Loading...
RC-000264-2017 TOWN OF QUE'ENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518)761-8256 DER11-11FICATE OF OCCUPANCY Permit Number: RC-000264-2017 Date Issued: Thursday, June 21, 2018 This is to certify that work requested to be done as shown by Permit Number RC-000264-2017 has been completed. Tax Map Number: 295.20-1-4.3 Location: 48 FARR LN Owner: Kelli Murphy,Kellogg Murphy Applicant: Kelli Murphy This structure may be occupied as a: Residential Addition 1102 s.f. By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518)761-8256 BUILDING PERMIT Permit Number: RC-000264-2017 Tax Map No: 295.20-1-4.3 Permission is hereby granted to: Farr Construction For property located at: 48 FARR LN In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Tvce of Construction Owner Name: Kelli Murphy Single Family-Addition $173,500.00 Owner Address: 48 FARR LN Total Value $173,500.00 Queensbury,NY 12804 Contractor or Builder's Name/Address Electrical Inspection Agency Brodie Farr 4 STONEFIURST DR Queensbury,NY 12804 Plans&Specifications Residential Addition 1102 s.f. $220.40 PERMIT FEE PAID-THIS PERMIT EXPIRES: Wednesday,June 13,2018 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of ueensb - n tes y Ju 17 SIGNED BY: �I Irj�('/ for the Town of Queensbury. Director of Building&Code Enforcement Office Use Only ADDITION/AL ; ft0"'A101T Pei 12�� ylx�Z(eN-a(�l� kt, rows ofQu ury APPLI N14AY ? Permit Fee:$ c� 2d r 742 Bay Road,Queensbury,NY 12804 �- --... _ . _ Invoice#: r V l P:518-761-8256 www.gueensbury.net T0V!:; `_'' Project Location: '+(+ T�-Yy- Ua.Y J Tax Map ID#: •3 Subdivision Name: CONTACT INFORMATION: • Applicant: �1 / Name(s): _ Ve ll °I V/I Ml( Mailing Address, C/S/Z: `b -FeLVyLewl I NV 12604 Cell Phone: ( Sit ) 79I—J(o,aq Land Lin��)gla Email: V- Yvtu-g lxy —II( p TWaiI. e3`/� Primary Owner(s): Name(s): 0 S• M h Mailing Address, C/S/Z: - " fetw Le;-nC QV4UA,, bUN , : 0.Ur 41 (1B Cell Phone ) -7q(- Land Line:! ( 51� ) Sla -OS1� Email: 1,Mwv\ehy-7 IC��VVU4; 1. Corr\ • Contractor(s): �n r� n� � � L�, , _ ` Business Name: byr)) l�) �"(r l (7V fVUUh� Contact Name(s): P-)yodl-t 1�r Mailing Address, C/S/Z: L- S4G kiu vs� NvC I cQ. U&nr1qu-rV IVY (J6D Cell Phone: ( 51� ) �ls --7DUCP Land Line: Email: • Architects En ineer s : Business Name: W( [i a-rn s )) a rvls O2SihrytrS , Trc - Contact Name(s): Dam Wli)(i tt.mS Mailing Address, C/S/Z: 501l 6WA SA. � 6(tm S t:iPi(Is�N� (JA01 :Cell Phone _) Land Line: 16— tbUSE Email: CDYY\ Contact Person for Building & Code Compliance: grudi( Cell Phone: ( 51t) Land Line: �) Email: Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017 PROJECT INFORMATION: t TYPE: Commercial Residential WORK CLASS: X Single-Family —Two-Family _Multi-Family (#of units ) Townhouse Business Office Retail Industrial/Warehouse _ Garage (# of cars ) _ Other (describe ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 3()q 1st floor: 2nd floor: 211 floor: 3rd floor: 31 floor: 4t'floor: 4"floor: Total square feet: V- Total square feet: ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 113, 6GO . On 2. If Commercial project, what is the proposed use: 3. Source of Heat (circle one): as Oil Propane Solar Other Fireplaces need a separate Fuel Burning Appliances&Chimney Application 4. Are there any structures not shown on the plot plan? ©E NO Explain: 5. Are there any easements on the property? YES NO 6. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? b. Is this a corner lot? ES NO c. Will the grade be changed as a resu a construction? YES NO d. What is the water source? C PUB LI PRIVATE WELL e. Is the parcel on SEWER or a RI E system? Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017 DECLARATION: 1. I acknowledge that no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or --description-cf.-the work—proposed,--that all_%mrk_will_lie.performed-in accordance with_the.NYS_Bui[ding__- __—_ Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed 1, or my agents, will obtain a certificate of occupancy. 5. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. have read and agree to the above: PRINT NAME: JGIId 17?v� SIGNATURE: 4 4 DATE: Town of queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017 REQUIREMENTS FOR SUBMITTAL: 1. Completed Additions/Alterations permit application e TWO (2) COPIES OF THE FOLLOWING: a 2. Structural drawings, which include: a.Signed &sealed architect or engineer stamp IF the cost of construction is over 0,000 b.Floor plan c. Foundation plan d.Cross sections e. Elevations f. Window & Door schedules—printed on the drawings is acceptable g.Calculation sheet for natural light,ventilation &emergency egress 3. Plot plan, using a survey map if possible,which includes: a.Drawn to scale (i.e. 1 inch = 1-feet) b.Indicate proposed changes,with setbacks c.Include all structures on the property d.Include location of water supply(well or water lines) e. Include location &configuration of septic system or sewer line 4. REScheck(residential projects) or COMcheck(commercial projects), signed and stamped— www.energycodes.gov ADDITIONAL INFORMATION: 1. Any changes to the approved plans prior to or during construction will require the submittal of amended plans, additional reviews and re-approval. 2. If,for any reason, the building permit application is withdrawn, 20% of the fee is retained by the Town of Queensbury. After 1 year from the initial application date, 100% of the fee is retained. Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017 ft -b y81 vr4ga blldi� iiA�SEPTIC DISPOSAL PERMIT APPLICATION Office Use Only 742 Bay Road,Queensbury,NY 12804 //P:551�1jj8-7✓6�1-82561 www.gueensbury.net Permit#: Tax Map ID#: l✓ GUI`���—I —"(y�� Permit Fee:$ : Invoice M Project Location: �0 r//IYVL,(dJi f(� Septic Variance? Yes No Primary Owner(s) U Mailing Address (J Phone& Email Installer/Builder • r Mailing Address Br 0�e Phone & Email v Engineer Mailing Address110 Phone& Email TOW NO MUNIT O Contact Person for Building&Code Compliance: RESIDENCE INFORMATION: Year Built #of bedrooms X gallons per bedroom =total daily flow Garbage Grinder Yes No 1980 or older Installed? (circle one) 1981-1991 Spa or Hot Tub Yes 'No Installed? (circle one) 1992-PresentD PARCEL INFORMATION: -j S '1 tu Topography _Flat Rolling _Steep Slop _%Slope Soil Nature _Sand _Loam _Clay _Other Groundwater At what depth? Bedrock/Impervious material At what depth? Domestic Water Supply IZMunicipal _Well (if well,water supply from any septic system absorption is_ft.) Percolation Test Rate: per minute per inch (test to be completed by licensed engineer/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION: Tank size gallons(min.size 1,000 gallons,add 250 gallons for each garbage cylinder or spa/hot tub System Absorption field with#2 stone Total length -360 ft., Each Trench Coo ft. Seepage Pit with#3 stone How many: :Size: Alternative System Bed or other type: Holding Tank System Total required capacity? Soo ;tank size •#of tanks NOTES: 1.Alarm system&associated electrical work must be inspected by a Town approved electrical inspection agency;2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved. The installed system must match the septic layout on file—no exceptions. Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinancce..I � '' 'I►//Jy PRINTNAME: '"`�A6 �®!/� 'I DATE: SIGNATURE: )kA UJ DATE: Town of Queensbury Building&Code Enforcement ��+ V 6lX l3 Revised February 2017 Generated by REScheck-Web Software Compliance Certificate Project PLAN NO: 111416 Energy Code: 2015 IECC Location: Warren County, New York Construction Type: Single-family Project Type: Addition Orientation: Bldg. faces 0 deg, from North Climate Zone: 6 (8499 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 48 FARR LANE KELLY MURPHY KELLI CHANDLER JESSICA CHENIER BULMAN QUEENSBURY, New York 12804 MURPHY WILLIAMS&WILLIAMS DESIGNERS 48 FARR LANE 509 GLEN ST QUEENSBURY, New York 12084 GLENS FALLS, New York 12081 518-798-4687 JESSICA@W ILLIAMSANDW ILLIAMSD ESIGNERS.COM Compliance: Passes using UA trade-off Compliance: 0.6%Better Than Code Maximum UA: 171 Your UA: 170 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code tradeoff rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or U-Factor UA= Ceiling: Flat or Scissor Truss 811 38.0 0.0 0.030 24 Wall:Wood Frame, 161n. o.c. 182 21.0 0.0 0.057 10 Orientation: Front Wall:Wood Frame, 16in.o.c. 55 21.0 5.0 0.043 2 Orientation: Right side Wall:Wood Frame, 16in.o.c. 164 21.0 5.0 0.043 5 Orientation: Back Window: Wood Frame, 2 Pane w/Low-E 24 0,290 7 Orientation: Back Window:Wood Frame, 2 Pane w/Low-E 30 0.300 9 Orientation: Back Wall:Wood Frame, 16in.o.c. 18 21.0 0.0 0.057 1 Orientation: Back Wall:Wood Frame, 161n.o.c. 146 21.0 5.0 0.043 6 Orientation: Left side Wall:Wood Frame. 16in.o.c. 178 21.0 5.0 0.043 6 Orientation: Front Window: Wood Frame, 2 Pane w/Low-E 30 0.300 9 Orientation: Front Wall:Wood Frame, 161n.o.c. 105 21.0 0.0 0.057 6 Orientation: Front 49 21.0 5.0 0.043 2 Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 1 of 10 Gross Area Cavity Cont. Assembly or U-Factor UA Wall:Wood Frame, 16in.o.c. 146 21.0 5.0 0.043 5 Orientation: Back Window:Wood Frame, 2 Pane w/Low-E 30 0.300 9 Orientation: Back Wall:Wood Frame, 16in. o.c. 32 21.0 0.0 0.057 2 Orientation: Back Wall:Wood Frame, 16in,o.c. 178 21.0 0.0 0.057 8 Orientation: Left side Window: Wood Frame,2 Pane w/Low-E 30 0.300 9 Orientation: Left side Wall:Wood Frame,16in.o.c. 129 21.0 5.0 0.043 6 Orientation: Left side Floor:All-Wood joist/Truss Over Uncond.Space 484 30.0 0.0 0.033 16 Floor:All-Wood Joist/rruss Over Outside Air 23 30.0 0.0 0.033 1 Basement:Solid Concrete or Masonry 160 21.0 0.0 0.043 7 Orientation: Front Wall height: 8.0' Depth below grade:7.0' Insulation depth: 8.0' Basement:Solid Concrete or Masonry 48 21.0 0.0 0.043 2 Orientation: Right side Wall height: 8.0' Depth below grade: 7.0' Insulation depth: 8.0' Basement:Solid Concrete or Masonry 160 21.0 0.0 0.043 6 Orientation: Back Wall height:8.0' Depth below grade: 7.0' Insulation depth: 8.0' Window:Vinyl Frame,2 Pane w/Low-E 20 0.300 6 Orientation: Back Basement: Solid Concrete or Masonry 128 21.0 0.0 0.043 6 Orientation: Left side Wall height: 8.0' Depth below grade:7.0' Insulation depth:8.0' Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 5.5.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Jessica Chenier Bulman Jessica Chmier rdwah 03/07/17 Name-Title Signature Date �E OF New zlY _'P'?P�KFI?H�a Q9t c Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 2 of 10 REScheck Software Version 5.5.0 CID( Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and ❑Complies 103.2 documentation demonstrate ❑Does Not [PR11' energy code compliance for the ❑Not Observable _ building envelope.Thermal envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for ❑Not Observable EPR311 lighting and mechanical systems. Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. _ 302.1, :Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: ❑Not Observable Manual J or other methods Btu/hr Btu/hr approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Law Impact(Tier 3) Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 3 of10 Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Re .ID 402.1.1 Conditioned basement wall R-_ R-_ ❑Complies See the Envelope assemblies (F0411 insulation R-value.Where interior R- R- ❑Does Not table for values. V,, insulation is used,verification may need to occur during ❑Not Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies [F0511 insulation installed per ❑Does Not manufacturer's instructions. ❑Not Observable ❑Not Applicable 402.2.9 Conditioned basement wall it it ❑Complies See the Envelope Assemblies [F0611 insulation depth of burial or ❑Does Not table for values. 0 distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies [FO11]2 to protect exposed exterior ❑Does Not insulation and extends a minimum of 6 in. below grade. ❑Not Observable []Not Applicable 403.9Snow-and ice-melting system ❑Complies [FO12]2 controls installed. ❑Does Not •ui ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 4 of 10 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Glazing U-factor(area-weighted U- U-_ ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, ❑ 402.3.6, Not Observable 402.5 ❑Not Applicable [FR2]1 303.1.3 u-factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or []Not Observable taken from the default table. ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ❑Complies [FR23]1 installed per manufacturer's ❑Does Not instructions. ❑Not Observable ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies [FR2011 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 W or has infiltration rates per NFRC [:]Not Observable 400 that do not exceed code ❑Not Applicable jlimits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]2 �sealed at housing/interior finish ❑Does Not and labeled to indicate<2.0 cfm ❑Not Observable leakage at 75 Pa. []Not Applicable 403.2.1 Supply and return ducts in attics ❑Complies [FR1211 insulated >= R-8 where duct is ❑Does Not >= 3 inches in diameter and >= ❑Not Observable R-6 where< 3 inches. Supply and return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>=3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. ❑Does Not fli ❑Not Observable ❑Nat Applicable 403.4 HVAC piping conveying fluids R- R-_ ❑Complies [FR17]' above 105 QF or chilled fluids ❑Does Not below 55 QF are insulated to a:R- [-]Not Observable - 3' ❑Not Applicable 403.4.1 Protection of insulation on HVAC ❑Complies [FR24]1 piping. ❑Does Not 0 ❑Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R-_ R- ❑Complies [FR18]2 aR-3. ❑Does Not �L ❑Not Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 5 of 10 I I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 6 of 10 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 All installed insulation is labeled ❑Complies [IN1312 or the installed R-values ❑Does Not to provided. ❑Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.6 [1 Wood F1 Wood ❑Does Not table far values. [IN111 ❑ Steel ❑ Steel ❑Not Observable ❑Not Applicable 303.2, Floor insulation installed per ❑Complies 402.2.7 manufacturer's instructions and ❑Does Not [I1,1211 in substantial contact with the '0 underside of the subfloor, or floor ❑Not Observable framing cavity insulation is in ❑Not Applicable contact with the top side of sheathing,or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies 'See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN311 exterior,the exterior insulation requirement applies(FR10). ❑ Steel ❑ Steel []Not Applicable 303.2 Wall insulation is installed per ❑Complies [IN411 manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) _ 3 1 Low Impact(Tier 3) Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 7 of 10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Re .ID 402.1.1, Ceiling insulation R-value. R-_ R-_ ❑Complies 'See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel ❑Not Observable 402.2.6 [Fill' ❑Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. ❑Does Not [FI211 Blown insulation marked every 300 ft'. ❑Nat Observable ❑Nat Applicable 402.2.3 Vented attics with air permeable ❑Complies [FI22]1 insulation include baffle adjacent ❑Does Not to soffit and eave vents that extends over insulation. ❑Not Observable ❑Nat Applicable 402.2.4 Attic access hatch and door R-_ R-_ ❑Complies (FI311 insulation >_R-value of the ❑Does Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 =_ ACH 50=_ ❑Complies [FI17]1 ach in Climate Zones 1-2,and ❑Does Not <=3 ach in Climate Zones 3-8. []Not Observable ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [FI411 cfm/100 ft2 across the system or ft' ft' '❑Does Not <=3 cfm/100 ft2 without air ❑Not Observable handler @ 25 Pa. For rough-in tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [FI2711 determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g.across the system including the manufacturer's air handler enclosure if installed at time of test.Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g.across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ❑Complies [FI2411 by manufacturer at<=2%of ❑Does Not design air flow. ❑Not Observable ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies [FI9]2 installed for control of primary ❑Does Not heating and cooling systems and ❑Not Observable initially set by manufacturer to code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10]2 on heat pumps. ❑Does Not ❑Not Observable ❑Not Applicable 403.5.1 Circulating service hot water ❑Complies [Fill]2 systems have automatic or ❑Does Not accessible manual controls. ❑Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 8 of 10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 All mechanical ventilation system ❑Complies [FI25]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy and airflow limits. ❑Not Observable []Not Applicable 403.2 Hot water boilers supplying heat ❑Complies (F126]2 through one-or two-pipe heating ❑Does Not systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor ❑Not Applicable temperature. _ 403.5.1.1 Heated water circulation systems ❑Complies (F12812 have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply ❑Not Observable pipe.Gravity and thermos- ❑Not Applicable syphon circulation systems are not present.Controls for circulating hot water system - pumps start the pump with signal for hot water demand within the occupancy.Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies [F[29]2 comply with IEEE 515.1 or UL ❑Does Not 515.Controls automatically []Not Observable adjust the energy input to the heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies [F130]2 have recirculation pumps that ❑Does Not pump water from a heated water supply pipe back to the heated []Not Observable water source through a cold []Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 1044F. 403.5.4 Drain water heat recovery units ❑Complies [F13112 tested in accordance with CSA ❑Does Not 855.1. Potable water-side pressure loss of drain water heat ❑Not Observable recovery units< 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units<2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies [FI611 fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. Does not apply to low-voltage []Not Observable lighting. ❑Not Applicable 404.1.1 Fuel gas lighting systems have ❑Complies [F12313 no continuous pilot light. ❑Does Not []Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 9 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 401.3 Compliance certificate posted. ❑Complies [FI712 ❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [FI1813 mechanical and water heating []Does Not systems have been provided. ❑Not Observable .. ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: PLAN NO: 111416 Report date: 03/07/17 Data filename: Page 10 of 10 �( 2015 IECC Energy j Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 21.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Door Rating U-Factor SHGC Window 0.30 Door Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater• Name: Date: Comments MURPHY FAMILY HOUSE; 48 FARR LANE QBY MATTS LANDSCAPING & STONESCAPING LLC HOUSE RD E C E D E OCT 1 ? 2017 I PORCH 23' FROM CORNER OF HOUSE TO RIGHT PIPE -� OF QUEENSBURY {+ { BUILDING&CODES ORIGINAL 1250 GAL TANK 4'1_ FENCE 500 GAL 2L PLS BUILT D-BOX 28'TO FENCE z z z z O o O o J J J J �o �o �o bo Kt � 6' BETWEEN EACH RUN 13' OFF POOL - 52' LONG VENT 3.5' OFF SHED