Loading...
Apex engineering comments THE .,: - IL Cba LO® orth Country Office 375 gay Road' Queensbury,NY 12804 .K_,o P. (518) 12-0513 F. (518) 812-2205 COMPAN I ES www.c�hazencompainies.com Enkrre Rs Hudson Valley Office 1 @845 454-'3980 Land Surveyors Capitan District Office (518)2" 55 rlru Environmental Professionals Landscape Arcnrr us March 9,2016 Mr. Craig Brown Zen ing,Adm iunistrautoraund Code Cori unce Officer Town of Queensbury 742 Say(Road Queensbury, New'York 12804 Delivered via emiail only. CralgBeq ueensbuArwr.net Re: ;pear Solar Power(Marvin Dob,ert) 'Fern of Queensbury, Warren County, Nein York brazen Project#Sul'6'00.19' Queensbury Ref SP 1.-2016 Dear Mr, Brow w The Cha en Companies (Ehazen) has received a submission package, from your office for the above referenced project. The applicant intends to upgrade their site located at 64 Main Street, Ind nudlng; recounfig;,urlung the existing parking areas and the addition of new landscaped areas. Submitted information includes the following'. • Site Plans and Details prepared by Jarrett(Engineers, PI.LC Jlani uary,2016; ■ Stormwater Polluution Prevention Plan prepared byJlarrett Engineering,„dated February 2016 and,. • Site P'larn Reviewing Application, Short EAF and Project Narrative,dated February 2016. Your office has requested that we limit our review to the design of stoirrnvwrater systema: as it relates,to compliance to local, state or relevant cou de's and regulations,. (based upon our review, Chaaen offers the following coimmernts for the Town's conslderationr Storrawater Management&Erosion and Sediment Control: 1. The project proposes to disturb,an airea of 1.,2 acres,and requires the preparation of a Stormwatier Pollution Prevention Plan (''SWPPP� in accordance with GP-0-15-00.2 that includes eresio n and sediment controls as well as post construction storm Ater management practices.,A Storruuwater Pollutpoun Prevention Plain (,S PPP) Inas been provided. Comments relating to the Stormwatder Management Deport aund.SPPP are offered below. 2. The suubratchmeunt Iboundarles on the pre and post-development drainage maps should not be limited to the sLubJect property Ilene, It shall include the entire watershed tributary to each design point.The dr,alinage,maps provided in theS'W 'PPP shall be revised to Incluude existing and proposed topography on the site so the drainage,divides can be verified,. Chazen Engineerft,Land Su ying,&L r ca e Amhftarure Co,,D, zen Envireanme aral Semis, drwc, The Wizen Cr eed'es; ,enc. Town of Queenitury Aptx Solar Poweir March%2016 page.2 3, It does not appear that documentation was provided per Part LF.4 of the SPDES,General, Permit concernibg construction activities that may affect threatened and endangered species. The Applicant shall provide the Town with any documentation regarding the above determination and incorporate the same into,the S'W'PP'P pursuant to Part LF.4 of the SPDES,General Permilt., 4. It does not appear that documentation was provided per Part I.F.8 of the SIRDES General Permit concerning, construction activities, that have the potential, to affect aiin historic property. The Applicant shall address the proiject"s potential to affect an histo,fic property in the WPPP aind provide the Town with any documentatiion required in accordance,with Part LF.8, of the SPOES General Permit. 5. The infiltration, swalle is modeled with an, exfiltration rate of 60, in/hr. The Applicant shiaill, clarify the percolation test results provided on the plans and how the,eAltration rate was establishecl. 6. The W'Qv calculations provided indicate that the Landscaped Infiltration Swale is equivalent to a DEC infiltration trenc`hi.The detafl provided does,not appearto meet all requirements depicted lirn figure 6,11 of the NYSSMDM. The Applicant shall clarify how the Landscape Infiltration Swale meets the design requirements of the infiltratibn trench, 7, 5ection,6.3.3,of the NYSSMDM, Indicates required pre-treatment voluiimes depending,on the fc of the, underlying soil. The required pre-treatment volume shall be provided meeting these requirements,The Applicant shall clarify in the 5WPPP how this Is provided. 8, The GS provided in the SW'PPP Is not completed.The Applicant shall provide a completed NOL 9� A legally binding and enforceable, Maintenance agreement may be executed between the facility owner and the Town ensuring, that proper maintenance rneasures, wil�l be Implemented for all proposed stormwater management practices as specified in Town code section 14:7-IO.D if the Town chooses., A draft olf this agreement should be provided to the Town for review and shall be inclutided in the RPP. In the,event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to,contact me at (518) 824-19,26, Sincerely, Sean M., Doty, P.E., FEED AP,CMS4S Principal Manager, Municipal Engineering Services cc: Sunny Sweet,Town Planning Office Administrator(via,email) Laura Moore,Town Land Use Pllainner(via e-mail)