Loading...
Site plan application "Standards A-O responses" and waivers request Laura Moore, Froom: Tom Hutchins <'thutchins @hunt ch insengii neeri,ng.colm> Sent Monday, March,1061, 2017 8:05 AM To: Laura Moore Cc: ion C. LAPPER Subject: RE ray salvage electronic copy of submission materials Attachments: A-O Rays Salva,giepdf H! Laura- Attached are Standards,A-0 riespomies, Walve,rs are requested for,Lighting, Site Grading,and Site Storm.water as the project,involves just the one replaceiment building lon a,9+acre property. 1,Willi cal I you later told ay to discuss,. Regards,Tom 0. Thomas Hutchin5j, P.E. Hutchins Engineering 169 Haviland Road' Queensbury, NY 126,04 5 fe,745 0307 phone 179-9-080 A-0 Resgonzes, Ray's Salvage This site involves a, long established comimieroi,,al;liumduistirial use, (commercial/! salvage yard), In Moderate Density' Residential Zone„ S. The proposed) 1pr jest as presented is in compliance with applicable code parameters for location and layout (setbacks, etc.),; A use variance its toeing requested as the use is no longer allowable in thiszone. C. The proposed project has been designed to allow interrnal pedestrian activities as necessary and applicable to,this type of use. D. The proposed project has been designed to be in compliance with Chapters 136 and 147 as applicable., E. The, proposed project has been designed to replace, a burned building at (long existing non-confirming use facility. F. The proposed project has been designed to be in compliance with principles of good site access, traffic flow, and safety and, general welfare of the neighborhood. , The proposed project has, been designed with the intent to provide safe, adequate, and functional off-street parking and (loading faciilitiies. H. The proposed project has been designed to not impact natural, scenic„ aesthetic ecollogical. wildlife,, historic, reoreatlonal or open space resouirces of the Town. II. The use does not lead itself to pedestrian uses between adjoining properties. Circulation between the buildings is maintained within, the subject parcel owned by the applicarnt. Ji, The proposed project has been designed to recharge building runoff to, grouridwater through stone eave trenches. The proposed project has leen designed to, be in cornpiance withi Chapter 147 as, applicable. K The proposed septic system has been designed to be iin compliance with Chapters 136 and all current Department of Health requirements as applicable. IL. The proposed projiect has been designed tua, maintain a vegetated buffer to, the northerly and southerly parcels and the existing vegetation and landscaping over the northerlly portion of the project areawill be maintained. I . The project has been designed in effort to meet the needs of emergency service providers adequately,. N, The area grading and drainage provisions have been developed 'with the intent of anroidling flooding and ponding. The site has been designed with the intent of maintaining the existing vegetation and landscaping as feasible,.