Loading...
RC-000396-2016 TOWN OF QUEENSBURY �?i 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development - Building& Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-000396-2016 Date Issued: Wednesday, October 24, 2018 This is to certify that work requested to be done as shown by Permit Number RC-000396-2016 has been completed. Tax Map Number: 308.18-2-2 Location: 36 Brickoven RD Owner: Daniel Hunt Applicant: Daniel Hunt This structure may be occupied as a: Single-Family Dwelling 1st flr: 2,077 sf, 2nd flr: 2,278 sq. ft. =Total 4,355 sf By Order of Town Board with 2-car Attached Garage of 960 sq. ft. TOWN OF QUEENSBURY Also, construction of 878 sq. ft. for cold storage with 2 access doors; front and r - 6 ft. in width and one man door access from the garage. Issuance of this Certificate of Occupancy DOES NOT relieve the j4 property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development - Building & Codes (518) 761-8256 BUILDING PERMIT Permit Number: RC-000396-2016 Tax Map No: 308.18-2-2 REVISED Permission is hereby granted to: Daniel Hunt For property located at: 36 Brickoven RD In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Daniel Hunt Single Family-New $220,000.00 Owner Address: 31 American Way Total Value $220,000.00 Queensbury,NY 12804 Contractor or Builder's Name/Address Electrical Inspection Agency Daniel Hunt 31 American Way Queensbury,NY 12804 Plans&Specifications Single-Family Dwelling I st f1r: 2,077 sf,2nd f1r: 2,278 sq. ft.=Total 4,355 sf with 2-car Attached Garage of 960 sq. ft. Also,construction of 878 sq. ft.for cold storage with 2 access doors; front and rear-6 ft. in width and one man door access from the garage. S 1,246.70 PERMIT FEE PAID -THIS PERMIT EXPIRES: Saturday, June 24,2017 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before he expiration at .} Dated at the To of Qu sbu �j e y, June 29, 2016 SIGNED BY: for the Town of Queensbury. Director or Building&Code Enforcement PRINCIPAL STRUCTURE APPLICATION Office Use Only Received Date: / { , A o j Tax Map ID Tax Ma `—� Permit No. Map ID ®$` 1 `�.-` Permit Fee I A Zone Rec Fee n A� Historic Site Yes No Site Plan# Subdivision Name J�gij=�ord c_Iyy mss,. ' 3 Lot#—i"' Subdivision# S-�)5 7a Project Location _ 0 r-1 C-Love-A c .f U N 2 '1 2016 TOWN BD. RESOLUTION 86-2013: $850 recreation fee for new dwelling units—single family, duplexes/two-family, multiple family,apartments, condominiums,townhouses,and/or manufactured &modular homes, but not mobile homes. This is in addition to the permit fee(s). Applicant 0�00 Owner 0�'V\ Address Addressyt,,` Willey-� CGS y ti 10 Phone/E-mail Phone/E-mail u.lti�.C.G M Contact Person for Building&Codes Compliance: CL1C�i '�` ^Phone S TYPE OF CONSTRUCTION ,/Check all that apply New Addition Alteration I"floor sf 2nd floor sf Total sf Height Singe Family (� q1 �� �� e '01 Two-Family Multi-Family (# of units Townhouse Business Office Retail-Mercantile Factory-Industrials? Attached Garage (1,424+) Other l£camrnercial or industrial please indicate of business , Town of Queensbury Building&Codes Principal Structure Application Revised September 2015 If commercial or industrial please indicate of business Proposed use of building or addition Source of Heat(circle one) nas� Oil Propane Solar Other Fireplace: Complete a separate application for Fuel Burning Appliances &Chimneys Are there structures not shown on plot plan? NO Are there easements on the property? NO Site Information a. Dimensions or acreage of lot 1 . 0-7 b. Is this a corner lot? N p c. Will the grade be changed as a result of construction Yes No d. Public water or Private well -?vb�i c— c. e. Sewer or Private Septic System t'�.,, -s c Value of all work to be performed (labor or materials) $ � q O 000 DECLARATION, 1. I acknowledge no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If work is not complete by the I year expiration date the permit may be renewed; subject to fees and department approval. 3. 1 certify that the application,plans and supporting materials are a true and complete statement 1 description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations 4. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. 5. I also understand that I I we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: ck-'Y1l L �u Vk-� DATE: /24 SIGNATURE: DATE: 5 For office use only, Operating Permit Issued: Yes No Occupancy Type Construction Classification Assembly Occupancy Limit Special Conditions Town of Queensbury Building&Codes Principal Structure Application Revised September 2014 308.18-2-2 RC 396-2016 Daniel Hunt l � I �� �(Ja+CHECKLV Lot 90, House 13 Brickoven Road :Name: SFD w/ 2-ca att. garage REQUIRED—2 SETS Yes No N/A 1. Building Permit completed 2. Energy Code inspector's report from REScheck completed 3. Septic alteration 4. Solid Fuel Burning or Gas Appliance form completed 5. Driveway Permit 6. Structural Drawings a. Floor plans b. Foundation plans c. Cross Sections d. Elevations e. Window& Door Schedule f. Natural Light, Ventilation and Emergency Egress 7. Plot plan: Show proposed structure(s)with setback dimensions from all surveyed property lines 8. Electrical inspection agency selected CHECKLIST MULTI-DWELLING/COMMERCIAL Project Name: REQUIRED---2 SETS Yes No NIA 1. Building permit application completed 2. Energy Code COMcheck and inspector's report form completed 3. Septic alteration 4. Solid Fuel Burning or Gas Appliance form completed 5. Driveway Permit 6. Structural Drawings a. Floor plans b. Foundation plan c. Cross Sections d. Elevations e. Design loads including floor, snow&wind load f. Seismic design g. Plans signed& sealed by registered architect or engineer h. Window&Door schedule 7. Plot plan: Show proposed structure(s)with setback dimensions from all surveyed property lines 8. Electrical inspection agency selected Town of Queensbury Building&Codes Principal Structure Application Revised September 2014 CC Fuel Burning Appliance & Chimney Application Office Use Only c, Received DATE: yv, ,�Q Tax Map ID TAX MAP ID: _ d ^a�a. JUN P- 4 201 Permit No. � Permit Fee ZONE: OWNER D Q V\, u V\. PHONE/E-MAIL ADDRESS 3t � w INSTALLER/ PHONE/E-MAIL BUILDER A0 CONTACT PERSON FOR BUILDING&CODE COMPLIANCE: v` V d� k �r, {� PHONE/E-MAIL BUILDING ADDRESS rt C k ©V2n-r 4 i.J ROOM OF INSTALL: O V\ �_ QyVt PLANNED INSTALL DATE: FUEL BURNING APPLIANCE INFORMATION WOOD COAL PELLET GAS OIL NOTE: ROUGH-IN& STOVE FINAL INSPECTION ARE FIREPLACE INSERT REQUIRED. FIREPLACE,FACTORY BUILT* :Solei NOTE: MANUFACTURER'S FIREPLACE,MASONRY INSTALLATION MANUAL FURNACE GARAGE ONLY) MUST BE AVAILABLE AT TIME OF INSPECTION *If factory built provide manufacturer name: ; Madel#: Listed by: Number: CHIMNEY INFORMATION Masonry** (check one) BLOCK BRICK STONE Flue TIE STEEL Size in inches Material DOUBLE WALL TRIPLE WALL INSULATED ** If non-masonry provide manufacturer name: ; Model #: DECLARATION: Construction/installation must conform to NYS Fire Prevention & Building Code and/or manufacturer requirements. The applicant or owner agrees to comply with all applicable laws, ordinances, regulations,and all conditions that are part of these requirements and also will allow inspector's to eater premises to perform required inspections. I HAVE READ AND AGREE TO THE ABOVE: PRINT NAME: cN v1� 0y DATE: S SIGNATURE: DATE: Torun of Queensbury Building&Codes Principal Structure Application Revised September 2014 SEPTIC DISPOSAL APPLICATION Office Use Only Received DATE: A wq— Cez� �fi 'ax Map ID TAX MAP ID: ��R,, 1 $--�`� Permit No. Permit Fee ZONE: APPLICANT 0 PHONE/E-MAIL 1 -3 ADDRESS INSTALLER/ PHONE/E-MAIL BUILDER � C 1• OWNER L l ADDRESS CONTACT PERSON FOR BUILDING&CODE COMPLIANCE: } PHONE/E-MAIL - RESIDENCE HONE/E-MAILRESIDENCE INFORMATION Year Built #of bedrooms X gallons per bedroom =total Daily flow 1980 or older Garbage grinder installed Yes _No 1981-1991 Spa or Hot Tub installed Yes o 1992-Present ' l 0 sQ PARCEL INFORMATION Topography Fla cling Steep slope _%Slope Soil Nature Sand Loam Clay Ocher Groundwater At what depth: Bedrock/Impervious material At what pth: Domestic Water Supply VMunicipal Well(if well,water supply from any septic system absorption is_ft.) Percolation Test Rate: per minute per inch(test to be completed by licensed engineer/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION Tank size gallons(min.size 1,000 gallons,add 250 gallons to size for each garbage cylinder or spa or hot tub System Absorption field with#2 stone Total length `-'ft.;Each Trench_ Seepage Pit with#3 stone How many: _;Size Alternative System Bed or other type: Holding Tank System Total required capacity? Tank size #of tanks Nates: 1)Alarm system&associated electrical work must be inspected by a Town approved electrical inspection agency; 2)We will no longer allow systems to be covered until such time as an As-Built plan is received&approved. The installed system must match the septic system layout on file—no exceptions. Declaration: Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void.I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: Q`Yt t O DATE: SIGNATURE: DATE: Town of Queensbury Building&Codes Principal Structure Application Revised September 2014 Town of Queensbury Thomas R.Van Ness Highway Department Highway Superintendent 742 Bay Road,Queensbury,NY 12804 Home: 518-745-0929 Phone: 518-761-8211 JUN 2 4 2016 Fax: 518-745-4466 David Duell Deputy.Highway Superintendent Home: 518-745-0938 DRIVEWAY PERMIT Date: )dn I-( Applicant Name: Q A Telephone No.: S i X —3&1 — LM 3 1 Address to be Inspected �'j}ri 1�3V ICA Return Address: Applicant must show exact location and width of driveway(s)to be connected to the highway by placing stakes at the specified location The Superintendent of Highways of the Town of Queensbury has reviewed this application. The following action has been taken: STEP 1: ( } Preliminary approval 308.18-2-2 RC 396-2016 Daniel Hunt NEED { } . Slight Swale Lot 90, House 13 Brickoven Road { } Deep Swale SFD w/ 2-ca att. garage ( } Level with the road ( } Level with the top.of the paved wing Size culvert pipe to be used(if necessary) { } 12" ( ) 15" ( } 18" ( } 24" { ) 36" Preliminary inspection completed by: Date: Approval by Highway Supt.: or Deputy Supt.: Upon completion please.resubmit this approval permit for a final approval. STEP 2: ( ) Final Approval ( } Rejected Date: Thomas R.Van Ness,Highway Superintendent David Duell,Deputy Highway Superintendent Town of Queensbury Building&Codes Principal Stiucture Application Revised September 2014 -- - - - WARREN COUNTY RFf��.- � ROPERLT - Y TAX SERVICES f i 9 , NI 1 O SW1IZer 11 3n A V op ` I. i 11 IN 2 4 2016 I 1 Ct 308.18-2-14.2 ( (� Russell.E Wade Tr. v C}. ~ 308.18-2-2 i �¢ Zc Din Hun+ A2-2 � I I SEPTIC PLOT PLAN 1 HAVE SEEN OR OBSERVED ALL OBJECT 3Q , CH AS HOUSES, WELLS, TREES, FENCES, ET N THIS DOCUMENT.I HAVE PERSONALL l URED TANCE T FORT ON THIS IAGRAM, i S G ATURE DATE 308 18.2-3 4 Frazee,Martin 308.18-2-2 RC 396-2016 - Daniel Hunt Lot 90, House 13 Brickoven Road SFD rw/ 2-ca att. garage 6p�o _ E ' 308 18-2-4 r1 308.18-2.13 Gerarde•Connie 60� Norton. Leroy F IMPORTANT NOTICE AND DISC LAIMf..R TMIS MAP AND INFORMATION is PROVIDE?AS IS AND WARREN COUNTY MAKES NO WARRANTIES OR GUARANTEES,EXPRESSED OR IMPLIED.INCLUDING 'NARRVOIES OF TITLE NON-INFRINGEMENT MERCHANTABILITY AND THAT OF FITNESSFOR A PARTICUtAIR PURPOSE CONCERNING THIS MAP AND r 1 inch 50 feet THE INFORMATION CJNfAtN(..DPrEPEtN LsSER it J ASSN IMES At L RISXS AF()RESs'(Ht�t 1,.71;(4, PURPOSES ItiT p£Di £R THIS MAP ;6t,l r 1. r ,, r',L r 1.. 'Tf'►• ;, GiS MAPS ARE NOT LAND SURVEYS' s REScheck Software Version 4.6.2 FIL=COPY Compliance Certificate Project DAN HUNT Energy Code: 2010 New York Energy Conservation ,rt IN 2 4 ?_Ofd Location: Warren County, New York Construction Type: Single-family Project Type: New Construction Conditioned Floor Area: 4,115 ft2 308.18-2-2 RC 396-2016 Glazing Area 13% Daniel Hunt Climate zone: 6 (7635 HDD) Lot 90, House 13 Briekoven Road Permit Date: Permit Number: SFD wl 2-ca aft. garage Construction Site: Owner/Agent: Designer/Contractor: QUEENSBURY, NY 12804 DAN HUNT KEVIN HAVENS 22 OAKVIEW DR. FORT EDWARD, NY 12828 518-791-5965 KLH DRAFTING@GMAIL.COM Compliance: Passes using LIA trade-off Compliance: 9.6%Better Than Code Maximum UA: 584 Your UA: 528 BUILDING :o The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Reviewed B Date: Envelope Assemblies ZI -17 Gross Area Cavity Cont. Perimeter Ceiling 1: Raised or Energy Truss 1,024 38.0 0.0 0.025 26 Ceiling 2: Cathedral Ceiling 2,704 38.0 0.0 0.027 73 Wall 1: Wood Frame, 16" o.c. 3,808 21.0 0.0 0.057 217 Floor 1:All-Wood joistfrruss:Over Unconditioned Space 320 30.0 0.0 0.033 11 Basement Wall 1: Solid Concrete or masonry 1,550 0.0 13.0 0.051 52 Wall height: 8.0' Depth below grade: 7.0' Insulation depth: 8.0' Window 1:Vinyl/Fiberglass Frame-.Double Pane with Law-E 425 0.290 123 Door 1: Glass 23 0.290 7 Door 2: Glass 40 0.290 12 Door 3: Solid 20 0.170 3 Door 4: Solid 20 0.180 4 Project Title: DAN HUNT Report date: 06/23/16 Data filename: C:\Userslkevin\Desktop\DAN HUNT.rck Page 1 of 7 Compliance Statement: The proposed building design described here Is c %p the building plans, specifications, and other calculations submitted with the permit application.The proposed buildi n d g�' to meet the 2010 New York Energy Conservation Construction Code requirements in REScheck VerAnu iA i d tzzr tory requirementX in t REScheck Inspecti n Cheeklis . gO!~ 64 Name-Title S Date i � 1 42 � �R��SS�ON Project Title: DAN HUNT Report date: 06/23/16 Data filename: C:1UserslkevinlDesktop\DAN HUNT.rck Page 2 of 7 REScheck Software Version 4.6.2 Inspection Checklist Energy Code: 2010 New York Energy Conservation Construction Code Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions° column is provided by the user in the REscheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section I Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Re 1113 103.2 Construction drawings and ❑Complies [PR111 documentation sufficiently ❑Does Not demonstrates energy code compliance for the building ❑Not Observable envelope. ❑Not Applicable 103.2, Construction drawings and ❑Complies 403.7 documentation sufficiently ❑Does Not [PR3]1 demonstrates energy code compliance for lighting and ❑Not Observable mechanical systems. systems ❑Not Applicable serving multiple dwelling units must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: d Heating: ❑Complies [PR217 sized per ACCA Manual s based Btu/hr Btu/hr ❑Does Not on loads per ACCA Manual J or Cooling: Cooling: other approved methods, ❑Not Observable Btu/hr Btu/hr ❑Not Applicable Additional Comm entslAssumptions: 1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: DAN HUNT Report date: 06/23/16 Data filename: C:lUserslkevin\DesktoplDAN HUNT.rck Page 3 of 7 Section # Foundation Inspection Complies? CommentslAssumptions & 303.2.1 Exposed foundation insulation ❑Complies [FO11]2 protection. ❑Does Not ❑Not Observable ❑Not Applicable 403.8 Snow melt controls. ❑Complies [FO12]2 ❑Does Not ,3 ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) 2 I Medium Impact(Tier 2) 3 11 Low Impact (Tier 3) Project Title: DAN HUNT Report date: 06/23/16 Data filename: C:IUserslkevinWesktop\DAN HUNT.rck Page 4 of 7 ' t . Section Plans Verified Field Verified # Framing/Rough-in Inspection Value Value Complies? Comments/Assumptions &Re .Id 402.4.4 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting []Does Not AAMA/WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC []Not Observable 404 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]2 sealed at housingAnterior finish ❑Does Not and labeled to indicate⁢= 2.0 ❑Nat Observable cfm leakage at 75 Pa. • []Not Applicable 403.2.2 Ail joints and seams of air ducts, ❑Complies (FR1311 air handlers,filter boxes,and []Does Not building cavities used as return ducts are seated. ❑Nat Observable ❑Not Applicable 403.2.3 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. ❑Does Not 4s. ❑Nat Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R- R- ❑Complies [FR17]2 above 105 4F or chilled fluids []Does Not below 55 4F are insulated to R-3. [lNot Observable ❑Not Applicable 403.4 Circulating service hot water R- R- ❑Complies [FR18]2 pipes are insulated to R-2. ❑Does Not ❑Not Observable ❑Not Applicable 403.5 Automatic or gravity dampers are ❑Complies [FR19]2 installed on all outdoor air []Does Not J intakes and exhausts. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 IHigh impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: DAN HUNT Report date: 06/23/16 Data filename: C:\Userslkevin\Desktop\DAN HUNT.rck Page 5 of 7 Section # Insulation Inspection Complies? Comments/Assumptions & Req.113 303.1 All installed insulation labeled or ❑Complies [IN13]2 installed R-values provided. ❑Does Not ❑Nat Observable ❑Not Applicable Additional Comments/Assumptions: E1:1 High Impact (Tier 1) 2 1 Medium Impact(Tier 2) 3Low Impact (Tier 3) Project Title: DAN HUNT Report date: 06/23/16 Data filename: CAUserslkevin\DesktoplDAN HUNT.rck Page 6 of 7 Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 402.4.2, Building envelope tightness ACH 50 = ACH 50 = ❑Complies 402.4.2.1 verified by blower door test result ❑Does Not [F117]1 of<7 ACH at 50 Pa.This requirement may instead be met ❑Not Observable via visual inspection,in which ❑Not Applicable case verification may need to occur during Insulation Inspection. 403.2.2 Duct tightness via post- cfm cfm ❑Complies [FI411 construction with maximum ❑Does Not leakage of 8 cfm to outdoors, or _- ®Not Observable 12 cfm across systems. For ®Not Applicable rough-in tests, verification may pA need to occur during Framing Inspection,with maximum leakage of 6 cfm across systems and 4 cfm without air handler. 403.1.1 Programmable thermostats ❑Complies [FI912 installed on forced air furnaces. ❑Does Not ❑Not Observable ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies --- - -- -- [F11012 on heat pumps. ❑Does Not []Not Observable ❑Not Applicable 403.4 Circulating service hot water ❑Complies [FI11]2 systems have automatic or ❑Does Not accessible manual controls. _ ❑Not Observable ❑Nat Applicable 401.3 Compliance certificate posted. _ ❑Complies [F17]2 ❑Does Not ❑Nat Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [FI1B]3 mechanical and water heating ❑Does Not equipment have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 (High Impact (Tier 1) T2 Medium Impact(Tier 2) 3 ,Low impact(Tier 3) Project Title: DAN HUNT Report date: 06/23/16 Data filename: C:IUserslkevin\Desktop\DAN HUNT.rck Page 7 of 7 2010 New York Energy Conservation Construction Code Energy Efficiency Certificate Insulation Rating -Value, Above-Grade Wall 21.00 Below-Grade Wall 13.00 Floor 30.00 Ceiling / hoof 38.00 Ductwork (unconditioned spaces): �.. Window 0.29 Door 0.29 'Heating &Cooling suipment Heating System: Cooling System: Water Heater: Name: Date: Comments