Loading...
Faden Special Use Permit General Criteria 2-°-)2 STATE F-1 0 LJTE 0 SUFFE DO 1 LANSING ENGINEERING, PC MALTA.NY'l 2020 'r(51 F33 E39'3--5L-Z1D t-L F(51B]BOO-5245 Faden Enterprises Site Plan Special Use Permit General Criteria January 15,2016 A. Comment: Harmony with Comprehensive Plan. The proposed use shall be in han-nony with and promote the general purposes and intent of the Comprehensive Plan, and this chapter and the health, welfare and safety of the Town and its residents, Response: The proposed Faden Enterprises Site Plan furthers and is consistent with the policies of the Town's Comprehensive Plan. The proposed pro ject uses are in accordance with the underlying Main Street(MS)zoning district and the proposed project expands on the existing commercial uses along Main Street that are outlined as a goal of the Town's Comprehensive Platt. B. Comment: Compatibility, The proposed use shall be compatible with the character of neighborhood,the area, the zoning district and the community surrounding the location of the proposed use and will not unduly prohibit or discourage future planned growth in the area. Response. The Faden Enterprises site plait is in harmony with general purpose and intent of the underlying Main Street(MS)zoning district and the Towns Comprehensive Plan. The location, character and size of the proposed uses and structures are in accordance with the zoning requirements and blend appropriately y ly with the surrounding neighborhood and uses.In addition to the above the project includes design features such as pedestrian connections and potential future vehicle interconnections that will help to promote future planned growth in file area. C. Comment: Access,circulation and parking. The proposed use shall have safe and efficient access for pedestrians and vehicles, and shall provide for appropriate off-road parking and loading areas. The interior circulation system must be adequate to provide safe accessibility to all parking spaces and ensure that adequate and safe integration of pedestrian and vehicular movement is provided. Response: The proposed project uses are in accordance with the underlying Main Street(MS) zoning district and the proposed project expands,on the existing commercial uses along Main Street that are outlined as a goal of the Town's Comprehensive Plan. The proposedparking and loading facilities are in accordance with the zoning requirements and blend appropriately with the surrounding neighborhood and uses. The parking areas and the associated access management for the project are proposed to provide for th esafe and efficient movement of vehicle in and out of the site. The proposed parking on the side of the building is consistent with other uses along the Main Street(MS)zoning district and has no negative effect on the surrounding areas. The proposed driveways exceed the,minimum twenty foot wide requirement and potential future linkage opportunities are accoin its odatedfor and available with the proposed plan. The project will provide additional commercial services without creating a significant impact on the existing road intersections, road all d driveway widths, and traffic controls. D. Comment: Infrastructure and services. There shall be sufficient infrastructure and services, including utilities, public facilities and services, available for the proposed use or the project shall extend or provide 2 of 3 Faden Enterprises Site Plant January 15, 2016 infrastructure and services for the area where the proposed use is located. There shall also be facilities and services implemented by the applicant to appropriately control any potential nuisances from the operation of the use, such as control of litter or trash, loitering and crime prevention, and any other features or aspects of the operation of the proposed use that may affect the public safety, health and general welfare. Response: The proposed project provides storrnwater collection, conveyance and infiltration to the greatest extent practical for the relative small site.Site soils are characterized as sandy soils which are excellent for infiltration.All aspects of the storntwater design will be adequate and are proposed in accordance with the drainage standards of Chapter 147 of the Town Code and the Town of Queensbury Subdivision Regulations where applicable. The proposed project inchrdes service connections to the public water supply and public sewage disposal facilities. All aspects of the water supply and sewage disposal facilities will be adequate and are proposed in accordance with the current requirements set forth by Department of Health regulations and Chapter 136 of the Town Code. The project includes a waste receptacle area to manage liter/trash and site lighting clear site lines to deter loitering and crime. It is our opinion that the project will not have an undue adverse impact on the public safety, health and general welfare of the overall community. L. Comment: Environment and nature features. The proposed use shall be compatible with and appropriately protect environmental and natural resources, including the environmental and physical suitability of the site for development, and the general landscaping, screening and buffering shall be in character with the surrounding areas, and the risk of fire, flood or erosion and impacts such as emissions of electrical charges, dust, light, vibration or noise detrimental to the public health, safety and welfare shall be minimized to the maximum extent practicable. Response: The proposed project rises are in accordance with the underlying Main Street(MS) zoning district and the proposed protect expands on the existing commercial uses along Main Street that are outlined as a goal of the Town's Comprehensive Platt. All aspects of the site plait are proposed in accordance with the Town of Queensbury Town Code and the Town of Queensbury Subdivision Regulations where applicable. It is our opinion that the project design and regulations provide adequate measures to insure that the proposed use is compatible with and appropriately protects environmental and natural resources, including the environmental and physical suitability of the site for development, and the general landscaping,screening and buffering is in character with the surrounding areas, and the risk offr.re,flood or erosion and impacts such as entissions of electrical charges, dust, light, vibration or noise detrimental to the public health,safety and welfare are minimized to the maxirnurn extent practicable. T. Comment: Long-term effects. The proposed use shall provide positive or beneficial effects on long-term economic stability, environmental integrity and community character of the Town and surrounding properties, districts and uses. Response: The proposed Farlen Enterprises Site Plan furthers and is consistent with the policies o f the Town's Comprehensive Plan. The proposed project uses are in accordance with the underlying Main Street(MS) zoning district and the proposed project expandv ort the existing commercial uses along Main Street that are outlined as a goal of the Town's Comprehensive Plat.It is our opinion that this project will provide long terur positive and beneficial effects on long-term economic stability, environmental integrity and community character of the Town and surrounding properties, districts and uses. 3 of 3 Faden Enterprises Site Plan January 15, 2016 Attached please find a copy of the revised plan set for your review. If additional information is required, please contact our office at your earliest convenience. Thank you. Sincerely, LANSING ENGINEERING, RC ---------- Yates S, ott Lansing,PE, CPESC, CPSWQ CC: