Loading...
RC-000224-2015 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518)761-8256 BUILDING PERMIT Permit Number: RC-000224-2015 Tax Map No: 289.14-1-15 Permission is hereby granted to: Michael O'Connor For property located at: 15 PIONEER PT In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Michael O'Connor Single Family-Alteration $100,000.00 Owner Address: 19 PIONEER PT Total Value $100,000.00 Queensbury,NY 12804 Contractor or Builders Name/Address Electrical Inspection Agency Vision Engineering 206 Glen ST,Suite 56 Glens Falls,NY 12801 Plans&Specifications Residential Add./Alt.&Garage Addition $0.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday,October 20,2017 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of Qyeeno ury; Tues Et , ob 7,2015 SIGNED BY: \/ 4 for the Town of Queensbury. Director of Building&Code Enforcement PRINCIPAL STRUCTURE APPLI "13 se Only d Date: 10/9/15p lD �2 _ � 289.14-1-15 o. s Tax Map ID ee Xi3.S�Zone WR . Historic Site _Yes x No BUILDING& CODS n# Su Subdivision Name Lot# division Project Location 15 PIONEER POINT,QBY NY 12804 TOWN BD. RESOLUTION 86-2013: $850 recreation fee for new dwelling units—single family,duplexes/two-family, multiple family, apartments, condominiums,townhouses,and/or manufactured & modular homes, but not mobile homes. This is in addition to the permit feels). Applicant MICHAEL O'CONNOR Owner MICHAEL O'CONNOR Address 15 PIONEER POINT Address 15 PIONEER POINT QUEENSBURY,NY 12804 QUEENSBURY,NY 12804 Phone/E-mail 518-792-8728 Phone/E-mail 518-792-8728 mjoconnor@littleocon nor.00m Contact Person for Building&Codes Compliance: DANIEL RYAN, P.E.NISION ENGINEERING Phone 792-9264 d ryan@visioneng.email TYPE OF CONSTRUCTION ✓Check all that apply New Addition Alteration I`floor sf 2"a floor sf Total sf Height Single Family X X 519SF+/- 165SF+/- 684SF+/- 24.5FT+/- 0nAlto Two-Family Bj Multi-Family (#of units Townhouse Michael O'Connor BP 2015-494 15 Pioneer Point Business Office Residential Addition and Res.Alt. plus garage addition Retail -Mercantile Factory-Industrial Attached Garage 305SF+/- X 305SF+/- Other If commercial or industrial please indicate of business Town of Queensbury Building&Codes Principal Structure Application Revised September 2015 • Proposed use of building or addition SFD Source of Heat(circle one) Gas Oil ropane Solar Other Fireplace: Complete a separate application for Fuel Burning Appliances & Chimneys Are there structures not shown on plot plan? NO Are there easements on the property? YES Site Information SEE HUTCHINS DWGS a. Dimensions or acreage of lot 0.24AC b. Is this a comer lot? NO c. Will the grade be changed as a result of construction _ Yes x No d. Public water or Private well PRIVATE e. Sewer or Private Septic System PRIVATE Value of all work to be performed(labor or materials) $ $100.000+/- DECLARATION. 1. I acknowledge no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If work is not complete by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. I certify that the application,plans and supporting materials are a true and complete statement/description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances,and in conformance with local zoning regulations 4. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAMICHAEL O'CONNOR DATE: 10/9/15 SIGNATURE: 1 —� > DATE: 10/9/15 For office use only Operating Permit Issued: Yes —No Occupancy Type Construction Classification Assembly Occupancy Limit Special Conditions Town of Queensbury Building&Codes Principal Structure Application Revised September 2015 p E VV 1D REScheck Software Version 4.6.2 OCT 3 2015 CNJ/ Compliance Certificate T "oma°DECODES Y 1�_ NES EL W. Ry y0 Project Michael O'Connor Addition Energy Code: 2010 New York Energy Conservation N' h Q Location: Warren County, New York Construction Type: Single-family tP ? Project Type: Addition �O op60 Climate Zone: 6 (7635 HDD) R Permit Date: FS Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 15 Pioneer Point VISION Engineering, LLC Queensbury, NY 12804 16 Pearl St Glens Falls, NY 12801 518-792-9264 Compliance: Passes using UA trade-off Compliance: 1.0%Better Than Code Maximum UA: 98 Your UA: 97 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code tradeoff rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or U-Factor Wrom Ceiling(floor Above): Flat Ceiling or Scissor Truss 520 30.0 0.0 0.035 18 Wall (1st Floor):Wood Frame, 16" D.C. 702 21.0 0.0 0.057 34 Windows:Vinyl/Fiberglass Frame:Double Pane with Low-E 82 0.320 26 Fire Door:Solid 18 0.140 3 Crawl Space:Solid Concrete or Masonry 300 0.0 11.0 0.073 16 Wall height:4.0' Depth below grade: 3.0' Insulation depth: 3.8' Compliance Statement: The proposed building design described here is c5? o sistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed build! g as been designed to meet the 2010 New York Energy Conservation Construction Code requirements in REScheck Versio 4. and to comply with the mandatory requirements listed in the RStchreck Inspection Checklist. /oAhIr 1 l r� Na -TKIe ture Date Project Title: Michael O'Connor Addition Report date: 10/09/15 Data filename: C:\Users\DWR Desktop\Desktop\O'Connor2.rck Page 1 of 6 CREScheck Software Version 4.6.2 �J( Inspection Checklist Energy Code: 2010 New York Energy Conservation Construction Code Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.lD 103.2 :Construction drawings and ❑Complies [PR111 documentation sufficiently ❑Does Not Q, demonstrates energy code ❑Not Observable compliance for the building envelope. ❑Not Applicable 103.2, Construction drawings and ❑Complies 403.7 documentation sufficiently ❑Does Not [PR311 demonstrates energy code ❑Not Observable u: compliance for lighting and mechanical systems.Systems ❑Not Applicable serving multiple dwelling units :must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: ❑Complies [1`11212 sized per ACCA Manual S based Btu/hr— Btu/hr ❑Does Not U, on loads per ACOA Manual J or Cooling: Cooling: ❑Not Observable other approved methods. Btu/hr Btu/hr ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 12 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Michael O'Connor Addition Report date: 10/09/15 Data filename: C:\Users\DWR Desktop\Desktop\O'Connor2.rck Page 2 of 6 Section # Foundation Inspection Complies? Comments/Assumptions A Re .ID 303.2.1 Exposed foundation insulation -❑Complies [FO11]2 protection. ❑Does Not ❑Not Observable ❑Not Applicable 403.8 -Snow melt controls. ❑Complies [FO12]2 ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Michael O'Connor Addition Report date: 10/09/15 Data filename: C:\Users\DWR Desktop\Desktop\O'Connor2.rck Page 3 of 6 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Re .ID 402.4.4 Fenestration that is not site built ❑Complies [FR2011 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/i.S.2/A440 []Not Observable or has infiltration rates per NFRC 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]2 sealed at housingfinterior finish ❑Does Not 0 and labeled to indicate&It;=2.0 ❑Not Observable cfm leakage at 75 Pa. ❑Not Applicable 403.2.2 All joints and seams of air ducts, ❑Complies [FR1311 air handlers,filter boxes, and ❑Does Not 14 .building cavities used as return [-]Not Observable .ducts are sealed. []Not Applicable 403.2.3 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. ❑Does Not ❑Not Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R-_ R-_ ❑Complies [FR17]= above 105 9F or chilled fluids ❑Does Not IV below 55 9F are insulated to R-3. ❑Not Observable ❑Not Applicable 403.4 Circulating service hot water R-_ R-_ []Complies [FR18]2 pipes are insulated to R-2. ❑Does Not U ❑Not Observable ❑Not Applicable 403.5 Automatic or gravity dampers are ❑Complies [FR19]2 installed on all outdoor air - - ❑Does Not intakes and exhausts. ❑Not Observable - - ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Michael O'Connor Addition Report date: 10/09/15 Data filename: C:\Users\DWR Desktop\Desktop\O'Connor2.rck Page 4 of 6 Section # Insulation InspectionComplies? Comments/Assumptions & Req.ID 303.1 All installed insulation labeled or ❑Complies [IN13]2 installed R-values provided. ❑Does Not []Not Observable. ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Michael O'Connor Addition Report date: 10/09/15 Data filename: C:\Users\DWR Desktop\Desktop\O'Connor2.rck Page 5 of 6 Section Plans Verified Field Verified # Final Inspection Provisions & Req.ID I I Value Value Compiles? Comments/Assumptions 402.4.2, Building envelope tightness ACH 50 =_ ACH 50 =_ ❑Complies 402.4.2.1 verified by blower door test result ❑Does Not [FI1711 of<7 ACH at 50 Pa.This - u requirement may instead be met []Not Observable via visual inspection,in which ❑Not Applicable case verification may need to occur during Insulation Inspection. 403.2.2 Duct tightness via post- _cfm _cfm ❑Complies (FI411 'construction with maximum ❑Does Not leakage of 8 cfm to outdoors,or 12 cfm across systems.For ❑Not Observable rough-in tests,verification may ❑Nat Applicable need to occur during Framing Inspection, with maximum leakage of 6 cfm across systems and 4 cfm without air handler. 403.1.1 Programmable thermostats ❑Complies [F19]2 installed on forced air furnaces. ❑Does Not 9 [-]Not Observable ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10)2 on heat pumps. ❑Does Not []Not Observable []Not Applicable 403.4 Circulating service hot water ❑Complies [FI1112 systems have automatic or ❑Does Not r. accessible manual controls. ❑Not Observable ❑Not Applicable 401.3 Compliance certificate posted. ❑Complies - [F1712 ❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [F 11813 mechanical and water heating ❑Does Not equipment have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 12 IMedium Impact(Tier 2) 3 ILow Impact(Tier 3) Project Title: Michael O'Connor Addition Report date: 10/09/15 Data filename: C:\Users\DWR Desktop\Desktop\O'Connor2.rck Page 6 of 6 2010 New York Energy Conservation Construction Code Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 11.00 Floor 0.00 Ceiling / Roof 30.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.32 Door 0.14 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments Ser. 19. 201611 :41A DIA No. 4458 P. 1/1 MIDDLE DEPARTMENT INSPECTION AGENCY, INC. `eertyfces that the electrical wiring to the electrical equipment listed below has been examined and is approved as being in accord with the National Electrical Code, applicable governmental, utility and Agency rules in effect on the date noted below and is issued subject to the following conditions. Owner: Mike O'Connor Date: 09/14/2016 Occupant Camp Locatio W5 Pioneer Point OccupancyServices Queensbury,Warren Co. NY Applil Cerrone Builders Gianni Cerrone 1589 Rt 9 L Fort Edward, NY 12828 J Joseph A.Holmes.: r No. '1463142U 1.142EL„ Equipment: 200-Amp. Service Equipment 4/0; 24,__3viit6es;'24'-Rece0taclet"31 -Fixtures; 1 -Air Conditioner, 1 -20 Amp. Receptacle; 1 -Vent Fan;3-Smoke Detectors This certificate applies to the electrical wiring to the electrical equipment listed immediately null and void. Tnis cadificete applies only to the use,occupancy and above end the installation inspected as of the above noted date based on a visual ownership all Indicated herein. Upon a change in the me.occupancy or ownership inspection. No warranty is expressed or implied as to the mechanical safety, efs. of the property indicated above,this ceftificate shall be immediately null snd void. ciancy or fitness of the equipment for any particular purpose. This cerdreate shall In the event that this ceNdcata becomes invalid based upon the above conditions. be valid for a period of one year from the above noted date. should the electrical this Certificate may be revalidated upon reinspection by Middle Department system to which this certificate applies be altered in any way,including but not limit. Inspection Agency,Inc. An application for inspection must be submitted to Middle ed to,the introduction of additional electrical equipment andlor the replacement of Department Inspection Agency, Inc.to initiate the inspection and revalidation any of the components installed as of the above noted date.this certificate shall be process. A fee will be Charged for the service.