Loading...
Water-Wastewater Comments (see pg. 2) January 29th 2016 Mr. Craig Brown, Administrator Town of Queensbury Planning Board 742 Bay Road Queensbury, New York 12804 Re: February 2016 Planning Board Applications Dear Craig: My comments regarding the agenda for the February 2016 Planning Board Applications. SP 51-2016 Water • This project is located within the Queensbury Consolidated Water District and sufficient water is available to meet domestic needs. • The water line is to be inspected prior to backfill. • The meter size and fee still to be determined. Tap application must be filed. • Fire sprinkler systems must comply with Queensbury Design & Construction Standards (January, 2015 version). • Tapping sleeve and valve on New Hampshire shall be placed on north side of hydrant. Wastewater • A detail showing a U-Trap/Fresh Air Vent/Cleanouts needs to be included in the Details Sheet. • Manhole covers shall have non-penetrating pick holes — Syracuse Casting Pattern 1009-8 Cast Iron • Building Drain shall be a minimum of 4" schd 40 and shall not extend more than 5' from the building line. Building Sewer shall be PVC SDR 35. FERNCO connections are NOT allowed. • Please consult Queensbury Wastewater's Homepage/Forms for Specifications and Details. Contractor must obtain a PERMIT from the Wastewater Department. SP 54-2016 -Bi2 Bay Lodtin2 -Hilton Water • This project is located within the Queensbury Consolidated Water District and sufficient water is available to meet domestic needs. • The water line is to be inspected prior to backfill. • The meter size and fee still to be determined. Tap application must be filed. • Fire sprinkler systems must comply with Queensbury Design & Construction Standards (January, 2015 version). Wastewater • Parcels 309.13-2-6,7,8,9 shall be merged into Parcel 309.13-2-2 in order to make them part of the West Queensbury Sewer District. Presently they are outside of the Sewer District. • A detail showing a U-Trap/Fresh Air Vent/Cleanouts needs to be included in the Details Sheet. • Manhole covers shall have non-penetrating pickholes — Syracuse Casting Pattern 1009-8 Cast Iron • Building Drain shall be a minimum of 4" schd 40 and shall not extend more than 5' from the building line. Building Sewer shall be PVC SDR 35. FERNCO connections are NOT allowed. • Please consult Queensbury Wastewater's Homepage/Forms for Specifications and Details. Contractor must obtain a PERMIT from the Wastewater Department. SP 73-2016 -Faden Enterprises —75-79 Main St. Water • The water lines to the existing houses must be cut and capped prior to demolition. Wastewater • A detail showing a U-Trap/Fresh Air Vent/Cleanouts needs to be included in the Details Sheet. Please consult Queensbury Wastewater's Homepage/Forms for Specifications and Details. • Each building must be connected to its own connection. Siamese connections not allowed. Please call Wastewater Department for location of these laterals. • Contractor must obtain a PERMIT from the Wastewater Department. Sincerely, Christopher T. Harrington Superintendent CTH/cth Cc: Scott Burnard, QWD Engineering Department File