Loading...
TRSB engineering comments THE E-MAILf0l, CbNorth Country Office a e 375 Bay Road,Queensbury, NY 12804 K,g P: (518),812-0513 F: (518)8,12-2205 COMPANIES www.chazencompaniescom Engineers Hudson Valley Office (845)454-3980, Land Surveyors Capital District Office (519)273-0055 Flanners Environmental Professionals, tandsCaoe.Architects (March 9,2016 �Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Say Road Quee nsbu ry,(Flew York 12804 Delivered via email only:CraligB@queensbu:ry.net Re: TRSS tnterprise5, UC Town of Queensbury, Warren County, Atew York Chozen Project#91600.20 Queensbury Ref#SP,88'-2016 Dear Mr. Brown, The Chazen Companies (Chazen) has received a slubmission, package from your loffice for the above referenced project., The applicant intends to construct an 8,400 sq.ft. building and associated site improvements.Submitted Information in,cludes the followlng 0 Site Plans and details prepared by Highlander Engineering Services, PLLC, dated January 119tN, 25'h, and 27th, 2015; a Project Narrative prepared by H*hlandeir Engineering Services, PLLC,dated February 15, 2016; 0 Stoirmwater Management Report, dated February 2016 0 Short EAF,dated February 15, 2016, a, Town of Queensbu ry Site Plain Application; Your office has requested that we review the design of stormwater system, it relates to compliance to local, state or relevant codes/regulations and general practice. Based upon our review, Chazen offers the follow!ng comments for the T'own's consideration. Stormwater Management&Erosion and Sediment Control: 1. It appears that the proposed site improvements disturb less, than one (1) acre and thus the project is not required to obtain coverage under the NYSIDEC SPDES, General Permit for Starmwateir Discharges from Construction ActMty (GP-0-1"02). Comments related to the proposed stormwater management and erosion and sediment control features proposed for the site are offered below: Chazen Engineering,Land Surveying&Landscape Ar hffedure Co-,D.R C, quo en rnvkolir enfal serdoes,Ma The Chazen,Companies_fnc Tawn on Que!enisbiury TR5B Enterpri5es,LIC Marth 9,2W6 Rage 2' 2,� The Applicant has provided a HydroCAD model whlch ana[ysis piost-develbprnent site condlitions. Hlow,ever, a predevelopment model was not provided such that accurate complarisions to demonstration stormwater runoff mitigation, has be achieved, can be made. Additionally, the Applicant shalt provide subcatchmenit maps which depict the subcatchments used to develop both the pre-and post-development runoff models. 3. Section 63.1 of the NYS SMW states,that the bottom of Infiltration faciliities,shall be located at least 3 feet above the seasonal[y, high groundwater table. It does not appear that soil testing was performed. Soii testing shouild be performed to confirm i adleq,uate separation frurni seasonally high groundwater as well as the Infiltration rates used in the modet 4. The, project narrative states that the new building is 8,400 sq.:ft., in size. However, the information provided in the HydroCAD model indicates that it Is 101,900 sq.ft- Applicant to clarify and revise as needed. 5,, The Hydro AD model uses a vold percentage of 50% for nodes 1P and 2P and 100% for 3P. However, crushed stone typically has, a maximurn void ratio of 40%. Additionally, the sizing, of the proposed Inf ilt ratio n/eave trenches varies f rorn that shown on the site plan and deta 11s.The Applicant shall revise the model accordingly. Conclusions and'Recommendations It is, our, opinion that the applicant should provide clarification for the above Iterns and Incorporate the changes in subsequent plan sibmissions. If you have any questions regarding the above, please do not hesitate to,contact me at(519)8244926. Sincerely, Sean MDoty, P.E.,, LEER AP, CMS4S Principal Manager, Municipal Engineering Services cc. Sunny Sweet,Town IPllarnrnimg Office Administrator(via emall) Laura Moore,Town Land Use Planner(via,e-mafl) File faGfCW4Zn5burAqi1saa.2o 5dpwi&26-TRA tnterprags, fMarpr1ses,2U1d-eMLL1,daa