Loading...
Engineer's Narative Proposed, ±15,665 SF Hotel Aviation Hospitalit y, LLC 524 Aviation Road Town of Queensbury Wari-en County, New York E n2ineer"s Narrative Revised May 7, 017 March 15, 2017 Introduction The applicant (Avia�tion Hospitality, LLQ is proposing to redevelop the site at 5124.Aviation Road by constructing a new*151,665 sf, 4 story, 92 room. hotel in the, Town of,Queensbury. The site is located to the southeast of the intersection of 11-87 and Aviation, Road (NYS, Route 254), east of the northbound off-ramp and soutil of the existing Ambrosia Diner. The hotel is, proposed to be constructed on a portion, of a tax parcel which is, identified as 302.05-1-96.1 Existing Conditions, The parcel is,currently vacant, having been subject to the recent dernolition, of a Howard Johnson Motor Inn and accessory diner. "I'he buildings, related to the former use were razed, however on grade slabs,footings, foundations, parking areas,driveways and djivelanes were left in place!. The site is, currently served by gravity sewer, water and other utilities, both on. site and in the public right of way along Aviation Road, Zoning and Land, Use Regulations "rhe subject parcel islocated. in, the Enclosed Shopping Center (ESC) zoning district. In this district, a Hotel is allowed ley approval of Special, Use Permit. it,is expected that the application. will require Area Variances to provide relief rrorn a setback.requirement along the westerly boundary and in addition to a variance to allow the lot to have a reui aote. access to the public right of way over an area of granted access by ingresslegrens easement. ,Pro* o n Protect Descrilati L— The applicant proposes to redevelop the existing lot, by constructing,a 92 room, 4 story, ±15,665 sf hotel on an approximately ±2.5 acre parcel which is proposed to be subdivided ftom the larger �±4.57 acre parcel. The applicant anticipates, renovation of the existing site in the interest of providing appiopriate site amenities for the new use, including parking, loading area s) landscaping and site lighting,appropriate utilities.. In addition, the applicant Proposes to construct a new dri veway and pedestrian access,to Town Road standards, upon the is nds wlu ch will remain in the: control of the current owner, PCO F NewCo, LLC providing access to Aviation Road to the north In addition, the current owner will provide a driveway connection to Aviation Mall. Rights for ingress/egress over these driveways and utilities construction and maintenance will be executed by easenitrit on the remainder of the subject parcel. Buildin The structure will be ±1 5,665, sf at grade oreatinX62,,660 gross square feet of hotel space. The hotel will contain 92 gue�st rooms, cornmon. areas, hallways, a lobby, pool and gyrn as well as exterior amenity spaces. Water It is our understanding that water Service: is available by connection to the Queensbury Water Department 12" QIP main at the Aviation Road Right, of Way by way of capped, existing F service,. The new facility will use current / modem plumbing fixtures which typically have low / water saving flow rates. It is our understanding that the Queensbury Water Department, the local service provider,has the required residual capacity to servethis project,.Construction of the Offsitc Comiector Road, will require the vertical realignment l`an existing water main. Sewn It is, our understanding that the Queensbury Consolidated Sanitary Sevver District currently serves this site, A new set-vice lateral will connect 'to the existing private 8" sewer main. along the southeasterly boundary of the site,which, lows in a generally northeasterly direction to an eventual connection to the public sewer main along Aviation Road. It is our understanding that The Queensbury Consolidated Sanitary Sewer District, has the required residual capacity to, serve this project. Construction of the Offshe Connector Road will require the, vertical realignment of the existing sewer main. Site and Access The site will be prepared for construction by deraolition of the existing on grade: slabs, footings, parking areas, and driveways which are in conflict with the proposed development on the subJect parcel. The site will be improved with new landscaping, around the building and grass will be planted in other areas. All driving and parking areas will 'be paved and clearly striped and will accommodate site and through traffic in a safe manner. Ingress/Egress easements,will be provided by and to the subject parcel and adjacent owners, to facilitate interconnection of drives, shared parking and access throughout. The project envisions the Offsite Improvements to access and circulation as well. These Offsite Improvements include the construction of a Driveway which will connect the proposed Hotel to Av iat ion Road in addition to making intersection.improvements and revising the existing connection to the Ambrosia Diner. PCG NewCo, LLC is; proposing to, construct a Connector Road which will provide access to the Aviation Mall loop road and the full access, traffic,signal on Aviation Road. Site,LiLh!!ng Light poles,and building mounted lightin,g will be installed to light areas for safety mid security, Storm Water Storm water will be collected by means of an on7SAe stormwate;r/drainage systems and directed through an at grade detention/infiltration facility and/or a hydrodynamic treatment unit within, the site. it is,proposed that the offsite discharges associated with the 1, 10 and 100 year rainfall event,-, will equal or represent a decrease of the existing discharge rate. Ston-riwater Pollution. Prevention Plans (SWPPP) as specified by the New York. State Department of Environmental Conservation SPDES General Permit for Storinwater Discharges, from Construction Activity Permit No. GP,-O- 15-002have been prepared and submitted to the Town of Queensbury, for review. Aviation Hospitality, LLC proposes to construct a 15,665 sf, 4 story hotel with 92 roams, associated parking facilities and a Proposed Offifte Driveway which. will provide aeoess to Aviation Road to the North. In addition.; PCGF NewCo, LLC is proposing to c-onstruct a Mail Connector road which wi I I provide access from the Proposed offsite Driveway to the loop road at the adjacent Aviation Mail. L Proposed Home 2 Suites: The development: will result in impervious coverage of approximately�64% including the proposed building and, paved parking areas. The remaining±36% will, be open greenspace, landscaped and grass, areas. The proposed developed area will discharge stor.in.water in a southerly direction at varying grades, to proposed stormwater managementsystems which are discussed in greater detail in, the: Stormwater Management Report included in this SWPPP. The site is located within a Municipal Separate Storm Sewer System (MS4) municipality. Aviation Hospitality, LLC will be responsible for all construction activities, post construction operations and maintenance of the system and all resp onsibflities specified in the WPPP. New parking, landscaping, lighting., utility improvements, stormwater management facilities and other miscellaneous site improvement are proposed as shown on the enclosed Site Development Plans prepared by Bohler Engineering. 2. Proposed Offifte Improvements �Driveway), The development will result in impervious coverageof approximately ±49% including the proposed driveway, intersection, access to the Ambrosia Diner and connection to the Connector Road (designed by C.T. Male), The remaining A!5 1% will be open greenspace and grass areas., Aviation Hospitality, LLC will be responsible for all construction activities.PCGF NewCO, LLC wi 11 be responsible for post construction operations,and annai riteriance of the system and all. post construction responsibilities specified in the WPPP, I Proposed Off'site Improvements (Mail Connector Road by C.T. Male). The total pl"OPosed land disturbance area associated with the proposed connector road is, approximately f1.60, acres with 3% impervious, cover, an increase of ±O»I acres of impervious cover. The total arnount of redeveloped impervious ous area associated with the proposed connector road is 0.36 acres, and the, total amount of new impervious area associated.with,the proposed connector road is approximately 0.1. acres. Two (2) bioretention areas are proposed along connector road, along with. a hydrodynamic treatment unit. E'ach bioretention area contains an overflow structure which, ties into the piped conveyance system. Due to the decrease inoverall impervious area, the proposed conditions 'llows are less, than those during existing conditions; therefore, overbank and extreme! flood control are not required,. Flows from larger storm events will bypass the treatment practices and continue to drain similarly to existing conditions. The bioretention areas have been desi gne:d in accordance withthe design manual an,d mill treat and detain runoff frorn the WQv event. P,CGF NewCo, LLC will be responsible for all construe6on activities. PCGF NewCO, LLC will be responsible for post c,onstruction. operations and maintenance of the system and all. post construction responsibilities specified in the PPP. 'rhe proposed developed areas will discharge storm Ater to proposed story ,water management systemswhich are discussed in greater detail in the Storinwater Management Report included in the S "PPP. The proposed stormwater management system as designed will serve to mitigate the effects of the development of the parcel., such that the proposed use will not adversely at"fect any downstream or adjacent properties, The ston-nwater management system is fbilher designed to mitigate the peak discharge rates from the site associated with the 1, 10 and 100 year rainfall events. The following tables demonstrate that peak discharge rates, shoulddecrease bover 50% over the entire project. Discharge 2uantity�Cfs)S", inmary Table far P'rGI)os ed Ronnie 2 Suites Rainfall Desigil Point I Design Point 2 Event Existj %A, Exi'stim Pro %A I Year 0.0.2 0,00 -100% 0,20 01.00 -1001% '00 101,00 -11000 10 Year 1,13 .100% A7 Lj 00 jear OM r1.00 4.49 0,00 j— -1,00% Discharge Quantity (ifs)Sunintary Table for roposed Offifte Driveway Rainfall Desi-n point I Doqiy,,n Point 2 DesiAn Point 3 %A %4 %A Event "Exis2t!'iiig'T'-' Pro —&'s'ting lir Pau'5uiPro I Year 1 0.34 0-24 -29% 0,22 0.00 1010% 0.93 01-5�2 -441% 10 Year 1-33 D'A 5-3% 144 L67 -32% 101.9 1 'W -1 100,Year 311 1,35 -6F7.7 237 0-18 -92� -] K32 � 197 -2,516dz Rain:Discharge Q an!Ut .Ltftu n!i nia ry I'able for Proeosed Offsite Conn ctor Road fall Event Design Point I mm.—I Existing Pro, %A 1. Yew 0.02 -5011/0 .............. 10 yl�ar 1.58: 1,38 43-a LLOO-zen"r '7.4 0 7.17 Composite Discharge2!!�Oft Lcfs,Su m ma ry"fable for Proposed,P,r2ilect Desiga poiht I Rainfall Event % A Existing Pro I Year 1.73 101.,77 -55% 10,Year, 8,,8 - 7 -590/0 LLj Oj. 10,01 Year 2-7,66 1167 24"Vil'i