Loading...
RC-000797-2016 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 ` Community Development-Building&Codes (518)761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-000797-2016 Date Issued: Friday, August 4, 2017 This is to certify that work requested to be done as shown by Permit Number RC-000797-2016 has been completed. Tax Map Number: 296.14-2-10 Location: 59 DEVIN CT Owner: CERRONE BUILDERS,INC. Applicant: CERRONE BUILDERS, INC. This structure may be occupied as a: Single Family Dwelling w/FP 1400 s.f. Garage 400 s.f. By Order of Town Board Village at Sweet Road,Lot 10 TOWNOF QQUEENSBUURY�J Issuance of this Certificate of Occupancy DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance,or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building& Codes (518)761-8256 BUILDING PERMIT Permit Number: RC-000797-2016 Tax Map No: 296.14-2-10 Permission is hereby granted to: CERRONE BUILDERS,INC. For property located at: 59 DEVIN CT In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: CERRONE BUILDERS,INC. Single Family-New $310,000.00 Owner Address: 1589 State Route 9 Total Value $310,000.00 Fort Edward,NY 12828 Contractor or Builder's Name/Address Electrical Inspection Agency CERRONE BUILDERS,INC. 1589 State Route 9 Fort Edward,NY 12828 Plans&Specifications Single Family Dwelling w/FP 1400 s.f. Garage 400 s.f. Village at Sweet Road,Lot 10 $1,240.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,December 7,2017 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expirationAdateostemfber ) Dated at the Town of ueensb J /Ne 7,2016 SIGNED BY: /VJor the Town of Queensbury. Director of Building&Code Enforcement MNCIPAL STRUCT RE APPLICATIO �w N, Tice' 'e" nl Date: 1% ,6 � 2c-607??` 16 p Permit o Tax Map ID 1 K�'a V 1 8 ARt G Zone Historic? _ esT F 4 50 ll Subdivision Name f t- I/ 17 t# B INO& Project Location JII TOWN BD.RESOLUTION 86-2013: $850 recreation fee for new dwelling units—single family,duplexes/two-family, multiple family, apartments,condominiums,townhouses,and/or manufactured&modular homes,but not mobile homes. This is in addition to the permit feels). Primary Owner(s) Address Phone/EmailOjl Applicant Address Phone/Email Contractor Address Phone/Email Contact Person for Building& Codes Compliance: Phone TYPE OF CONSTRUCTION ✓Check all that apply New Addition Alteration I'floor sf 211 floor sf Total sf Height Single Family /G � ! 0 Two-Family LSOt' Multi-Family (#of units Townhouse Business Office Retail-Mercantile Factory-Industrial Attached Garage / (103' 4+) ✓ [� VOO Other l Town of Queensbury Building&Codes Principal Structure Application revised January 2016 If commercial or industrial please indicate name of business Proposed use of building or addition Source of Heat(circle one) Gas Oil Propane Solar Other Fireplace: Complete a separate application for Fuel Burning Appliances & Chimneys Are there structures not shown on plot plan? {� Are there easements on the property? A10 Site Information: a. Dimensions or acreage of lot 1W Y b. Is this a corner lot? _Yes ✓ No c. Will the grade be changed as a result of construction Yes No d. Public water or Private well(circle one) Public Private e. Sewer or Private Septic System (circle one) Sewe Private Value of all work to be performed (labor or materials) $ DOC) DECLARATION: 1. I acknowledge no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If work is not complete by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. I certify that the application, plans and supporting materials are a true and complete statement / description of the work proposed, that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances,and in conformance with local zoning regulations 4. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. 5. I also understand that I /we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: !D ��,P/j7� DATE: �l SIGNATURE: DATE: 11117 I(o For office use only Operating Permit Issued: _Yes —No Occupancy Type Construction Classification Assembly Occupancy Limit Special Conditions Town of Queensbury Building&Codes Principal Structure Application Revised January 2016 Fuel Burning Appliance & Chimney Application Office Use Onlv Received DATE: L111 7 6 Tax Map ID TAx MAP ID: E O v Permit No. y4z ZQA 4, ZONE: D Permit Fee FEE OWNER 3 P ONE/E-MAIL i ADDRESS INSTALLER/ PHONE/E-MAIL BUILDER CONTACT PERSON FOR BUILDING&CODE COMPLIANCE: PHONE/E-MAIL BUILDING ADDRESS / ROOM OF INSTALL: 60,e_jjL1— env, PLANNED INSTALL DATE: l�c°c` . L C>J(7 FUEL BURNING APPLIANCE INFORMATION WOOD COAL PELLET GAS OIL NOTE: ROUGH-IN& STOVE FINAL INSPECTION ARE FIREPLACE INSERT REQUIRED. FIREPLACE,FACTORY BUILT* NOTE: MANUFACTURER'S FIREPLACE,MASONRY INSTALLATION MANUAL FURNACE(GARAGE ONLY) MUST BE AVAILABLE AT TIME OF INSPECTION *If factory built provide manufacturer name: Model#: Listed by: Number: CHIMNEY INFORMATION Masonry** (check one) BLOCK _BRICK _STONE Flue TIE STEEL Size in inches Material DOUBLE WALL TRIPLE WALL INSULATED ** If non-masonry provide manufacturer name: Model#: DECLARATION: Construction/installation must conform to NYS Fire Prevention & Building Code and/or manufacturer requirements. The applicant or owner agrees to comply with all applicable laws, ordinances, regulations,and all conditions that are part of these requirements and also will allow inspector's to enter premises to perform required inspections. I HAVE READ AND AGREE TO THE ABOVE: PRINT NAME: 1 c dirt v DATE: 1111-7116 SIGNATURE: DATE: / 6 Town of Queensbury Building&Codes Principal Structure Application Revised January 2016 Town,of Queensbury Thomas R. Van Ness Highway Department Highway Superintendent 742 Bay Road, Queensbury,NY 12804 Home: 518-745-0929 Phone: 518-761-8211 Fax: 518-745-4466 David Duell Deputy Highway Superintendent Home: 518-745-0938 DRIVEWAY PERMIT Date: D Applicant Name: �?i ! { is f NOV 18 2016 Telephone No.: TOWN OF QUEENSBURY Address to be Inspected BUILDING&CODES Return Address: /� �' E/' (,�• Mzaj /7S-Z-Y Applicant must show exact location and width of driveway(s) to be connected to the highway by placing stakes at the specified location The Superintendent of Highways of the Town of Queensbury has reviewed this application. The following action has been taken: STEP 1: ( ) Preliminary approval 296.14-2-10 RC-000797-2016 NEED ( ) Slight Swale Cerrone Builders ( ) Deep Swale 59 Devin Court, Lot 10 ( ) Level with the road SFD w/FP 1400 s.f., Garage 400 s.f. O Level with the top of the paved wi Size culvert pipe to be used(if necessary) ( ) 12" ( ) 15" ( ) 18" ( ) 24" ( ) 36" Preliminary inspection completed by: Date: Approval by Highway Supt.: or Deputy Supt.: Upon completion please resubmit this approval permit for a final approval. STEP 2: ( ) Final Approval ( ) Rejected Date: Thomas R. Van Ness, Highway Superintendent David Duell, Deputy Highway Superintendent Town of Queensbury Building&Codes Principal Structure Application Revised January 2016 id TOWN OF QUEENSBURY BUILDING & CODES 296.14-2-10 RC-000797-2016 Cerrone Builders — 59 Devin Court, Lot 10 — SFD w/FP 1400 s.f., Garage 400 s.f. i 01 1,tvw I � 11 t I i I U1 i REScheck Software Version 4.6.2 Compliance Certificate 296.14-2-10 RC-000797-2016 Project Cerrone Builders Inc Cerrone Builders59 Devin Court, Lot 10 Energy Code: 2015IECC SFD w/FP 1400 SJ., Garage 400 s.f. Location: Warren County, New York Construction Type: Single-family Project Type: New Construction D D Conditioned Floor Area: 1,400 ft2 Glazing Area 12% NOV ' 2��5 Climate Zone: 6 (8499 HDD) Permit Date: Permit Number: TOWN OF QUEENSBURY BUILDING&CODES Construction Site: Owner/Agent: eslgner/Contractor: 59 Devin Court Vision Engineering, LLC Lot 10 206 Glen Street Queensbury, NY 12804 Suite 56 Glens Falls, NY 12801 (518) 792-9264 ;Compliance: Passes using UA trade-off Compliance: 0.0%Better Than Code Maximum UA: 223 Your UA: 223 The%Better or worse Than Code Inez reflects how close to compliance the house is based an code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or U-Factor U Ceiling 1: Raised or Energy Truss 1,400 38.0 0.0 0.025 35 Wall 1: Wood Frame,16"D.C. 1,458 21.0 0.0 0.057 72 Window 1:Vinyl Frame:Double Pane with Low-E 114 0.290 33 Door 1: Front: Solid 20 0.200 4 Door 2: Slider: Glass 40 0.290 12 Door 3: Fire Door: Solid 18 0.140 3 Basement Wall 1:Solid Concrete or Masonry 1,264 0.0 15.0 0.046 57 Wall height: 7.8' Depth below grade: 6.8' Insulation depth:7.8' _ Basement Sashes: Wood Frame:Double Pane 7 0.340 2 Basement Egress:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.340 5 Project Title: Cerrone Builders Inc Report date: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200 - DES - Page 1 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck Y ik Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed i di has bedesigned to meet the 2015(ECC requirements in RESche5k Version 4.6.2 and to comply with the mandatory r creme listed ,bee the REScheck Inspection Checklist. ' Name-Titletle ° ure It I cc if liv( . D,p �o. ROFES S( Project Title: Cerrone Builders Inc Report date: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200- DES- Page 2 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck REScheck Software Version 4.6.2 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & 103.1, Construction drawings and ❑Complies 103.2 '.documentation demonstrate ❑Does Not [PRI]' •energy code compliance for the ❑Not Observable building envelope.Thermal envelope represented on ❑Not Applicable Construction documents. 103.1, 'Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 •energy code compliance for [PR311 ,lighting and mechanical systems. ❑Not Observable y Systems serving multiple ❑Nat Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, :Heating and cooling equipment is Heating: Heating: ❑Complies 403� -''sized per ACCA Manual S based Btu(hr_ Btu/hr ❑Does Not [P {on loads calculated per ACCA Cooling: Cooling: ❑No[Observable Manualj or other methods Btu/hr { Btu/hr approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200 - DES - Page 3 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions: 402.1.1 Conditioned basement wall R-_ R- ❑Complies -See the Envelope Assemblies [F0411 insulation R-value.Where interior R- R- ❑Does Not table for values. insulation is used,verification ❑Not Observable may need to occur during Insulation Inspection. Not ❑Not Applicable j required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall I4❑Complies [F0511 insulation installed per "❑Does Not !,manufacturer's instructions. ❑Not Observable >-❑Not Applicable 402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies [FO611 insulation depth of burial or ❑Does Not table for values. 0 distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies [F011]2. to protect exposed exterior ❑Does Not v insulation and extends a - ❑Not Observable minimum of 6 in. below grade. ❑Not Applicable j 403.9 '.Snow-and ice-melting system ❑Complies [F012]' controls installed. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2'. Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200 - DES- Page 4 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck Section Plans Verified Field Verified # Framing/Rough-in Inspection Value Value Complies? Comments/Assumptions &Re .ID 402.1.1, Door U-factor. U-_ U-_ ❑Complies 'See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR11' ❑Not Observable ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U-_ ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not gable for values. 402.3.3, 402.3.6, ❑Nat Observable . 402.5 ❑Not Applicable j [FR211 303.1.3 IU-factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or ❑Not Observable taken from the default table. ❑Not Applicable 402.4.1.1 '.Air barrier and thermal barrier ❑Complies [FR2311 installed per manufacturer's ❑Does Not ;instructions. ❑Not Observable ❑Not Applicable j 402.4.3 'Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting ❑Does Not 'AAMA/WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC ❑Not Observable -400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR1612 'sealed at housing/interior finish ❑Does Not and labeled to indicate<_2.0 cfm ❑Nat Observable leakage at 75 Pa. ❑Not Applicable 403.2.1 Supply and return ducts in attics ❑Complies [FR12]1 -insulated >= R-8 where duct is []Does Not >= 3 inches in diameter and >_ ❑Not Observable R-6 where< 3 inches.Supply and return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for<3 inches in diameter. 403.3.3.5 Building cavities are not used as ❑Complies [FR1513 ducts or plenums. ❑Does Not ❑Not Observable ❑Not Applicable j 403.4 HVAC piping conveying fluids R- R- ❑Complies [FR1712 above 105 4F or chilled fluids ❑Does Not below 55 QF are insulated to zR- ❑Not Observable 3. ❑Not Applicable 403.4.1 Protection of insulation on HVAC ❑Complies [FR2411 piping. []Does Not ,v ❑Not Observable -;❑Not Applicable j 403.5.3 Hot water pipes are insulated to R- R- ❑Complies [FR18]2 >_R-3. []Does Not ❑Nat Observable ❑Nat Applicable j 403.6 Automatic or gravity dampers are ❑Complies [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable I ❑Not Applicable j 11 High Impact(Tier 1) j 2 Medium Impact(Tier 2) 3' Low Impact(Tier 3) Project Title: Cerrone Builders Inc Reportdate: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200- DES - Page 5 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck Additional Comments/Assumptions: 11 High Impact(Tier 1) Medium Impact(Tier 2) 3 1 low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200 - DES - Page 6 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck Section Plans Verified Field Verified # Insulation Inspection . Value Value Complies? Comments/Assumptions & Req ID 303.1 All installed insulation is labeled ! ❑Complies [IN13]' :or the installed R-values ❑Does Not 'provided. ❑Not Observable ❑Not Applicable 402.1.1, Wall insulation R-value. If this is a R- R-_ ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1h of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 -.wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN311 ..exterior,the exterior insulation :requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies [IN411 manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable j Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200 -DES - Page 7 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck Section Plans Verified # Final Inspection Provisions Field Verified Value Value complies? Comments/Assumptions & Re .ID 402.1.1, '.Ceiling insulation R-value R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood F-1Wood ❑Does Not table for values. 402.2.2, j❑ Steel ❑ Steel j❑Not Observable 402.2.6 [Fill' ❑Not Applicable j 303.1.1.1,,Ceiling insulation installed per - ❑Complies ; 303,2 manufacturer's instructions. ❑Does Not [F1211 Blown insulation marked every 300 ft'. ❑Not Observable ❑Not Applicable Pte. Vented attics with air permeable ❑Complies insulation include baffle adjacent ❑Does Not :to soffit and eave vents that extends over insulation. -.❑Nat Observable ❑Not Applicable 402.2.4 (Attic access hatch and door R-_ R-_ ❑Complies [F1311 insulation >_R-value of the ❑Does Not 'adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50=_ ACH 50 =_ ❑Complies [FI17]1 �ach in Climate Zones 1-2,and ❑Does Not <=3 ach in Climate Zones 3-8. - []Not Observable ❑Not Applicable 403.2.3 Duct tightness test result of<=4 ! cfm/100 cfm/100 ❑Complies [FI4]1 cfm/100 ft2 across the system or ! ft2 - ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ❑Not Observable tests,verification may need to ;❑Not Applicable !occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F127]1 determine air leakage with ft2 ❑Does Not either: Rough-in test:Total ❑Not Observable leakage measured with a pressure differential of 0.1 inch !❑Not Applicable j w.g,across the system including j :the manufacturer's air handler enclosure if installed at time of ;test.Postconstruction test:Total :leakage measured with a pressure differential of 0.1 inch w.g.across the entire system ;including the manufacturer's air handler enclosure. - 403.3.2.1 Air handler leakage designated ❑Complies [FI2411 by manufacturer at<=2%of ❑Does Not design airflow. ❑Not Observable ❑Not Applicable j 403.1.1 ,Programmable thermostats ❑Complies [1`19]2 ` installed for control of primary ❑Does Not heating and cooling systems and ❑Not Observable 1. .. .;initially set by manufacturer to ❑Not Applicable Observable j code specifications. _____ 403. Heat pump thermostat installed ❑Complies [F11012'" on heat pumps. ❑Does Not ❑Not Observable ❑Not Applicable j 403.5.1 'Circulating service hot water ❑Complies [Flll]2 '.systems have automatic or ❑Does Not ',accessible manual controls. ❑Not Observable -. ❑Not Applicable 11 High Impact(Tier 1) 12' Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200 - DES - Page 8 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck Section Plans Verified Field Verified # Final inspection Provisions Value Value Complies? Comments /Assumptions Req.ID & 403.6.1 All mechanical ventilation system ❑Complies [F125]2 fans not part of tested and listed !:❑Does Not HVAC equipment meet efficacy and airflow limits. `:❑Not Observable ❑Not Applicable j 403.2 Hot water boilers supplying heat ❑Complies [F[26]2 through one-or two-pipe heating ❑Does Not systems have outdoor setback ❑Not Observable control to lower boiler water temperature based on outdoor ❑Not Applicable -temperature. 403 S l,la Heated water circulation systems ❑Complies [112812 +have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply ❑Not Observable pipe. Gravity and thermos- - ❑Not Applicable syphon circulation systems are not present.Controls for - circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403 5.14' Electric heat trace systems ❑Complies [FI29]2 comply with IEEE 515.1 or UL - ❑Does Not 515.Controls automatically ❑Not Observable adjust the energy input to the heat tracing to maintain the ❑Not Applicable j desired water temperature in the piping. _ 403.5.2 Water distribution systems that ❑Complies [F13012 have recirculation pumps that ❑Does Not pump water from a heated water [-]Not Observable supply pipe back to the heated ❑Not Applicable water source through a cold water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 1044F. _ 403.5.4 Drain water heat recovery units ❑Complies (F13112 tested in accordance with CSA ❑Does Not 355.1. Potable water-side ❑Not Observable pressure loss of drain water heat recovery units < 3 psi for ❑Not Applicable individual units connected to one or two showers.Potable water- side pressure loss of drain water heat recovery units <2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies [F16]1 fixtures or 75%of permanent ❑Does Not f '.fixtures have high efficacy lamps. ❑Not Observable Does not apply to low-voltage ❑Not Applicable j lighting. 404.1.1 Fuel gas lighting systems have ❑Complies [F12313 no continuous pilot light. ❑Does Not 4d� ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200-DES- Page 9 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck Section plans Verified Fiel�Verifled# Final Inspection Provisions Value Complies? Comments/Assumptions & Req ID 401.3 :Compliance certificate posted. ❑Complies [F17[2 ❑Does Not ❑Nat Observable ❑Nat Applicable 303.3 Manufacturer manuals for ❑Complies [Fi18]3 :mechanical and water heating ❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 11/17/16 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1200 - DES- Page 10 of 10 Cerrone Devin Court Lot 10\1200 Rescheck.rck 2015 IECC Energy Efficiency Certificate insulation Rating R.Value Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass& Door Rating U-Factor SHGC Window 0.29 Door 0.29 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments Manual S Compliance Report Job: Date: Dec 06,2016 Entire House By: CERRONE P&H QUEENSBURY,NY 12804 `��(/��� 461)U, Project • • For: 59 devin queensbury, NY 12804 Cooling Equipment Design Conditions Outdoor design DB: 85.0°F Sensible gain: 11647 Btuh Entering coil DB: 75.0°F Outdoor design WB: 71.0°F Latent gain: 1198 Btuh Entering coil WB: 62.5°F Indoor design DB: 75.0°F Total gain: 12845 Btuh Indoor RH: 50% Estimated airflow: 547 cfm Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: Split AC Manufacturer: York Model: YCJF18S41S1+BC**A2(6,9)24++TD Actual airflow: 547 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% Heating Equipment Design Conditions Outdoor design DB: -4.0°F Heat loss: 53212 Btuh Entering coil DB: 70.0°F Indoor design DB: 70.0'F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: York Model: TM9X060B12MP11 Actual airflow: 547 cfm Output capacity: 57000 Btuh 107% of load Temp. rise: 50 'F ra 00 F ONIOiine N33no 30 NMO.L F7,,,7 , /s 3-Q Meets are all requirements ofACCA Manual S. 3 a R ] G` �� 2016Dec 06 16:47:77 wrightsofC Right-Suite®Universal 2077 77.0.16 RSU25116 ` Page 1 .SCA ...s\scott.lengmonhy\Documents\York\59DEVIN.mp Calc=MJB Fmnt Dcorfaces: N Residential Plans E _ —r Review Form Form RPER 1 ACCP.® for HVAC System •n (Loads, Eauioment. 15 Mar 09 acadm.yono-aa,nuA„a� Header Information Contractor: CERRONE P&H REQUIRED ATTACHMENTS ATTACHED Manual J1 Form(and supporting worksheets): Yes ❑ No ❑ Mechanical license: or MJ1AE Form'(and supporting worksheets): Yes ❑ No ❑ OEM performance data(heating,cooling,blower): Yes ❑ No ❑ Building plan A Manual D Friction Rate Worksheet: Yes ❑ No ❑ Duct distribution sketch: Yes ❑ No E]Home address(Street or Lot#,Block,Subdivision): , Entire House HVAC •A• • • Design Conditions Buildinq Construction Information Winter Design Conditions Building Outdoor temperature: -4 -F Orientation: Front Door faces North Indoor temperature: 70 =F North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 53212 Btuh Number of bedrooms: 0 Conditioned Floor area: 2718 ft' Summer Design Conditions Number of occupants: 0 Outdoor temperature: 85 °F Indoor temperature: 75 °F Windows Roof Grains difference: 28 gr/Ib @60p/o RH Eave overhang depth: 0 ft Sensible heal gain: 12941 Btuh Internal shade: none Latent heal gain: 1331 Btuh Blinds,drepea,etc. OapM vend. Total heat gain: 14272 Btuh Number of skylights: 0 HVAC EQUIPMENT SELECTION (IRC M1401.3) Heating Equipment Data Coolinq Equipment Data Blower Data Equipment type: Gas furnace E%igment type: SpIRAC Heating cfm: 547 umace,Heatpump,Boller,etc. it ond6loner,Heat pump,etc. Cooling cfm: 547 Model: York Model: York Static pressure: 0 in H2O TM9X060B12MP11 YCJF18S41S1+BC"A2(6,9)24++TD fan's ret ed eztemai static pressure for Heating output capacity: 57Q00 Btuh Total cooling capacity: 0 Btuh deelgn airflow Heat pumps-capacity at winter design on door conditions Sensible cooling capacity: q Btuh Aux heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh HVAC DUCT DISTRIBUTION SYSTEM • 1 Design airflow: 547 cfm Longest supply duct: 0 ft Duct Materials Used Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct: Total device pressure losses: 0 in H2O Total effective length(TEL): 0 It Available static pressure(ASP): 0 it H2O Friction rate: rel lon Rate=ASP+(TFL a 10 Q) in/100fl Branch duct: Sheet metal I declare the load calculation,equipment equipment selection and duct • -• above. •- • - -•- e - • be subject todesign review and verification. Contractor's printed name: Contractor's signature: Date: Reserved for County,Town Municipality orAuthority having jurisdiction 'Home qualifies for MJ1AE Form based on Abridged Edition Checklist +I+ wrightSOfr Right-Supe®universal 2017 17.0.16 RSU25116 y Project SummarJob: { ' 1 Date: Dec 06,2016 Entire House By: CERRONEP&H QUEENSBURY, NY 12804 Promect Information For: 59 devin queensbury, NY 12804 Notes: Design • • Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 OF Outside db 85 OF Inside db 70 OF Inside db 75 OF Design TO 74 OF Design TO 10 OF Daily range M Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 53212 Btuh Structure 11647 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 53212 Btuh Use manufacturer's data n Rate/swingg multipplier 0.90 Infiltration Equipmentsensibleload 10482 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 1198 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Heating Cooling (none) Area(ft') 2718 2718 Equipment latent load 1198 Btuh Volume(ft') 24222 24222 Air chan�gges/hour 0.32 0.16 Equipment total load 11680 Btuh Equiv.AN (cfm) 129 65 Req, total capacity at 0.70 SHR 1.2 ton Heating Equipment Summary Cooling Equipment Summary Make York Make York Trade YORK Trade ADP Model TM9X060B12MP11 Cond YCJF18S41S1 AHRI ref 2008693 Coil BC**A2(6,9)24++TD AHRI ref 5664015 Efficiency 95.5AFUE Efficiency 11.0 EER, 14 SEER Heating input 60000 Btuh Sensible cooling 11480 Btuh Heating output 57000 Btuh Latent cooling 4920 Btuh Temperature rise 96 OF Total cooling 16400 Btuh Actual air flow 547 cfm Actual air flow 547 cfm Air flow factor 0.010 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.91 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htSOft' 2016-Dec-0616:41:17 AC g Right-ork\59 universal 2017 17.0.16 RS rant D Page 1 ...slscott.langewonhy\Documents\York\59 DEVIN.rup Calc=MJB Front Door faces: N AED Assessment Job: Date: Dec 06,2016 Entire House By: CERRONEP&H QUEENSBURY, NY 12804 Project For: 59 devin queensbury, NY 12804 Design C • • • Location: Indoor: Heating Cooling Glens Falls AP, NY, US Indoor temperature(°F) 70 75 Elevation: 335 ft Design TD (°F) 74 10 Latitude: 43'N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 51.8 27.6 Dry bulb (°F) -4 85 Infiltration: Daily range (°F) - 20 ( M ) Wet bulb (°F) - 71 Wind speed (mph) 15.0 7.5 Test forAdequate Exposure Hourly Glazing Load 8.000- 7,000- 6,000-- 5,000-- 0 ,0007,0006,0005,0000 4,000-- N N 3,000 2,000 1,000-- 0 ,0000 8 9 10 11 12 13 14 15 16 17 18 19 20 Hour of Day / Hourly / Average / AED limit Maximum hourly glazing load exceeds average by 34.2%. House does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 227 Btuh (PFG - 1.3*AFG) htSofY 2016-Dec-06 16 41 wri 9 Right-Buda®Universa1201717.0.16 RSU25116 Page 1 ACCN ...s\scott.langeworthy\Documents\York\59DEVIN.rup Catc=MJB Front Door faces: N Right-J® Worksheet Job: Entire House Date: Dec 06,2016 CERRONEP&H By: QUEENSBURY NY 12804 1 Room name Entire House Room1 2 Exposed wall 322.0 ft 0 It 3 Room height 9.0 ft d 9.0 It heat/cool 4 Roan dimensions 0 x 4.0 ft 5 Room area 2718.0 ft' 0 ft' Ty Construction U-value Or HTM Area (ftp Load Area (ft-) Load number (BtulVft;°F) (Btulvft� or perimeter (ft) (Stuh) or perimeter (ft) (Btuh) Heat FCol Gross N/P/S Heat Cad Gross N/P/S Heat Cod 6 1q/ 12F4sw 0.053 n 3.92 0.41 828 756 2965 309 0 0 0 0 �-G 1Dc2ov 0.570 n 4218 16.38 72 0 3037 1178 0 0 0 0 w 15811-8wc-6 0.055 n 3.48 0.10 90 90 313 9 0 0 0 0 12F4sw 0.053 a 3.92 Q41 531 527 2087 215 0 0 0 0 11 1D-c2ov 0.570 a 4218 58.17 4 0 169 233 0 0 0 0 lQ! 12F45w 0.053 s 3.92 0.41 918 828 3247 338 0 0 0 0 ��CD 1D-C20v 0.570 s 42.18 30.67 48 0 2025 1467 0 0 0 0 11P0 0.290 s 21.46 6.23 42 42 901 262 0 0 0 0 12F4sw 0.053 w 3.92 0.41 495 463 1816 189 0 0 0 0 1D-c2ov 0.570 w 42.18 58.17 32 0 1350 1881 0 0 0 0 w 15811-8wc-6 0.055 w 3.48 0.10 36 36 125 4 0 0 0 0 C 16B-38W 0.028 - 1.92 1.17 1441 1441 2772 1686 0 0 0 0 F 19A-0bswp 0.295 - 8.20 1.11 1280 1280 10497 1418 0 0 0 0 F 19A-Obswp 0.295 - 8.20 1.11 1398 1398 11465 1549 0 0 0 0 F 21A-24t 0.025 - 1.85 0.00 40 40 74 0 0 0 0 0 6 c)AED excursion 2271 10 Envelope loss/gan 42823 10945 0 0 12 a) Infiltration 10389 702 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 subtotal(lines 6 to 13) 53212 11647 0 0 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtota 53212 11647 0 0 15 Duct loads 0% 0% 0 0 -0% 0% 0 0 Told mom load 53212 11647 0 0 Air required(cfm) 547 547 1 0 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .�G`A Art- wrightsoft' RighiSude®Universal 2017 6 RSU251 2016-Dec-0616:41:17 ...s\scott.langewonhy\Documents\York\59 DEVIN.rup Cele lc==MDoor Front Door faces: N Page 1 Right-J® Worksheet Job: Entire House Date: Dec 06, 2016 CERRONEP&H By: QUEENSBURY,NV 12804 1 Room name WIC MASTER BATH 2 Exposed wall 14.0 ft 7.0 It 3 Room height 9.0 It heaVcool 9.0 ft heatfccol 4 Room dimensions 10.0 x 4.0 ft 10.0 x 7.0 it 5 Room area 40.0 W 70.0 W Ty I Construction U-value Or HIM Area (ftp Load Area W) Load number (Bb.10MF) (BtulVryj or perimeter (It) (Bluh) a perimeter (ft) (Btuh) Heat Cod Gross N/P/S Heat Cod Gross N/P/S Heat Cod 812F-4sw 0.053 n 3.92 0.41 0 0 0 0 0 0 0 0 1D-c2ov 0.570 n 4218 16.36 0 0 0 0 0 0 0 0 W 15311-8wc6 0.055 n 3.48 0.10 90 90 313 9 0 0 0 0 12F4sw 0.053 a 3.92 0.41 0 0 0 0 0 0 0 0 11 1Dc2ov 0.570 a 4218 5317 0 0 0 0 0 0 0 0 t12FAsw 0.053 s 3.92 0.41 0 0 0 0 0 0 0 0 GD 1Dc2ov 0.570 s 4218 30.57 0 0 0 0 0 0 0 0 11P0 0.290 s 21.46 6.23 0 0 0 0 0 0 0 0 12F4sw 0.053 w 3.92 0.41 0 0 0 0 63 55 218 22 Y-G 1Dc2ov 0.570 w 42.18 58.17 0 0 0 0 8 0 337 465 W 15811-8wo-6 0.055 w 3.48 0.10 36 36 125 4 0 0 0 0 C 16B38ad Q028 - 1.92 1.17 0 0 0 0 0 0 0 0 F 19A-Obswp 0.295 - 8.20 1.11 0 0 0 0 70 70 574 78 F 19A6bswp 0.295 - 8.20 1.11 0 0 0 0 0 0 0 0 F 21A-24t 0.025 - 1.85 0.00 40 40 74 0 0 0 0 0 e c)AEC)excursion -2 185 Envelope loss/gain 512 11 1127 750 12 a) Infiltration 155 10 233 16 b) Room ventilation 0 0 0 0 13 Intemal gains: Occupants(31 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 667 21 1360 766 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redlsldbullal 0 0 0 0 14 Subtotal 887 21 1380 788 15 Duct loads -0% 0% 0 0 -0% 0% 0 0 Total man load 667 21 1360 766 Air required(cfm) 1 7 1 1 14 36 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. c4F wrl htSoft• 2016-Dec-0616:41:17 . M 9 RightYork\5DUniversal 201717.0.16 FmntD Paget ...s\scott.langeworthy\Documents\York\59 DEVIN.rup CeIc=MJB Front Door feces: N Right-J® Worksheet Job: Entire House Date: Dec 06,2016 CERRONE P&H By. QUEENSBURY,NY 12804 1 Roan name MASTER BED MUD 2 Exposed wall 26.0 it 8.0 It 3 Roan height 9.0 It heat/cool 9.0 it heatf000l 4 Roan dimensions 13.0 x 13.0 it 8.0 x 11.0 ft Roan 5 Ron area 169.0 ft' 88.0 ft' Ty Constriction U-value Or HTM Area (ftp Load Am (ft) Load number (BtubfftMF) (Btuhlft� or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) HeatCod Gross N/P/S Heat Cod Gross N/P/S Heat cod 6 l4/ 12F4sw 0.053 n 3.92 0.41 0 0 0 0 0 0 0 0 �--r; 1Dc2<1v 0.570 n 4218 16.38 0 0 0 0 0 0 0 0 w 15811-0m6 0.055 n 3.46 0.10 0 0 0 0 0 0 0 0 12F4sw 0.053 a 3.92 0.41 0 0 0 0 0 0 0 0 11 1Dc2ov 0.570 a 42.18 58.17 0 0 0 0 0 0 0 0 1q/ 12F4sw 0.053 s 3.92 0.41 117 117 459 48 72 51 200 21 1Dc2w 0.570 s 42.18 30.57 0 0 0 0 0 0 0 0 11P0 0.290 s 21.46 6.23 0 0 0 0 21 21 451 131 lM 12F4sw 0.053 w 3.92 0.41 117 93 365 38 0 0 0 0 �-C 1D-c2ov 0.570 w 42.18 58.17 24 0 1012 1396 0 0 0 0 w 15811-8wc6 0.055 w 3.48 0.10 0 0 0 0 0 0 0 0 c 18B38ad 0.028 - 1.92 1.17 0 0 0 0 0 0 0 0 F 19A-Obswp 0.295 - 8.20 1.11 169 169 1386 187 88 88 722 98 F 19A-Obswp 0.295 - 8.20 1.11 0 0 0 0 0 0 0 0 F 21A-24t 0.025 - 1.85 0.00 0 0 0 0 0 0 0 0 61 c)AED excursion 556 -24 Envelope loss/gen 3222 2225 1372 226 12 a) Infiltration 864 58 256 18 b) Raxn ventilation 0 0 0 0 13 Intemal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 4086 2283 1638 244 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistnbulion 0 0 0 0 14 Subtotal 4086 2283 1638 244 15 Duct leads 1 -0% 0%1 0 0 -0% 0% 0 0 Total room load 4086 2283 1638 244 Air required(cfm) 42 107 17 11 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. c wri htsofY 2016-Dec-0616:41:17 . h 9 Right-Suite®Universal 201717.0.16 RSU25116 Page 3 ...slscott.langewonhy\Documents\York\59DEVIN.mp Calc=MJB Front Doorfaces: N Right-J® Worksheet Job: Entire House Date: Dec 06,2016 CERRONEP&H By: QUEENSBURY,NY 12804 1 Room name STAIRS BED 2 2 Exposed wall 3.0 It 25.0 ft 3 Room height 9.0 It heat/cool 9.0 ft heat/cod 4 Room dimensions 3.0 x 12.0 ft 120 x 12.0 It 5 Room arm 38.0 ft° 144.0 W Ty Construction U-value Or HTM Area (ftp Load Area (ft2) Load number (BtuIVft;°F) (Stubtti a perimeter (ft) (Bluh) a perimeter (ft) (Btuh) Heat Cod Gross N/P/S Heat Cod Gross N/P/S Heat Cod 6 l4/ 12F-0sw 0.053 n 3.92 0.41 27 27 106 11 106 96 377 39 �-G lDC20v 0.670 n 4218 16.36 0 0 0 0 12 0 506 196 w 151311-Bwc-6 0.055 n 3.48 0.10 0 0 0 0 0 0 0 0 12F4sw 0.053 a 3.92 0.41 0 0 0 0 108 108 424 44 11 1Dc2ov 0.570 a 4218 58.17 0 0 0 0 0 0 0 0 1qJ 12F4sw 0.053 s 3.92 0.41 0 0 0 0 9 9 35 4 L�-CD 1Dc2ov 0.570 s 4218 30.57 0 0 0 0 0 0 0 0 11P0 0.290 5 21.46 6.23 0 0 0 0 0 0 0 0 12F4sw 0.053 w 3.92 0.41 0 0 0 0 0 0 0 0 1Dc2ov 0.570 w 4218 58.17 0 0 0 0 0 0 0 0 w 15B11-8M-S 0.055 w 3.48 0.10 0 0 0 0 0 0 0 0 C 16B38ad 0.025 - 1.92 1.17 0 0 0 0 24 24 46 28 F 19A-0bswp 0.295 - 8.20 1.11 36 36 295 40 144 144 1181 160 F 19A-Obswp 0.295 - 8.20 1.11 0 0 0 0 0 0 0 0 F 21A-241 0.025 - 1.85 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion _5 -47 Envelope loss/gain 401 46 1 2569 424 12 a) Infiltration 100 7 831 56 b) Roan ventilation 0 0 0 0 13 Internal gains: Oauparrts 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 501 53 3399 480 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 501 53 3399 480 15 Duct loads -0% 0°/ 0 0 -0%1 0% 0 0 Total roan load 501 53 1 3399 480 Air required(cfm) 5 2 35 23 J, Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .AGF►. -141j- wrightsoft- Right-Sulte®Universal 2017 17.0.16 RSU25116 2016-Dec-06 16:41 age 4 ...s\scott.langmorthy\Documents\York\59 DEVIN.mp Calc-MJ8 Front Door faces: N Right-J® Worksheet Job: Entire House Date: Dec 06,2016 CERRONE P&H By: QUEENSBURY,NY 12804 1 Room name BATH OFFICE 2 Exposed wall 5.0 If 20.0 It 3 Room height 9.0 ft heaUccd 9.0 ft heat/cool 4 Room dimensions 9.0 x 5.0 It 12.0 x 8.0 It 5 Room area 45.0 ft2 98.0 W Ty Construction U-value Or HTM Arm (112) toad Arm (ft2) toad number (Btuhlft;*F) (Btulvft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cad Grass N/P/S Heat Cod Gross N/PIS Heat Cod 6 W 12F-4sw 0.053 n 3.92 0.41 0 0 0 0 0 0 0 0 �G 1Dc2w 0.570 n 42.18 16.36 0 0 0 0 0 0 0 0 w 15811-8wc-0 0.055 n 3.48 0.10 0 0 0 0 0 0 0 0 12F-4sw 0.053 a 3.92 0.41 45 45 176 18 72 72 282 29 11 1Dc2ov 0.570 a 4218 58.17 0 0 0 0 0 0 0 0 Y// 12F-"w 0.053 s 3.92 0.41 0 0 0 0 108 84 329 34 I�-(D; 1Dc2ov 0.570 5 42.18 30.57 0 0 0 0 24 0 1012 734 11P0 0.290 5 21.46 6.23 0 0 0 0 0 0 0 0 12F4sw 0.053 w 3.92 0.41 0 0 0 0 0 0 0 0 1Dc2ov 0.570 w 4218 58.17 0 0 0 0 0 0 0 0 w 15811-8wc-6 0.055 w 3.48 0.10 0 0 0 0 0 0 0 0 C 1613-38ad 0.026 - 1.92 1.17 5 5 10 6 8 8 15 9 F 19A-0bswp 0.295 - 8.20 1.11 45 45 369 50 96 96 787 106 F 184-0bswp 0.295 - 8.20 1.11 0 0 0 0 0 0 0 0 F 21A-24t 0.025 - 1.85 0.00 0 0 0 0 0 0 0 0 61 c)AED excursion -8 129 Envelope loss/gain 555 67 2427 1042 12 a) Infiltration 166 11 665 45 b) Roan ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 721 78 3091 1087 Less extenlal load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 721 78 3091 1087 1151 Duct bads -0% 0% 0 0 -0% 0% 0 0 Trial roan load 721 78 3091 1087 Air required(cfm) 7 4 32 51 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -Pk wrightsofr2016-Dec-0616:41:17 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 5 ...s\scott.langeworthy\DocumentslYork\59 DEVIN.rup Calc=MJ8 Front Door faces: N Right-JO Worksheet Job: Entire House Date: Dec 06,2016 CERRONEP&H By: OUEENSBURY,NY 12804 1 Roan dame KITCHEN GREAT Rcam16 2 Exposed well 520 ft 1620 fl 3 Room height 9.0 ft healfccol 9.0 It heat/cool 4 Roan dimensions 1.0 x 632.0 it 1.0 x 1398.0 ft 5 Roon arm 632.0 ft- 1398.0 ft- Ty Constriction U-value Or HTM Area (ftp Load Area (ill Load number (Btuh/ftMF) (Btutvft.) a perimeter (H) (Btuh) or perimeter (ft) (Btuh) HeatCod Gross N/P/S Heat Cod Gross N/P/S Heat Cod 6 l4/ 12F45w 0.053 n 3.92 0.41 243 2(Y7 812 84 450 426 1671 174 �-G 1Dc2w 0.570 n 42.18 18.36 36 0 1518 589 24 0 1012 393 w 15811-8wc-6 0.055 n 3.48 0.10 0 0 0 0 0 0 0 0 12F45w 0.053 a 3.92 0.41 27 23 90 9 279 279 1094 114 11 113c2or 0.570 a 4218 58.17 4 0 169 233 0 0 0 0 lt! 12F4sw 0.053 s 3.92 0.41 162 129 506 53 450 438 1718 179 I�-(D; iDc2ov 0.570 s 4218 30.57 12 0 506 367 12 0 506 367 11P0 0.290 s 21.46 6.23 21 21 451 131 0 0 0 0 Y-0 12F4sw 0.053 w 3.92 0.41 36 36 141 15 279 279 1094 114 Y-C 1Dc2w 0.570 w 4218 58.17 0 0 0 0 0 0 0 0 w 15B114�wcb 0.055 w 3.48 0.10 0 0 0 0 0 0 0 0 C 16B38ad 0.026 - 1.92 1.17 6 6 12 7 1398 1398 2690 1636 F 19A-0bswp 0.295 - 8.20 1.11 632 632 5183 700 0 0 0 0 F 19.4-ftwp 0.295 - 8.20 1.11 0 0 0 0 1398 1398 11465 1549 F 21A-24t 0.025 - 1.85 0.00 0 0 0 0 0 0 0 0 61 c)AED excursion qp4 _354 Envelope loss/gain 9388 1984 21250 4171 12 a) Infiltration 1728 117 5383 364 b) Rahn ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 11115 2101 26633 4535 Less external load 0 0 0 0 Less trarssfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 11115 2101 28833 4535 15 Duct loads -0% 00/0 0 0 -0% 0% 0 0 Total room load 11115 2101 28633 4535 Air required(cfm) 114 99 274 213 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed wrightsoft- Right-SuBe®Universal 2017 17.0.A6 RSU25116 2016-Dec-061:41:176 ...s\scott.langeworhy\Documents\York\59DEVIN.mp Calc=1038 Front Dcarfaces: N Page Aug. 14. 2011JJ 2: 16P MDIA No. 0252 P. 4/4 MIDDLE DEPARTMENT INSPECTION AGENCY, INC. td� ty mt that the electrical wiring to the electrical equipment listed below has been examined and is approved as being in accord with the National Electrical Code, applicable governmental, utility and Agency rules in effect on the date noted below and is issued subject to the following conditions. Owner: Date: Cerrone Bldrs 08/01/2017 Occupant Location: Same Lot 10#59 Devin Court Occupancy: .Ingle Family Dwg, Queensbury,Warren Co. NY Applicant: Cerrone Builders Gianni Cerrone 1589 Rt 9 L Fort Edward, NY 12828 J No. Joseph A.Holmes - - .1.453L4208065EL :_ - -- - - - - - -• - - - - Equipment: 200 -Amp. Service Equipment; 4/0-Service Cond"uc-tor 38-Switches; 48 -Receptacles; 44- Fixtures; 1 - Bunter, Wiring&Control:2-Vent Fans; 6-Smoke Detectors; 10-Arc Fault Breakers This certificate applies to the electrical wiring to the electrical equipment listed immediately null and void. This cerdrlcate applies only to the use,occupancy and above and the installation inspected as of the above noted date based on a visual ownership as indicated herein. upon a change In me use,occupancy or ownership inspection, No warranty is expressed or implied 08 to the mechanical safety,am- of the property indicated above,this ce/tifie to shall be immediately null and void. Clancy or fitness of the Equipment for any particular purpose. This certificate shell In the event chat this certificate becomes invalid Wed upon the above conditions, be valid for a Wod of one year from the above noted data. Should the electrical this certificate may be revalidated upon rainspection by Middle Deparlmant system m which this certificate applies be altered in anyway Including but not limit- Inspection Agency,Inc. An application for inspection must be submined to Middle ed to.the introduction of additional alettriral equipment and/or the replacement of Department Inspection Agency. Inc. to Inl(Iate the inspection and revalidation any of the components installed as of the above noted date•this certificate shall be process. A fee will be charged for this service. p ECE5VC AUG 16 2017 D TOWN OF QUEENSBURY BUILDING&CODES