Loading...
RC-000448-2016 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building& Codes (518)761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-000448-2016 Date Issued: Thursday, September 8, 2016 This is to certify that work requested to be done as shown by Permit Number RC-000448-2016 has been completed. Tax Map Number: 302.17-4-10 Location: 7 RESERVOIR DR Owner: O.Thomas Young Applicant: Kelly Homes This structure may be occupied as a: HUD Application Roof work and some interior work By Order of Town Board TOWN OF QUEENSBUURY Issuance of this Certificate of Occupancy DOES NOT relieve the �„ _j/ 4 property owner of the responsibility for compliance with Site Plan, w IGG. Variance,or other issues and conditions as a result of approvals by the Director of Building 8r.Code Enforcement Planning Board or Zoning Board of Appeals. r� TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development - Building & Codes (518) 761-8256 BTUILDING PERMIT Permit Number: RC-000448-2016 Tax Map No: 302.17-4-10 Permission is hereby granted to: Kelly Homes For property located at: 7 RESERVOIR DR In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: O.Thomas Young Single Family-Alteration $16,000.00 Owner Address: 7 Reservoir DR Total Value $16,000.00 Queensbury,NY 12804 Contractor or Builder's Name/Address Electrical Inspection Agency Kelly Homes PO Box 4381 Queensbury,NY 12804 Plans&Specifications HUD Application Roof work and some interior work $ 25.00 PERMIT FEE PAID -THIS PERMIT EXPIRES: Sunday,July 9,2017 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Townu bury; Thur y my 14,2016 WSIGNED BY: far the Town of Queensbury. Director of Building&Code Enforcement PRINCIPAL STRUCTURE APPLICATION Office Use Only �)/ Received Date: �� 0/G Tax Map ID lZ� gt- Permit No. 4 Tax Map ID 2,17 -q -!D Permit F e Zone Rec Fee Historic Site Yes No Site Plan# Subdivision Name Lot # Subdivision# Project Location _ JUL 12 2016 TOWN BD. RESOLUTION 86-2013: $850 recreation fee for new dwelling units—single family, duplexes/two-family, multiple family, apartments, condominiums,townhouses, and/or manufactured & modular homes, but not mobile homes. This is in addition to the permit fee(s). Applicant / ��`� Owner �7r -eS Address Address W6 Ay Phone/E-mail / Phone/E-mail Contact Person for Building&Codes Compliance: J rev e Lf/1 y Phone JiS ;< dY TYPE,OF CONSTRUCTION D ✓Check all that apply New Addition Alteration Is`floor sf / 2nd floor sf Total sf Height Single Family Two-Family Multi-Family (# of units Townhouse Business Office Retail -Mercantile Factory-Industrial Attached Garage (1, 2, 3, 4+) Other If commercial or industrial please indicate of business "Down of Queensbury Building&Codes Principal Structure Application Revised September 2015 Proposed use of building or addition Source of Heat(circle one) Gas Oil Propane Solar Other Fireplace: Complete a separate application for Fuel Burning Appliances& Chimneys Are there structures not shown on plot plan? Are there easements on the property? Site Information a. Dimensions or acreage of lot b. Is this a corner lot? c. Will the grade be changed as a result of construction Yes No d. Public water or Private well e. Sewer or Private Septic System Value of all work to be performed(labor or materials) $ DECLARATION.- 1. ECLARATION:1. I acknowledge no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If work is not complete by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. I certify that the application,plans and supporting materials are a true and complete statement/description of the work proposed,that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances,and in conformance with local zoning regulations 4. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: 3-fwiek Y�'j /``�fir` DATE: SIGNATURE: w7 DATE: / r1l For office use only Operating Permit Issued: Yes No Occupancy Type Construction Classification Assembly Occupancy Limit Special Conditions Town of Queensbury Building&Codes Principal Structure Application Revised September 2015 TOWN CSFcFlNSBURY IMPROVEMENTS TO Bt!lLD1NC } p." I�AEN7 7 Reservoir Dr. �,, It', n compliance Based on our Ih7itc, .. :>jp construed as Queensbury, NY 12804 JUL I �Q�s with our comments :,, .1.. . ;�cfcations are m indicating the plan full comp!ianGe wtt#, int '3uilding Codes of New York State. PROPERTY OWNER ". Thomas and Diana Young 7 Reservoir Dr. Queensbury, NY 12804 MW Phone: 518-792-0057 TOWN OF (�UEENSBURY BUILDING & COID T. Reviewed N: NOTES Date: 1. All work is to be pe rmed in accordance with manufacturer's instructions, NYS building and local building codes and any applicable national codes. 2: UNLESS OTHERWISE NOTED, "INSTALL" MEANS TO PROVIDE AND INSTALL. ALL NEW MATERIALS ARE TO BE USED. 3. All work is to be completed within a 2 month timeframe. Please keep this requirement in mind when providing start and completion dates in your bid. LEAD-BASED PAINT HAZARDS Regulations The Department of Housing & Urban Development (HUD) has issued regulations regarding the ......."Reduction of Lead-Based Paint Hazards in ....... Housing Receiving Federal Assistance." The rehabilitation work called for by these work specifications will be paid for in whole or part with Federal assistance. Therefore HUD's regulations governing the reduction of lead-based paint hazards apply to this project(24 CFR Part 35). Risk Assessment A risk assessment has been performed for this property and project (attached) which has identified lead hazards which must be corrected. These hazards and the rehabilitation work to remedy these hazards is spelled out in the work specifications. The Contractor is responsible for reading the attached Lead- Based Paint Risk Assessment Report. This is one reason why the report is attached to this document. The contractor is responsible for addressing all property components listed as lead hazards. Contractor Certification This project will require the contractor to undertake improvement activities that require lead-safe work practice. Therefore the contractor must be trained and certified in accordance with regulations issued by the US Environmental Protection Agency (EPA). The contractor must provide the Town of Queensbury or its representative with evidence of such certifications prior to execution of the contract for improvements. Interim Controls The work to be done in accordance with these specifications that addresses identified lead hazards is designed to result in a lead-safe dwelling. The measures called for to reduce temporarily human exposure or likely exposure to lead-based paint hazards are called Interim Controls. 7 Reservoir Dr., Queensbury 1 Clearance Examination A visual inspection and dust wipe sampling is required after the lead-based paint has been rendered intact. The inspector will look for visible dust and debris in areas where the defective lead-based paint has been stabilized. Dust wipe samples in at least four rooms are required. Dust wipes shall be taken in all rooms where lead-based paint has been stabilized. The contractor is responsible for obtaining a Lead-Based Paint Clearance from a certified firm. The contractor is required to provide the owneriand the Town of Queensbury with evidence that a Lead Hazard Clearance Examination was done after completion of the rehabilitation work. Clearance is required before final payment to the contractor will be approved. This Clearance Examination must be done by an individual or firm licensed or certified to conduct such an examination and must certify that the hazard reduction activities are complete and that no soil lead hazards or settled dust lead hazards exist in the dwelling unit or work site. The cost of such Clearance Examination is to be included as part of the contract total bid price for the rehabilitation work. It is the contractor's responsibility to obtain such clearance. Final payment for completed work will be withheld until such clearance is provided. Recommendations Please refer to the risk assessment report for recommendations, which are also incorporated into specifications for each work element. Following each days work and at the end of the project, any areas affected shall be properly cleaned using HEPA vacuums and wet wiping. Shop vacuums are usually NOT HEPA vacuums. It is the contractor's responsibility to keep the site cleaned throughout the work process and pass final dust wipe sampling and/or soil sampling at completion. All defective lead-based paint areas should be rendered intact by the following methods: 1. Wet scraping and wet sanding,or 2. Removed and replaced,or 3. Kept intact and covered with an impermeable layer(vinyl, aluminum,etc.) LEAD-BASED PAINT INTERIM CONTROLS NOTE 1: Sun porch sides and windows do not have deteriorated lead-based paint as per report and so do not need to be painted. NOTE 2: All original wood window frames and trim are peeling and chipping and tested positive for lead-based paint. Inaccessible interior window troughs have deteriorated, lead-based paint as assumed per the Lead-based Paint Report. Lead-Safe Work Practices to be followed as required. Exterior Painting i Z 1. Wood Siding, left and right gable ends Side B and D Walls, below vinyl Zl�► X • Wet scrape and wet sand • Prime and paint with two coats of good quality exterior latex paint to match existing r � 2. Front roof soffit(Side A) • Same as above 3. Front door trim (Side A) • Same as above 7 Reservoir Dr., Queensbury 2 4. All exterior wood window frames, trim, and sills, and interior troughs • Remove storm windows • Wet scrape and wet sand • Prime and paint with two coats of good quality exterior latex paint to match existing. • Reinstall storm windows LIST LEAD-BASED PAINT INTERIM CONTROLS PRICE HERE$ NOTE: Refer to the attached lead-based paint risk assessment report pertaining to areas that have tested positive for defective lead-based paint. The items listed above note where lead-based paint interim controls need to be followed. The original intent of the specifications for such items as listed below was to require work for energy efficiency, health and/or safety/security reasons and would have been specified whether or not deteriorated lead-based paint was found.Therefore, any such items that have or may have deteriorated lead-based paint are to be priced separately as indicated below. LEAD-BASED PAINT INTERIM CONTROLS PRICE HERE $ ELECTRICAL 1. Kitchen • GFI protect all existing countertop receptacle, as required. • Provide dedicated 20A circuits for microwave, dishwasher and refrigerator, as necessary. 2. Hall • Install Lithium-ion battery operated smoke and CO detector. 3. Bedroom#1 • Install Lithium-ion battery operated smoke detector. 4. Bedroom#2 • Install smoke detector, as above. 5. Bedroom#3 • Install smoke detector, as above. 5. Basement h '+ • Install smoke and CO detector, as above. Pticz_lr " • Provide GFI-protected receptacle and dedicated 20a circuit for washing machine. • GFI protect double receptacles on post. 9r f l,Ozj� 2 NOTE: We must receive a copy of the electrical inspection with ALL items listed,as above. LIST ELECTRICAL PRICE HERE$ 7 Reservoir Dr., Queensbury 3 a- REPLACEMENT WINDOWS • Install new white vinyl, Energy Star-rated replacement windows(Pella Therma Star or equivalent) in the following locations. • Window U factor will not be greater than .30. • All new windows will have full screens. • Where combination storm windows are removed, exterior stops will be covered with coil stock or painted to match existing trim. • Basement(Sliders) -4 Replacement Windows -4 Total LIST REPLACEMENTWINDOWS PRICE HERE$ ROOFING 1. Main House, Attached Garage and Back • Remove existing roofing and dispose of properly • Repair or replace sheathing as required • Install ice and water shield over entire roof. • Install new drip edge and all required flashings. • Install new architectural grade shingles. Homeowner will have choice of stock color. • Provide continuous ventilation at ridge. 2. Photographs • Contractor will provide progress photographs at the following stages: a After roof is stripped. o After installation of ice and water shield. o After sheathing repairs, if any. LIST ROOFING PRICE HERE$ NOTE:ANY FINISHED SURFACES DAMAGED DURING THE COURSE OF REHABILITATION WORK SHALL BE REPAIRED AND FINISHED TO MATCH ORIGINAL CONDITION. CONSIDER THIS IN YOUR BIDS, DO NOT INCLUDE AS EXTRAS. Extras 1. Identify additional separate cost to install or remove additional items not mentioned in specifications that may be necessary to comply with code and complete the job in a satisfactory manner and list separately here. 2. Items not listed as additional are assumed to be included in contractors bid price. LIST EXTRAS PRICE HERE$ 7 Reservoir Dr., Queensbury 4