun-uniiy, and found that-, MOTION TO MAKE A RE,CONLAIENDATION, ON, BEHALF OF TRE PLANNING 130ARD To THE ZONING BOARD OF APPEALS FOR AREA VARIANCE NO. PZ-0049-2015 JOHN & AT HO] GKLNIS: lntroduct�d b-v—who moved its adoption, seconded by— ; and a) 'fhe Planning Board, based on a limiwd review. has not idenfified any significant adverse impacts that cannot be,mitigated with curTera project proposal - OR b) The Planning Board. based on a 11miIed riew, has identified the following areas of concern- Duty adopted this 191 day of January,2016 by the following vow: ANTS: Pham2_ �19:764> ?2 0. Fav �18.745.44-'' ' 74? Bav Road. Q-iceAsbury, NY 12 804 Planned Unit Development Site Plan -2015 Queensbury Partners @ Corner of Bay & Blind Rock Roads Public Hearing continues from December 15, 2015 SEQR Type I — N egative Declaration reaffirmed f ro rn October 2011 & October 27th Draft Resolution — grant deny PUD Site Plan approval Town of Quevnsbu ry Planning Board ' -munity Development Department Staff Notes De mber 15, 201 S. January 19, 2016 Site plan 57-201 eensburyarse-N, Southwest corner of Bay & Blind Rock Roads SEAR Type 1 Material I vie ; Site plan review application, Parcel istor v: SP 62-2011, ' 61-11 approved SB 1 -99 to be rescinded as part of Site plan 62-2 0 11 R,eguegted Action PUD Site plan sato ect to Plaimina Board review and approval Resolutions 1. ply D Site Plan Review= Piep#leseriratinn Site Plan .Applicant proposes a Planned Tit Development elopment (PT cori.sisq&g of office, business retail and as-tulti-family uses. The proposed mixed uw density is for 142 residential units and 56,180sq fl. of commercial space. Activities also include land ist r rr for installation of a parking areas, parking garage, side-walks and drive arms along with a socitated i fit et re and utilities for the project j Staff Comments f Site Plan overall The applicant proposes to construct I 1 buildings to he located at the comer- of Bay- Road and Mind Rock- Road. The &,velopment is t include de #dee, l i t r il., and �l .tibmily. Bi gg, 1 is to include businesses such as convenience store, coffee shop, personal wrvi", food service, or small office, Bldg. 2 is to include buslnesses similar to Bldg I including bank service and will include 70 apartment Gaits on the "1 and 33'floor, Bidgys_ 3-11 are to be actor , 7;5011 , ft- footprint xvi a 8 units each for mufti-family residential apartments. T e,building configuration locates. the parking behind the building and includes a parking garage for the commercial and ara es for the multi-family units. The environmental assessment indicates the bill I�r ht varies fio�aa 40 54 ft. Site internal and jgmg dans Access is proposed from Bay Road and Mind Rack whcre Blind Rock access aligns with both access points of Hunter Brook Lane—a multi-use building complex across-die street froth the proposedproject- The project data indicates -503 parking spaces -Mll be available to accommodate the uses on the site. The applicant has indicated j that a t err-lane area is provided for on Blind Rock Road. The Blind Rock load turn ].€etre �nld pr��vide a lame for left turns,a laDi.e for t1wough traffic and right hand urns_ Site Wetlands The project has previously received a `res -Wates' Wetland permit F ' -2101IAug , 2013 for activities adjacent to a designates wetland. Site details Plans show details of lighting, landscaping. g snow removal storage. building drive-thr s, t r zter measures. erasion control measures. and einer enc F access areas. The applicant has previously explained Haat the light timing has been changed at the intersection of Flay Roand Mad Rock Road and this intersection is aide to aCC:01 r odate the traffic generated by the project, The application has previously been reviewed by the Town Engineer and received final sign cuff in January of 2014. The N&Tater and Sewer department has reviewed the application materials and had discussions with the applicants the project as met the Town requirements. U N ARM The applicant has completed site plan revlexv for the project development of multiple buildings and uses on 34 +,x acres as a Planned Unit Development T e Town Board approved the PUD in December of 2015 with conditions on the numb of units,height, and further devOopme t Application Process 9-28-15—ToNkm Board referral to Planning Board 8.29.15--To Board consent to Planning Board Dead Agency 10-20.15—Planning Board Opened Public hearing for PULS referral 10,20,15—Planning Board Opened Public hearing for Site Plan 1 0.20-15—Planning Board r -lewed PUID zoning referral: PUD Sitz Plan and conducts S EC RA. 1 O.20&2 T1 5—Planning Board provided reaffirm SEQRA 10.20.15—Planning Board provided recommendation to the'Fo Board Nov 201 —Town Board received recormnendation and sets public bearing for PUD zoning Dec 2015--Town Board opens public bearing, reviews PUD and provides decision Jan 12-016—Planning Board review and decision on PUD site plan i I i i i f i s Town of Quwisbury Plam-fing Board RESOLUTION—Grant/Deny Site Plan Approval for PUID Site Plan 57-2015 QUE-ENS13URY PARTNERS Tax Map ID: 2-89.19-1-23) Through-35 /Property Address, Corner of Bay & Blind Rock- Reads Zoning: Planmd Unit Development The applicant has submitted an application to the Planning Bward for Site flim approval pursuant to Article 9 of the Town zoning OrdiTian" ibr- a PUmed Unit Development (PUD) consisting of office, business retail and multi-fanny usess. The pmposed rn ixed use density is for 142 residential units and 56,180 sq, ft. of commercial spao-- Activities also include land disturbance for installation of a parking areas, parking garagge, sidewalks and drive areas along with associated infrastructare and utilities for the project- Pursuant to Chapter 179.12 PUD of the Zoning Ordinance, Planned U1111 Developments are subject to Planning Board revk-w mid approval. Pursuant to rele-vam see ians of the Town of Queensbury Zoning Code-Chapter 179-9-080. the Planning Board has dett-m-tined that this proposal satisfies the n-,quirements as stated in the Zoning Code; As requirr4 by General Municipal Law Section 239-m the site plan application was referred to the Warrt!n County Planning Deparft-nent for its re-corrimendation; The Planning Board has reviewed the potential envilmarnental impacts of the project. pursuant to the State Environmental Quality Review Act (SFQR-A) and reaffirmed a SEQRA, Negafive Declaration — Determination of Mon-S-1 gnificznce (October 20 & October 27.2015; The, Planning Board opened a public hearing on the Site plan application on 12/15/2015 and wntinued the public hearing to I tl9/2016. when it was closed, The Planning Board has reviewed the application materials skibmitted by the applicant a-ad all comments made at the public hearling and submi Ued in i�qiling through mid including 1119/2016, The Planning Board deter n-tInes that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approN-al,, MOTION, TO APPPOVE / DISAPPROVE PUD SITT PLAN 57-2015 QUE-ENSBURY PARTNERS. Introduced by who moved for its adoption, snded by P(-,r the draft provi&d by staff conditioned upon the fbllering conditions: a. The limits of clearing shown on the applicant`s plans well eorstte a rwut buffer zorle. During construction, orange construction fencing shall be installed around these arews and field veri5M by Community Dzt-velopment st,,7K Page I of 3 Phone- 518-761.8220 Fax, 518-745.4437 742 Bay ROad. nSbWy, NY 12804 . ww mqut�ensbury,mR b. Any sanitary sinver cannecti n pl4n must be submitted to the 'Waste ater Depanment for its review,approval.,permitting and inspection, e. if curb cuts are added or changed, a drimvay perinit shall be required. A building pen-nit: will not be issued until the appwv driveway permit has n spa Witted to the Planing, Office. d, Engineering sign-off shalt be required prior to signature of Zoning Administrator on the approved plans. e. A right-tum lane shall be insWled at the carne- of Bay Road and Blind Rock load at the inception ofo .%mcti n. f If�uired,copies of the fell(TMirig will submitted to the Planning Office: i. Pr ct Notice of1 tit JNT #ewe under the car t "NYSDEC SPDF-5 General Peru for Constniction Activit' prior to the start of any site work: ii. Project Notice f'Ter ina on (Nupon completion of the project. The folloNving must be maintained on the project site for review by`town std. i. AppTaved fmal plans that have been scam d by, the onin Administrator. i cludirr the Slormwater Pollution Prevention Flan WPPP). ii. Project [ and proof ofe r e, under the curt NYSDEC SPDaS Genera! Per-unit for Construcfion Activity°, or an ind-Prid al SPDES permit issued for t prcject, h, Final approved plans. in compliance with any Site Plan approval must he submitted to the Community F Developme t ILTartm nt e mT.-y further review by the Zoning 1 d ini trator fir Building and Codes personnel. L The project develop and c ontractor must ineet with Planning Department staff after ap val.and prior to issuance of any bLUMITig pent and/or the beghming of any site work. j. Su6.9--clent issuance of ti neer permits, liaelading building penuats. is dependent on compliance with the tbregoing conditions. . As-built plans to rrtily that the sits plan is developed wording to the approved plans is to provided prig to the issuance of"any cw fcate ofoccupancy. 1. Con.qrwtion traffic shall use Bay Road. Site speeffics. a. Residential density. No more than 142 residential dwell ing units as set forth on the plans and specificallons shall be permitted. Page 2 €f-1 Phone; 518.761.8220 � Fax= 518.745.4437 742 Bay Road, Q star , NY 12304 M www.queensbuty.nel, . Commercial density, No more than 5 6.18 0 square feet shall be permitted. c. Site Plan Approval. Site plan approval ll tw, rfquirt-d for all development of the project, d, Phase I11 Approval. Any constructon for Phase III shall require approval from the T win Board for conformity -with the planned Unit Devidopment contained. herein and shall require, site plea appro�-,,�l from the Planning Beard. e. Setbacks: i, Setbacks along Blind Rock Road shall he no less than 53 feet. ii. Setbacks along Bay Road shall be no less gars 75 feet, provided that this shall not include roof ha iigpver. light fixtures, deck overhangs= and provided that pergolas shaII be permitted off Blind Rock Road as shmvn on di- Fi L2.2)- o t. iii, Setbacks from all wetlands for building locations shall be at lust 75 feet., f height Limits: i, For the comm ial reside tial suet s, height shall be li-mited to 54 feet- g- Modifications. Any changes to the plate and spific tions shall require Site Flan approval. Duly adopted this 19' day= of anuax , 2016, by the following vote: AYES- NOES: ES:N E : C: Fags 3 of 3 €ne 518.761.8220 Fax, 518.745,4437 74Z Say Road, Queen�;b r ,NY 12804 r ,q crensb r .riet Site Plan PZ-0028-2015 Tom Barber @ 462 Corinth Road Public Hearing Scheduled SEAR Unlisted Draft Resolution — grant / deny site pian approval Town n of Queensbury Planning Board Community l evelopment l eparnermt SmITNotes January 1 ,2 1 Site Plan. PZ-0029-2015 TOM BARB ER/462 Coririth RoadJommet�ci Liget Industrial -CLI ' SEQR Type Unlisted Material review. application, site plan -1. :-1.2 3, signage, and st rmwater pian; and report Parcel istory. SP 44-2012; SP 75-2013; RequtMcd Niton Planning Board review and approval to construct a phased storage facility where first phase vvith 52 west and 46 east Uvo facilities. The second phase proposed for two 36 units each. Clearing more than an acre. Plams for office area and f`n t area units to be used for BounoArotuid business. Resolutions I. PB Decision Project Description Applicant proposes to construct a phased storage facility where first phase with 52 west and east two facilities. The second phase proposed for two 36 units each. Clearing inure than an acre. FTs for office area and first area units to be used for Bounce round business. Pursuant to Chapter 179-3-040 of the Zoning °dinanee, nevi}sto.ra e facility shall be subject to Planning Board review and approval. , i Staff Comments Location.-The project is located at 462 Corning Road on the west side of the Northway adjacent to ars existing national grid power line property. Arrangement-The applicant proposes two construct four self storage facility buildings_ The first two buildings are to be 30 t x 220 ft. The building on the west would have 52 storage units and the buildi a on the east would have storage units. 'The east building would also contain the 300 sq ft office area. In addition the east 3 building would utilize the fiat few storage-units for storage of equipment for -i existing business' bomice around' peration. Thepr€ eat includ additional huiltli.r€gs that are to be 3 01 x 145': and 2u' x 145' with 6 storage units each. Site Design-n-The pard is 150 ft�4a by 585 ft +/-. The buildings at the frost of the property are to be constructed first and the two remaining buildings to be oonstrueted at a later time. Signage-the pig shrew a free standing sign to he compliant and no wall sign at this time. Site oaditIons-the site was previously proposed as a funeral home and an area was cleared for the development f the site, Trade- the applicant has iudicaled that Diaximum of trips peg'day might he 5-7. The pr ject is designed with one way traffic route. Parking is proposed to be adjacent to e-a hi unit, Site utility& lighting plan—tire project will utilize on-site septic system and coTmect to municipal water. The project includes installation of one pole light and then wall lights to be mounted on the buildings to be down east and an motion detector. Grading and drainage plan & Sediment and erosion o trol�tor water xl-ater and erosion control measures are to be installed. Prc�jp�t has been referred to the To n engineer for review and comment. j Landscape plan. the applicant has included landscaping at the sign area and along the east side of the property line for 180 ft then no clearing on the east border. le.{atio --ed evations haN mi pr vi ded indicating a color scheme of tan siding iVit green roofing. Th office area is to include stone appearance on tlw- front under the windoxY& Floor plans—the fluor plan sbows The interior of the ogee area and the typical for the storage units. Summa T4e app]icant has completed a site plan review a p]ic tion for the devOopment of a 1.97 acre parcel with sell` storage facility to be iaompleted in phases. I I 3 3 i a t i i a i I I t t i c F 1 S 1 1 FIRE MARSHAUS OFFICE ` wnOOteerrsbrrr 74 2 Bay Kora, Quee rzsbiii-y, INT 126 044 4EIL 14owe of Natural Beat ... A Good 'lace to Live ' .. . LSI REVIEW Tom Barber 462 Corinth Road SITE PLAN 1141201 P -0028-2015 FM has no site issues at this time Michael J Palmer Fire Marshal 742 Flay Road Queensbury NY 12804 firemars al ueensb r .n t R r r N1ars4a1s Off c FhputF_ Faxr 'its-,,-4 -4437 finglulIAL96T4 €tecn gwr'y-rw THE North Country Country Office Cha 375 Say Road, Queensbury, NY 12304 P, (518)812-0513 F, (518)812-2205 COMPAN I ES www.chazenf cm pi nies.com udson vafir-y Qffic'� S451 454-39,R0 Land Surveyors Caoftal llgri ct Of f ice ! 773 115r- 518 r J, Planners Ervvrronminital M January 12, 2016 Mr.Craig BFxnv n Zon!ng Ad min ist rator a.nd Code Complia rice Officer Town of Queens" 742 Bay Road Queensbury, New York 128D4 DeWered via email only: ueewbuU.net Re: rho as Barber-Self-Storoge Focility Town of Queensbury, Warren County, New York Chazen Project#91600.04 Queensbufy Ref#SP PZ-0028-201 5 Dear PAr- Brown: The Chazen Companies (Chazen) has received a submi5sbn package from your office for the above referenced project. The applicant intends to con5truct in two phases a new 170 unit self-storage facility- Phase I will nsist of 98 units and an office. Phase It will insist of 72 units. Submitted information includes the folJowing: * Site Pans and Details pre pa red by Kevin L Hastings, PEI,dated Deter n.ber 17 h,2015; * Stormwate r Management Report and Stormwater Pol[utio n Prevention Plan Narrative prepared by Kevin L. Hastings, PE., dated. November,23 2015; * Project Narrative; Short EAF,dated November 16, 2015;and, Site Plan Review Application Your office has mquested that we review the submitted Stormwater Management Report and Stormwater Pollution Prevention Plan Narrative and the design of stormwater system it relates to compliance to local, state or mlevant codes/regulatbi-ts and general practice. Based upon our revue w, CDaze n offers the following comme rft for the Town's consideration: Stwmwater Management& Erosion and Sediment Control- 1. The proposed disturbed area of 1.37 acres requires the preparation of a Stormwater Pollution Prevention Plan (SWPPP) in accordance with GP-0-15-002 that includes erosion and sediment controls as well as post construction slormwate r management practices.A Stormwater Pollution Prevention Plan (SWPPP) has been provided. Comments relating to the Stormwater Management Report and SWPPP are offie red below: Chazen Engnae&rg, Land Sarveymg&Landscape AmhAocftue Co., D_P_C_ chazeD Env&mMorgal servkaz. W he own of Queensbury S -Stwate Fadqty . Januey 1Z,2016 Pat 2. The stormwater marsagernert runoff calculations provided by the applicant indicate that the rate of runoff is increased from pre- to post-development under the 10-year storm. NYSDEC requires that post development runoff rates remain equal to, or less than predeveloprrsent rates. Applicant to revise the design and ca Mations to demonstrate conforTnations with the noted requirement. The Applicant proposes new impervious area. (proposed dr ay) within Subcatchment IS, NYSDEC requires that all new impervious areas be tributary to a stormwater management facility designed in accordance with the Y5S M_ 4. part 1,FA of the General permit, prop-th.lt discharges frons construction activities that adversely affect a listed or proposed to be listed, endangered or threatened species or in Its critical habitat. in � pport of permit eligibility, the Applicant shall provide documentation that this project complies with this provision of the Permit. This information shall included within the SWPPP with reference made to any supporting studies completed. 5. The pro pied su bcatchm ent reap shall be revised to depict the bone of Concentration flow paths for each su beatchme nt.The su catchment maps shall he revised to show existing a.nd proposed contours, It is difficult to discern the existing condition flog path without contour or spot slot information. The Developed Conditions HydroCAD model does not provide distlnct inflaw value depths for the proposed rain gardens,which indicates that the time span of 5-72 hrs may not be suff icient, The Applicant shall re-rise the time span sttct that the full effects of each storm are realised_ 7. The Applicant shall provide a Grapy of the NOT in t he SW PPP. 9- The Applicant shall provide ars unsigned copy of the MS4 SWPPP acceptance forTn within the SWPPP, 9. It does not appear that the sail tens were performed to a depth to confirm 3' separation to seasonally high groundwater or bedrock, Applicant states "Additional Reid resting will be performed at the time of construction to verify the depths of the soil profile and seasonal high groundwater in relationship to the proposed infiltration practices," We do not tale exception to this approach. However, it shall be noted that if any design changes occur because of discovered jncon5iswncy in soli conditions the project may be subject to additional Site plan review. The applicant shall notify the Town prior to advancing soil testing; such that the Town can Witness the testing if they so choose. M 6.11 of the SMDM states that infiltration devices shall be separated from any water supply veils by at least 10feet, Alto, subpart 5-B.7 Standards for Water Wells by the NYS DOH stag that horizontal separation distance to surface recharge areas be at least 1t ft. The Applicant small depict all neighboring gator wells applicable, in order to show conformance to DOH and ITEC standard& IL The Applicant has provided storage volumes for each of the pre-treatment infiltration trenches. However, calculations to support these volumes have riot been pravided. Per Section 6-33 of R;%%%9. s-9Jz iS, .W-ren& ns ,AMEOOJX-K-00,1�_2015-r*b 5�*.-Sri a= n€ se��-5� ST W. y _ : To"of 0.ueiin nary 5LI#=5 W€atc,Fri`icy Jam12,2016 rave 3 the NY55DM, pre-treatment settling chambers shall be sized using the method describers in Section 6.4.3. Per Section 6,33, �tf the fc fbr the underlying soil is greater than 5.00 in hr, 100% of the WQv shall be pretreated prior to entry into an infiltrationfacility.." The Applicant shall provide the above calculations to verify that the pre-treatment basins have been sized to capture 100%of the Ov- 1 , The required water quality volume and minoff reduction volume shalt be calculated for each individual practice beim used for treatment as required by the NYSSMOM,ThN shall be done for each practice being used to treat WClv to ensure the rninimum require ents are being mi3t. 13. Section 63.1 of the NYSSMDM states OInfiltrarton practices cannot be placed in farations that cD se water problems to downgradlent properties. Infiltraribn trenches and bosira shall be setback 25 ftet down rudient frnrrr structures and septic systems. Dry wells sW1 be se rated a min xr tuf I et stru res,"Drywells and trenches are shorn within 4`of structure o. drawing S1 and sewage disposal field is within 15' of the infiltration trench. As such, the applicant revise the design to demonstrate conformance with the noted pr rision. If the Applicant intends to deviate from the noted NYSDEC standard, he shall provide justi€[cation that provides the same hire[of preter-tion that the standard provides. 14, dater-Quality Treatment Facility Maintenance requirements for drywelis are n t included in the SWPPP on page 2 of 4 of the Post-Construction Operation & ]VlMntenance Plan. Applicant to provide. Conmiens and Recommendations It is our opinion that the applicant should provide clan Icat€on for the abs items and incorpurate the changes in subsequent plan submissions. If you have any questions regarding the above, please do not hesitate to contact me at (5 18) 824-1926, 5incereiy, Sean M. Doty,P.E,,LEED AP Prin ipat Manager, MunicipaI Engineering Services cc-, Sunny Sweet,Town Planning Office Administrator(via email) Laura Macre,Town Land Use Planner(via e-mail) Fite f: W-S,5 lhmW,-za. 94 76b Pwh� rsa,r"w'tf s'gma Rev i i 1 rvt1k'41 €vE- nsm 3rir�€5tc��c�2 X51-Iz��i. U U V c Town of QueensbutT Planning Board SEQR RESOLUTION —Grant Positive or Negative Declaration Site Plan PZ-0028-2015 Tom Barb,--r Tax MapIli; 308.15-1-34/Property Address: 462 Corinth Road /Zoning- CLI The applic-ant pro posesApplicant proposes to construct a phased storap facility, where first phase with 52 west and 46 east two facilities. The scf.:ond phase proposed for two 36 units each, Clearing more than an acre. Plates for office area and first area units to be used for Bounce Around business. PuTsuant to Chapter 179-3-040 of the Zoning Ordinance, new, storage facility shatl be subject to Plaiming 13-oard review-aud approval. The Planning Board has determined that the proposed project and Planning Board action is subject to reiriew under the State Eniron rnenW Quality Review Act-, The proposed action considered by this ward is Unlisted Iiii the Department of Environmental Conservation Regulations implementing the State Environmental Quality Rtrvriew Act and the regulations of the Town of Queensbuny; No Federal or other agencies are in-volved; Part I of the bort I Icor g,'EAF has been compluted by the applicant; Upon review of the infonnation recorded on this EAE it is the conclusion of the Town of Queembury Planning .Board as lead argency that this project will result in no significant adverse impacts on the environment, and, therefore. an environmental impact statement need not be prepared. Accordingly, this, negative declaration is issued- MOTION TO GRANT A POSITIVE DECLARATION OR NEGATIVE DECLARATION FOR SITE PLAN PZ-OOM2015 TOM BARRER, Introduced by _ who mo'ved for its adoption, sDconded by As per the resolution prepared by staff. I, Part 11 of the EAF has been reviewed and completed by the Planning Board. 1 Part III of the E lm bet-n reviewed a-ad completed by the PlanningBoard. Or Fart Ili of the — EAF is not ncce-ssaU because the Planning Board did not identify potentially moderate to large impacts. Duly adopted this 19"day of lanuary,2016, by the following vote: AYES- NOES- Phone- ';19-761-92-20 Fnx- 18-745-443,71 74 Bay Road.QuounNim NY 128"1 .'www,queonsbury.tiet Town of Qutczvbury Community l evelo meat office 742 Bay Road. Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION - Grant i Deasy Site plan Approval for Site plana -0028_2015 TOM BARBER Tax flap ID. '209,15-1-34 /Proper address: 462 Corinth Road."Zoning: CLI The applicant has submitted zm application to the Planning Board for Site plan approval pursuant to article 9 of the Town zoning Ordinance for: Applicant proposes to construct a phased storage facility where first phase with 52 west and 46 east two facilities. The second phase proposed for two '56 units each. Clearing more than an acre. Plans for office aria and fast area units to be used for Bounce Around b Slnes . Pursuant to Chapter 179-3=040 of the Zoning Ordiname, new storage facility shall be subject to Planning Board revi�w and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Cade-Chapter 179-9-080, the Planning Board has deterrrrin d that this pr poo satisfies the requiTements as stated in the Zoning Code; As rt! a re-d by General Municipal Law Section 239-m the site plan application was referred to the Warrun County Planning Departiutnt for its r-c ommendatio ; The Plawiing Beard has reviewed the potential eirdro-nme tai impacts of tlu� pwiect. pursuant to the Mate Environmental Quality kevictE l- and adopted a SEQRA Negative Declaration– l eteT inatiou of No .-Significance The Planning Board opened a public hearing on th4c Site plan application on 1/19/2016 and continued the public hearing to 1/19/2016 when it was closed. The Planning Board has review=ed the application ax terials submitted by the applicant and all comments made at the,public hearing and sub itl.?ffd in writing through and including 1119/2016; The planning Board determines that the application complies with the review co sideratians and standards set forth in article 9 of the Zoning Ordinance, for Site Plan approval, MOTION T APP S DISAPPROVE SUE PLAN PZ-0028-2015 TOM BARBER:: i trod cd b who moved for its adoption, seconded b —�. According to the daft resel ution prepared by Staff with the fol loring; 1Waivers requested graut 'den, d-, . Adherence to the items outlined in the follow-up letter sent with this resolution. a The limits of clearing will constitute a no-cut buffer W-ne, orange, construction fencing shall be installed around these areas and field verified by Community Development staff, b If applicable, the Sanitary Sewu cormectiori plan must be submitted to the 'Ykraswwater Depaytment for its review, approval, pe itting aid inspection; i� If curb outs ars beim added or changed a driveway pent is required, A building per ail sN1111 riot be issued until the approved driveway permit has been provided to the Plwning Office; Phoma. 516,761.6220 ' Fax 518.745.4437� 742 Say RQueensbury. NY IZ804. www,queensbury.net d if application was referred to engineering then B91 n4wed ng sign-off regw-red prier t n si 1_ure of Zoning Administrator of the approved plans; e If re uir A, the applicant u-st submit a copy of the folloNving to the T hi , a. The projoa NOT (Notice of Intent) for cover-age under the current "NTYSDEC SPDESGeneral Permit from Construction Activity" prior to the start of any site work. h. The project NOT (Notice of Termination)upon oo pletion of the project: c. The applicant must maintain on their project site, for revieNv by std: i, The approved final pies that have been stamped by the Town Zoning Administrator. Theme plans must include the project SWPPP (Storni eater Pollution Prevention Plan) when such a plan was prepared nd approved; ii. The project N01 and proof ofcoverage under the current NYSDEC SPDESGeneral Permit, or an irdividuai PI1w pe it issued fir pr€jet if required. f Final approved plans, in compliance With the Site Ply must be gubmitted to the Community Development Department bef a furtlw r�Mew by the Zoning Administrator or Building and Com personnel: The appli=t must meet i%ith Staff after approval and prig to is a . of Building PeTmit and/or the begging of any site work; h Subsequent issuance of further permits, including building pert-nits is dependent on i plian with this and all other conditions of this resolution-, iAs-built plans to certify that the site plan is developed according to the approved plans to be prop}i d prior to issuance of the certificate of occu an yy. This resolution is to be placed in its entirety on the final phins Duly adopted this 1 dad- of January, 2016,by the following vote. AYES. N . Pho ; 18,761,6220 Fax. 516,745,4437 742 Bay Road, Queensbury. NY 12804 M yr , Bens z►r _net