Loading...
2014-387 TOWN OF QUEENSBURY OS742 Bay Road,Qucensbury,NY 12804-5902 (518) 761-8201 Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF COMPLIANCE Permit Number: P20140387 Date Issued: Friday, October 31, 2014 This is to certify that work requested to be done as shown by Permit Number P20140387 has been completed. Tax Map Number: 523400-278-000-0002-026-000-0000 Location: 650 STATE ROUTE 149 Owner: PUTNAM REALTY ENTERPRISE, LLC Applicant: PUTNAM REALTY ENTERPRISE, LLC This structure may be occupied as a: Septic Alteration Residential By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Compliance DOES NOT relieve the Gv property owner of the responsibility for compliance with Site Plan, ' ite Variance, or other issues and conditions as a result of approvals by the Director of Building&Code nforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development-Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20140387 Application Number: A20140387 Tax Map No: 523400-278-000-0002-026-000-0000 Permission is hereby granted to: PUTNAM REALTY ENTERPRISE. LLC For property located at: 650 STATE ROUTE 149 in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: PUTNAM REALTY ENTERPRISE, L Septic Alteration Residential 668 STATE ROUTE 149 Total Value LAKE GEORGE NY 12845-0000 Contractor or Builder's Name /Address Electrical Inspection Agency ELLSWORTH & SON EXCAVATING 57 ELLSWORTH Ln LAKE GEORGE.NY 12845-0000 Plans&Specifications 2014-387 Res. Septic Alteration $40.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Saturday,August 22,2015 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town f Que bu / /IF t 22,2014 SIGNED BY for the Town of Queensbury. Director of Building&Code Enforcement o. SEPTIC DISPOSAL P)ERMITTTTTTTV Iy O W �� Ji U� � IInI' Office Use Only DATE 08/2.!'/12.10 4 1.66 � ., ! I Received 15Ut) 2G LUN VV Tax Map ID ' - - - /� TAX MAP ID 278.-2-26 _ �.. Permit No. _ / TOWN OF ClUttNSBURY permit Fee / LOCATION OF INSTALLATION 650 STATE'ROUTE.'i4�9CODES Approvals: APPLICANT BOB GUAM PHONE/E-MAIL (518) 424-2282 ADDRESS 16 THISTLEWOOD DRIVE, QUEENSBURY NY 12804 INSTALLER/BUILDER: ELLSWORTH & SON EXCAVATING PHONE/E-MAIL (518) 792-9246 ADDRESS: 76 ELLSWORTH LANE EXT. , LAKE GEORGE NY 12845 OWNER PUTNAM REALTY ENTERPRISES, LLC PHONE/E-MAIL Address (9 50 6' h., STATE ROUTE 149, LAKE GEORGE NY 12845 CONTACT PERSON FOR BUILDING&CODES COMPLIANCE: PHONE RESIDENCE INFORMATION Year Built #of bedrooms X Gallons per bedroom =Total Daily Flow 1980 or older Garbage grinder installed Y X N 1981-1991 Spa or Hot Tub installed _Y X N 1992-Present 4 110 440 PARCEL INFORMATION Topography X Flat rolling Steep slope %slope Soil Nature _Sand X Loam Clay _Other Groundwater At what depth? 20" Bedrock/Impervious Material At what depth? >44" Domestic Water Supply Municipal X Well (if well, water supply from any septic system absorption is 100 ft_) Percolation Test Rate. 8:20 per minute per inch(test to be completed by licensed engineering/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION Tank Size 1,250 gallons(minimum size 1,000 gallons, add 250 gallons to size for each garbage grinder or spa or hot tub) System Type Absorption field with#2 stone Total length ft.. Each trench x Seepage Pit with#3 stone How many: ;size Alternative System _ Bed or other type? 20' x 32' ABSORPTION BED Holding Tank System Total required capacity? Tank size _ #of tanks it Notes: 1) Alarm system&associated electrical work must be inspected by a Town approved electrical inspection agency,2)We will no longer allow systems to be covered until such time as an As-Built plan is received & approved. The installed system must match the septic system layout on file-no exceptions. DECLARATION: Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance know by or on behalf of an applicant, shall be void. I have read the regulations and agree to abide y th-se and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. Print Name: . -i•MAS HUT INS, .E. (AS AGENT) Date: 8/21/2014 Signature: • • CCM A(-0.)r Date: epi It Town of Queensbury Building&Codes Septic Disposal Permit July 2014 Town of Queensbury Building & Code Enforcement (7 aQ y : 3 0 Office No. (518) 761-8256 3 :30 Septic Inspection Report Inspection request received: n1 /! � Name: �tLi/wNQ�_Q .00•QICC / V�-c� ected on: ! '/a—/A1 Location: 4 6d R f isci ((( Ar7ive: `Le p.m. Permit No.: I y " 3 p I Inspector's Initials: 'r/ C ulnts and/or dia.ram Soil Typ<, n)Loam/Clay Type of Water. Municipal/Well Water r Waterline separation distance ft. , Lm'y�J 't"�'` Well separation distance ft. 1 Other wells. ft. _ Well Casing Length 50'+/- Y N N/A c MQ ,s kUk 5 o [150'to well required if NO] Absorption Field. Total length ft. F1fc'?. .'t__ Length of each trench ft. 'k Depth of trenches ft. Size of Stone Seepage Pits: Number Size: x Stone Size: Piping Size Type Building to tank (P y„3c' WD Tank to Distribution Box Distnbution Box to Field/Pit Opening Sealed: Y_N End Cap Inlet/Outlet Pipes&Baffles N Manholes 12"or less below grade N [provide extension collar if Yes] Y N Location/Separations Foundation to tank ft. Foundation to absorption ft. IJ EEp E i w`j , n'' Separation of Pits ft. Conforms as per Plot Plan Y NC— 7W`L` Engineer Report and As-Built Y N ETU Maintenance Contract provided Y N Location of System on Property: Front Rear Left Side Right Side Middle Front Middle Rear System Use Statu • Approved Partial Approved and needs to be re-inspected, please call the Building &Codes Office Disapproved Septic Inspection Report Town of Queensbury Building & Code Enforcement CS a -j Office No. (518) 761-8256 Septic Inspection Report Inspection request received: n Name: t LA-4 qjm Reap k. Inspected on: — y' Location: (y 6D r(4€ (�99 Arrive: a /m.1�� Permit No:: /Nt5 /'3 Inspector's Initials: // 7 (MCCP‘‘___ C• mentsand/or dia•ram Soil Typr Sand Loam/Clay i Type of Water: Municipal/Well Water t o Waterline separation distance ft. — �tSE ) EOG 113 E6$J'b Well separation distance % o ft.-k- Other wells: I 0 0 ft.+ –���–` Well Casing Length 50'+/- Y N N/A — 0 E-EVTCJ-- C�c2)0 M?Ok [150'to well required if NO] p Absorption Field: Total length \35 ft. Length of each trench /4€eft ` � � Depth of trenches t ft RR tbFb 9,`r D — t> Size of Stone 42__ Size: p)ES7 7_06x9-61 Stone Size: Piping Size Type Building to tank n Li Iu O 4 \N6C 00 Tank to Distribution Box 1vt2`,% c�-C F6 l 1a Distribution Box to Field/Pit n 9\w:.---to "tnd� E� a!1 "0 FOAM •FC‘c i KW Opening Sealed: N T ?ot46\ c,vA End Cap ‘E�� \ DoVrc-, Inlet/Outlet Pipes&Baffles t.:(11 P.t�-`-� _ \UCS� E ) \ �T�� Manholes 12"or less below grade V/Y yds [provide extension collar if Yes] _Y N Location I Separations Foundation to tank Q ft. Foundation to absorption ft. ?,5 pEGL Pt3 Separation of Pits /ft.Conforms as per Plot Plan �Engineer Report and As-Built Y ETU Maintenance Contract provided Y N Location of System on Property: Fron Rear Left Side Right Si.• Middle Front Middle Rear System Use Status: JApproved °V).—VD encYF1Li___ Partial Approved and needs to be re-inspected, please call the Building &Codes Office Disapproved Septic Inspection Report r Septic Inspection Re P • Office No. (518) 761-8256 Date Ins.-.ion ..i - � TE,1�i ,� Queensbury Building &Code Enforcement Arrive: - ., or.-part: .may amm 742 Bay Rd., Queensbury, NY 12804 Inspector's Initial-1,4 NAME: WirOPttA RFe r1J( C$C ' 'P NO.: \4 --(3i7 LOCATION: (ORO r5fltE. RO1TF \yek I -. CT ON: 1n --1 -1 L1 RECHECK: Comments and/or diagram Soil Type: Sand/ Loam/Clay Type of Water: Municipal/ Well Water Waterline separation distance ft. Well separation distance ft. Other wells: ft. Well Casing Length 50' + / - Y_N_N/A [150'to well required if NO] Absorption Field: Total length _ft. Length of each trench ft. Depth of trenches ft. Size of Stone Seepage Pits: Number Size: x Stone Size: Piping Size Type Building to tank Tank to Distribution Box Distribution Box to Field / Pit Opening Sealed: _Y _ N End Cap Y_ N Inlet/Outlet Pipes&Baffles _Y_ N Manholes 12"or less below grade _Y_N [provide extension collar if Yes] Y _ N Location/ Separations Foundation to tank ft._ Foundation to absorption _ft. Separation of Pits ft. Conforms as per Plot Plan Y N Engineer Report and As-Built YN ETU Maintenance Contract Y —N provided Location of System on Property: Front r Left Side Right Side Middle Front Middle Rear S stem Use S s: Approved Partial Approved and needs to be re-inspected, please call the Building &Codes Office Disapproved L:\Pam Whiting\2010\Building Codes Forms\L 1spedion Fonns\Septic Inspection Report_03 29 10.doc Hav2d Queensbury, N NY 12804 Hutchins Engineering Phone:(518)745-0307 9 9 Fax: (518)745-0308 October 30, 2014 Mr. John O'Brien Town of Queensbury 742 Bay Road Queensbury NY 12804 Re: Bob Guay/ Putnam Realty, 650 State Route 149 Tax Map#278.-2-26 Dear Mr. O'Brien: A representative from our office visited the above-referenced site on multiple occasions during construction. It is my opinion that the wastewater system was installed in general conformance with the approved plans and the attached record drawing. Please contact me if you have any questions or if you require additional information. Best Regards, G. Nomas Hutchins, P.E. . ILIC Cc: Mr. Bob Guay via e-mail G.Thomas Hutchins,P.E. FILL MATERIAL NOTES WASTEWATER SYSTEM DESIGN SYSTEM MATERIAL SITE SOILS DATA LL MA]ERra To AF PLA m ro AI oB D E H£E E-mAB r.a PRIOR ro Fo w BEOH oM uLST N SPECIFICATIONS NSiaUAI.OF ABSSAIDS,BEO DESIGN ROw-D0 mD/BEOROOM TEST PTTE SSS B DEEILN FLOW-1.GPO PIPKIN 4S WE J5 PVC IM1'STALL wires i/4"PER wH favi lP_).6/12J)4 BY J DNTCNN£P F APTFR afMOL4NG ORGANic£PUCE AISrFu FILL DtER HIS FNERE AREA I SEPRG TN:N-1.250 LATEEN PRECAST CONCRE2 SEPAL TA t =`N ttt`TNA`­-4 URFAE£irU PRmOSED ABSDIBON BED AND TAPER AREA. PUMP STAnON-1,000.11.➢RECAST COx B,PUMP TANK 8-20" =`NAL NAT`S -DARK BRDWN SILT LOAM ]£RLN FIEYO-ADISAD IDN BED EFFIVEW SE?IL- y 20-44" IXltf BROxx SANDY SrtT-flftu,uOTRm "SYE2M FILL"IBATEAIAL END.BE CAREPUUY SELECTED EA40.SANDY LOAM INH OE_VGN PERCgARDN SAIF=8-to MINJw FOOT M.HEINATIN 9t0=£35 PtC.rn'."tN)N;/A*PER 1p NBTTEIN,AT 20' SAND T LOAMY GRAVEL BYTH R,-PLACE PERaxADIXH RATE OF 3-6 INHANIDT Lf DN Ra rt=.J m0/s Roofs ro zB- AND No oacawres OR oeaEcrs DVER 3 w sls z BY aesceDS S,AREA aemRrno�amy Tao s -� ./12/14 BY r.HUTc1rvI£P.E. C A1. 37`F +N R NUMBER 2cb 51£4£ LLSS iNax ID NflGhT O WA>ER w➢OLt¢on BED xf1L BE t-f z'sDR-�G Pw aR SBR-1)xOPE " J8^34 SNAL AS PINEA TN ar LEAST 2 BF n,E MATEAIAL USE O- T BROWN ALT LOAN FILL B BY,W'I,IN-6E AT IHE RANGE�O.SOmm m 20rrm. LESS TNA,I-P M Aw xi /4'-.-0� C.M. TAINTAIN 50'SEPARAMIN TO SEPBC ANK 1a-18" AN.NL TOPSOIL-DARN BROWN EYLi LDA. A ! I m iHF MATERIA eY l5FI6HT SHN.t BE LARGER MRN A i/2"SEVE. PERFGRA BE 4P£P£RFDRA]ED SDR-3S 11 'SEPRR CN i0 ABSORPnCN FlFLD PIPINO lO / e-zz- aJVE eaaxx mT.soME cur-uornfo MAIERw.Is To BE NECNANR y ITawuz£D,N 6 uFrs WTIN ABSORPTION FIELD NOTES TT GRAY FlNE SANDY LOAM-NOTICED F�/ I I YsiEM TILL Q� �F ]HACREO EWiPMENT P_JO WSTALLA_.iRENpHES. NS OESHW URLIZES A SigN0AR0 I—AASORPtigv BED rNSTALLEO E Is TO BE 3/4'TO)-]/2•WA—SITH, �2 MOiiLRlG aJ 2 �(moi ^'_' / STABNZED FILL MATERIAL CUT AL TREE£ti SUMPS ANO I—VE4ETAT. .I VYJ I 9 y ' I IxSIAttER TO xOiIPY ENGINEER OF PROD SDURCE cF SISI£. Fltt AT GRIDS AID REMOVE R£MOIE STEMPS N XIS NG OfiGN+G M4TE RL -TEA rnPML PERLOUTfONip:. / \ R i x!/ N LIES FABRIC TO BE lENLA]£MNHAA 14Av OR EWIVAt Exi. PT-I:6/12/)4 AY T.HUTGINN£P.E MA]EFIAL M+lINt ro ANSPTM11N0 N E11E. FROM SURFACE PRIOR TO AREA. FlLL P USE iaAG:ED EWWMENT FOR AU Frt[u IEPoAt 4lE LOCAl10N SJABIu2ED PERGGLAnoN RAIE of a MrNUTEs zo SEEDITS / 0�^°°/ I WOK IN AD oPR ON FIaD ARE BA. LOCATION MAP A , NA BE REWIRED TO PPO NDE CCt£R m SEPAL}ANIS AND PUNS STgifpV BACKFILL ro BE GRANULAR'(-S).Lt MAIFRIAL AlIN NU I. \Q NAY BE NAIIUE uARRiAL CR DINER MARFIat x1,1CH IS NOi NECESSgalt PGRapE m SYSTEM R,ORDER i0 DIVERT PARDCLES GFEATEft IRAN 2'(-2f. F/LL SURFACE RUNOiF ARWND ABSORrnON FIELp. Trocplr EFFD AND SE—S.NRF. ODER ExRRE BACHFlLL AREA �IQiM \ i �`"! 44'5 TDTAL (��^yy• [ fig R F ti i SSIEM wDiH i F.R'^ L �P (, J{ nu WDTD i J Q5 % A OO I I 1 6 D Tm ... .--....— •Mlx.S]GWE COMER IS'TAP BOM 9DEE 2o'BED WTO'M xSTait£3O5x£aF tE)£L IN�O c—i>(%MAitON ..t._ I Q1-�/ `'\ ��.(,.A%G' 4'MINIMJM iOPEpL QV _.:.,:-..•,�-I - _ � `Q' R� 4'Q!!'4 r 0 ESTa6Lr5H NFF N.Sit#HE BELOW MPE �t• �'j ,tea SEED AN _ / i T BAY ':,/ --`• �Y' YO135'CRUSxEO ST0.YE �v e P pg Q5 \ / SIATEu LL MATERIAL -� BED s M MAERIAI I 15 1 1 l S FILTER FABPoC T ER R£ ,J TD MANJAM 24' T£NC41E-1 141 AB6DRPA(w a \)` r� SUP NH—t0 GROUNDWA rLH, m EDIRVALENT uaxrMUM SLOPE i:J _ t�I.. 0/ SN \ M1 macRED Ecu'PMENi - - - .,�^/ ABSORPTION BED SECTION 4• - ]rAE )TAME-AREA; / ) ./ I \ 3, SEm vD ESiaBUSH NPF 4 01 _ I.NDDI _ ` C38N ` �IXHXe�ED ti�/ •�fY I al'A �\ i I EX,ST.HgISE SEM£R m raP.aoM-E —.-.. .. -...-- JI£JNBED A '\`a, a REPLACE N NELESS'ARY - i °`+ePFm.i T50 GAL —ASAS rA+eLa'eREIE w� I(`'°1 EFRUENI _ - _- ,—crE 4 NRBED CO ED NEAR PERFORAI D PVL SlAnpV RaR� - -- - a—THS WSTA(tC1 A FDRCEaAAV - I BEo 1. A. f e gZ O \ ESTRBLISN LEVEL AREA BENEATSISTVJ�U AS NEEDED H 1<r BE AnRAFlAeRIC, ' SOPOSED STONE ASIDSPT)ON PEO RASE +CROS EWIVALENr _ BV ZION BOx all I 0,: i ABSORPTION BED PROFILE \ SITE PLAN W ABSORPTION BED PLAN SCALE:I"aJo' / EXTENDS WEAixmhT mJIM NTS ' DOC((F NECE55AR).O SEAL C POLYE]NYlfHE Ptt rEMnENE Ex]ExgW TO �INIIDROL TAPMlELG RlTlI0u5< i0 GRADE xt71— R M1D£xfnl Tnu➢ER / PE45TulI ACCESS COVER -U FLOAT SVATGH£S TD OPER^i£PUMP E615ta"r ACCESS LGVER AID RINTArN LEVELS AS INOLAIED t2.5 COUCP 1NSTTLL PIXttOk Pt122 j_.._. M �m IT'5 COt'ER Fll F SUCH PIAT a IS BEASS-1 M�sTA>N nJ PROW 5)DAYS ` IIH�BUII ]xE is REOMOVaBLE 111 1 H T K ACCESS M WAGE FLOW TDR MW c VrR 6a5 D£T]£CTCR BDUE ALARM FLOAT L£r£t BE EN 4•PLC - BAFFLE- Lk15E SEWER IDLE 4'FVC'Y,H-J5 h uIN uD3��'T 1WW(EffL ENDST ERRUENI SEx£R Batt VALVE iENS AT /4•PER FOO M'x.AmE I,STa�YAI—AN x,CN S'JnY NE EDMLESI IDE An D] aL RRARON m IsTAX MAOCUufr278 EPT BY A IICENS£D )JB•FER FBDT uv CAN BE i-i/2"ROPE ac n ELEv 0 O T 5 TN4T PU LX N PROFESAONAL E,CANEER IS a 4lotnnW,OF NTS EDDCAIION Uw. 16- '• 5GU]ED ANO REM0I,SIT SWOT TCRETAIaW PVC SB'41M _35 M DEADER r0 )e•MN. : REWIFML➢!i EHWv PERFANI£0 aBSORPnBN Bm --- - ----- 1EE4EAMIORSEai �.J sx]—I-INSia�s N BE ADD.•PUMP W' ADNEDrPri SNTRI""a sI PUMPSTAWNNOM PUUP DN J / SEA AU TANK—AS WATED1.1 ) REGmO DPnxfxG !D/JO/l4 Dlx �I.eMETo ;/r S 4D P4c DR o41DE AID ASTAu LISTED PACxAGEO PTINP LONrHGL MAP REFERENCE o DED Fol PERMIT B/zv14." AL PF£ T a uH a.Y'NiD Mr p'F`�--\— E1 S / GALVANrZEDR iPwG WADE inNE wt t AN➢L auRSOE AFWu INS ignCCE59AND aP m a SUryKY MADE Fm No. Dole CONCRf]E SEPTIC iArvK PU xET DELL WCN BALL CO RIX Pa N- I sE PUTNaM PEAL ENTERPR5E5. ,B-MrN. �CaiE vuvE LOCAnW"rM lESEN o s¢Iv,ce LBa.Y'DIN rss SITE PLAN uStaLL POWER A,CON]ROI WR)NG TO CONnHOLLEA MM �R'4'roRS DUEENES-,BY, SEPTIC TANK NOTES •'. REDucuG IS PANTED ARM:x HOUSE w ALcmoaxcf YYYN AxuFA R£Rs r>rewreeTo.' NIPS SNAIL COMPLY IN THE HEUDASMENTS m ITS HE'CORK STATE OEPAR]MEH+T OF NEALIN /✓ .� __A`RD BY.I .11 VatrE,NSIRUCROxS ANO NARONAL ELELRNC MCODE L(NEG) ALL SH+LL BE OF PRECAST CONCR£rE a5 MANIIF4cn/REB BY 11—YA JN]FAPR6Es BE EDUIVAENT. eau Cx£CK VACLE-� / �C000 cA PREca' IHROTTIfD To aLmw rRicKt£ RECU,REMExiS Bob G!!dy cxcnETE PUMP TANK DRAIN eacK rxio wETu. Dig �Safe(y. sMPtfx EFFLPUNDT PUMw mx—AND SORT LEVET.s To BE.—IT.TD New York Bw Rosas Nr Rr f4BES IDI SIRNC NRREs NIA BSE,CHISH OI, M.5OMPa H DA DF A ASC Ba SE wn SN EXlsnxc BUIL () OCATE 1-1 A,a NI DE 0 ILL DOSE wn RrquremWry.vamp nn NY FlR a HE aALEo�ns NLGEssaar>o ACHrE4E a sramE uurov z-L BBASE.IDs CHISHED srw,E E..N rRwpEv£aN"`ND i SEPTIC TANK AND PUMP STATION DETAIL to BE NIDRLxrAnc AIEF45 EF—1 PUMP IX= RI a N o m Dol,av2:na, SEPDC i aFPoC AREA5 SILL BE OF EXIDI HEAVY GBNEIRLNBBI DESIGNED FSH NTS Mf�N.,TANK ENTTI PUUF )64 DawmR Rana N-20 xNER LOADWC N iR 4EAiFr Ex�SiwG ELECTRrCAL SER4KE PRIOR TO PURLD45x,G ®�.n�1 m.v.m G WamsUvey Nv 12804 PUMP. 800.9.2-]962 sr BF SEATED WTm.11 EEAUNT. ,I .euow RIE L+WeD LE_MVST BE TEssD (,,A __,P,7 29805-0I ATL eACIMtPauxG. Hutchins Engineering 518 245-030,Fo. SITE SOILS DATA TEST PITS TP -1: 6/12/14 BY T. HUTCHINS, P.E. 0-8" SILTY SURFACE FILL 8-20" ORIGINAL TOPSOIL - DARK BROWN SILT LOAM 20-44" OLIVE BROWN SANDY SILT - FIRM, MOTTLED MOTTLING AT 20" ROOTS TO 20" TP -2 6/12/14 BY T. HUTCHINS, P.E. 0-10" LIGHT BROWN SILT LOAM FILL 10-18" ORIGINAL TOPSOIL - DARK BROWN SILT LOAM 18-22" OLIVE BROWN SILT, SOME CLAY - MOTTLED 22-36" GRAY FINE SANDY LOAM - MOTTLED MOTTLING AT 20" ROOTS TO 19" PERCOLATION TESTS PTPT1: 6/12/14 BY T. HUTCHINS, P.E. STABILIZED PERCOLATION RATE OF 8 MINUTES 20 SECONDS FILL MATERIAL NOTES WASTEWATER SYSTEM DESIGN SYSTEM MATERIAL FILL MATERIAL TO BE PLACED TO ALLOW ONE FREEZE—THAW CYCLE PRIOR TO FOUR BEDROOM DESIGN v fi 1 SPECIFICATIONS INSTALLATION OF ABSORPTION BED. DESIGN FLOW - 110 GPD/BEDROOM ° SYSTEM DESIGN FLOW 440 GPD HOUSE SEWER PIPING TO BE 4" SDR -35 PVC. INSTALL WITH 1/4" PER AFTER REMOVING ORGANICS PLACE SYSTEM FILL OVER THE ENTIRE AREA OF SEPTIC TANK 1,250 GALLON PRECAST CONCRETE SEPTIC TANK WI FOOT MINIMUM SLOPE. " PROPOSED ABSORPTION BED AND TAPER AREA. PUMP STATION - 1,000 GALLON PRECAST CONCRETE PUMP TANKs+ LEACH FIELD ABSORPTION BED EFFLUENT SEWER " DESIGN PERCOLATION RATE 8-10 MIN IN PIPING TO BE 4" SDR -35 PVC. INSTALL WITH 1 8" PER ':<•4' art, f } SYSTEM FILL" MATERIAL SHALL BE CAREFULLY SELECTED SAND, SANDY LOAM OR / / ; SF FOOT MINIMUM SLOPE. APPLICATION RATE _ .7 GPD/ 1 SANDY LOAMY GRAVEL WITH IN-PLACE PERCOLATION RATE OF 3-6 MIN/INCH x r t 1 S, AND NO ORGANICS OR OBJECTS OVER 3" IN SIZE. LESS:THAN 10% BY WEIGHT ABSORPTION AREA REQUIRED = 629 SF FORCEMAIN %9'34' SHALL BE FINER THAN A NUMBER 200 SIEVE, AT LEAST 25% OF THE MATERIAL USE 20'X35' ABSORPTION BED = 700 SF PIPING TO BE 1-1/2" SDR -26 PVC OR SDR -11 HDPE. C'M%2�¢'' E BY WEIGHT SHALL BE IN THE RANGE OF 0.50mm TO 2.Omm. LESS THAN 15% POTABLE WATER SUPPLY IS ON SITE WELL MAINTAIN 4 MINIMUM COVER. 0$ C. M. MAINTAIN 50' SEPARATION TO SEPTIC TANK i OF THE MATERIAL BY WEIGHT SHALL BE LARGER THAN A 1/2" SIEVE. PERFORATED 'PIPE MAINTAIN 100' SEPARATION TO ABSORPTION FIELD2 x /� ® ^� PIPING TO BE 4' PERFORATED SDR -35 PVC. A<,r s SYSTEM FILL MATERIAL IS TO BE MECHANICALLY STABILIZED IN 6'" LIFTS WITH �SORPTI®N FIELD NOTES � vi� TRACKED EQUIPMENT PRIOR TO INSTALLATION OF TRENCHES. THIS DESIGN UTILIZES A STANDARD STONE ABSORPTION BED INSTALLED IN STONE t ,� g STONE IS TO.BE 3/4" TO 1-1/2'" WASHED STONE. STABILIZED FILL MATERIAL. CUT ALL TREES, STUMPS AND OTHER VEGETATION INSTALLER TO NOTIFY ENGINEER OF PROPOSED SOURCE OF SYSTEM FILL AT GRADE AND REMOVE. REMOVE STUMPS AND EXISTING ORGANIC MATERIAL FILTER FABRIC =" , f / FILTER FABRIC TO BE TENCATE MIRAFI 140N OR EQUIVALENT. ' " ' /U�• I MATERIAL PRIOR TO TRANSPORTING TO SITE. FROM SURFACE PRIOR TO PLACING FILL. USE TRACKED -EQUIPMENT FOR -ALL - n I ct ^ " ^ __ -^ " ^^ ^^ ^T ^ _. WORK IN ABSOPRTlON FIELD AREA. BACKFILL MATERIAL SITE LOCATION LOCATION MAP