Project Cover Letter "' ""E ,M E a Ay ..n nn
NOV15 2016
ENVIRONMENTAL DESIGN
111"CAAMNI ()F 01 J mURY PARTNERSHIP,LLP
..
November 15, 2016
"own of Queensbury Planning Board
742 Bay Road
Queensbury,NY 12804
Attn: Chris Hunsirngcr, Chairman
Fie. Feeney Residence-Lockhart eaurntain load
Dear Chris:
Submitted for your review and distribution are l 5 sets of"revised, Site Plan drawings f"or,the
referenced project, As previously discussed this project is su bject to reviewand p rrrnittin b the
Adirondack Park Agency(APA). Review connnents by APA have resulted in slight changes to
the plans in the area of the drives stream crossing. Basically AP.A warted there to bre less
disturbance in the wetland area so the design has been revised and this has now been reduced frcrn
an additional 1040 sfof disturbance to,now 575 sf. As there were slight changes to the plans
previously Submitted for the Site Plan application the attached plains update the file.
Thank you for your consideration ofthis application, and l look Berard to meeting with the Board
again dor review at a December r meetirng,
Sincerely,
Dennis Mac 'lro ,,Ply:
Environmental Design. partnership
Attachments
hments
Cc: Michael Feeney
Route 146ā€˛Clifton Park. New York 12065 phone(514):371-762x1 fax(518) 71