Loading...
Staff notes & draft resolutions Town of Queensbury Planning Board Community Development Department Staff Notes March 15,2016 Site Plan PZ 44-2015 & Special Use Permit IIZ 50-2015 PERFORMING ASSETT"RATEGIES / 87 Main Street/Main Street,— MS Zoning SEQR Type Unlisted Material Review: application, revised site development sheet of 2/5/16, Site Plan submitted 2/8 revised date of November 24, 2015, Landscape Plan submitted 2/8 revised date of February 5, 2015, elevations dated 11/29/2015 submitted 12,11/15, letter description of potential uses, letter dated 11/17/15 addressing special use permit, engineering report date 8/24/IS, letter of 12/2/2015 additional information about uses and note indicating additional review for future tenants in regards to lighting, signage and parking; floor plan Parcel History: AV 72-2000; SP 63-2000&Mod.; SP 2-2003 &Mod. Reauested Action Planning Board review and approval of construction of two commercial buildings with an existing single curb cut. Building one proposed to be two story 86' x 40'. A proposed second building may be constructed in the fluture. Resolutions 1. SEQRA I PB Decision Proiect Description Applicant proposes to construct the first of two commercial buildings with an existing single curb cut. Building one proposed to be two story 3440 sq ft (footprint). A proposed second building may be constructed in the future. Tossible uses include restaurant, coffee shop,deli, wine store, medical office, to promote Pedestrian and mixed use businesses. Pursuant to Chapter 179-10-040 of the Zoning Ordinance, commercial development on Main Street shall be subject to a Special Use Permit. Also, pursuant to Chapter 179-3-040 of the Zoning Ordinance,commercial development on Main Street shall be subject to Planning Board review and approval. Staff Comments Site plan overall-The applicant proposes to redevelop an existing site where there is air existing curb cut, parking, lighting and landscaping. The applicant proposes to construct a two story building that is to be 86 ft by 40 ft. The new building is arranged to have three tenants allowing each tenant to have an office/storage space above the main space. The site has an existing 21 parking spaces and 39 new spaces are proposed. Grading and drainage Bl au—The applicant had indicated new pervious pavement and pervious concrete sidewalks are to be installed on the site. Information should be clarified in regards to catch basin installation one of the stormwater reports includes a catch basin but none are shov'm on the plan.- Sediment and erosion control—The applicant's pollution prevention plan indicates there is to sediment and erosion control but the plans do not show this information, Landsealm plan—the plans indicate 15 new yew trees are to be installed and five inaples on the site are to remain, The property front and rear are proposed to be new lawn areas. Site likiting plan-The applicant proposes to utilize the existing 3 light poles on the site. The plans do not show any new lighting on proposed building, Site details The project is subject to Main Street requirements—refer,to spreadsheet. Mgnage the plans show location of signage and the applicant has indicated cacti tenant would be responsible for sign review details. Elevations and Floor plans-The applicant has provided proposed elevations for a 27+/- ft in height 2-story building. The floor plans show the three proposed tenants having equal space. The site plan shows a future 50 ft by 120 111 building that has no additional details and will be, built dependent on the market. The future building will be subject to further review. Summat2L The applicant has completed a site plan application for the development of a two story 3,440 sol ft building on Main Street. The board may request additional information on the following: I. Future second building proposed height, uses, and time of construction 2. Confirm main building final proposed height. 3. Landscaping number of existing trees/plantings to remain and number of proposed trees and building landscaping details 4. Outdoor space usage for coffee/restaurant usage—will there be outdoor seating, type and space size 5. Rooftop mechanicals—does not show any so where on site will mechanicals be located 6Building elevations side view to determine faqade detail —overhangs or awnings T Parking summary for the uses proposed or anticipated should be provided & Building lighting—type, fixture and candle information will be needed 9. Window transparency calculation should be provided for board review 10. Window type for first floor and second floor should be provided. 11. Building color should be provided. 12. Special use permit criteria—to be consistent the board may request each criteria be addressed 13. Engineering comments should be addressed. - 2- TWAII (4'Quo:nshury Office 74,', Ba , Road, (,�ueens[ ury, NY 12804 Town of Queensbtuy Planning Board SE QR RE SOLUTION—Grant Positive or Negative Declaration Site Plan PZ-0044-2015 & Special Use Permit PZ-0050-2015 PERFORMING ASSET STRATEGIES Tax Map ID: /Property Address: /Zoning: The applicant proposes to construct two commercial buildings with an existing single curb cut. Building one proposed to be two story 76' x 48'. A proposed second building may be constructed in the future, Tossible uses include restaurant, coffee shop, deli, wine store, medical office, to promote pedestrian and mixed use businesses. Pursuant to Chapter 179-10-040 of the 7xning Ordinance, commercial development on Main Street shall be subject to a Special 'Use Permit. Also, pursuant to Chapter 179-3-040 of the Zoning Ordinance, commercial development on Main Street shall be subject to Planning Board review and approval. The Planning Board has determined that the proposed project and Planning Board action is subject to review under the State Environmental Quality Review Act; Tile proposed action considered by this Board is Unlisted in the Department of Environrnental Conservation Regulations implementing the State Envirownental Quality Review Act and the regulations of the Town of Queensbury; No Federal or other agencies are involved; Part I of the Short EAF has been completed by the applicant; Upon review of the information recorded on this EAF, it is the conclusion of the Town of Queensbuty Planning Board as lead agency that this project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. MOTION TO GRANT A, POSITIVE DECLARATION OR NEGATIVE DECLARATION FOR SITE PLAN PZ-0044-2015 & SPECIAL USE PERMIT PZ-0050-2016 PERFORMING ASSETST`MTE GIES. Introduced by who inoved for its adoption, seconded by As per the resolution prepared by staff. 1. Part 11 of the Short, EAF has been reviewed and completed by the Planning Board. 2. Part III of the Short IAP'has been reviewed and completed by the Planning Board. Or Part III of the Short IAP is not necessary because the Planning Board did not identify potentially moderate to large impacts. Duly adopted this 15"'day of March, 2016 by the following vote: 11fione: 51&761,8220JFax: 518.745.44371742BiiyRoac1Queetisl)ury,NY 12804�www.queensburyxot AYES: ()ES: rlhonc� 5M701,9220 [aa x: 518345,44371742 Bay Road,QUellSbUry,NY 12804 �WWWqUeeVlSbUrysict 74 ka'Y lir:ad. Qneerrw hr ry, �4 12804 Town of Queensbury Planning Board. RESOLUTION - Grant 1 Deny Site Ilan Approval for Site flan PZ-0044-2015 & Special Use Permit PZ-0050-2015 FE1 .1rORMfNCl ASSET STRATEGIES Tax Map IIS: 309.10-1-37/Property Address. 8blain Street fZoning: MS The applicant has submitted an application to the Planning hoard for Site flan approval pursuant to Article of the Town zoning Ordinance for Pursumnt to relevant sections of the Town of Queensbury Zoning Bode-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board has reviewed the potential environmental impacts of the project, pursuant to the State Environmental Quality Review ActSE, adopted a SEQRA Negative Declaration_.. Determination of bion-Significance The Planning board opened a public hearing on the Site plan application on 2/5/2015 and continued the public hearing to 3/15/2016 when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/15/2016; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning t rdinance for Site flan.approval, MOTION TO A: PR >V;+ / DISAPPROVE SITE PLAN PZ-0044-2015 & SPECIAL USE PERMIT PZ-0050-2015 PERFORMING ASSETSTRATEGIES; Introduced by who moved for its adoption, seconded b According to the draft resolution prepared by Staff w1th the fallowing: 1) Waivers requested granted/denied; 2. Adherence to the items outlined in the follow-up letter sent with this resolution. a The limits of clearing, will constitute a no-cut buffer sone, orange construction fencing shall be installed around these areas and field verified by Community Development staff, b) Ifapplicable,the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection c) If curb carts are beim added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off requited prior to signature of Zoning Administrator of the approved playas, Phone: 518,76t8220 0 I Fax: 518.745.4437 742 Bay Road,Queensbury.ICY 12804 4 www.queensbury.net Page, I (if 2 e) If required,the applicant must submit a copy of the following to the Town: a. The project N01 (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT(Notice ofTennination) upon completion of the project; c. The applicant must maintain on their project,site, for review by staff: i. The approved final plans that have been stamped by the To Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project N01 and proof of coverage under the current NYSDEC S,PDES General Permit, or an individual SPDES permit issued for the project if required. f) Final approved plans, in compliance with the Site Plan,must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; g) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; h) Subsequent issuance of further permits,including building permits is dependent on compliance with this and all other conditions of this resolution; i) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. j) "I'his resolution is to be placed in its entirety on the final plans Duly adopted this 15"day of March,2016, by the following vote: AYES: NOES: Phonett: 516.761.8 220[ Fax: 518,745,4437 G 742 Bay Road, Queensbury,NY 12804 � www.queensbury.net