03 - Waivers for SPR Richard E. Jones Associates
Architects - Environmental Planners
339 Aviation Road
Queensbury, NY 12804
Phone: (518) 793-1015 Fax: (518) 793-2223
E-mail:info@rejaarchitects.com
October 17, 2016
Waiver Requests from Site Plan Review Requirements
Re: Hudson Headwaters Health Network- Proposed Privacy Fence
161 Carey Road
Tax Map Parcel 309.13-2-31
Waiver Request Narrative:
Item G-Site Lighting:
A waiver from this requirement is requested as the project does not involve any changes to the
existing light fixtures and does not add any new light poles or wall mounted fixtures to the existing
building.
Item H-Site Signage:
A waiver from this requirement is requested as the project does not involve any changes to the
existing site signage and does not add any new freestanding signs or wall mounted signage to
the existing building.
Item I-Utility Systems:
A waiver from this requirement is requested as the project does not involve any changes to the
existing on-site utility systems.
Item J-SWPPP:
A waiver from this requirement is requested as site disturbance required for installation of the
privacy fence would be approximately 1,000 square feet which will have no impact on the
existing storm drainage system for the project site.
Item K-Site Topography:
A waiver from this requirement is requested as the proposed installation of the privacy fence
would not require alteration to the existing site grades.
Item L-Landscaping:
A waiver from this requirement is requested as the existing trees, shrubs and other landscaping
provided by the original site plan review would remain and no additional planting would be
required.
Item P-Floor Plans& Building Elevations:
A waiver from this requirement is requested as the project does not involve any additions or
alterations to the existing buildings.
P:\01 -Projects\2014\1404\SPR-Fence\Letter-Waivers for SPR.doc
Item Q-Soil Logs,etc.:
A waiver from this requirement is requested as there is no proposed site disturbance that would
impact on site storm drainage systems.
Item R-Construction Waste Disposal:
A waiver from this requirement is requested as the project does not involve construction that
would result in major quantities of construction debris and waste.
Item S-Snow Removal &Storage:
A waiver from this requirement is requested as the project does not involve any changes to the
existing pavement or walkway areas for the site. Existing snow removal and snow storage areas
have proven to be adequate for the existing site layout.