Loading...
Staff Notes et Town of Queensbury Planning Board Community Development Department Staff Notes March 21, 2017 Site Plan 22-2017 FASTRAC MARKETS, LLC Special Use Permit 5-2017 220 Corinth Road/ CI-18 —Commercial Intensive Exit 18 /Ward 4 SEQR Type Unlisted Material Review: application, narrative, traffic, stormwater, drawing set Parcel History: SP PZ 51-2016 & AV PZ 69-2016 Hotel, DISC 2-2017, AV 18-2017, SV 3-2017 Requested Action Recommendation to the Zoning Board of Appeals for relief for permeability and signs. Resolutions Planning Board recommendation Prosect Description Applicant proposes a 5,800 sq. ft. convenience store with 752 sq. ft. fuel canopy and 2,008 sq. ft. diesel canopy. Project includes clearing 2.15 acre parcel, installation of new cut on Corinth Road, 2 new curb cuts on private drive and other site details. Applicant proposes waivers from landscaping requirements. Project subject to CI- 18 special use permit. Pursuant to Chapter 179-3-040 & 179-10 of the Zoning Ordinance, new commercial use shall be subject to Planning Board review and approval. Staff Comments Location-The project site is at 220 Corinth Road on the west side of Exit 18 McDonalds. Arrangement- The project as proposed includes construction of a one- story 5, 800 sq ft convenience store with fuel service. The project also includes clearing the 2.15 acre parcel. Site Design- Fuel pumps with a canopy to the side of the building is also proposed with 10 fuel pumps. A diesel service station is proposed with 3 pumps. Building—The building is to be located 133 ft to the Corinth Rd property line and is compliant for setbacks. The building will face Corinth Rd. The information indicates the building height will be 26 ft. The building is also to have a drive-thru on the north side of the building. Signage-The applicant proposes wall signs and free standing signs. A variance is being requested for the number of wall signs and the size of the free standing sign. Site conditions-The site will be cleared and graded to accommodate the development. The site is proposed to be 79%impermeable where a variance is requested for permeability. Traffic- The site will have 10 fuel pumps (20 fueling positions). Access is planned with a new curb cut onto Corinth Rd that will allow only right in and right out. Two additional curb cuts will be placed along the new private drive. The site is proposed to have 39 spaces and has three spaces at the front for larger vehicles —tourist traffic (trailers/boats tow-behinds). The applicant has not included an interconnect location with the McDonald's property—Board should consider requesting interconnect. The applicant's traffic report provides an analysis with the CHA report as required for the special use permit criteria. The report indicates that there will be 14 additional trips in the morning peak hour and 15 less trips during the evening peak hour compared to the build-out analysis in the CHA report. The application with traffic has been provided to Chazen for review and comment. Site layout and utility plan—The existing site will require connections to the electric, water etc for the building location and canopies on site. The project includes connection to Town sewer also. Grading and drainage plan, Sediment and erosion control—the project as identified in the SWPPP will disturb about 2.155 ac. Landscape plan—the applicant has provided a landscaping plan maple, spruce and hack berry noting substitution of species due to availability and preference—Board should consider requesting native plantings and compliant plantings note should be on landscape plan. Also plans include a mixture of shrubs and other low level plantings for the site. Site lighting plan- The plans show the lighting scheme around the site, building and both the gas and diesel canopies. This overall lighting lumens show staying on site. The canopies guidance is to average 10 foot candles where the site proposed for the diesel 39.7 avg. and the fuel is at 61.77. The board should consider requesting clarification and discuss as a waiver as the foot candles proposed are more than the guidance. Site details- The information submitted indicates the business is open 24 hours a day and will have freshly prepared foods as a major component of the store services. Elevations —the applicant has included all four elevation sides where the north side of the building will have a drive thru area. Floor plans- the plans show the internal arrangement for food aisles, check out, and restrooms. The floor plan will need to be updated to show the west entrance as the fuel canopy is on the west side of the building. Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The applicant has requested a waiver from the design guidelines to have parking at the front of the building to direct traffic to the side of the building for fuel services and landscape strip at 4ft versus 10 ft. to adjoining private drive property. A waiver from driveway spacing standards for projects that are on arterial roads 330 ft per 0-100 Peak Hour Trips where they propose 40 ft and a waiver from footcandle average illumens exceeds 10 for both canopies. Special Use Permit Criteria: A special use permit is required as outlined in the Cl 18 Section 179-10-070 for implementation of traffic improvements. Harmony with the Comprehensive Plan—The project site is located in the CI-18 zoning district allowing commercial businesses to seek site plan approval. Compatibility—the project site area is currently seeing a trend of commercial development. Access, circulation and parking—the site development has located the fuel station to the side of the structure and as provided two access points to a private drive to utilize the lighting intersection. In addition, the applicant has restricted the direct movement on Corinth Rd access to rights in only and right out only. Infrastructure and services —the project proposed to connect to existing utilities in the area. Environment and natural features —the project requires compliance with the stormwater pollution prevention plan due to the disturbance more than an acre. Long-term effects —the applicant has indicated the development will be part of the developing commercial corridor providing access for travelers and residents in the area. Specific Criteria — The applicant has submitted a traffic study that has been forwarded to the Town Designated Engineer for review and comment. The applicant has also been provided with comments from the County, noting the striping at the west side of the intersection at Corinth and Big Bay is to be completed as part of the project proposed. Items below outline the criteria that is to be completed within the stud BB. All uses in the CI-18 Zone/District. In addition to the application requirements for Special Use Permit as identified in 179-10-040 all applicants for new or modified uses in the CI-18 District shall provide the following: (1)A schematic plan depicting the floor area of all proposed uses. The plan shall include a description of the planned uses utilizing the Institute of Transportation Engineers (ITE) Land Use Codes as contained in the latest edition of the ITE Trip Generation Manual (or a similar successor publication). (2)An estimate of the trip generating characteristics of the planned uses utilizing the note ITE reference. Should a project not fall within an ITE Land Use Code, documented trip generating characteristics of sufficient sample size may be substituted subject to the approval of the Town Engineer. (3)A traffic impact analysis (or traffic study) shall be prepared consistent with generally accepted industry practices (including ITE and NYSDOT guidelines). The NYSDOT Highway Design Manual Chapter 5 shall serve as the standard. The Town and/or its designees may stipulate the form, scope and content of the analysis. (4)Applicants are required to comply with the Exit 18 Rezone [Traffic] Study dated February 2016 as prepared by CHA in preparing the project traffic study, as noted below in Subsection 4 a , (b) and(c). Applicants are subject to the following conditions: (a)Access to Big Boom Road, Big Bay Road, Main Street, Corinth Road and impacts to roadways shall be provided consistent with the Exit 18 Rezone [Traffic] Study. (b)Site specific access and intersection improvements as described in the Exit 18 Rezone study shall be completed by individual applicants where the project is contributing traffic to an affected intersection. The Town's Engineer shall advise the Planning Board, during its review process and before it issues any approvals, about which improvements the applicant should be required to construct. (c)Where the trip generating characteristics of a proposed project exceed those contemplated and examined in the Exit 18 Rezone [Traffic] Study, the project applicant may be required to reduce the size or scale of the project so as to reduce the trip generating characteristics of the project. (5)The Town may utilize a developer's agreement to memorialize the conditions of approval. The purpose of such development agreement shall be to establish, in writing and for the benefit of both parties, the specific parameters, conditions and requirements of the approval which has been granted by the Planning Board and upon which the applicant may rely in proceeding to arrange the financing and construction of the planned development, including any public improvements and/or land dedications required in connection therewith. Nature of Variance The applicant requests variance for permeability where 30%is required and project proposed to have 21%. In addition the applicant requests variances for the sign requirements. The applicant proposes 3 wall signs where only 1 is allowed at 30 sq ft. (or two wall signs no larger than 30 sq ft total). The main building sign is proposed to be 78.13 sq ft„ fuel canopy sign at 22.2 sq ft, and wall sign west side of building 32 sq ft. The proposed free standing sign at 76.42 sq ft where 45 sq ft is the maximum allowed. Summary The Planning Board is to provide a recommendation to the ZBA in regards to the request for relief from area variance for the building and signage. Meeting Hg istory: PB discussion 1/24/17