Loading...
2014-584 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: P20140584 Date Issued: Monday, January 26, 2015 This is to certify that work requested to be done as shown by Permit Number P20140584 has been completed. Location: 23 BOULEVARD Tax Map Number: 523400-303-020-0002-030-000-0000 Owner: CARLOS GARCIA Applicant: CARLOS GARCIA This structure may be occupied as a: Residential Alteration By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the property /lit- owner of the responsibility for compliance with Site Plan, Variance, or A' G other issues and conditions as a result of approvals by the Planning Board Director of Building&Code Enforcement or Zoning Board of Appeals. ' Lw- TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development- Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20140584 Application Number: A20140584 Tax Map No: 523400-303-020-0002-030-000-0000 Permission is hereby granted to: CARLOS GARCIA For property located at: 23 BOULEVARD in the Town of Queensbury, to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: CARLOS GARCIA Residential Alteration $19,405.00 23 BOULEVARD QUEENSBURY, NY 12804-0000 Total Value $19,405.00 Contractor or Builder's Name /Address Electrical Inspection Agency HOME IMPROVEMENT GALLERY. INC. 10 SARATOGA AVENUE - SO GLENS FALLS.NY Plans&Specifications 2014-584 HUD rehab Res. Alterations: windows, doors, elec. service, repair foundation etc. • $50.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Tuesday,November 17,2015 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town ue sbuty i t :y ovember 17,2014 SIGNED BY li' OfflGl \ for the Town of Queensbury. Director of Building& Code Enforcement Town of Queensbury Building & Codes Office Use Only ACCESSORY STRUCTURE APPLICATION Received: Tax Map ID: / 3 • - - D A permit must be obtained before beginning construction Permit N ov ] 3 2(114 s3 y For any structure other than residential principal structure(house)to include, but Permit Fee: not limited to: garage, shed, dock deck, carport, pole barn, greenhouse, etc. Site Plan No.: Refer to Informational Brochure No.3 Accessory Structures—Sheds/Fences Date Applicant #pc,.( �,.�v''r�*^� Ca //r'7- z Tax Map ID Address ��/ /vf. Zoning >d �F�s / '-(6 lip Phone (57, 7 Sir 7 Owner CA-4Z as C2' ' c, 1 Contractor/Agent /p4— Address 23 / e. /?G'44k7 /e.2 Address 76. J ; " 51 A- 4 .� (Li?. ,�-v /2 r S��/C�Ce, lbs /4-f' 7cY c Phone ('57642 L' du`C_ Phone (5--/k) 7 ` .f- 7 Contact Person for Building&Code Compliance: PAv - 4'9 Day Phone: (5-74 7'61 C/°) ()' Building Street Address: 2 f Subdivision Name: Lot#: Historic Site: _Yes No Estimated cost of construction: $ /9. 9'c1 Are there any other accessory structures on property? If yes,please list: Type of Construction: Check all that apply Please indicate measurements as required below 1st Floor sq.ft. 2nd Floor sq.ft. Total sq.ft. Height Boathouse ' Boathouse with Sundeck Deck Detached Garage(#of cars_) Dock Pole Barn Porch-Open **Porch-3 season,Covered, Enclosed Shed Other Accessory Structure(s) **Considered floor area&must comply with FAR(Floor area ratio) requirements if located in the Waterfront Residential zone. Town of Queensbury Building&Codes Accessory Structure Packet 518-761-8256 Please include two(2)sets of the following documentation with the application fee: 1. Accessory Structure Application 2. Plot plan drawn to scale with the use of a survey map, if possible[40 scale-1 inch=40 feet] a) Indicate proposed structure,showing setback dimensions from all surveyed property lines b) Show location of all existing structures on the property c) Show location of water supply(well or water lines) d) Show location and configuration of septic disposal system or sewer line 3. Structural Drawings to include: Floor Plan; Foundation Plan; Cross Sections; Elevations 4. Registered Architect or Engineer's Stamp (signed & sealed) under the following circumstances: Residential addition or alterations with construction costs over$20,000;Any commercial construction Other Notes: 1. Changes to Plan -Any changes prior to or during construction will require submittal of amended plans [review and re-approval are necessary]. 2. Withdrawn Permits -20% of the initial fee is retainable by the Town of Queensbury. No fee is refundable after 1 year from initial application date. 3. Additional Review-All Applications are subject to Zoning Administrator, Code Compliance,and Structural plan review CHANGES TO RESIDENTIAL BUILDING CODE EFFECTIVE 1.1-2011 (INFORMATIONAL) Residential Building Code • New driveway requirements for structures located over 300 feet from main road; • Spray foams are allowed to be exposed in rim joist box area only,must be covered by 15 minute thermal barrier all other areas; • Protection against decay requirements; • Landings are no longer required on the outside of secondary doorways less than three risers provided no doors swing over steps; • Vent stacks must be 18 inches minimum above roof for all structures New Electrical Requirements • Arc fault breakers required in all habitable spaces for receptacles; • GFI protection for all other receptacles in kitchens, bathrooms,garages,and unfinished basements; • All receptacles must be tamper resistant; • Carbon Monoxide detectors must be located within 15 feet of sleeping area; • All corrugated stainless steel piping must be bonded to the common ground for electrical service New Energy Code Requirements • Blower door tests required by credential contractor or structure inspected by air barrier supplier and certified compliant; • Programmable thermostats required; • Lighting must be 50%energy saving light bulbs; • Separations between dwelling units must have minimum of R-10 in common wall of each dwelling unit; • Res Check inspector's checklist must be available at time of insulation inspection Declaration: I acknowledge no construction activities shall be commenced prior to issuance of a valid permit. I certify that the application, plans, and supporting materials are a true and complete statement/description of the work proposed, that all work will be performed in accordance with the NY State Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. ✓I have read and agree to the above Print Name: AA. CiAr.4 4 Signature: Date: IMAM(It Town of Queensbury Building&Codes Accessory Structure Packet 518-761-8256 /0-1, --- .Queensbury J.Queensbury Building & Code Enforcement - Residential Final Inspection wed Office No. (518) 761-8256 t ld � DaArriv-: am/p Depart: /pm to Inspection request receivved: at `� In-•- oar's Initials: , . ` .C� 1NAME: ALE �l �' i 1 C -i� ea_5 PE' T#: �! ��T LOCATION: __ iimpAr irif , . arum DATE: /PM. 41 4 TYPE OF STRUCTU'E: , � > Comments: We' - Yes No N/A I 4" Building Number Address visible from road Chimney Height/"B"Vent/Direct Vent Location /;rerFresh Air Intake Yki-4( lV 3 inch Plumbing Vent through roof minimum 18 inchesT�r m Roof Complete/Exterior Finish Complete 11A G Platform at all exterior doors �� Handrail 4 or more risers 79& Guards at stairs,decks, patios more than 30 inches above grade ` /�� Guard at stairwell at 34 inches or more Guard at deck,porches 36 inches or more Gia Handrail Termination at Newell Post or Wall Interior/Exterior Railings 34 inches to 38 inches Deck Bracing/Handicapped Ramp Compliant Grade away from foundation 6 inches with 10 feet 6 inch clearance to sill plate W--1,1 __ �(.)--n Gas Valve shut-off exposed/regulator 18 inches above grade Interior privacy/trim/doors 1 main entrance 36 inches 1 — Bathroom/Kitchen watertight Safety glazing/Window in stairwells safety glazing Interior Smoke Detectors/Carbon Monoxide Detectors //' j Every level: Every Bedroom: Outside every bedroom area: k t V-2- r`"r) Inter Connected: Battery backup: i Attic access 30 inches x 22 inches x 30 inches(height)in accessible area L Crawl Spaces 18 inch x 24 inch access, 1 sq.ft.-150 sq.ft.vents Bathroom Fans,if no window Plumbing fixtures tAri • Foundation insulation to floor 1 Sticker on Panel Duct work sealed properly/Blower Door Test Certification ;, Floor truss,draft stopping finished basement 1,000 sq.ft.;' i `l) ` 0 Emergency egress below grade Gas Furnace shut-off within 30 feet or within line of site (0,4-(07-CW 0 r r' Oil Furnace shut-off at entrance to furnace area -i` p� Furnace/Hot Water Heater operating Low water shut-off boiler Relief Valve(s)installed I Heat Trap/Water Temp 110 Enclosed Stairs Sheetrock Underside minimum'A"Gypsum Basement stairs closed rise>4 inches Garage Floor Pitched Garage fireproofing/%hour fire door/door closer / Gas Logs in Sealed or Glass Enclosure / Final Electrical; Energy Saving Light Bulbs 50% v Final Survey Plot Plan Arc Fault Breaker Habitable Spaces/Tam•er Proof Rece•tacles Flex Gas Pipe Bonding As Built Septic System/Sewer Dept. Inspection Sticker Site Plan /Variance required Flood Plain Certification, if required Okay to issue C 1C or C/O[Temporary/Permanent] l r v S5\b 3 ttr\d9e oao co" b r nGr.t. r L:1Buiiding&Codes Forms\Building&Codesllnspection Forms\Residential Final Inspection Form_revised_100405.doc;Revised January 7,2008;Revised 6/26/08; Revised 12/22/10, Revised 04/13/11 beAmssg41' Inspector's No. Date 20 COMMONWEALTH ELECTRICAL INSPECTION SERVICE, INC. (Consulting and Fire Inspection Services) (Incorporated in the states of New York, Pennsylvania, and West Virginia) Desiring Certification of Approval, application is made for inspection of electrical installation in the premises described below.On demand, applicant agrees to pay for inspection service in accord with schedule of charges. PLEASE PRINT Owner Type Building:Dwelling Other (please specify) Job Location City State County Permit From — Permit# M/C# Swimming Pool:Inground Aboveground Bonding Date Application For Rough Wiring ❑ Fixtures ❑ Service ❑ or Work-New 0 Additional❑ Bldg.-New ❑ Old❑ Ready for Inspection APPLICANTS SIGNATURE LICENSE# PLEASE PHONES PRINT NAME APPLICANTS NAME OF ADDRESS UTIUTY ICE CITY STATE ZIP CODE TO BE NOTTO JOB# BE OT SPACE BELOW FOR USE OF INSPECTORS ONLY Switches Water Heater Service Equipt Receptacles Pump Service Equipt GFCI Recept Paddle Fan Panel AMP Recept Paddle Fan/Light Dryer Rec Lights Vent Fan Washer Rec Lights Air Conditioner Dishwasher Rec Smoke Detectors AFC!Breaker Microwave Rec Smoke/CO Detectors GFCI Breaker Garbage Disp Rec Inspector's Comments: Inspector: For Certificate Job Notes RON MUMBLO Electrical Inspector 1 State Street Glens Falls, NY 12801 (51 s 7'98-0905 Installed By(if other than applicant):' OFFICE USE ONLY WORK INSPECTED REPOR- NOTIFIED TED Q 9 FEE PAID U SERVICE DATE CON- TOTAL $ Date Received: TRACTOR TOTAL R.W.DATE OWNER CHECK NO. FINAL DATE OCCUPANT CREDIT CARD Certificate No.: CERTIFICATE NEEDED AGENT CASH Date Sent: DYES DDUP ELEC. CHARGE LT.CO. INSPECTOR FINAL FEE PROGRESS FEE THIS APPLICATION EXPIRES ONE YEAR FROM DATE MAKE ALL FEES PAYABLE TO C.E.I.S.INC. IMPROVEMENTS TO 23 Boulevard ^ Queensbury, NY 12804 6 ,✓ )(1 -5S I PROPERTY OWIa NN OF QUEENSBUR far Carlos Garcia . •r� t !� r t , BUILDI :r, f z ; 23 Boulevard Ro NG & CG�+ES r .� .��i� r } L err Queensbury, NY`t B� WGd y: . � q-5 "erw^4�, , 3 - � Phone: 518-252-0026 \-1- 11,;it .R` " ' _ At TOWN OF 01 IFEN;;nL'pY BUILDINGEJf=f�A F,t'fv'�N'f Based on our limihcl 1''?I ,Irn cc.: min our comments 'f `;o con::.., Incicw'Iri(] <n(;u son o.fiC9tton3 i2 Ifl ' full C4mr)II nCe +'.il 1F'C r' iIIC11ng Codv'S Cf ht =v rte New York State. • NOTE 1: UNLESS OTHERWISE NOTED, "INSTALL" MEANS TO PROVIDE AND INSTALL. ALL NEW MATERIALS ARE TO BE USED. NOTE 2:ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS, NYS BUILDING CODE, LOCAL BUILDING CODE AND GENERAL SPECIFICATIONS NOTE 3: CONTRACTOR IS REQUIRED TO OBTAIN ALL PERMITS. NOTE 4: A CERTIFICATE OF OCCUPANCY FROM MUNICIPAL CODES DEPT. IS REQUIRED AND LEAD-BASED PAINT CLEARANCE REQUIRED BEFORE FINAL PAYMENT. Some or all of the rehabilitation work called for in these specifications is subject to HUD regulations governing the reduction of lead-based paint hazards and must be accomplished pursuant to lead-safe work practices. LEAD-BASED PAINT HAZARDS Regulations The Department of Housing & Urban Development (HUD) has issued regulations regarding the "Reduction of Lead-Based Paint Hazards in Housing Receiving Federal Assistance." The rehabilitation work called for by these work specifications will be paid for in whole or part with Federal assistance. Therefore HUD's regulations governing the reduction of lead-based paint hazards apply to this project(24 CFR Part 35). Risk Assessment A risk assessment has been performed for this property and project (attached) which has identified lead hazards which must be corrected. These hazards and the rehabilitation work to remedy these hazards is spelled out in the work specifications. The Contractor is responsible for reading the attached Lead- Based Paint Risk Assessment Report. This is one reason why the report is attached to this document. The contractor is responsible for addressing all property components listed as lead hazards. 23 Boulevard 1 Contractor Certification This project will require the contractor to undertake improvement activities that require lead-safe work practice. Therefore the contractor must be trained and certified in accordance with regulations issued by the US Environmental Protection Agency (EPA). The contractor must provide the Village of Scotia or its representative with evidence of such certifications prior to execution of the contract for improvements. Interim Controls The work to be done in accordance with these specifications that addresses identified lead hazards is designed to result in a lead-safe dwelling. The measures called for to reduce temporarily human exposure or likely exposure to lead-base paint hazards are called Interim Controls. Clearance Examination A visual inspection and dust wipe sampling is required after the lead-based paint has been rendered intact. The inspector will look for visible dust and debris in areas where the defective lead-based paint has been stabilized. Dust wipe samples in at least four rooms are required. Dust wipes shall be taken in all rooms where lead-based paint has been stabilized. The contractor is responsible for obtaining a Lead-Based Paint Clearance from a certified firm. The contractor is required to provide the owner/and the Village of Scotia with evidence that a Lead Hazard Clearance Examination was done after completion of the rehabilitation work. Clearance is required before final payment to the contractor will be approved. This Clearance Examination must be done by an individual or firm licensed or certified to conduct such an examination and must certify that the hazard reduction activities are complete and that no soil lead hazards or settled dust lead hazards exist in the dwelling unit or work site. The cost of such Clearance Examination is to be included as part of the contract total bid price for the rehabilitation work. It is the contractor's responsibility to obtain such clearance. Final payment for completed work will be withheld until such clearance is provided. Recommendations Please refer to the risk assessment report for recommendations, which are also incorporated into specifications for each work element. Following each days work and at the end of the project, any areas affected shall be properly cleaned using HEPA vacuums and wet wiping. Shop vacuums are usually NOT HEPA vacuums. It is the contractor's responsibility to keep the site cleaned throughout the work process and pass final dust wipe sampling and/or soil sampling at completion. All defective lead-based paint areas should be rendered intact by the following methods: 1. Wet scraping and wet sanding, or 2. Removed and replaced, or 3. Kept intact and covered with an impermeable layer(vinyl, aluminum, etc.) LEAD PAINT INTERIM CONTROLS See also the standard painting specifications and the attached Lead Paint Risk Assessment Report for detailed descriptions. INTERIOR— 15t Floor Painting Living Room -Side A • Using lead-safe work practices, wet scrape, wet sand, prime and paint window stool to match existing 23 Boulevard 2 Laundry Room-Side D • Using lead-safe work practices, wet scrape, wet sand, prime and paint window stool to match existing • Dining Room - Side B • Using lead-safe work practices, wet scrape, wet sand, prime and paint window stool to match existing • Kitchen Side D • Using lead-safe work practices, wet scrape, wet sand, prime and paint window stool to match existing Side B • Using lead-safe work practices,wet scrape, wet sand, prime and paint wall baseboard to match existing Side A • Using lead-safe work practices,wet scrape, wet sand, prime and paint door to basement to match existing INTERIOR—2nd Floor Painting Room 200 (front bedroom)-Side A • Using lead-safe work practices,wet scrape, wet sand, prime and paint window stool to match existing • Room 201 Side C • Using lead-safe work practices, wet scrape, wet sand, prime and paint window stool to match existing Side D • Using lead-safe work practices, wet scrape, wet sand, prime and paint door stop to match existing Room 202 Side A • Using lead-safe work practices, wet scrape, wet sand, prime and paint door stop to match existing Side C • Using lead-safe work practices, wet scrape, wet sand, prime and paint window stool to match existing • Using lead-safe work practices, wet scrape, wet sand, prime and paint wall baseboard to match existing LIST LEAD-BASED PAINT PRICE HERE $ 7(9C (Price includes any cleaning and clearance) 23 Boulevard 3 ELECTRICAL All work is to be performed in accordance with manufacturer's instructions, NYS Building Code, Local Building Code and attached ELECTRICAL SPECIFICATIONS. 1. Living Room • Secure loose box and switches at entry door, install cover plate. • Provide cover plate for receptacle in baseboard behind TV. 2. Laundry Room • Ceiling light fixture is hanging by wire. Install properly. (Provide new box, if required.) • Install new GFI protected receptacle at washing machine, on dedicated 20A circuit. 3. Bathroom#1 • GFI protect existing receptacle. • Install box extender or spacers and cover plate. 4. Dining Room • Install lithium ion battery operated smoke and CO detector. • Provide dedicated 20A circuit for refrigerator, as necessary. • Properly secure receptacle near stairs and provide cover plate. 5. Kitchen • GFI protect existing countertop receptacle at left of sink and secure properly. • Add 1 new GFI protected countertop receptacle at right of sink, on dedicated 20A circuit. • Add 1 new GFI protected receptacle at small countertop to left of stove, on dedicated 20A circuit (microwave) • GFI protect existing receptacle at table. • Provide cover plate for switch. 6. Family Room • Install lithium ion battery operated smoke detector. • Provide cover plates for receptacles at door and at fireplace. 7. Stairway • Provide cover plates for switch at bottom of stairs. 8. Upstairs Hall • Install lithium ion battery operated smoke and CO detector. 9. Bedroom#1 (Front) • Install smoke detector, as above. • Light switch at door does not work. Correct as necessary. • Receptacle in front wall, near window, does not work. Correct as necessary. • Provide cover plate for light switch at front wall. 10. Bathroom #2 (Off Bedroom#1) • Install new ceiling light fixture (approximately$25) in proper mounting box. Include CFL bulbs. • Homeowner has light bar for vanity. Install in proper mounting box. Include CFL bulbs. • GFI protect existing receptacle at vanity. • Install Romex connectors for switch box at door, or install new box with proper connectors. • Staple and secure loose Romex cables. 23 Boulevard 4 11. Bedroom#2 (Left) • Install smoke detector, as above. • Provide cover plate for light switch at door. • Homeowner has second matching ceiling fixture. Install in existing box. Include CFL bulbs. 12. Bedroom#3 (Back) • Install smoke detector, as above. • At upper wall near door, where drywall missing, properly run and staple wires inside wall. 13. Basement Stairway • Secure furnace switch and box into wall. • Provide junction box and cover plate for spliced Romex cables. • Provide cover plate for open junction box in ceiling at bottom of stairs. 14. Basement • Install hard-wired smoke and CO detector with battery backup. 15. Exterior • Homeowner has lantern for front entry. Install at existing J-block. Provide proper mounting box, if necessary. • GFI protect existing receptacle at front entry and provide weather proof cover. • Install motion-sensing fixture (approximately $30) at existing J-block at back of house. Provide proper mounting box, if necessary. Include flood bulb(s). 16. Service • Remove existing 100A service. • Install new 200A service. Provide new panel with sufficient breaker spaces to accommodate all existing and new branch circuits. • Staple and secure all existing wires. • Label all breakers. • Contractor will be responsible for all service orders, fees and inspections. LIST ELECTRICAL PRICE HERE$ WINDOWS 1. Living Room • Replacement window at right does not operate properly. Repair or remove and re-install correctly. 2. Bedroom#3 • Fill gaps around replacement window with fiberglass or foam. • Install interior stops and paint to match existing trim. 3. Basement • Install 2 white vinyl, Energy Star rated replacement windows, slider type(Pella, Therma Star or equivalent) • Window U factor will be greater than .30. • New windows will have full screens. • Repair or replace framing, as necessary. Replacement Windows -2 C/J LIST WINDOWS PRICE HERE$ 7U) 23 Boulevard 5 ENTRY DOORS 1. Dining Room: • Install new pre-hung, flush style, energy star-rated steel or fiberglass entry door, 9-lite style (Pease, Therma Tru or equivalent). • Finish according to manufacturer's specifications with good quality latex paint. • Provide new entry lockset(Kwikset or equivalent) and deadbolt, keyed alike. • Reinstall existing interior casings Install white aluminum coil stock at exterior brickmould. Entry Door -1 LIST DOORS PRICE HERE$ 7 7 INTERIOR CARPENTRY 1. Living Room • Tape and finish new drywall at right of entry door. Prime and paint toimatch existing walls. • Install and grout small area of tile (floor) at new entry door. Homeowner has tile. • Install blocks at bottom of casing, archway to dining room. Prime.and paint to match existing casing. 2. Laundry Room • Install casings at\door from living room and at door to bathroom. rt • Style and finish to.match existing woodwork. • 3. Stairs • Install graspable wood handrail at left wall. 4. Upstairs Hall • Remove existing safety railing. • Install new railing of proper height, with square or turned balusters 4" O.C. • Prime and paint to match existin woodwork. 5. Bedroom#1 '`\, • Install new door casings, both sides of,door. Style and finish to match existing trim. • Install small area of drywall at door. Tape and finish. Prime and paint to match existing wall. 6. Bathroom #2 i • Install new casings at both sides of door, style and finish to match existing woodwork. • Install small area of drywall, left wall. Tape ar,,d finish. Prime and paint to match existing wall. • Install sheet vinyl floofing (approximately$20/square yard, uninstalled) over appropriate underlayment. Homeowner will have choice of stock pattern/color. 7. Bedroom#3 • Secure loose drywall at ceiling. • Install new drywall at areas near door. • Tape and finish all new drywall. • Prime and pa int to match existing wall. 23 Boulevard 6 8. Basement • Remove existing basement stairs. • Install new pressure-treated stairs, level and secure, with best possible rise and run. • Install graspable wood handrail. •� LIST INTERIOR CARPENTRY PRICE HERE.'S- �r '\ N.. STRUCTURAL 1. Basement • Reinforce existing, or install new center support beam. • Provide footings, as required. • Install adjustable floor jacks and raise floor to best possible level. LIST STRUCTURAL PRICE HERE$ 7 2 75 EXTERIOR CARPENTRY 1. Left Side, Porch • Install pressure treated railing at steps, with square balusters, to match existing porch railing. 2. Right Side, Porch • Repair or replace broken PVC intake or exhaust for furnace. LIST EXTERIOR CARPENTRY PRICE HERE $ /7�S FOUNDATION All work is to be performed in accordance with manufacturer's instructions, NYS Building Code, Local Building Code and attached SPECIFICATIONS. 1. Right Side • Fill open spaces in foundation with mortar. 2. Left Side, Addition • Repair damaged corner in block. • Fill open spaces with mortar. 3. Back Addition • Fill open spaces with mortar. a9 LIST FOUNDATION PRICE HERE$ 3G8 23 Boulevard 7 • NOTE: ANY P'INISHEID,SURFACES DAMAGED DURING THE COURSE OF REHABILITATION WORK SHALL BE REPAIRED AND FINISHED TO MATCH ORIGINAL CONDITION. CONSIDER THIS IN YOUR BIDS, DO NOT INCLUDE AS EXTRAS. Extras 1. Identify additional separate cost to install or remove additional items not mentioned in specifications that may be necessary to comply with code and complete the job in a satisfactory manner and list separately here. 2. Items not listed as additional are assumed to be included in contractors bid price. LIST EXTRAS PRICE HERE $ 23 Boulevard 8 23 Boulevard, Queensbury, NY 12804 4.4 LEAD-BASED PAINT 1 �S ELECTRICAL 65 �5 WINDOWS /Dv ENTRY DOORS INTERIOR CARPI=NTRY /v/_��s��l STRUCTURAL 3 3„5,-4-:_ EXTERIOR CARPENTRY / 7;.s' FOUNDATION /cia'd TOTAL COST $ -�/' '" j V EXTRAS COST $ Estimated Starting Date: Estimated Ending Date: Signature of Principal: My signature also indicates that I have read and understand the attached GENERAL CONTRACT TERMS AND CONDITIONS. // Name of Company: f ¢ /��:vcc.-.c-/ (NT( !'= �-> Address: 57: 7 Phone: Cc)) vs' —SG77 CONTRACTOR: RETURN ALL NINE (9) PAGES TO HERE 23 Boulevard