Loading...
CC-000277-2016 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development- Building& Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: CC-000277-2016 Date Issued: Monday, June 20, 2016 This is to certify that work requested to be done as shown by Permit Number CC-000277-2016 has been completed. Tax Map Number: 309.14-1-4 Location: 24 BIG BOOM RD Owner: JALARAMBAPA, INC. Applicant: Paresh Patel This structure may be occupied as a: Interior Alterations: Fitness Room & Boiler Room By Order of Town Board Days Inn TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the S property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director o'Building&Code Er orcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY Q— W 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development - Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: CC-000277-2016 D'P 201,�- Tax Map No: 309.14-14 Permission is hereby granted to: JALARAMBAPA, INC. REVISED For property located at: 24 BIG BOOM RD In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: JALARAMBAPA, INC. Business Office-Alteration $5,000.00 Owner Address: 24 Big Boom RD Total Value $5,000.00 Queensbury,NY 12804 Contractor or Builder's Name/Address Electrical Inspection Agency RENEWED Plans&Specifications Interior Alterations: Fitness Room&Boiler Room Days Inn $ 50.00 PERMIT FEE PAID -THIS PERMIT EXPIRES: Saturday,April 22,2017 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town(n ,!7 W b A Th r d 23,2015 SIGNED BY: ,�� "(/ /`�f for the Town of Queensbury. Director of Building&Code Enforcement ,l I r '" : -bet L'1 ot )-)n-t- (— PRINCIPAL STRUCTURE APPLICATION Office Use Oniv DATE J C 2 N I Received Tax Map ID -- TAX MAP ID Permit No. Permit Fee _ ZONING Rec Fee C`i .-- 7 211t de Plan# HISTORIC SITE _Yes _No ubdivision # SUBDIVISION NAME Lot#_ TOWN BD.RESOLUTION 86-2013: $650 RECREATION FEE FOR NEW DWELLING UNITS,INCLUDING SINGLE FAMILY DWEWNGS,DUPLEXES OR TWO FAMILY DWELLINGS, MULTIPLE FAMILY DWELLINGS, APARTMENTS, CONDQMINIUMS, TOWNHOUSES, AND/OR MANUFACTURED & MODULAR HOMES,BUT NOT MOBILE HOMES. THIS IS IN ADDITION TO THE PERMIT FEE. APPLICANT — >WS l Lnn I �� p� OWNER �A�ZESJ-IJJ ADDRESS �CN�([� ADDRESS .2q 19161 1JOOIYI_gy#p 24 is L91fEENSAL RY PHONE/E-MAIL PHONE/E-MAIL ,SIS 7 9 3 8,9q ) 00 CONTRACTOR COST OF CONSTRUCTION(ESTIMATED): $ Erb✓ ADDRESS: BUILDING ADDRESS: PHONE/E-MAIL CONTACT PERSON FOR BUILDING&CODES COMPLIANCE: PHONE TYPE OF CONSTRUCTION Check all that apply Please indicate measurements as required below New Addition Alteration 15'floor sq.ft. 2n4 floor sq.ft. Total sq.ft. Height Single Family Two-Family Multi-Family L (#of units_46 ) m 1 7 Q Orti Townhouse Business Office Retail - Mercantile Factory- Industrial Attached Garage (#Of ) Other Town of Queensbury Building&Codes Principal Structure Application July 2014 If commercial or industrial indicate name of business Proposed use of building or addition R e – Source of heat(circle one) Gas Oil Propane Solar Other Fireplace: complete a separate application for Fuel Burning Appliances & Chimneys Are there structures not shown on plot plan? Are there easements on the property? Site Information a. Dimensions or acreage of lot -><Lp 0 X Q!-I b. Is this a comer lot? y0 c. Will the grade be changed as a result of construction Yes 4/ No d. Public water or Private well e. Sewer or Private Septic System Value of all work to be performed (labor or materials) $ DECLARATION: 1. 1 acknowledge no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If work is not complete by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. 1 certify that the application, plans and supporting materials are a true and complete statement/ description of the work proposed,that all work will be performed in accordance with the NY State Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. 5. 1 also understand that I /we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: I.OQ� F/ i"O`Fet— DATE 10122'J"Ll SIGNATURE: DATE �olZzlly FOR OFRCE USE ONLY . Operating Permit Issued: —Yes _No Occupancy Type Construction Classification Assembly Occupancy Limit Special Conditions 2 Town of Queensbury Building&Codes Principal Structure Application July 2014 FIRE MARSHAL'S OFFICE Toznn of Queensbury 742 Bay Road, Queensbury, NY 12804 (aw " Horne of Natural Rrauty ... A Lood Place to Live " PLAN REVIEW Best Inn 24 Big Boom Road 2015 - 6/22/2015 • Locks / laches shall comply with Chapter 10 of NYSFC • Add combo pak at exit • If fire alarm devices are added or modified, an NFPA 72 letter of compliance is required —Zv� Michael J Palmer Fire Marshal 742 Bay Road Queensbury NY 12804 firemarshal@queensbury.net Fi r e M a r s It a I's Off i c e • P h a n e: 518-761-8206 • F a s: 518-745-4437 firemarshal@queensbunf.net - eoeoeu queensbnni.net COMcheck Software Version 4.0.0 Interior Lighting Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: days inn Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 18 exist queensbury ny Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (111:2) Watts/ft2 (B X C) 1-room(Gymnasium/fitness center:Fitness area) 294 0.90 265 Total Allowed Watts= 265 Proposed Interior Lighting Power A B C D E Fixture ID : Description I Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. room(Gymnasium/Fftness Center Fitness Area 294 saftJ LED 1:Other: 1 12 17 204 Total Proposed Watts= 204 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed in the Inspection Checklist. -'bw.IS Thi -\ l 2U Nam -Title gnature D to Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\Y)EBNP79\EXERCISE CENTER.ccl Page 2 of 15 COMcheck Software Version 4.0.0 Envelope Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: days inn Location: Warren County, New York Climate Zone: Be Project Type: Alteration Vertical Glazing/Wall Area: 0% Construction Site: Owner/Agent: Designer/Contractor: 18 exist queensbury ny Building Area Floor Area 1-room(Exercise center) : Nonresidential 294 Envelope Assemblies R-Value Proposed Max.Allowed Post-Alteration Assembly Cavity Cont U-Factor SHGC U-Factor SHGC Exterior Wall 1:Wood-Framed, 16"o.c.,[Bldg.Use 1 -room], — — -- — — — Exemption:Framing cavity filled with insulation. Window 1:Vinyl/Fiberglass Frame:Operable,Other,Operable, -- — 0.330 0.430 0.400 Operable,[Bldg.Use 1 -room] Window 2:Vinyl/Fiberglass Frame:Operable,Other,Operable, — — 0.330 — 0.430 0.400 Operable,[Bldg. Use 1 -room] Door 1:Insulated Metal,Swinging,[Bldg.Use 1 -room] — — 0.070 — 0.370 -- Door 2:Insulated Metal,Swinging,[Bldg.Use 1 -room] — -- 0.070 -- 0.370 -- Floor 1:Slab-On-Grade:Unheated,[Bldg.Use 1 -room] — — 1.000 — 0.550 — (a) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (b)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope PASSES Envelope Compliance Statement Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed in the Inspection Checklist. � `szV\V\ D Name-Title Signature Dake Project itle: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppOata\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 1 of 15 COMcheck Software Version 4.0.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. _72012 IECC Plan Review: Complies? Comments/Assumptions -. C103.2 Plans and/or specifications provide all ❑Complies [PR1]1 ;information with which compliance ❑Does Not jcan be determined for the building ,envelope and document where ❑Not Observable ;exceptions to the standard are ❑Not Applicable claimed. C103.2 ;Plans, specifications, and/or ❑Complies [PR2]1 calculations provide all information ❑Does Not :with which compliance can be determined for the mechanical I❑Not Observable :systems and equipment and :❑Not Applicable ;document where exceptions to the i ;standard are claimed. Load !calculations per acceptable ;engineering standards and ;handbooks. C103.2 ;Plans, specifications, and/or ;❑Complies [PR4]1 :calculations provide all information ❑Does Not :with which compliance can be ,determined for the interior lighting :❑Not Observable land electrical systems and equipment ❑Not Applicable :and document where exceptions to ;the standard are claimed. Information (provided should include interior ;lighting power calculations,wattage of :bulbs and ballasts,transformers and :control devices. C4023.1 Vertical fenestration area <= 30 ❑Complies [PR10]1 percent of the gross above-grade wall :❑Does Not ;area. ❑Not Observable ❑Not Applicable C402.3.1 ;Skylight area <= 3 percent of the ;❑Complies [PR11]1 (gross roof area. ❑Does Not ❑Not Observable', ❑Not Applicable 0402.3.2. Areas with obstructions that block ❑Complies 2 direct beam sunlight on >= 1/2 of the :❑Does Not [PR15]1 roof over the enclosed area for more than 1,500 daytime hours per year :❑Not Observable', between 8 am and 4 pm. ;❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) =2- Medium Impact(Tier 2) 13 low Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\Y)EBNP79\EXERCISE CENTER.ccl Page 5 of 15 Section Footing/ Foundation Plans Verified Field Verified # Complies., Comments/Assumptions Req.ID Inspection Value Value C402.2.6 ;Slab edge insulation R-value. R- R- ❑Complies See the Envelope Assemblies [F03]2 ❑ Unheated ❑ Unheated L1 Does Not table for values. j❑ Heated ❑ Heated ❑Not Observable L❑Not Applicable C303.2 ;Slab edge insulation installed per ❑Complies (F04]2 manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable C402.2.6 ;Slab edge insulation ft _ft ❑Complies See the Envelope Assemblies [F05]1 1 depth/length.Slab insulation ❑Does Not table for values. extending away from building is j ❑Not Observable .;covered by pavement or>= 10 j❑Not Applicable inches of soil. C403.2.7, ;Exterior insulation protected ❑Complies 0408.2.8, !against damage, sunlight, ❑Does Not 0404.5 ;moisture, wind, landscaping and ❑Not Observable [F06] equipment maintenance ❑Not Applicable activities. PP C403.2.4. ;Freeze protection and snow/ice ❑Complies 5 melting system sensors for future ❑Does Not [Fog]3 connection to controls. - ❑Not Observable ON Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2",.Medium Impact(Tier 2) 13 ILow Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 6 of 15 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? FComments/Assumptions & Re .ID - C402.4.1, ;The building envelope contains a ❑Complies C402.4.2 I continuous air barrier that is ❑Does Not [FR16]1 ;sealed in an approved manner ;and either constructed or tested ❑Not Observable in an approved manner.Air ❑Not Applicable barrier penetrations are sealed in ;an approved manner. C402.4:3;'_I Factory-built fenestration and ❑Complies C402.4'.4 -doors are labeled as meeting air ❑Does Not [FR1813 ;leakage requirements. ❑Not Observable ') ❑Not Applicable j 0402..4.7. .;Vestibules are installed on all ❑Complies [FR17]3,, a building entrances. Doors have ❑Does Not ]self-closing devices. ❑Not Observable ❑Not Applicable 0402.3.3, ;Vertical fenestration U-Factor. U- U-_ ❑Complies See the Envelope Assemblies C402.3.4 []Does Not :table for values. [FRB]1 ❑Not Observable j❑Not Applicable 0402.3.3 ;Vertical fenestration SHGC value. SHGC:_ SHGC:_ ❑Complies 'See the Envelope assemblies [FR10]1 ❑Does Not table for values. ❑Not Observable j❑Not Applicable C303.1.3 Fenestration products rated in ❑Complies [FR12]2 accordance with NFRC. ❑Does Not ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products are ❑Complies [FR13]1 certified as to performance labels ❑Does Not j or certificates provided. ❑Not Observable ❑Not Applicable C402.2.7 U-factor of opaque doors U- U__ pi See the Envelope Assemblies [FR14]2 associated with the building ❑ Swinging EJ winging ❑Does Not table for values. 'thermal envelope meets ❑ Nonswinging ;❑ Nonswinging ❑Not Observable requirements. - ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 7 of 15 Section Mechanical Roh-In Plans Verified Field Verified # Inspection Value - Value Complies? Comments/Assumptions & Req.ID C403.2.3 I HVAC equipment efficiency Efficiency:_ Efficiency:_ ❑Complies See the Mechanical Systems list [ME55]2 'verified. ;❑Does Not /or values. ❑Not Observable ❑Not Applicable C402.4.5. Stair and elevator sha]ha nts ❑Complies 1 have motorized dampat ❑Does Not [ME3]3 automatically close. ❑Not Observable ❑Not Applicable C402.4.5. Outdoor air and exhaustems ❑Complies 2 have motorized dampat El Does Not [ME58]3 automatically shut whot in [-]Not Observable use and meet maximuakage (--]Not Applicable rates. Check gravity ders where allowed. C403.2.5. :,Demand control ventil ❑complies 1 ;provided for spaces> 2 and ❑Does Not [ME59]' ;>25 people/1000 ft2 oantdensity and served byems ❑Not Observable with air side economizuto ❑Not Applicable modulating outside airpercontrol, or design airfl3,000 cfm. C403.2: HVAC ducts and plenums R-_ R-_ ❑Complies [ME60]='.;,insulated.Where ducts or ;❑Does Not plenums are installed in or under j ❑Not Observable a slab,verification may need to ?occur during Foundation ❑Not Applicable Inspection. 0403.2.8 I HVAC piping insulation thickness. ! _in. I in. ❑Complies [ME61]2 I Where piping is installed in or ❑Does Not j under a slab, verification may need to occur during Foundation []Not Observable Inspection. ❑Not Applicable C403.2.8 ';Thermally ineffective panel ❑Complies [ME41]3 I surfaces of sensible heating El Does Not panels have insulation >= R-3.5. ❑Not Observable ❑Not Applicable C403.2.7 Ducts and plenums sealed based ❑complies [ME10]2 on static pressure and location. El Does Not ❑Not Observable ❑Not Applicable C403.2.7. f;Ductwork operating >3 in.water ❑Complies 1.3 'column requires air leakage ❑Does Not [MEll]3 ;testing. ❑Not Observable ❑Not Applicable C403.3.1, ;Air economizers provided where ❑complies 0403.3.1. irequired, meet the requirements ❑Does Not 1 ;for design capacity, control ❑Not Observable [ME62]1 ;signal,ventilation controls, high- I limit shut-off, integrated ❑Not Applicable ;economizer control, and provide !a means to relieve excess outside air during operation. 0408.2.2. ;Air outlets and zone terminal ❑Complies 1 devices have means for air ❑Does Not [ME5313 'balancing. ❑Not Observable E]Not Applicable 1 lHigh Impact(Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.cd Page 8 of 15 Section Mechanical Rough-In. Plans Verified Field Verified # Inspection Value Value Complies? Comments/Assumptions & Re .ID C403.4.2 i VAV fan motors >=7.5 hp to be ❑ VSD j❑ VSD ❑Complies [ME66]2 driven by variable speed drive, ❑ Vane axial ❑ Vane axial j❑Does Not have a vane-axial fan with fan fan ❑Not Observable ;variable pitch blades, or have ❑ Other ❑ Other controls to limit fan motor ;❑Not Applicable demand. C403.2.6 ',Exhaust air energy recovery on ❑Complies [ME57]' systems meeting Table C403.2.6 El Does Not ❑Not Observable ❑Not Applicable j C403.2.11 Unenclosed spaces that are ❑Complies [ME71]2 .heated use only radiant heat. ❑Does Not ❑Not Observable I ❑Not Applicable j C403.4.7 Hot gas bypass limited to: <=240 OComplies [ME35]1 �kBtu/h-50%>240 kBtu/h-25% ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 9 of 15 20121ECC Rough-In Electrical Inspection Complies? Comments/Assumptions C405.2.2. Automatic controls to shut off all ❑Complies 1 building lighting installed in all ❑Does Not [EL22]2 buildings. I❑Not Observable', j❑Not Applicable C405.2.1. Independent lighting controls installed ;❑Complies 1 per approved lighting plans and all ❑Does Not [EL23]2 manual controls readily accessible and ❑Not Observable visible to occupants. ❑Not Applicable 0405.2.1. Lighting controls installed to uniformly ❑Complies 2 reduce the lighting load by at least ❑Does Not [EL15]1 ,50%. ;❑Not Observable; ❑Not Applicable C405.2.2. Daylight zones provided with ❑Complies 3 individual controls that control the ❑Does Not [EL16]2 j lights independent of general area E] lighting. Not Observable; j❑Not Applicable C405.2.3 Sleeping units have at least one ❑Complies [EL17]3 master switch at the main entry door j❑Does Not ,that controls wired luminaires and I switched receptacles. ENot Observable; ❑Not Applicable C405.2.2. ;Occupancy sensors installed in ❑Complies 2 required spaces. :[:]Does Not [EL18]1 ;❑Not Observable' :[]Not Applicable j C405.2.2. Primary sidelighted areas are ❑Complies 3 :equipped with required lighting ❑Does Not [EL20]1 ;controls. ❑Not Observable ❑Not Applicable C405.2.2. ;Enclosed spaces with daylight area ❑Complies 3 under skylights and rooftop monitors ❑Does Not [EL21]1 ;are equipped with required lighting ❑Not Observable controls. ❑Not Applicable C405.2.3 Separate lighting control devices for ❑Complies [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ❑Not Observable ❑Not Applicable C405.3 Fluorescent luminaires with odd ;❑Complies [EL19]3 numbered lamp configurations that UDoes Not are with 10 feet center to center(if recess mounted) or are within 1 foot ❑Not Observable! edge to edge(if pendant or surface ❑Not Applicable _ mounted) shall be tandem wired. C405.4 Exit signs do not exceed 5 watts per ❑Complies [EL61' 'face. ❑Does Not ❑Not Observable! j❑Not Applicable C405.2.3 ;Additional interior lighting power ❑Complies [EL81' allowed for special functions per the ❑Does Not ;approved lighting plans and is automatically controlled and ![-]Not Observable; ;separated from general lighting. ;❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 IMedium Impact(Ter 2) 3 Low Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 10 of 15 11 High Impact(Tier 1) ,2nP Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 11 of 15 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 0402.4.1. All sources of air leakage in the _ ❑Complies 1 'building thermal envelope are ❑Does Not [IN1]1 jsealed, caulked, gasketed, ❑Nat Observable ;weather stripped or wrapped with moisture vapor-permeable ❑Not Applicable ;wrapping material to minimize air leakage. C3032 ;Above-grade wall insulation ❑Complies [IN7]1 installed per manufacturer's ❑Does Not ;instructions. ❑Not Observable ❑Not Applicable C4 02.2.5 '.Floor insulation R-value. R-_ R-_ ❑Complies ;See the Envelope Assemblies [IN8]2 E] Mass ;❑ Mass ❑Does Not table for values. ❑ Steel ;E] Steel j❑Not Observable ❑ Wood I❑ Wood ❑Not Applicable C303.1 .Building envelope insulation is ❑Complies [IN10]2 labeled with R-value or insulation ❑Does Not certificate providing R-value and >M other relevant data. ❑Not Observable ❑Not Applicable 0303.2.1 !Exterior insulation is protected ❑Complies (IN14]� '.from damage with a protective ❑Does Note, material.Verification for exposed ❑Not Observable foundation insulation may need to occur during Foundation EJ Not Applicable Inspection. Additional Comments/Assumptions: 1 JHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 12 of 15 2012 1ECC Final inspection Complies? Comments/Assumptions C402.4.6 I Weatherseals installed on all loading ❑Complies !. [F137)1 dock cargo doors. ;❑Does Not ❑Not Observable ;❑Not Applicable C403.2.4. Heating and cooling to each zone is ❑Complies 2 controlled by a thermostat control. ❑Does Not [FI47]3 ;Minimum one humidity control device ❑Not Observable per installed ❑Not Applicable humidification/dehumidification PP system. C403.2.4. ;Thermostatic controls have a 5 °F ❑Complies 2 deadband. :❑Does Not [F138]3 ❑Not Observable 1 ❑Not Applicable C403.2.4. ;Temperature controls have setpoint ❑Complies 2 overlap restrictions. ;❑Does Not [F120]3 ;❑Not Observable; j❑Not Applicable j C403.2.4. Each zone equipped with setback I❑Complies 3 controls using automatic time clock or ;❑Does Not [FI39]3 programmable control system. ;❑Not Observable: ;❑Not Applicable C403.2.4. Automatic Controls: Setback to 550F ❑Complies 3 (heat)and 85°F(coop; 7-day clock, 2- ❑Does Not [F140]3 hour occupant override, 10-hour backup ;❑Not Observable ;❑Not Applicable j C408.2.5. Furnished HVAC as-built drawings ;❑Complies 1 submitted within 90 days of system ;❑Does Not (F17]3 ;acceptance. ;❑Not Observable; ;❑Not Applicable j C303.3,C4:Furnished O&M manuals for HVAC ;❑Complies 08.2.5.2 systems within 90 days of system ❑Does Not [F18]3 .acceptance. I❑Not Observable ;❑Not Applicable C408.2.5. An air and/or hydronic system ;❑Complies 3 balancing report is provided for HVAC ;❑Does Not [F]43]' ;systems. ;❑Not Observable', ;❑Not Applicable C408.2.3. HVAC control systems have been ;❑Complies 2 tested to ensure proper operation, ;❑Does Not [FI10]1 :calibration and adjustment of controls. ❑No[Observable ;❑Not Applicable C402.4.8 !Recessed luminaires in thermal ;❑Complies [F]26]3 envelope to limit Infiltration and be IC I❑Does Not j rated and labeled.Seal between ❑Not Observable interior finish and luminaire housing. j❑Not Applicable C403.2.2 HVAC systems and equipment ❑Complies [FI27]3 capacity does not exceed calculated ❑Does Not j loads. j❑Not Observable: j❑Not Applicable ; 1 I High Impact(Tier 1) 1,.2j Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Mlcrosoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 13 of 15 20121ECC Final Inspection Complies? Comments/Assumptions C408.2.5. ;Furnished as-built drawings for ❑Complies 1 !electric power systems within 30 days I❑Does Not [FI16]3 of system acceptance. ❑Not Observable ❑Not Applicable j C303.3,C4I Furnished 0&M Instructions for - ❑Complies 08.2.5.2 systems and equipment to the ;❑Does Not [FI17]3 building owner or designated , representative. ❑Not Observable ,❑Not Applicable 0405.5.2 Interior installed lamp and fixture ❑Complies ;See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting ❑Not Observable' plans, demonstrating proposed watts are less than or equal to allowed ❑Not Applicable j watts. C408.2.1 !Commissioning plan developed by ❑Complies [FI2811 registered design professional or ❑Does Not ;approved agency. I❑Not Observable ❑Not Applicable j C408.2.4 Preliminary commissioning report (F12911 [FI29]' (completed and certified by registered El Not design professional or approved ❑Not Observable agency. I❑Not Applicable C408.2.5. Final commissioning report due to ❑Complies 4 building owner within 90 days of ;❑Does Not [F130J1 !receipt of certificate of occupancy. I❑Nat Observable ❑Not Applicable C408.2.3. HVAC equipment has been tested to ❑Complies 1 ensure proper operation. ❑Does Not [FI31]1 ;❑Not Observable; j❑Not Applicable C408.2.3. Economizers have been tested to I❑Complies 3 ;ensure proper operation. ❑Does Not [FI32]' j❑Not Observable j❑Not Applicable 0408.3 ;Lighting systems have been tested to ❑Complies [F13311 !ensure proper calibration, adjustment, ❑Does Not programming, and operation. ❑Not Observable', j❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 14 of 15 Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frankWppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl Page 15 of 15 COMcheck Software Version 4.0.0 Exterior Lighting Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: days inn Project Type: Alteration Exterior Lighting Zone 0 (Unspecified) Construction Site: Owner/Agent: Designer/Contractor: 18 exist queensbury, ny Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/Unit Wattage (B X C) Total Tradable Watts(a)= 0 Total Allowed Watts= 0 Total Allowed Supplemental Watts(b)= 500 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power Exterior Lighting TBID: Exterior lighting zone not specified (see project screen) Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppOata\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.cd Page 3 of 15 COMcheck Software Version 4.0.0 Mechanical Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: days inn Location: Warren County,New York Climate Zone: 6a Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor. 18 exist queensbury ny Mechanical Systems List Quantity System Type & Description 1 HVAC System 1 (Single Zone): Heating:1 each-Other,Electric,Capacity=12000 kBtu/h No minimum efficiency requirement applies Cooling:1 each-Split System,Capacity= 12000 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=9.70 EER,Required Efficiency=9.70 EER Fan System: None Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document Is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed intheInspection Checklist. "� \ �5 t �� Z 2�tS Name-Title ignature D to Project Title: days inn Report date: 04/10/15 Data filename: C:\Users\frank\AppData\Local\Microsoft\Windows\INetCache\IE\YJEBNP79\EXERCISE CENTER.ccl, Page 4 of 15 COMcheck Software Version 4.0.0 Envelope Compliance Certificate Project Information Energy Code: 2014 New York Energy Conser. Constr. Code(by application of 90.1 (2010)Standard) Project Title: Location: Warren County, New York Climate Zone: 6a Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: z"�s K Building Area Floor Area 1-excersise room(Exercise Center) : Nonresidential 330 Envelope Assemblies R-Value Proposed Max.Allowed Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC Exterior Wall 1:Wood-Framed, 16"o.c.,[Bldg.Use 1 -excersise — -- --- -- — '- room],Exemption:Cavity filled with minimum R-3/inch insulation Envelope PASSES Envelope Compliance Statement Compliance Statement The proposed envelope alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 90.1 (2010) Standard require en in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed in the Inspection Checklis Narir a-Title Signature Defile L7-VS link l^ '�1 l u QJfChS (�O ✓L r 1� �l Project itle: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new Lcck Page 1 of 16 COMcheck Software Version 4.0.0 Interior Lighting Compliance Certificate Project Information Energy Code: 2014 New York Energy Conser.Constr. Code(by application of 90.1 (2010) Standard) Project Title: Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (11:2) Watts/ft2 (B X C) 1-excersise room(Gymnasium/Fitness Center:Fitness Area) 330 0.72 238 Total Allowed Watts= 238 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. excersise room (Gymnasium/Fitness Centeffitness Area 330 sa ft) LED 1:Other: 1 12 17 204 Total Proposed Watts= 204 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2010) Standard requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed in the Inspection Checkls . Name-Title nature Da Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new l.cck Page 2 of 16 COMcheck Software Version 4.0.0 Exterior Lighting Compliance Certificate Project Information Energy Code: 2014 New York Energy Conser. Constr. Code(by application of 90.1 (2010) Standard) Project Title: Project Type. Alteration Exterior Lighting Zone 0 (Unspecified) Construction Site: Owner/Agent Designer/Contractor: Z)tiY S-1 . r Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/ Unit Wattage (B X C) Total Tradable Watts(a)= 0 Total Allowed Watts= 0 Total Allowed Supplemental Watts(b)= 500 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power Exterior Lighting TBD: Exterior lighting zone not specified(see project screen) mac- S.kr, � c � �>:i �' � 0 �u �c✓t 1� � 2�. 1� �I Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new l.cck Page 3 of 16 COMcheck Software Version 4.0.0 Mechanical Compliance Certificate Project Information Energy Code: 2014 New York Energy Conser.Constr. Code(by application of 90.1 (2010)Standard) Project Title: Location: Warren County, New York Climate Zone: 6a Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: in V? JS+-k Mechanical Systems List Quantity System Type& Description 1 HVAC System 1 Heating: 1 each-Unit Heater,Electric,Capacity=35000 kBtu/h No minimum efficiency requirement applies Cooling: 1 each-Other,Capacity=35000 kBtu/h,Air-Cooled Condenser,Air Economizer No minimum efficiency requirement applies Fan System: None SYSTEM COMPLIANCE REQUIRED. Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 90.1 (2010) Standard requirements In COMcheck Version 4.0.0 and to comply with the mandatory r�requirements listed in the Inspection Checklist. �J Name-Title Signature L. / W �CAr S .4-n t�1 r�C�� \�6 �c 2 vt S �J✓L� /l9 ,�/� Projed Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new 1.cck Page 4 of 16 1 J High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new l.cck Page 10 of 16 90.1 (2010) Rough-In Electrical Inspection Complies? Comments/Assumptions Standard 8.4.2 At least 50%of all 125 volt 15-and ❑Complies [EL10]' 20-Amp receptacles are controlled by ODoes Not an automatic control device. ONot Observable ❑Not Applicable 9.4.1.1 Automatic controls to shut off all ❑Complies [EL1]' building lighting. ODoes Not ❑Not Observable ❑Not Applicable 9.4.1.2 Independent lighting controls installed ❑Complies [EL2]1 per approved lighting plans and all ❑Does Not manual controls readily accessible and ❑Not Observable visible to occupants. []Not Applicable 9.4.1.3 Parking garage lighting is equipped ❑Complies [EL1112 with required lighting controls and ❑Does Not daylight transition zone lighting. ❑Not Observable ❑Not Applicable 9.4.1.4 Primary sidelighted areas>=250 ft2 ❑Complies [EL12]1 are equipped with required lighting ❑Does Not controls. ❑Not Observable ONot Applicable 9.4.1.5 Enclosed spaces with daylight area ❑Complies (EL1311 under skylights and rooftop monitors ❑Does Not >900 ft2 are equipped with required ❑Not Observable lighting controls. ❑Not Applicable 9.4.1.6 Separate lighting control devices for ❑Complies [EL411 specific uses installed per approved ❑Does Not lighting plans. ❑Not Observable ❑Not Applicable 9.4.2 Exit signs do not exceed 5 watts per ❑Complies (EL611 face. ❑Does Not ❑Not Observable []Not Applicable 9.6.2 Additional interior lighting power ❑Complies [EI-811 allowed for special functions per the ❑Does Not approved lighting plans and is ❑Not Observable automatically controlled and ONot Applicable separated from general lighting. 10.4.1 Electric motors meet requirements ❑Complies [EL9]2 where applicable. ❑Does Not ONot Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) ''21 Medium Impact(Tier 2) 13 LowImpact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new l.cck Page 11 of 16 COMcheck Software Version 4.0.0 Inspection Checklist Energy Code: 90.1 (2010) Standard Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. 90.1 (2010) Plan Review Complies? Comments/Assumptions standard 4.2.2,5.4. Plans and/or specifications provide all ❑Complies 3.1.1,5.7 information with which compliance ❑Does Not [PR1]1 can be determined for the building ❑Not Observable envelope and document where ❑Not Applicable exceptions to the standard are pP claimed. 4.2.2,6.4. Plans, specifications, and/or ❑Complies 4.2.1,6.7. calculations provide all Information ❑Does Not 2 with which compliance can be ❑Not Observable [PR2] determined for the mechanical ❑Not Applicable systems and equipment and pP document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. 4.2.2,8.4. Plans, specifications, and/or ❑Complies 1.1,8.4.1. calculations provide all information ❑Does Not 2,8.7with which compliance can be phot Observable [PR6]2 determined for the electrical systems ❑Not Applicable and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.2,9.4. Plans, specifications, and/or ❑Complies 4,9.7 calculations provide all information ❑Does Not [PR4]1 with which compliance can be phot Observable determined for the interior lighting ❑Not Applicable and electrical systems and equipment pP and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. 6.7.2.4 Detailed instructions for HVAC ❑Complies [PR5]1 systems commissioning included on ❑Does Not the plans or specifications for projects ❑Not Observable >=50,000 ft2. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new 1.cck Page 5 of 16 Section Footing /Foundation Plans Verified Field Verified # Inspection Value Value Complies? Comments/Assumptions & Req.ID 5.5.3.3 Below-grade wall insulation R- R-_ R- ❑Complies See the Envelope Assemblies [FO112 value. ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.3.5 Slab edge insulation R-value. R- R- ❑Complies See the Envelope Assemblies [F03]2 ❑Unheated ❑ Unheated ❑Does Not table for values. ❑ Heated ❑ Heated ❑Not Observable ❑Not Applicable 5.5.3.5 Slab edge insulation _ft _ft ❑Complies See the Envelope Assemblies [FO5]2 depth/length. ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.8.1.7.3 Insulation in contact with the ❑Complies [F0711 ground has<=0.3%water []Does Not absorption rate per ASTM 0272. ❑Not Observable []Not Applicable 6.4.3.8 Freeze protection and snow/ice ❑Complies [F09]3 melting system sensors for future ❑Does Not connection to controls. []Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new l.cck Page 6 of 16 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 5.4.3.2 Factory-built fenestration and ❑Complies [FR1]3 doors are labeled as meeting air ❑Does Not leakage requirements. ❑Not Observable ❑Not Applicable 5.5.4.3a Vertical fenestration U-Factor. U- U- ❑Complies See the Envelope Assemblies [FR8]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.4.3b Skylight fenestration U-Factor. U-_ U-_ ❑Complies See the Envelope Assemblies [FR9]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.4.4.1 Vertical fenestration SHGC value. SHGC_ SHGC:_ ❑Complies See the Envelope assemblies [FR10]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.4.4.2 Skylight SHGC value. SHGC:_ SHGC:_ ❑Complies See the Envelope Assemblies [FR11]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.8.2.1 Fenestration products rated in ❑Complies [FR12]2 accordance with NFRC. ❑Does Not ❑Not Observable ❑Not Applicable 5.8.2.2 Fenestration products are ❑Complies [FR13]1 certified as to performance labels ❑Does Not or certificates provided. ❑Not Observable ❑Not Applicable 5.8.2.3,5. U-factor of opaque doors U- U- ❑Complies See the Envelope Assemblies 5.3.6 associated with the building E] Swinging E] Swinging ❑Does Not table for values. [FR14]2 thermal envelope meets ❑ Nonswinging ❑ Nonswinging ❑Not Observable requirements. ❑Not Applicable 5.4.3.1 Continuous air barrier is ❑Complies [FR15]1 wrapped, sealed, caulked, ❑Does Not gasketed, and/or taped in an ❑Not Observable approved manner, except in ❑Not Applicable semiheated spaces and in climate zones 1-6. Additional Comments/Assumptions: 1 JHigh Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new l.cck Page 7 of 16 Section Mechanical Rou h-In Plans Verified Field Verified # Inspection Value Value complies? Comments/Assumptions & Req.ID 6.4.1.4,6. HVAC equipment efficiency Efficiency:_ Efficiency:_ ❑Complies See the Mechanical Systems list 4.1.5 verified. Non-NAECA HVAC El Does Not for values. [MEJ]' equipment labeled as meeting ❑Not Observable 90.1. ❑Not Applicable 6.4.3.4.1 Stair and elevator shaft vents ❑Complies [ME3)3 have motorized dampers that ❑Does Not automatically close. ❑Not Observable ❑Not Applicable 6.4.3.4.2, Outdoor air and exhaust systems ❑Complies 6.4.3.4.3 have motorized dampers that ❑Does Not IME413 automatically shut when not in ❑Not Observable use and meet maximum leakage rates.Check gravity dampers ❑Not Applicable where allowed. 6.4.3.4.5 Enclosed parking garage ❑Complies [ME39]3 ventilation has automatic ❑Does Not contaminant detection and ❑Not Observable capacity to stage or modulate ❑Not Applicable fans to 50%or less of design capacity. 6.4.3.4.4 Ventilation fans >0.75 hp have ❑Complies [ME5]3 automatic controls to shut off fan ❑Does Not when not required. ❑Not Observable ❑Not Applicable 6.4.3.9 Demand control ventilation ❑Complies [ME6]1 provided for spaces>500 ft2 and El Does Not >40 peopie/1000 ft2 occupant density and served by systems [:]Not Observable with air side economizer, auto ❑Not Applicable modulating outside air damper control,or design airflow >3,000 cfm. 6.4.3.10 Single zone HVAC systems with ❑Complies see the Mechanical Systems list IME40]2 fan motors >=5 hp have variable ❑Does Not for values. airflow controls.Air conditioning ❑Not Observable equipment with a cooling capacity >=110,000 Btu/h has ❑Not Applicable variable airflow controls. 6.4.4.1.1 Insulation exposed to weather ❑Complies [ME7]3 protected from damage. EJ Does Not Insulation outside of the ❑Not Observable conditioned space and associated ❑Not Applicable with cooling systems is vapor retardant. 6.4.4.1.2 HVAC ducts and plenums R-_ R-_ ❑Complies [ME8]2 insulated. Where ducts or ❑Does Not plenums are installed in or under ❑Not Observable a slab, verification may need to ❑Not Applicable occur during Foundation Inspection. 6.4.4.1.3- HVAC piping insulation thickness. _in. in. ❑Complies [ME9]2 Where piping is installed in or El Does Not under a slab,verification may ❑Not Observable need to occur during Foundation ❑Not Applicable Inspection. 6.4.4.1.4 Thermally ineffective panel IMEJE Complies [ME41]3 surfaces of sensible heating Does Not panels have insulation >= R-3.5. -]Not Observable NotApplicable 1 JHigh Impact(Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new 1.cck Page 8 of 16 Section Mechanical Rough-In Plans Verified Field Verified # Inspection Value Value Complies? Comments/Assumptions & Req.ID 6.4.4.2.1 Ducts and plenums sealed based ❑Complies [ME10]2 on static pressure and location. El Does Not ❑Not Observable ❑Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water ❑Complies [MEll]3 column requires air leakage El Does Not testing. ❑Not Observable ❑Not Applicable 6.5.1,6.5. Air economizers provided where ❑Complies 1.1,6.5.1. required, meet the requirements ❑Does Not 3 for design capacity,control ❑Not Observable [ME12]1 signal,ventilation controls, high- limit shut-off, integrated ❑Not Applicable economizer control,and provide a means to relieve excess outside air during operation. 6.5.2.3 Dehumidification controls ❑Complies [ME19]3 provided to prevent reheating, El Does Not recooling, mixing of hot and cold ❑Not Observable airstreams or concurrent heating ❑Not Applicable and cooling of the same airstream. 6.5.3.3 Multiple zone VAV systems with ❑Complies See the Mechanical Systems list [ME42]3 DDC of individual zone boxes ❑Does Not for values. have static pressure setpoint ❑Not Observable reset controls. ❑Not Applicable 6.5.4.1 HVAC pumping systems>10 hp ❑Complies [ME25]3 designed for variable fluid flow. ❑Does Not ❑Not Observable ❑Not Applicable 6.5.6.1 Exhaust air energy recovery on ❑Complies [ME56]1 systems meeting Table 6.5.6.1:' []Does Not ❑Not Observable ❑Not Applicable 6.5.7.1.1 Kitchen hoods>5,000 cfm have ❑Complies [ME32]2 make up air>=50%of exhaust ❑Does Not air volume. [-]Not Observable ❑Not Applicable 6.5.7.1.5 Approved field test used to ❑Complies [ME49]3 evaluate design air flow rates ❑Does Not and demonstrate proper capture [-]Not Observable and containment of kitchen exhaust systems. ❑Not Applicable 6.5.7.2 Fume hoods exhaust systems ❑Complies [ME3311 >=15,000 cfm have VAV hood i ❑Does Not exhaust and supply systems, ❑Not Observable direct make-up air or heat ❑Not Applicable recovery. 6.5.8.1 Unenclosed spaces that are ❑Complies [ME34]2 heated use only radiant heat. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new l.cck Page 9 of 16 Section Pl�Value Field Verified # Insulation Inspection Value Complies? Comments/Assumptions & Req.ID 5.4.3.1 All sources of air leakage in the ❑Complies [IN111 building thermal envelope are L1 Does Not sealed,caulked,gasketed, ❑Not Observable weather stripped or wrapped with ❑Not Applicable moisture vapor-permeable wrapping material to minimize air leakage. 5.5.3.1 Roof R-value. For some ceiling R- R- ❑Complies see the Envelope Assemblies [IN211 systems,verification may need to ❑ Above deck ❑ Above deck [-]Does Not table for values. occur during Framing Inspection. ❑ Metal ❑ Metal ❑Not Observable ❑ Attic ❑ Attic ❑Not Applicable 5.5.3.2 Above-grade wall insulation R- R- R- ❑Complies see the Envelope Assemblies [IN6]1 value. F1Mass F1Mass ❑Does Not table for values. ❑ Metal ❑ Metal ❑Not Observable ❑ Steel ❑ Steel ❑Not Applicable ❑ Wood ❑ Wood 5.8.1.2 Above-grade wall insulation ❑Complies [IN711 installed per manufacturer's ❑Does Not instructions. ❑Not Observable ❑Not Applicable 5.5.3.4 Floor insulation R-value. R- R ❑Complies Seethe Envelope Assemblies [IN8]2 F-1Mass F-1mass ❑Does Not table for values. ❑ Steel ❑ Steel ❑Not Observable ❑ Woad ❑ Wood ❑Not Applicable 5.8.1.1 Building envelope insulation is ❑Complies [IN10]2 labeled with R-value or insulation ❑Does Not certificate providing R-value and ❑Not Observable other relevant data. ❑Not Applicable 5.8.1.4 Eaves are baffled to deflect air to ❑Complies [INll]z above the insulation. ❑Does Not [-]Not Observable . .,❑Not Applicable 5.8.1.5 Insulation is installed in y❑Complies [IN12]2 substantial contact with the ❑Does Not inside surface separating ❑Not Observable conditioned space from ❑Not Applicable unconditional space. 5.8.1.6 Recessed equipment installed in ❑Complies [IN13]2 building envelope assemblies ❑Does Not does not compress the adjacent ❑Not Observable insulation. - ❑Not Applicable 5.8.1.7 Exterior insulation is protected ❑Complies [IN14]2 from damage with a protective []Does Not material. Verification for exposed [-]Not Observable foundation insulation may need ❑Not Applicable to occur during Foundation Inspection. 5.8.1.7.1 Attics and mechanical rooms ❑Complies [IN15]2 have insulation protected where ❑Does Not adjacent to attic or equipment ❑Not Observable access. _ ❑Not Applicable 1 iHigh Impact(Tier 1) -1 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new 1.cck Page 12 of 16 Section Plans Verified Field Verified # Insulation Inspection Value Value Compiles? Comments/Assumptions & RegAD 5.8.1.7.2 Foundation vents do not interfere ❑Complies [IN16]2 with insulation. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new Lcck Page 13 of 16 90.1 (2010) Final Inspection Complies? Comments/Assumptions Standard 5.4.3.3 Weatherseals installed on all loading ❑Complies [Fill' dock cargo doors in Climate Zones 4- ❑Does Not 8. ❑Not Observable ❑Not Applicable 6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies [FI3]3 deadband. ❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.2 Temperature controls have setpoint ❑Complies [F120]3 overlap restrictions. ❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.3.1 HVAC systems equipped with at least ❑Complies [FI21]3 one automatic shutdown control. ❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.3.2 Setback controls allow automatic ❑Complies [FI22)3 restart and temporary operation as ❑Does Not required for maintenance. ❑Not Observable ❑Not Applicable 6.4.3.7 When humidification and ❑Complies [FI6]3 dehumidification are provided to a ❑Does Not zone, simultaneous operation is ❑Not Observable prohibited. ❑Not Applicable 6.7.2.1 Furnished HVAC as-built drawings ❑Complies [FI7]3 submitted within 90 days of system ❑Does Not acceptance. ❑Not Observable ❑Not Applicable 6.7.2.2 Furnished O&M manuals for HVAC ❑Complies [FI8]3 systems within 90 days of system ❑Does Not acceptance. ❑Not Observable ❑Not Applicable 6.7.2.3 An air and/or hydronic system ❑Complies [FI911 balancing report is provided for HVAC ❑Does Not systems serving zones >5,000 ft2 of ❑Not Observable conditioned area. ❑Not Applicable 6.7.2.4 HVAC control systems have been ❑Complies [FI1011 tested to ensure proper operation, ❑Does Not calibration and adjustment of controls. ❑Not Observable ❑Not Applicable 8.7.1 Furnished as-built drawings for ❑Complies [FI16]3 electric power systems within 30 days ❑Does Not of system acceptance. ❑Not Observable ❑Not Applicable 8.7.2 Furnished O&M instructions for ❑Complies [F[17]3 systems and equipment to the ❑Does Not building owner or designated ❑Not Observable representative. ❑Not Applicable 111 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new l.cck Page 14 of 16 90.1 (2010) Final Inspection Complies? Comments/Assumptions Standard 9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting ❑Not Observable plans,demonstrating proposed watts are less than or equal to allowed ❑Not Applicable watts. 10.4.3 Elevators are designed with the ❑Complies [FI24]2 proper lighting,ventilation power, and ❑Does Not standby mode. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2?I Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new 1.cck Page 15 of 16 Project Title: Report date: 03/28/15 Data filename: C:\Users\frank\Desktop\days inn new 1.cck Page 16 of 16 Inspection Form I�hHr Town of Queensbury Fire Marshal CD Periodic Inspection Date: ttme, tg,- 742 Bay Road,Queensbury NY 12804 o Re-Inspection 518 7y 8206/518 7618205 OP CO Inspection Permit#: it arshals Representative MJ Palmer Business Name: � Sndr Location: �I 3.c. law•� GK Stillman Contact: AIGi� Type of Inspection N/A Yps No EXITS: Exit Access FC 1014&FC1029 NOTES Exit Enclosure FC 1020&FC1029 Exit Discharge FC 1024&FC1029 Locks and latches FC1008& FC1029.2 Sign:Normal FC 1011 &FC1029 Sign:backup FC 1011.5.3&FC7029.7.5 AISLES: 1 Main Aisle Width FC 1024/1025&FC1029.11 Seconds Aisle Width FC 1025&FC1029.11 FIRE EXTINGUISHER: Hung FC 906 Inspection of extin uisher FC 906 EVAC Plan FC 404.2 TRUSS ID SIGNAGE FC 505.3 EMERGENCY LIGHTING: Interior FC 1006.3&FC1029.8 Exterior FC 1006.3 Clearance to Electrical FC 605.3 Electric Wiring Enclosed Labeled FC 605.3.1 Combustibles in Equipment Rooms FC315.2.3 F.D.Signage- FC510 No Smoking Signs FC 310.3 Storage FC 315.2 Compressed Gas FC 3003 Vehicle Impact Protection FC 312.1 Interior Finishes FC 803-804 Smoke Detectors FC 907 CO detectors FC 610 Clearance to Sprinkler/Ceiling FC 315.2.1 18" / 24" EVAC SIGNS IN Rooms FC 404.6 R7 &R2 Fuel Pump Warning Signs FC2205.6 Fuel Station Emer Procedures FC2204.3.5 Exterior Storage FC 315.3 REINSPECTION DUE APPROXIMATELY Vacant Buildings FC 311 Emergency Disconnect FC 2203.2 21 DAYS SYSTEMS: FC 901.6 Insp o NC DATE: OK NC Date Generator Annual DATE: OK NC Hood Installation Elevator Semi Annual FIRE ALARM Annual DATE: OK NC HVAC Shutdown S rinkler System Annual Sprinkler FDC Kitchen Suppression Semi Annual Fuel Island Suppression Semi Annual HoodCleanin 3-6 -Annual Knox Box:installed/checked FC506 Operating Permit, if required will be issued after Completion of Inspection � Oct 081512:15p NEI 518-370-1927 p.1 NORTHEAST ELECTRICAL INSPECTIONS, LLC 65 Albermarle Road Scotia, NY 12302 PHONE: (518) 852-0826 Electrical (518) 866-1663 Inspec2ioan� WLLC ELECTRICAL INSPECTION CERTIFICATION This is to certV that the electrical writing and equipment which is introduced by the named applicant is in the accordance with the National Electrical Code and local utility company, It also complies with the application on fife at the date listed. Date of Final Inspection: 10/6/15 job#• Days Inn Applicant: Days Inn Address: 24 Big Boom Road Queensbury, NY 12803 Owner: Days inn Permit #: 14-543 Final Inspection for Fitness Room ,194M AW- Dave Near Electrical Inspector Town of Queensbury Building&Code Enforcement 1 7�L Office No.(518)781-8256 Commercial Final Inspection Report I"3 Inspection U request received- b 5�2-C,, Name: t--L` Ylr'h n a — Inspected on: IriI to I2z[5 Location: br4 hQuim _ Arrive: a.m./P.M. Permit No.: 2 _ Inspector's Initials: COMMENTS Y N NA Chimney I"B"Vent I Direct Vent Location Plumbing Vent Through Roof 6'/Roof Complete Exterior Finish/Grade Complete 6"in 10'or Equivalent Ir , Interior I Exterior Guardrails 42 inch Plafform/Decks ,r-a S lt-T Interior/Exterior Balusters 4 inch Spacing Platform I Decks Stair Handrail 34 inch—38 inch I Step Risers 7"/Treads 11" Vestibules For Exit doors>3000 sq.ft. All Doors 36 inch w/Lever Handles/Panic Hardware,if required Ex1ts At Grade Or Platform 36"(w)x 44"(1)/Canopy or Equiv. / Gas Valve Shut-off Exposed&Regulator(18")Above Grade Floor Bathroom Watertight 1 Other Floors Okay / V Relief Valve,Heat Trap 1 Water Temperature 110 Degrees Maximum ���� G✓ems e 11-4het Boiler I Furnace Enclosure 1 hour or Fire Extinguishing System Fresh Air Supply for Occupancy/Ventilation Combustion Low Water Shut Off For Boilers Gas Furnace Shut Off Within 30 ft.or Within Line Of Site Oil Furnace Shut Off at Entrance to Furnace Area Stockroom/Storage/Receiving/Shipping Room(2 hr.), 1 '%doors >10%>1000 sq.ft. %Hour Corridor Doors&Closers Firewalls I Fire Separation,2 Hour,3 Hour Complete I Fire Dampers I Fire Doors Ceiling Fire Stopping,3,000 sq.ft.Wood Frame Attic Access 30"x 20"x 30"(h),Crawl Space Access 18"x 24" Smoke Vents Or Fan,if required Elevator Operation and Signage I Shaft Sealed Handicapped Bathroom Grab Bars I Sinks I Toilets/Mirrors Handicapped Bath 1 Parking Lot Signage Public Toilet Room Handicapped Accessible Handicapped Service Counters,34 inch,Checkout 36 inch Handicapped Ramp I Handrails Continuous/12 inch Beyond[Both sides] Active Listening System and Signage Assembly Space Final Electrical/Flex Gas Piping Bonded Site Plan(Variance required Final Survey,New Structure I Flood Plain certification,if req. As-built Septic System Layout Required or On File Building Number or Tenant Address on Building or Driveway 4" P Water Fountain or Cooler Building Access All Sides by 20'/Drivable Surface 20'wide Special Inspections I Engineer or Architect Approval Okay To Issue Temporary or Permanent C/O Okay To Issue C/Cj Commercial Final 127 2712 (✓ 8 --to Rough Plumbing 1 Insulation Inspection Report Inspection request received q 1 ',7- Name S V1 Y1 Inspected on `1 3 Location l + Arrive am/pm Permit No. _ r Inspector's Initials (� Type of Structure + t COMMENTS Y N NA Plumbing under slab Rough Plumbing /Nail Plates Plumbing Vent /Vents in Place 1 Vz inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet/change of direction Pressure Test Drain / Vent Air/ Head 5 P.S.I. or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping Air/Head 50 P.S.I for 15 minutes Insulation / Residential Check/ Commercial Check // G �l LsQlLfl �N Window Sealing Tyvek or Similar Exterior Sealant Proper Vent,Attic Vent Door/Window Sealed (No Insulation) �reSJ" Duct /Hot Water Piping Insulation If required unheated spaces �2neV+T U/�1 Combustion Air Supply for Furnace Duct work sealed properly/ No duct tape Blower Door Test . /ec 7 !/7 0/fir Air Sealing /� of 1 /na��f7e�r .nv,L ��r�j �crrh Town of Queensbury Building & Code Enforcement Office No. (518) 761-8256 Rough Plumbing / Insulation Inspection Report Inspection request received S Name k YA Inspected on FAj Location a I >1 13(.GSM 2, Arrive 3 am/pm Permit No. Inspector's Initials Type of Structure COMMENTS Y N NA Plumbing under slab Rough Plumbing /Nail Plates Plumbing Vent/Vents in Place I Y, inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet/change of direction Pressure Test Drain/Vent Air/ Head 5 P.S.I. or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping Air/Head 50 P.S.I for 15 minutes �flsulation /Residential Check / Commercial Check Ur Window Sealing A Tyvek or Similar Exterior Sealant �q�j E✓S eJ Q�`� S/��`� n Proper Vent.Attic Vent ��, C4A All h� L154 Door/Window Sealed (No Insulation) Duct/ Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly / No duct tape Blower Door Test Air Sealing Town of Queensbury Building & Code Enforcement Office No. (518)761-8256 `� Rough Plumbing / Insulation Inspection Report Inspection request received Name Inspected on Location � >Arrive ? am/pm Permit No, L Inspector's Initials Type of Structure COMMENTS Y N NA Plumbing under slab Rough Plumbing/Nail Plates Plumbing Vent/Vents in Place 1 Y, inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet/change of direction Pressure Test Drain /Vent Air/ Head 5 P.S.I. or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping Air/ Head 50 P.S.I for 15 minutes sulation/ Residential Check/ Commercial Check Window Sealing Tyvek or Similar Exterior Sealant Proper Vent, Attic Vent Door/ Window Sealed (No Insulation) Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly / No duct tape Blower Door Test Air Sealing Town of Queensbury Building & Code Enforcement Office No. (518) 761-8256 Rough Plumbing 1 Insulation Inspection Report Inspection request received Q q 1 2�z) Name nn Inspected on ZC 1S Location �Q ;� Arrive &L/J am/pm Permit No. Inspector's Initials / Type of Structure COMMENTS y N NA Plumbing under slab Rough Plumbing /Nall Plates Plumbing Vent /Vents in Place 1 %: inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet/change of direction Pressure Test Drain / Vent Air/ Head 5 P.S.I.or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping Air/ Head 50 P.S.I for 15 minutes n Insulation / Residential Check/ Commercial Check Window Sealing Tyvek or Similar Exterior Sealant Proper Vent,Attic Vent Door/Window Sealed(No Insulation) Duct / Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape Blower Door Test Air Sealing U � Town of Queensbury Building & Code Enforcement Office No. (518) 761-8256 Town of Queensbury Building &Code Enforcement Office No.(518)761-8256 Framing / Firestopping Inspection Report Inspection request received: 8121 I-? . Name: 11r-\ Inspected on: 1211-2-Qts Location: 2 6 � 24� Arrive: a.m.l p.m. Permit No.: zl� –5q Inspector's Initials: TYPE OF STRUCTURE: CCL✓y�w1G—(t t rte_ Y N NIA COMMENTS: Framing Attic Access 22"x 30"minimum Jack Studs/Headers Truss Specification Provided Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft.8 in. Stairwells 36 in.or more Exterior Deck Bracing Headroom 6 ft.8 in. Notches/Holes I Bearing Walls Metal Strapping for Notches Top Plate 1 Y2(w) 16 gauge(8)16D nails each side Draft stopping 1,000 sq.ft.floor trusses Anchor Bolts 6 ft.or less on center Ice and water shield 24 inches from wall Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed / 1 16 inch insulation in cavity min. A Ua.e Garage Fire Separation House side%inch or 518 inch Type X Garage side 518 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in.(H) 20 in.(W) 5.7 sf above/below grade 5.0 sf grade Design Professional Sign-off,if required Framing/Firestopping Inspection Report DI' I6NgRa OF FINE HOMES SING1a 1 q 63 J�L.LIAMSk C90 J DESIGNERS 5041 61-MIN STKZe1'-&L9N5 FAL LB-HFYq YORK 1 284 1 FFt4�T+iR':f'61 LS) 9WEv-trl+a'9J5E F�,.ti4c(51 P,R 74L-9t71 "7 uaurl,u.utilll�msandwilllamsdesi c�nereP.ryam August 18, 2015 Peter Patel Days Inn of Queensbury 24 Big Boom Road Queensbury, New York 12004 RE: Field Mortification at Days Inn of Queensbury Dear Peter, At your request, I inspected the renovation this morning. I notioad the contractor slstered a notched 2x10 floor joists to the existing 7x8 41ourJolsts being supported with a Joist hanger, This does not add any additional loading to the joist. It only sinangthens the exi=sting joist, Since we cannot verify the capacity of the existing, hanger in use,a secondary suppcwt method should be used. On the WD side of the combined - jeist where the now Joist meets the flush turn, inetall a Simpson ML26Z angle wiih 8-SIDS-1/4"O1/2" fasteners as per manufacture's TV01C iMkm specifications_ rrrmnm LMI?rFsS�,i Should you have.any questions please dant hesitate to contact me. Sincerely, 1 i• iia. A'• t t t 5.5 NI + j Met Iliams ' Vice President `` Town of Queensbury Building &Code Enforcement Office No. (518)761-8256 Framing 1 Firestopping Inspection Report Inspection requst received: �V4,,Atlj Name: 1 Inspected on: Location: of hpamQ-d Arrive: a.m.I p.m. Permit No.: 2©����_ Inspector's Initials: TYPE OF STRUCTURE: &MUt Lu&-L_ Y N NIA COMMENTS: Framing Attic Access 22"x 30"minimum Jack Studs/Headers Truss Specification Provided Bracing/Bridging Joist hangers Jack Posts I Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft 8 in. Stairwells 36 in.or more Exterior Deck Bracing Headroom 6 ft.8 in. Notches/Holes I Bearing Walls Metal Strapping for Notches Top Plate 1 %(w)16 gauge(8)16D nails each side Draft stopping 1,000 sq.ft.floor trusses Anchor Bolts 6 fl.or less on center Ice and water shield 24 inches from wall Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side%inch or 518 inch Type X Garage side 518 inch Type X Ceiling/wall Windows Habitable Space I Bedrooms 24in.(H) 20 in.(W) 5.7 sf above I below grade 5.0 sf grade Design Professional Sign-off,if required Framing I Firestopping Inspection Report PE516NEKS OF FINE «IGNES SINGE 1 &168 �A DESIGNERS 609 6LCN 13TREET-SU=NS FALLS-Hf r4 YORK 12601 PHONE-(15 1 8) -144 a-HOUSE FAX.(b 1 9) 7 qb-qO 17 www.williamsandwilii amsdesignera.com August 1 a, 2015 Peter Patel Days Inn of Queensbury 24 Big Boom Road Queensbury, New York 12804 RE: Field Modification at Days Inn of Queensbury Dear Peter, At your request, I inspected the renovation this morning. I noticed the contractor sistered a notched 200 floor joists to the existing W floor joists being supported with a joist hanger. This does not add any additional loading to the joist. It only strengthens the existing joist. Since we cannot verify the capacity of the existing hanger in use, a secondary support method should be used. On the 2x10 side of the connWned joist where the new joist meets the flush beam, install a Simpson ML26Z angle with 8SDS-114"x1 112" fasteners as per manufacture's specifications- rriuu Miro Ir Iufiw vummm-wn Should you have any questions please dont hesitate to contact me. Sincerely,11, �X niel Iliams Vice President i, Inspection Form ff �� Town of Queensbury Fire Marshal O Periodic Inspection Date: tdt�t S I I Time: f� 742 Bay Road,Queensbury NY 12804 o Re-Inspection 518 7618206/518 7618205 o CO Inspection Permit Fire Marshals Representative -XMJ Palmer Business Name: VWyS Location: GK Stillman Contact: Type of Inspection N/A Yes No EXITS: Exit Access FC 1014&FCI029 NOTES Exit Enclosure FC 1020&FC1029 Exit Discharge FC 1024&FC1029 Locks and latches FC1008& FC1029.2 Sign:Normal FC 1011 &FC1029 Sign:backup FC 1011.5.3&FC7029.7.5 - AISLES: Main Aisle Width FC 1024/1025&FC1029.11 Secondary Aisle Width FC 1025&FC1029.11 — FIRE EXTINGUISHER: Hung FC 906 Inspection of extinguisher FC 906 EVAC Plan FC 404.2 TRUSS ID SIGNAGE FC 505.3 EMERGENCY LIGHTING: Interior FC 1006.3&FC1029.8 Exterior FC 1006.3 - Clearance to Electrical FC 605.3 Electric Wiring Enclosed/Labeled FC 605.3.1 Combustibles in Equipment Rooms FC315.2.3 F.D.SI na e- FC 510 No Smoking Signs FC 310.3 Storage FC 315.2 Compressed Gas FC 3003 Vehicle Impact Protection FC 312.1 Interior Finishes FC 803.804 Smoke Detectors FC 907 CO detectors FC 610 Clearance to Sprinkler/Ceiling FC 315 2.1 18" / 24" EVAC SIGNS IN Rooms FC 404.6 R1 &R2 Fuel Pump Warning Signs FC2205.6 Fuel Station Emer Procedures FC2204.3.5 Exterior Storage FC 315.3 REINSPECTION DUE APPROXIMATELY Vacant Buildings FC 311 Emergency Disconnect FC 2203.2 21 DAYS SYSTEMS: FC 901.6 Insp OK NC DATE: OK NC Date Generator Annual DATE: OK NC Hood Installation Elevator Semi Annual FIRE ALARM Annual D.9 TE: OK NC HVAC Shutdown Sprinkler System Annual S Kitcchenhen Sprinkler Suppression Semi Annual A V Fuel Island Suppression Semi Annual Hood Cleanin 3-6-Annual Knox Box:installed/checked FC506 OCT 15 2 Operating Permit, if required will be issued after FireMarsryal Completion of Inspection sbLi Foundation Inspection Report Office No. (518)761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive: ,�) am/nm Depart: am/pm 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials: NAME: ^0-� PERMIT#: LOCATION: Zz4 b �A• INSPECT ON: / TYPE OF STRUCTURE: Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofmg Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- D Rough Grade 6 inch drop within 10 ft. L:\Building&Codes Farms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/9/2014 Town of Queensbury Building & Code Enforcement Office No. (518) 761-8256 Framing / Firestopping Inspection Report Inspection request received: 'S"5 Name: b*,kS )1r)n) C." V aa-n�x L �c� . Inspected on: $I134CAt> Location: tQ 60C4-Y, 41, Arrive: l21Ij a.m.l P.M. Permit No.: 20)q- � Inspector's Initials: WO TYPE OF STRUCTURE: cn>",vrr,Vc�..o...l Y N NIA COMMENTS: Framing Attic Access 22"x 30°minimum Jack Studs I Headers Truss Specification Provided Bracing I Bridging Joist hangers Jack Posts I Main Beams Exterior sheeting nailed properly 12°O.C. Headroom 6 ft.8 in. Stairwells 36 in.or more Exterior Deck Bracing Headroom 6 ft.8 in. Notches I Holes I Bearing Walls Metal Strapping for Notches Top Plate 1 %(w)16 gauge(8)16D nails each side Draft stopping 1,000 sq.ft.floor trusses Anchor Bolts 6 ft.or less on center Ice and water shield 24 inches from wall Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side%inch or 518 inch Type X Garage side 5/8 inch Type X Ceiling/Wall Windows Habitable Space I Bedrooms 24 in.(H) 20 in.(W) 5.7 sf above I below grade 5.0 sf grade Design Professional Sign-off,if required Framing/Firestopping Inspection Report Foundation Inspection Report Office No. (518)761-8256 Date Inspection request received: 611312015 Queensbury Building&Code Enforcement Arrive: 121(, am/pm Depart: am/pm 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials: NAME: ]CaaM_lrin I C�ilO v�ml�rXa PERMIT#: 2o14-45S 513 LOCATION: ' U 2/1 Qatq EX%2*n Q J• INSPECT ON: 0I 13120AS TYPE OF STRUCTURE: LIWYIY C,*-CA-0 J Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior //1��{ j ✓u�J W / �, `7 R- /U (r4 / Rough Grade 6 inch drop within 10 ft. /t e !✓c bve // L:\Building&Codes Forms\Building &Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/9/2014 Town of Queensbury Building &Code Enforcement e Office No. (518)761-8256 j 5 /- SS Framing / Firestopping Inspection Report Inspection request received: O k k2o1S Name: \n� I arAy!244b,�, Inspected on: U Location: 7A PJIa bxaxyl Arrive: A3' —a.m./p.m. Permit No.: 0 2Q14 ' }3 Inspector's Initials: TYPE OF STRUCTURE: l QNnw�PXCA Ll� Y N NIA COMMENTS: Framing Attic Access 22"x 30"minimum Jack Studs 1 Headers Truss Specification Provided Bracing I Bridging Joist hangers Jack Posts I Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft.8 in. Stairwells 36 in.or more [/ Exterior Deck Bracing �r n _Tn r/vri.,. ^1-V r/!C Headroom 6 ft.8 in. Notches I Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 Y2(w)16 gauge(8)16D nails each side Draft stopping 1,000 sq.ft.floor trusses Anchor Bolts 6 ft.or less on center Ice and water shield 24 inches from wall Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side'%inch or 518 inch Type X Garage side 518 inch Type X Ceiling/wall Windows Habitable Space I Bedrooms 24 in.(H) 20 in.(W) 5.7 sf above I below grade 5.0 sf grade Design Professional Sign-off,if required Framing/Firestopping Inspection Report G\.3) Foundation Inspection Report Office No. (518)761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive: c9ft-) am/pm Depart: am/pm 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials: NAME: 1 -*'� PERMIT#: LOCATION: bmw) INSPECT ON: 22 2QA TYPE OF STRUCTURE. Comments Y N N/A Zp Footings ) C)oIJ(rJ" � (Jry Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofng Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\Building&Codes Forms\Building &Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/9/2014 R�1occ�+` Doo2- 3 29 DOOR z " � 7-- h`F-c.cs c�oil� (30+1 v✓ Roo rv� nn� 6 CLT 7 2014