RC-000802-2016 TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
-- Community Development-Building&Codes (518)761-8256
CERTIFICATE OF OCCUPANCY
Permit Number: RC-000802-2016 Date Issued: Thursday, June 22, 2017
This is to certify that work requested to be done as shown by Permit Number RC-000802-2016
has been completed.
Tax Map Number: 296.14-2-3
Location: 25 DEVIN CT
Owner: CERRONE BUILDERS,INC.
Applicant: CERRONE BUILDERS, INC.
This structure may be occupied as a: Single Family Dwelling w/FP 1400 s.f.
Garage 844 s.f. By Order of Town Board
Village at Sweet Road,Lot 3 TOWN OF QUEENSBUR,Y/
Issuance of this Certificate of Occupancy DOES NOT relieve the
property owner of the responsibility for compliance with Site Plan,
Variance,or other issues and conditions as a result of approvals by the
Director of Building&,Code Enforcement
Planning Board or Zoning Board of Appeals.
TOWN OF QUEENSBURY
742 Bay Road.Queensbury,NY 12804-5904 (518)761-8201
Community Development-Building& Codes (518)761-8256
BUILDING PERMIT
Permit Number: RC-000802-2016
Tax Map No: 296.14-2-3
Permission is hereby granted to: CERRONE BUILDERS,INC.
For property located at: 25 DEVIN CT
In the Town of Queensbury,to construct or place at the above location in accordance with application together
with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform
Building Codes and the Queensbury Zoning Ordinance
Type of Construction
Owner Name: CERRONE BUILDERS,INC. Single Family-New $340,000.00
Owner Address: 1589 State Route 9 Total Value $340,000.00
Fort Edward,NY 12828
Contractor or Builder's Name/Address Electrical Inspection Agency
CERRONE BUILDERS,INC.
1589 State Route 9
Fort Edward,NY 12828
Plans&Specifications
Single Family Dwelling w/FP 1400 s.f.
Garage 844 s.f.
Village at Sweet Road,Lot 3
$1,306.60 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday,December 8,2017
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the Town pfQRCet bury; _In 4 Th say ece ber 8,2016
SIGNED BY: `( Limit{// for the Town of Queensbury.
Director of Building&Code Enforcement
PRINCIPAL 8-1-RU "1'UKE APPLICATION Office Use Only
Date: Z f Z9 Permit No. (LC -602• ZO 110
Tax Map ID / Permit Fee 5to• -0 t1.0..
Zone . �H/1istooriri'c? _Yes /No Rec Fee
Subdivision Name '//Nf /��.�lG>!C/ cLC Lot# _ Site Plan#
Subdivision#
Project Location AL5- /iu �� ALA'3
TOWN BD.RESOLUTION 86-2013: $850 recreation fee for new dwelling units—single family,duplexes/two-family, multiple family,
apartments,condominiums,townhouses,and/or manufactured&modular homes,but not mobile homes. This is in addition to the
permit fee(s).
Primary Owner(s)
Address
Phone/Email
Applicant
Address
Phone/Email
Contractor
Address
Phone/Email
Contact Person for Building&Codes Compliance: .96dGn/ Lily /n i Phone
TYPE OF CONSTRUCTION
✓Check all that apply New Addition Alteration la floor sf 2nd floor sf Total sf Height
Single Family
Two-Family 7(J
Multi-Family
(#of units_)
Townhouse
Business Office 15
Retail-Mercantile TOWN OF QUEENSB RY
BUIL ING&CODE
Factory-Industrial
Attached Garage
(1, 26)4+)
Other ` 7
Town of Queensbury Building&Codes Principal Structure Application revised January 2016
'I f commercial or industrial please indicate name of business
Proposed use of building or addition
Source of Heat(circle one) Oil Propane Solar Other
Fireplace: Complete a separate application for Fuel Burning
Appliances & Chimneys
Are there structures not shown on plot plan?
Are there easements on the property?
Site Information:
a. Dimensions or acreage of lot I
b. Is this a corner lot? _Yes No
c. Will the grade be changed as a result of construction Yes ✓ No
d. Public water or Private well(circle one) Public Private
e. Sewer or Private Septic System(circle one) Sewe Private
Value of all work to be performed (labor or materials) $ 60 0f
DECLARATION.
1. I acknowledge no construction shall be commenced prior to issuance of a valid permit and will be
completed within a 12 month period.
2. If work is not complete by the 1 year expiration date the permit may be renewed, subject to fees and
department approval.
3. I certify that the application, plans and supporting materials are a true and complete statement /
description of the work proposed, that all work will be performed in accordance with the NYS
Building Codes,local building laws and ordinances,and in conformance with local zoning regulations
4. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate
of occupancy.
5. I also understand that I /we are required to provide an as-built survey by a licensed land surveyor of
all newly constructed facilities prior to issuance of a certificate of occupancy.
I have read and agree to the above:
PRINT NAME: / /J �.L� /1�t� DATE:
SIGNATURE: DATE: �� l•% �6
For office use only
Operating Permit Issued: —Yes —No
Occupancy Type
Construction Classification
Assembly Occupancy Limit
Special Conditions
Town of Queensbury Building&Codes Principal Structure Application Revised January 2016
Fuel Burning Appliance & Chimney Application Office use Only
/ Received
DATE: 11127 Z l6 Tax Map ID
TAx MAP ID: Permit No. 2 . 2o l b
Permit Fee
ZONE:
OWNER �� / PHONE/E-MAIL -V/-
ADDRESS
INSTALLER/ PHONE/E-MAIL
BUILDERi�G�/�/QGL CO
CONTACT PERSON FOR BUILDDING&CODE COMPLIANCE:
PHONE/E-MAIL � / , e! jnl BUILDING ADDRESS z ��N
ROOM OF INSTALL: �a/ �!'h� , PLANNED INSTALL DATE: 6r,4 1• ZA9/7
FUEL BURNING APPLIANCE INFORMATION WOOD COAL PELLET GAS OIL NOTE: ROUGH-IN&
STOVE FINAL INSPECTION ARE
FIREPLACE INSERT Vi LL REQUIRED'
NOTE:
FIREPLACE,FACTORY BUILT* 20116
t
OV j 1 20 MANUFACTURER'S
FIREPLACE,MASONRY
INSTALLATION MANUAL
FURNACE(GARAGE ONLY) I QVVII OF Out BUI DING& ODES Y MUST BE AVAILABLE AT
TIME OF INSPECTION
*If factory built provide manufacturer name: e/ / c, ;Model#: 11M 310
Listed by: Number:
CHIMNEY INFORMATION
Masonry** (check one) _BLOCK _BRICK _STONE
Flue YIE STEEL Size in inches
Material DOUBLE WALLTRIPLE WALL INSULATED
_
** If non-masonry provide manufacturer name: ! a-- ;Model#:
DECLARATION: Construction/installation must conform to NYS Fire Prevention & Building Code and/or
manufacturer requirements. The applicant or owner agrees to comply with all applicable laws, ordinances,
regulations,and all conditions that are part of these requirements and also will allow inspector's to enter premises
to perform required inspections.
I HAVE READ AND AGREE TO THE ABOVE: /
PRINTNAME: DATE: A
SIGNATURE: DATE:
Town of Queensbury Building&Codes Principal Structure Application Revised January 2016
Town of Queensbury Thomas R. Van Ness
Highway Department Highway Superintendent
742 Bay Road, Queensbury,NY 12804 Home: 518-745-0929
Phone: 518-761-8211
Fax: 518-745-4466 David Duell
Deputy Highway Superintendent
Ho
p t� � od �
DRIVEWAY PERMIT D
Date:
Zz 6 NOV 2 1 2016
Applicant Name: 0W— r TOWN OF QUEENSSURY
BUILDING&CODES
Telephone No.: �j f '�QL�//Z/�
Address to be Inspected z5- 1-loll
Return Address: , o�G
Applicant must show exact location and width of driveway(s) to be connected to the highway by placing stakes
at the specified location
The Superintendent of Highways of the Town of Queensbury has reviewed this application. The following action
has been taken:
STEP 1: O Preliminary approval 296.14-2-3 RC-000802-2016Cerrone Builders
NEED ( ) Slight Swale 25 Devin Court, Lot 3
( ) Deep Swale SFD W/FP 1400 s.f.,Garage 844 s.f.
O Level with the road -
( ) Level with the top of the paved wing
Size culvert pipe to be used (if necessary)
( ) 12" ( ) 15" ( ) 18" ( ) 24„ ( ) 36"
Preliminary inspection completed by: Date:
Approval by Highway Supt.: or Deputy Supt.:
Upon completion please resubmit this approval permit for a final approval.
STEP 2: ( ) Final Approval ( ) Rejected
Date:
Thomas R. Van Ness, Highway Superintendent David Duell, Deputy Highway Superintendent
Town of Queensbury Building&Codes Principal Structure Application Revised January 2016
/off
EE
tNbIJURY
BUILDING&CODES
' I
Nil1 �
I /
�7
90'
zs ;
REScheck Software Version 4.6.2
Compliance Certificate
296.14-2-3 RC-000802-2016
Project Cerrone Builders Inc Cerrone Builders
Energy Code: 2015 IECC 25 Devin Court, Lot 3
Location: warren County, New York SFD w/FP 1400 s.f.,Garage 844 s.f.
Construction Type: Single-family
Project Type: New Construction
Conditioned Floor Area: 1,400 ft2
Glazing Area 14% FILE COPY
Climate Zone: 6 (8499 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
25 Devin Court VISION Engineering, LLC
Lot 3 206 Glen Street
Queensbury, NY 12804 Suite 56
Glens Falls, NY 12801
(518) 792-9264
Compliance: Passes using UA trade-off
Compliance: 0.0%Better Than Cade Maximum UA: 223 Your UA: 223
The%Better or worse Than Code Index reflects haw close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area
Assembly or Cavity Cont. U-Factor UA
Ceiling 1: Raised or Energy Truss 1,400 38.0 0.0 0.025 35
Wall 1: Wood Frame, 16" o.c. 1,404 21.0 0.0 0.057 68
Window 1: Vinyl Frame:Double Pane with Low-E D EC
E BY
Y E 139 0.290 40
Door 1: Front: Solid �p V 0 0.200 4
Door 2: Back: Glass 2 l c 0 0.290 12
NOV
Door 3: Fire Door: Solid , 2015 8 0.140 3
Basement Wall 1: Solid Concrete or Masonry 13 D0 0.0 15.0 0.046 54
Wall height: 7.8' TOWN OF QUEENSBURY
Depth below grade: 6.8' BUILDING 8 CODES
Insulation depth: 7.8'
Window 2: Wood Frame:Double Pane 7 0.320 2
Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.320 5
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201 - DES - Page 1 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in
REScheck VersiTM
mply with the mandatory require is listed in the REScheck Inspection Chet ist.
f
Name-Title Signature DJP VU
Project Notes:
VISION Project 1201
OF NFw
LW q y y0
Ar:
w
z
40 0
311
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201 - DES- Page 2 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
CREScheck Software Version 4.6.2
�J( Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions' column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-inspection Review Value Value Complies? Comments/Assumptions
& Re .ID -
103.1, .Construction drawings and - ❑Complies
103.2 ''documentation demonstrate ❑Does Not
[PRM energy code compliance for the
Al :building envelope.Thermal ❑Not Observable
envelope represented on ❑Not Applicable
construction documents.
103.1, Construction drawings and ❑Complies
103.2, documentation demonstrate ❑Does Not
403.7 energy code compliance for
[PR311 lighting and mechanical systems ❑Not Observable
Systems serving multiple ❑Not Applicable
!dwelling units must demonstrate ,
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is Heating: Heating: ❑Complies
403.7 sized per ACCA Manual S based Btu/hr Btu/hr— ❑Does Not
[PR212 on loads calculated per ACOA Cooling: Cooling:
Manual J or other methods Btu/hr— Btu/hr ❑Not Observable
approved by the code official. ❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201- DES - Page 3 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
Section Plans Verified Field Verified
# Foundation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies
[F04]1 insulation R-value.Where interior R- R- ❑Does Not table for values.
4Y, insulation is used,verification ❑Not Observable
may need to occur during ❑Not
Insulation Inspection. Not Applicable
required in warm-humid locations
in Climate Zone 3.
303.2 Conditioned basement wall ❑Complies
[F0511 insulation installed per ❑Does Not
manufacturer's instructions. ❑Not Observable
❑Not Applicable j
402.2.9 !Conditioned basement wall ft it ❑Complies See the envelope Assemblies
[FO611 linsulation depth of burial or ❑Does Not (table for values.
distance from top of wall. ❑Not Observable
❑Not Applicable j
30321G
A protective covering is installed ❑Complies
[FO110 'to protect exposed exterior ❑Does Not
insulation and extends a
' ❑Not Observable minimum of 6 in. below grade.
❑Not Applicable
4039 . . ..Snow-and ice-melting system ❑Complies
[FO12]2'" controls installed. ❑Does Not
❑Not Observable
❑Not Applicable j
Additional Comments/Assumptions:
111 High Impact(Tier 1) r 'u Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\I rob ision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201 - DES - Page 4 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
Section Plans Verified 'Field Verified'
# Framing / Rough-In Inspection Value Value Complies? 'Comments/Assumptions
& Rep.ID
402.1.1, Door U-factor. U-_ U-_ ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR111 ❑Not Observable .
[]Not Applicable
402.1.1, .Glazing U-factor(area-weighted U-_ U-_ ❑Complies See the Envelope Assemblies
402.3.1, '.average). ❑Does Not table for values.
402.3.3,
402.3.6, ❑Nat Observable
402.5 E]Not Applicable j
[FR211
303.1.3 :U-factors of fenestration products ❑Complies
[FR411 are determined in accordance ❑Does Not
with the NFRC test procedure or
taken from the default table. r : ❑Not Observable I
_ ❑Not Applicable
402.4.1.1 .Air barrier and thermal barrier _ ❑Complies
[FR2311 installed per manufacturer's ❑Does Not
instructions. ❑Not Observable
❑Not Applicable j
402.4.3 '.Fenestration that is not site built ❑Complies
[FR20]3 -is listed and labeled as meeting ':' ❑Does Not
'AAMA/WDMA/CSA 101/1.5.2/A440
or has infiltration rates per NFRC ❑Not Observable
1400 that do not exceed code ❑Not Applicable
limits.
402.4.5 '..IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing/interior finish ❑Does Not j
and labeled to indicate <_2.0 cfm -]Not Observable
;leakage at 75 Pa. ❑Not Applicable j
403.2.1 Supply and return ducts in attics []Complies
(FR1211 insulated >= R-8 where duct is ❑Does Not
>= 3 inches in diameter and >_ ❑Not Observable
R-6 where < 3 inches.Supply and
return ducts in other portions of ❑Not Applicable j
the building insulated>= R-6 for
diameter>= 3 inches and R-4.2
for<3 inches in diameter.
403.3.3.5 Building cavities are not used as ❑Complies
[FR15]3 ,ducts or plenums. ❑Does Not
e3 ❑Not Observable
❑Not Applicable
403.4 HVAC piping conveying fluids R-_ R-_ ❑Complies
(FR17]' above 105 QF or chilled fluids - ❑Does Not
below 55 4F are insulated to all- []Not Observable
_ 3. ❑Not Applicable j
403.4.1 Protection of insulation on HVAC ❑Complies
[FR2411 piping. ❑Does Not
M ❑Not Observable
❑Not Applicable j
403.5. -7 Hot water pipes are insulated to R-_ R-_ ❑Complies
[FR18]2 '>_R-3. ❑Does Not
M) ' ❑Not Observable
❑Not Applicable j
403.6 .Automatic or gravity dampers are ❑Complies
[FR19]2 Jinstalled on all outdoor air :]Does Not
sill intakes and exhausts. :]Not Observable
:]Not Applicable
1 I High Impact(Tier 1) Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201- DES - Page 5 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
Additional Comments/Assumptions:
1 IHigh Impact(Tier 1) -2- Medium Impact(Tier 2) 3.1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201- DES - Page 6 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
Section Field Verified
# Insulationinspection Plans Verified Value Value Complies? Comments/Assumptions
303.1 All installed insulation is labeled "❑Complies
[IN13]2 or the installed R-values -❑Does Not
provided. ❑Not Observable
❑Not Applicable
402.1.1, Wall insulation R-value. If this is a R- R-_ El Co
'See the Envelope Assemblies
402.2.5, mass wall with at least 1/2 of the [I Wood F1 Wood Do=Not table for values.
402.2.6 wall insulation on the wall ❑ Mass j❑ Mass ❑Not Observable
[I1,13]1 exterior,the exterior insulation
requirement applies (FR10). ❑ Steel ❑ Steel ❑Not Applicable
303.2 Mall insulation is installed per ;❑Complies
[IN411 `.manufacturer's instructions. ❑Does Not
❑Not Observable
- ❑Not Applicable
Additional Comments/Assumptions:
----------
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201 - DES- Page 7 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req,ID
402.1.1, .Ceiling insulation R-value. R- R- ❑Complies :See the Envelope Assemblies
402.2.1• E] Wood ❑ Wood ❑Does Not 'table for values.
402.2.2• ❑ Steel ,❑ Steel
❑
402.2.6 Not Observable
[Fill' ❑Not Applicable
303.1.1.1, ;Ceiling insulation installed per ❑Complies
303.2 manufacturer's instructions. ❑Does Not
[FI211 Blown insulation marked every
1300 ft'. ❑Not Observable
❑Not Applicable
4022, Vented attics with air permeable ❑Complies
[F1227z::•.—:insulation include baffle adjacent ❑Does Not
to soffit and eave vents that
;extends over insulation. ❑Not Observable
c =❑Not Applicable
402.2.4 Attic access hatch and door '. R-_ R-_ ❑Complies
[FI311 insulation all-value of the r ❑Does Not
:.adjacent assembly. ❑Not Observable
j❑Not Applicable
402.4.1.2 Blower door test @ 50 Pa. <=5 : ACH 50 =_ ACH 50 =_ ❑Complies
[FI1711 Tach in Climate Zones 1-2, and ❑Does Not
<=3 ach in Climate Zones 3-8. ❑Not Observable
❑Not Applicable i
403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies
[FI411 -cfm/100 ft2 across the system or : ft2 ft' []Does Not
<=3 cfm/100 ft2 without air ❑Not Observable
handler @ 25 Pa. For rough-in
tests,verification may need to - ❑Not Applicable j
'occur during Framing Inspection.
403.3.2 :Ducts are pressure tested to cfm/100 cfm/loo ❑Complies
[FI2711 determine air leakage with ft2 ft2 ❑Does Not
either: Rough-in test:Total :❑Not Observable
leakage measured with a
pressure differential of 0.1 inch ❑Not Applicable
:w.g.across the system including
:the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test:Total
.leakage measured with a
pressure differential of 0.1 inch
-w.g.across the entire system
including the manufacturer's air
handler enclosure.
403,3.2.1 :Air handler leakage designated ❑Complies
[F12411 r by manufacturer at<=2%of ❑Does Not
:design air flow. ❑Not Observable ;
❑Not Applicable
4U20,�,Programmablethermostats ❑Complies
installed for control of primary ❑Does Not
heating and cinitially set by manufacturer to ❑Not Observablecode specifications. ❑Not Applicable
,. Heat pump thermostat installed ❑Complies
: on heat pumps. ❑Does Not -
n
❑Not Observable
❑Not Applicable
Circulating service hot water ❑Complies
systems have automatic or ❑Does Not
accessible manual controls. ❑Not Observable
❑Not Applicable
11 High Impact(Tier 1) 2'-` Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201 - DES- Page 8 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& RegAD
403.6.1 All mechanical ventilation system ❑Complies
[F12512 fans not part of tested and listed ❑Does Not
HVAC equipment meet efficacy
and airflow limits. -❑Not Observable
❑Not Applicable j
403.2 Hot water boilers supplying heat ❑Complies
[F12612 through one-or two-pipe heating El Does Not
systems have outdoor setback ❑Not Observable
control to lower boiler water
temperature based on outdoor []Not Applicable
temperature.
403.5.1.1 Heated water circulation systems ❑Complies
[F12812 have a circulation pump.The []Does Not
system return pipe is a dedicated ❑Not Observable I
return pipe or a cold water supply:
pipe.Gravity and thermos- ❑Not Applicable
syphon circulation systems are
not present.Controls for
circulating hot water system
pumps start the pump with signal 1
for hot water demand within the ` 1
occupancy.Controls
automatically turn off the pump
when water is in circulation loop _
is at set-point temperature and
no demand for hot water exists.
403.5.1.2 Electric heat trace systems ❑Complies
(F12912 comply with IEEE 515.1 or UL ❑Does Not
515. Controls automatically
adjust the energy input to the ❑Not Observable
heat tracing to maintain the ❑Not Applicable i
desired water temperature in the -
piping. -
403.5.2 Water distribution systems that ❑Complies
[F13012 have recirculation pumps that El Does Not j
pump water from a heated water - ❑Not Observable 1
supply pipe back to the heated
water source through a cold ❑Not Applicable
water supply pipe have a
demand recirculation water
system.Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 1044F.
403.5.4 Drain water heat recovery units ❑Complies
[F13112 tested in accordance with CSA ❑Does Not
855.1.Potable water-side ❑Not Observable
pressure loss of drain water heat
recovery units<3 psi for ❑Not Applicable
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units<2 psi for
individual units connected to
three or more showers.
404.1 75%of lamps in permanent ❑Complies
[FI611 fixtures or 75%of permanent ❑Does Not
fixtures have high efficacy lamps., ❑Not Observable
Does not apply to low-voltage
'lighting. ❑Not Applicable j
404.1.1 Fuel gas lighting systems have ❑Complies
[F12313 no continuous pilot light. ❑Does Not
u ❑Not Observable ',
❑Not Applicable
1 High Impact(Tier 1) 2] Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201 - DES - Page 9 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Compliesi Comments/Assumptions
& Req ID _ __
401.3 Compliance certificate posted. ❑Complies
[FI712 ❑Does Not
❑Not Observable
❑Not Applicable
303.3 Manufacturer manuals for ❑Complies
[FI18)3 'mechanical and water heating ❑Does Not
systems have been provided.
[]Not Observable
❑Not Applicable j
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 11/21/16
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1201- DES- Page 10 of 10
Cerrone Devin Court Lot 3\1201 Rescheck.rck
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 15.00
Floor 0.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Glass&Door Rating U-Factor SHGC
Window 0.29
Door 0.29
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments
_ .
NOV 2 1 2016
TOWN OF QUEENSSURY
BUILDINGi
LAW
a
Q cc1�
I`7
i
�zs �
296.14-2-3 RC-000802-2016
Cerrone Builders
25 Devin Court, Lot 3
SFD w/FP 1400 s.f.,Garage 844 s.f.
Manu>Uan comdpil is ce pepo r Job: 2
Date: Dec O5,2016
Entire House By:
CERRONE Plan: 59 devin
Project • •
For: CERRONE,A CERRONE f���V //V C
QUEENSBURY, NY 12865
cooling
Design Conditions
Outdoor design DB: 85.0°F Sensible gain: 36025 Btuh Entering coil DB: 72.0°F
Outdoor design WB: 71.0°F Latent gain: 9116 Btuh Entering coil WB: 60.1°F
Indoor design DB: 72.0'F Total gain: 45140 Btuh
Indoor RH: 50% Estimated airflow: 1560 cfm
Manufacturers Performance Data at Actual Design Conditions
Equipment type: Split AC
Manufacturer: York Model: CZF04814C+FC48C3XC1+TM8VO8OC16MP11+S1-1TVM4N1
Actual airflow: 1550 cfm
Sensible capacity: 0 Btuh 0% of load
Latent capacity: 0 Btuh 0% of load
Total capacity: 0 Btuh 0% of load SHR: 0%
Heating Equipment—
Design
• •Design Conditions
Outdoor design OR -4.0°F Heat loss: 104336 Btuh Entering coil DB: 70.0°F
Indoor design DB: 70.0°F
p EC 1E9WE
Manufacturer's Performance Data at Actual Design Conditions
L ;
Equipment type: Gas furnace TOWN OF QUEENSBURY
Manufacturer: York Model: TM9X120D20MP11 BUILDING& CODES
Actual airflow: 1550 cfm
Output capacity: 114000 Btuh 109% of load Temp, rise: 50 OF
FILE COPY
Meets are all requirements ofACCA Manual S.
,- - wri htsoft° Right-Suite®Universal 201717.0.16 RSU25116 2016-Dec-07 08:33:02 ACCA ...slScott.langewanhylDDcumentslYork%Projecl2.mp Calc=MJ7 Front Door faces: N Page 1
ResidentialPlans Review
Form Form
RIPER 1
ACCK for Desi•n (Loads, E• • 15 Mar 09
u�um,a�coaxv:narem
QUEENSBURY
Header Information
Contractor: REQUIRED ATTACHMENTS ATTACHED
Manual J1 Form(and supporting worksheets): Yes I—] NoE-1Mechanical license: or MJ1AE Form'(and supporting worksheets): Yes ❑ No ❑
OEM performance data(heating,cooling,blower): Yes No
Building plan#: 59 Bevin Manual D Friction Rate Worksheet: Yes No
Home address(Street or Lol#,Block,Subdivision): , Entire House Duct distribution sketch: Yes E] No I—]
• .DCALCULATION
Design Conditions Building Construction Information
Winter Design CondlUons Building
Outdoor temperature: -4 °F Orienttion: Front Door faces North
Indoor temperature: 70 of North,East,West,South,Northeast,Northwest,Southeast,southwest
Total heat loss: 104336 Btuh Number of bedrooms: 3
Conditioned floor area: 2780 ft'
Summer Design Conditions Number of occupants: 36
Outdoor temperature: 85 °F
Indoor temperature: 72 °F Windows Roof
Grains difference: 33 gr/Ib @50% RH Eave overhang depth: 0 it
Sensible heat gain: 40027 Btuh Internal shade: none Eava
Latent heat gain: 10128 Btuh Blinds,drapes,etc. Oeplp wmdo.
Total heat gain: 50156 Btuh Number of skylights: 0
EQUIPMENTHVAQ • 1
Heating Equipment Data Cooling Equipment Data Blower Data
Equipment t�a, Gas furnace E%igment type SpIitAC Healing cfm: 1550
umaca,Ne pump,Boller,etc. Ir ondkloner,neat pump,etc. Cooling aft 1550
Model: York Model: York Static pressure: 0 in H2O
TM9X120D20MP11 CZF04814C Fans rated external static pressure for
design airflow
Heating output capacit 11417r100 Bluh Total cooling capacity: 0 Btuh
Neat pumps•capacity at InterEeslpnouC000rcondhmns Sensible cooling capacity. 0 Btuh
Aux.heating output capacity 0 Btuh Latent cooling capacity: 0 Btuh
HVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M16•
Design airflow: 1550 chilli Longest supply duct: 254 it Duct Materials Used
Equipment design ESP: 0 in H2O Longest return duct: 74 It Trunk duct: Sheet metal
Total device pressure losses: 0 in H2O Total effective length(TEL): 328 ft
Available static pressure(ASP): 0 in H2O Friction rate:
Friction Rete=ASP+iTELx IOL)((�1 iN100ft Branch duct: Sheet metal
declare the load calculation,equipment,equipment selectionand duct design were rigorously performed based on - building
plan listed above. I understand the claims made on these forms will be subjectto review and verification.
Contractor's printed name:
Contractor's signature: Date:
Reserved for County.Tomn Nli-�cipal:ty orAuthority having jurisdiction use.
'Home qualifies for MJ1AE Form based on Abridged Edition Checklist
+ wrightsoft' RightsuheO universal 2017 17X.16 RSU25116
Load Short Form Job: 2
Date: Dec 05, 2016
Entire House By:
C E R RO N E Plan: 59 devi n
• 161911APM16311
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Design Information
Htg Clg Infiltration
Outside db(°F) -4 85 Method Simplified
Inside db(°F) 70 72 Construction quality Best
Design TO (°F) 74 13 Fireplaces 1 (Best)
Daily range - M
Inside humidity (%) 30 50
Moisture difference(gr/Ib) 29 33
HEATING EQUIPMENT COOLING EQUIPMENT
Make York Make York
Trade YORK Trade AFFINITY
Model TM9X120D20MP11 Cond CZF04814C
AHRI ref 2008696 Coil FC48C3XC1+TM8V08oCl6MPJJ+S1-ITVM4N1
AHRI ref 5561866
Efficiency 95.5AFUE Efficiency 12.3 EER, 14 SEER
Heating input 120000 Btuh Sensible cooling 32550 Btuh
Heating output 114000 Btuh Latent cooling 13950 Btuh
Temperature rise 67 OF Total cooling 46500 Btuh
Actual air flow 1550 cfm Actual air flow 1550 cfm
Air flow factor 0.015 cfm/Btuh Air flow factor 0.043 cfrn/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.80
ROOM NAME Area Htg load Clg load Htg AVF CIgAVF
W) (Btuh) (Btuh) (cfm) (cfm)
MASTER BEDROOM 204 9989 3193 148 137
MASTER BATH 66 6863 1926 102 83
WIC 55 2450 1413 36 61
ENTRY 48 3504 1556 52 67
CLOSET 20 1480 1393 22 60
BEDROOM 3 144 7478 2980 111 128
BEDROOM 2 100 8928 2896 133 125
BATH 54 2794 1456 42 63
KITCHEN/GR 689 19605 3953 291 170
BASEMENT 1400 41246 15258 613 657
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
wri htsott" 2016-Dw-0708:33:02
9 MghtSuile®Universal 2017 17.0.16 RSU25116 Page 1
AM ...slscott.lang"onhy\Documents\York\Pmject2.mp CWC=MV Front Door faces: N
Entire House d 2780 104336 36025 1550 1550
Other equip loads 0 0
Equip. @ 0.90 RSM 32422
Latent cooling 9116
TOTALS 2780 104336 41538 1550 1550
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
wrightsoftRight.Sude®Univetsa1 201717.0.16 RSU25NPage 2016-Oft-077 08 age 2
2
SCA ...s\scoff.langeworthy\DocumentslYoficlProject2.rop CeIc=MJ7 Frorn Door faces: N
Building AnMysis Job: 2
Date: Dec OS, 2016
Entire diocese By:
GERRONE Plan: 69devin
��-.Gilact InformationFor: CERRONE,A CERRONE
OUEENSBURY, NY 12865
Desicin Conditions
Location: Indoor: Heating Cooling
Glens Falls AP NY US Indoor temperature (°F) 70 72
Elevation: '335 ft Design TD (°F) 74 13
Latitude: 43°N Relative humi lty (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F -4 85 Infiltration:
Wety ranle�F) _ 20 ( M ) Method Simplified
( Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
Heating
Component Btuh/ft2 Btuh % of load
Walls 16.4 41751 40.0 Ducts
Glazing 26.7 4343 4.2 DuInfiltration
Doors 30.3 1166 1.1
Ceilings 21.5 30151 28.9 Walls Floors
Floors 11.4 15966 15.3
Infiltration 29.8 5991 5.7
Ducts 4968 4,8
Piping 0 0
Humidification 0 0 Glazing Ceilings
Ventilation 0 0 Other
Adjustments 0
Total 104336 100.0
• • 11•
Component Btuh/ft2 Btuh % of load
Walls 1.7 4375 12.1
Glazing 30.7 4986 13.8 Walls
Doors 6.8 262 0.7
Ceilings 10.8 15075 41.8 Internal Gains
Floors 0 0 0 Glazing
Infiltration 2.6 526 1.5 ether
Ducts 0 0
Ventilation 0 0
Internal gains 10800 30.0
Blower 0 0 s Ceilin
Adjustments 0 9
Total 36025 100.0
Latent Cooling Load= 9116 Btuh
Overall U-value= 0.267 Btuh/ft'--°F
WARNING: window to floor area ratio= 5.8% - less than 10%.
WPI tltsof- g 2016-Dec-07 08:33:02
RI
9 hl-Sufte®universal 2017 17.0.16 RSU25116 Page 1
/ +C.�A ...slswtt.langewonhylDocuments%YorklProject2.mp Calc=MR Front Door feces: N
Component Constructions jDaatt
e: Doc 05, 201E
Entire House By:
CERRONE Plan: 59 devir,
Project • •
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Design Conditions
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature (°F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 43°N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F) -4 85 Infiltration:
Daily range(°F) - 20 ( M ) Method Simplified
Wet bulb (°F) - 71 Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
r�rrYrlianrr---
- - - - -
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
BWh/ --'F fl'-TF h BWNR` BWh SWOV BWh
Walls
12MO:Frm wall,vnl ext,3/8"wood shth,r-21 cav ins, 1/2"gypsum 72 0.037 27.0 2.74 196 0.61 44
board int fnsh,r-4 ext bd ins,2"x6"wood frm,16"o.c.stud
12MO:Frm wall,vnl ext,1/2"wood shlh,r-21 cav ins,1/2"gypsum 377 0.037 27.0 2.74 1032 0.61 232
board int fnsh,r-4 ext bd ins,2"x6"wood frm,16"o.c.stud
14AO:Blk wall,stucco ext,8"thk,vermiculite core,1/2"gypsum 864 0.510 0 37.7 32623 4.74 4100
board int fish
15EO:Bg wall,light dry soil,2"x4"wood Int frm,concrete wall,r-13 1227 0.087 0 6.44 7899 0 0
cav ins,10"thk
Partitions
(none)
Windows
3D0:2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/4"gap, n 73 0.361 0 26.7 1950 17.6 1285
1/4"thk;6.67 ft head ht a 15 0.361 0 26.7 401 62.6 939 '
S 60 0.361 0 26.7 1592 30.6 1823
W 15 0.361 0 26.7 401 62.6 939
all 163 0.361 0 26.7 4343 30.7 4986
Doors
10DO:Door,wd so type 18 0.460 0 34.0 596 7.64 134
1180:Door,mil fbrgl type,mtl strm 21 0.367 6.3 27.2 570 6.09 128
Ceilings
C pa:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns 1400 0.291 1.0 21.5 30151 10.8 15075
Floors
19AO:Part floor,hrd wd fir fnsh,frm fir,6"thkns 1380 0.312 0 11.5 15931 0 0
21AO:Bg floor,heavy dry or light damp soil,6'depth 20 0.024 0 1.78 36 0 0
2016-Dec-07 08:33:02
,it, + wrightsoft Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1
AEUK ...s\scatt.langmorthylDocuments%YorklProject2.mp Calc=MH Front Door faces: N
Component Constructions Job: 'L
Date: Dec 05,1096
MASTER BEDROOM By:
CERRONE Plan: 59devin
Project • •
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
CQnditions
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature(°F) 70 72
Elevation: 335 it Design TD (°F) 74 13
Latitude: 430N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F) -4 85 Infiltration:
Daily range("F) - 20 ( M ) Method Simplified
Wet bulb(°F) - 71 Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain
W BtuhlR'-F ff.-FIBluh B hlfl' Duh BWhM BNh
Walls
12MO:Frm wall,vnl ext, 1/2"wood shth,r-21 cav ins, 1/2"gypsum 93 0.037 27.0 2.74 255 0.61 57
board int fnsh,r-4 ext bd ins,2"x6"wood frm,16"o.c.stud
14AO:Blk wall,stucco ext,8"thk,vermiculite core,1/2"gypsum 138 0.510 0 37.7 5208 4.74 655
board int fnsh
Partitions
(none)
Windows
3D0:2 glaang,clr outr,air gas,vnl frm mat,cir low-e innr,1/4"gap, n 15 0.361 0 26.7 401 17.6 264
1/4"thk;6.67 it head ht w 15 0.361 0 26.7 401 62.6 939
all 30 0.361 0 26.7 801 40.1 1203
Doors
(none)
Ceilings
(none)
Floors
19A0:Part floor,hrd wd flr fnsh,frm flr,6"thkns 204 0.312 0 11.5 2355 0 0
wri httsofl° 2076-Dec-0733
g RightSude®Unlversa12017 17.O.t6 R6U25176 Pae 2
11CCP. ...s\scott.langmorthy\Documents%YorklProject2.mp Calc=MJ7 Front Door faces: N 0
Component Cons'tIY0.tlC'dons- Job: 2
Date: Dec 05, 2096
MASTER BAM By:
CERRONE
ERRONE Plan: 59 devin
Project Information
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Design Conditions
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature(°F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 43°N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F) -4 85 Infiltration:
Daily range(°F) - 20 ( M ) Method Simplified
Wet bulb(°F) - 71 Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft' BWhV-'F ft'-'FMWh BWhlft' BWh 9WhH' BWh
Walls
14AO:Blk wall,stucco wd,8"thk,vermiculite core,1l2"gypsum 153 0.510 0 37.7 5774 4.74 726
board int fish
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19AO:Part floor,hrd wd Or fnsh,frm fir,6"thkns 66 0.312 0 11.5 762 0 0
2016-Dec-07 00:33:02
rt wrilghtsoft• Right-SufteO univemal201717.0.96 RSU25116 Page 3
.91.E ...s\scoff.langmorlhy\DocumentslYork\Pmject2.mp Cale=M.17 Front Door faces: N
UateCom ement Constructions- .ae
: Doc 05, 2016
w/c By:
GERRONE Plan: 59 devirr
Project • •
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Design Conditions
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature(°F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 43°N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F) -4 85 Infiltration:
Daily range(°F) - 20 ( M ) Method Simplified
Wet bulb (°F) - 71 Construction quality Best
Wind speed(mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions or Area U-value Insul N Htg HTM Loss Clg HTM Gain
W Btuhfitz T ft''FiStuh BIuhHP Btuh ROM, Btuh
Walls
14AO:Bilk wall,stucco ext,8"thk,vermiculite core,1/2"gypsum 45 0.510 0 37.7 1698 4.74 213
board int fnsh
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19AO:Part floor,hrd wd fir fnsh,frm fir,6"thkns 55 0.312 0 11.5 635 0 0
wri htSOfY 2016-Dec-07 08:age 4
9 Right-Saha®Universal 201717.0.16 RSU26116 Page 4
/ICCh ...slscott.langmorthyk0mumentslYork%Pmfect2.mp Calc-MJ7 Front Doer faces: N
job: 2
Component construe'aron's
Byte: Dec05, 2016
ENTRY
G E R RO N E Plan: 59 devin
ijProject information
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Design Conditions
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature(°F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 43°N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F) -4 85 Infiltration:
Daily range(°F) - 20 ( M ) Method Simplified
Wet bulb (°F) - 71 Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions Or Area U•value Insul R Htg HTM Loss Clg HTM Gain
ft' BWhW-'F W-TF h BtuhM BWh BWMn Bluh
Walls
12MO:Frm wall,vnl ext,3/8"wood shlh,r-21 cav ins, 1/2"gypsum 24 0.037 27.0 2.74 66 0.61 15
board int fnsh,r-4 ext bd ins,2"x6"wood frm, 16"o.c.stud
14AO:Blk wall,stucco ext,8"thk,vermiculite core, 1/2"gypsum 72 0.510 0 37.7 2717 4.74 341
board int fnsh
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19AO:Part floor,hrd wd flr fnsh,frm fir,6"thkns 48 0.312 0 11.5 554 0 0
2016-Dec-07 06:33:02
wrrgtltSOft" Right-S,%,®Universal 2017 17.0.16 RSU25116 Page 5
ACCl4 ...s\scott.langewo0hy\Documents\York\Project2.mp Calc=MJ7 FrontDoorfaces: N
Job: 2
Component Constructions Dae: Dec 05,2016
CLOSET By:
CERRONE Plan: 59 devin
Project information
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Design Conditions
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature(°F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 430N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F) -4 85 Infiltration:
Dally range(°F) - 20 ( M ) Method Simplified
Wet bulb(°F) 71 Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain
fP Btu MY--'F fl'-'FI8Wh BWhA? BWh fl.W GWh
Walls
12MO:Frm wall,vnl ext,3/8"wood shth,r-21 cav ins, 1/2"gypsum 23 0.037 27.0 2.74 62 0.61 14
board int fnsh,r-4 ext bd ins,2"x6"wood frm,16"o.c.stud
Partitions
(none)
Windows
(none)
DOOR
10DO:Door,wd sc type 18 0.460 0 34.0 596 7.64 134
Ceilings
(none)
Floors
19AO:Part Floor,hrd wd 0r fnsh,frm 0r,6"thkns 20 0.312 0 11.5 231 0 0
2016-Dec-07 06:33:02
wrightS01fr RlghtSunes Universal 2017 17.0.16 RSU25116 Page 6
. .a1 ...s%scott.tangmonhy%Documents%York%Prolect2.mp Calc=MJ7 Fr°nt Doorfaces: N
Component Constructions Dab:
Date: Dec 05, 201E
BEDROOM 3 By:
GERRONE Plan: 59 devir:
Project • •
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Qesign Conditions
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature(°F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 43°N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F) -4 85 Infiltration:
Daily range(°F) - 20 ( M ) Method Simplified
Wet bulb ("F) - 71 Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions or Area u-value Insul R Htg HTM Loss Clg HTM Gain
W BWhff-'F I --FIBNh BWhM' BWh 2whff BWh
Walls
12M0:Frm wall,vnl ext, 1/2"wood shlh,r-21 cav ins, 1/2"gypsum 93 0.037 27.0 2.74 255 0.61 57
board int fish,r-4 ext bd ins,2'x6"wood frm,16"o.c.stud
14AO:Bilk wall,stucco ext,8"thk,vermiculite core,1/2"gypsum 93 0.510 0 37.7 3510 4.74 441
board int fish
Partitions
(none)
Windows
3130:2 glazing,clr ,outr,air gas,vnl frm mat,clr low-e innr,1/4"gap, n 15 0.361 0 26.7 401 17.6 264
1/4"thk;6.67 ft head ht a 15 0.361 0 26.7 401 62.6 939
all 30 0.361 0 26.7 801 40.1 1203
Doors
(none)
Ceilings
(none)
Floors
19AO:Part Floor,hrd wd flr fnsh,frm Or,6"thkns 144 0.312 0 11.5 1662 0 0
$ ht'SOfC 2016-Dec-07 08:age 7
Wrl
9 RIgMSuke®UnNersa12017 77.0.18 RSU26116 Page 7
...s\scott.langewonhy\Doouments\York\Pmject2.mp Calc=MJ7 Front Doorfaces: N
job: 2
Component Concstruc0col(11u Date: Dec 05,201E
BEDROOM 2 By:
C E RRO N IE Plan: 59 devin
Project Information
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Qesign Conditions
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature (°F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 430N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F) -4 85 Infiltration:
Daily range(°F) - 20 ( M ) Method Simplified
Wet bulb (°F) - 71 Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain
R aWhM-'F R'-'F/Bluh BWhM' BWb BWhtlt' BWh
Walls
14AO:Blk wall,stucco ext,8"thk,vermiculite core, 1/2"gypsum 150 0.510 0 37.7 5677 4.74 713
board int fnsh
Partitions
(none)
Windows
3D0:2 glazing,Or outr,air gas,vnl frm mat,clr low-e innr,1/4"gap, s 30 0.361 0 26.7 790 30.6 905
1/4"thk;6.67 ft head ht
Doors
(none)
Ceilings
(none)
Floors
19AO:Part Floor,hrd wd Or fnsh,frm Or,6"thkns 100 0.312 0 11.5 1154 0 0
2016-Dec-07 06'.33'02
wrightsofr Right-Su te®Universal 2017 17.0.16 RSU25116 Page 8
.4CCp. ...slscotl.langeworthy\DocumentslYork\Project2,mp Calc=MJ7 Front Door faces: N
Cort onent Constructions Jeb 21BATH Byte: Dec 05, ?01'0
CERRONE Plan: 59 devir;
_
Project Information
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Design Conditions-______
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature(°F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 43°N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb(°F) -4 85 Infiltration:
Daily range(°F) - 20 ( M ) Method Simplified
Wet bulb ( F) - 71 Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft BWh&--'F °'-'Fl6tuh 6!uhd' BUh Etuhrlt' BWh
Walls
14AO:&k wall,stucco ed,8"thk,vermiculite core,1/2"gypsum 54 0.510 0 37.7 2038 4.74 256
board intfnsh
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19AO:Part Floor,hrd wd fir fnsh,frm fir,U'thkns 54 0.312 0 11.5 623 0 0
33 02
+ wrightSOft' RIghP6uHeO Universal Zan n.D.16 Rsu25116 2016-Dec-07 0 Page 9
Z51 ...stscott.lang..Ahy\Dacuments%York\Project2.mp Cale=MJ7 Front Door faces: N
Coot onent Constructions Dob: ?
Date: Dec 05, 209E
KITCHENIGR By:
CERRONE Plan: 59 devir,
Project • •
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Design Conditions -
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature("F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 430N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.1 33.4
Dry bulb (°F) -4 85 Infiltration:
Daily range(°F) - 20 ( M ) Method Simplified
Wet bulb (°F) - 71 Construction quality Best
Wind speed(mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Cie HTM Gain
ft' 6NhN.-F V-TATA BUMP BWh amnm' BUh
Walls
12MO:Fan wall,vnl ext,3/8"wood shth,r-21 cav Ins,1/2"gypsum 25 0.037 27.0 2.74 68 0.61 15
board int fnsh,r-4 ext bd ins,2'x6"wood frm,16"o.c.stud
12MO:Fnn wall,vnl at,1/2"wood shth,r-21 cav Ins,1/2"gypsum 191 0.037 27.0 2.74 523 0.61 117
board int fnsh,r-4 ext bd ins,2"x6"wood frm,16"o.c.stud
14AO:Blk wall,stucco ext,8"lhk,vermiculite core,1/2"gypsum 159 0.510 0 37.7 6001 4.74 754
board int fnsh
Partitions
(none)
Windows
3D0:2 glazing,clr outr,air gas,vnl frm mal,clr low-e innr,1/4"gap, n 43 0.361 0 26.7 1149 17.6 757
1/4"thk;6.67 R head ht s 30 0.361 0 26.7 801 30.6 918
all 73 0.361 0 26.7 1950 22.9 1675
Doors
(none)
Ceilings
(none)
Floors
19AO:Part Floor,hrd wd 8r fish,frm Or,6"Mrs 689 0.312 0 11.5 7954 0 0
2016-De -0708:33:02
wri hft0ft- RIgM-Softs®UnMersel 201717.0.16 RSU26116
Page 10
...s\Scott.longmarthy\Document\York\Prolect2.mp Calc=MJ7 Front Dow faces: N
Coorunt Constvli efoons Job: 2
Com
Date: Dec 05,2096
BASEMENT By:
CERRONE Plan: 59 devin
Project • •
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Design CQnditions,
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature(°F) 70 72
Elevation: 335 ft Design TD (°F) 74 13
Latitude: 43°N Relative humidity (%) 30 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 29.1 33.4
Dry bulb (°F) -4 85 Infiltration:
Daily range (°F) - 20 ( M ) Method Simplified
Wet bulb (°F) - 71 Construction quality Best
Wind speed (mph) 15.0 7.5 Fireplaces 1 (Best)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
M 3uhV-'F M1?'Fratuh BluhV DO i3NW auh
Walls
15EO:Bg wall,light dry soil,2"x4"wood int frm,concrete wall,r-13 1227 0.087 0 6.44 7899 0 0
cav ins,10"thk
Partitions
(none)
Windows
(none)
Doors
11BO:Door,mtl fbrgl type,mtl strm 21 0.367 6.3 27.2 570 6.09 128
Ceilings
C pa:C part ceiling,hrd wd Or fnsh,frm flr,6"thkns 1400 0.291 1.0 21.5 30151 10.8 15075
Floors
21AO:Bg floor,heavy dry or light damp soil,6'depth 20 0.024 0 1.78 36 0 0
Wrl I7tsOft° 2016-Dec-07 08:33:02
9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 11
RCCA ...s\scalLlangewonhy\Documents\York\Project2.wp Calc=MJ7 Front Doorfaces: N
Calculation Procedures A, B, C, D Dar i
Dale: Dec 05,2016
Entire House By:
CERR®NE Plan: 59 devin
Procedure A-Winter Infiltration HTM Calculation*
1. Winter infiltration AVF
0.40 ach x 11040 fits x 0.0167 = 74 cfm
2. Winter infiltration load
1.1 x74 cfm x 74 OF Winter TD = 5991 Btuh
3. Winter infiltration HTM
5991 Btuh / 201 ft' Total window = 29.8 Btuh/ft'
and door area
Procedure B -Summer Infiltration HTM Calculation
1. Summer infiltration AVF
0.20 ach x 11040 ft3 x 0.0167 = 37 cfm
2. Summer infiltration load
1.1 x37 cfm x 13 OF Summer TD = 526 Btuh
3. Summer infiltration HTM
526 Btuh / 201 ft2 Total window = 2.6 Btuh/ft'
and door area
Procedure C - Latent Infiltration Gain
0.68 x33 gr/Ib moist.diff. x 37 cfm = 836 Btuh
Procedure D - Equipment Sizing Loads
1. Sensible sizing load
Sensible ventilation load
1.1 x 0 cfm vent. x 13 OF Summer TD = 0 Btuh
Sensible load for structure(Line 19) + 36025 Btuh
Vent + structure+ other equip loads = 36025 Btuh
Rating and temperature swing multiplier x 0.90
Equipment sizing load- sensible = 32422 Btuh
2. Latent sizing load
Latent ventilation load
0.68 x 0 cfm vent. x 33 gr/Ib moist.diff. = 0 Btuh
Internal loads = 230 Btuh x 36 people + 8280 Btuh
Infiltration load from Procedure C + 836 Btuh
Equipment sizing load- latent = 9116 Btuh
*Construction quality: Best
Fireplace construction: Best Number of fireplaces: 1
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
02
wri htsOft- 2016Deo-0708:age1
9 Right-Sude®UnNersal 201717.0.16 RSU25116 page 1
.ACCA ...s\scoff.lwgmorthy\Dm merdslYoAN mject2.rup Calc=MJ7 Front Door faces: N
M
Project Summary Dateo
Ent re douse J By : Dec 0 , 201"0
CERRONE Plan: 59 devir-,
6iect Information
For: CERRONE,A CERRONE
QUEENSBURY, NY 12865
Notes:
Desiqn Information— --
Weather: Glens Falls AP, NY, US
Winter Design Conditions Summer Design Conditions
Outside db -4 OF Outside db 85 OF
Inside db 70 OF Inside db 72 OF
Design TO 74 OF Design TD 13 OF
Daily range M
Relative humidity 50 %
Moisture difference 33 gr/Ib
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 99368 Btuh Structure 36025 Btuh
Ducts 4968 Btuh Ducts 0 Btuh
Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh
(none) (none)
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 104336 Btuh Use manufacturer's data n
Rate/swing multiplier 0.90
Infiltration Equipment sensible load 32422 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Best
Fireplaces 1 (Best) Structure 9116 Btuh
Dus CCentral vent (0 cfm) 0 Btuh
Heating Cooling (none)
Area(ftp 2780 2780 Equipment latent load 9116 Btuh
Volume(W) 11040 11040
Air changes/hour 0.40 0.20 Equipment total load 41538 Btuh
Equiv.AR (cfm) 74 37 Req. total capacity at 0.70 SHR 3.9 ton
Heating Equipment Summary Cooling Equipment Summary
Make York Make York
Trade YORK Trade AFFINITY
Model TM9X120D20MP11 Cond CZF04814C
AHRI ref 2008696 Coil FC48C3XC1+TM8V080C16MP11+S1-1TVM4N1
AHRI ref 5561866
Efficiency 95.5AFUE Efficiency 12.3 EER, 14 SEER
Heating Input 120000 Btuh Sensible cooling 32550 Btuh
Heating output 114000 Btuh Latent cooling 13950 Btuh
Temperature rise 67 OF Total cooling 46500 Btuh
Actual air flow 1550 cfm Actual air flow 1550 cfm
Air flow factor 0.015 cfm/Btuh Air flow factor 0.043 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.80
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
wri htsoft 2016-Dec-0706:33:02
9 Right-Suite®Universal 201717.0.16 RSU25116 Page 1
...s\scott.langeworthy\Documents\York\Projecl2.mp Calc=MR Front Door faces: N
Mght-J@ ryVorksheet JOb:
Entire House Date: Dec 05,2016
By:
CERRONE Plan: 59 dew
MANUAL J:7th Ed.
1 Name of roan Entire House MASTER BEDROOM MASTER BATH WIC
2 Length of exposed wall 330.0 It 29.0 It 17.0 It 5.0 It
3 Room dimensions 12.0 x 17.0 It 6.0 x 11.0 It 5.0 x 11.0 It
4 Ceilings I Condit.Option 8.0 ftl d 8.0 ftl heat/cool 8.0 111 heat/ood 8.0 it heal/cool
TWE OF CST HTM Arm Load(Btuh) Area Load(Bluh) Area Load(Btuh) Area Load(Bhfi)
EXPOSURE NO. Htg I Clg (112) Htg I CIg (it) Htg Clg (III Htg Cig (ftp Htg Clg
5 Grass a 12MO 2.7 0.6 89 •••• TMTM 0 «TM •••• 0 •,« "" o -"» ••••
Exposed b 12MO 27 0.6 W) •'« 106 "" •• 0 ••• 0 +•• """
walls and c 14AO 37.7 4.7 gm 163 153 "' 45
_
partitions d 15E0 6.4 0 1248 "" 0 "'" •" 0 ' "• 0 «•
e 0 0 111111 "" •••• 111111 TM« IIIII! "•' 111111 ""^ `TM
f 0 0 111111 »« "`• 111111 ••"" 111111 "" 111111 ""» `••
6 Wlndvws and a 3D0 26.7 TM 73 1950 '•" 15 401 .... 0 0 ...: 0 0 "••
glass doors b 3D0 28.7 90 2393 "•' 15 401 '••• 0
0 .... 0 0 "••
Heating c 0 0 0 '•" 0 0 - 0 0 TMTM 0 0 "••
d 0 TM 0 0 TMTM 0 0 « D 0 0 0 TMTM
e 0 0 0 0 0 0 0 0 0
f 0 0 0 ""• 0 0 0 0 0 0
7 Windows and North 17.6 73 •"' 1225 15 TM*' 264 0 - 0 0 ^ " 0
glass doors NE/NW 0 0 0 0 0 0 0 0 """ 0
Cooling E/W 828 30 1878 15 ""• 939 0 'TM 0 0 •""` 0
SE/SW 0 0 0 0 '^" 0 0 •" 0 0 ""« 0
South 30.6 60 "" 1823 0 """" 0 0 •`•' 0 0 ""^ 0
Hoz 0 0 ... 0 0 ""' 0 0 "' 0 0 "•• 0
8 Other does a 10D0 34.0 7.6 18 596 134 0 0 0 0 0 0 0 0 0
b 11BO 27.2 6.1 21 570 12B 0 0 0 0 0 0 0 0 0
C 0 0 0 0 D o 0 0 0 0 0 0 D 0
9 Net a12MO 27 0.8 72 196 44 0 0 0 0 0 0 0 0 0
exposed b 12MO 27 0.6 377 1032 232 93 255 57 0 0 0 0 0 0
wells and c 14AO 37.7 4.7 884 32623 4100 138 52DB 655 153 5774 726 45 1698 213
partitions d 16E0 6.4 0 1227 7898 0 0 0 0 0 0 0 0 0 0
e 0 0 mut 0 0 111111 0 0 111111 0 0 111111 0 0
f 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
10 Ceilings a C pa 21.5 10.81400 30151 15075 0 0 0 0 0 0 0 0 0
b 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
c 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
d 0 0 111111 0 0 111111 00 111111 0 0 111111 0 0
e 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
f 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
11 Floors a 19AO 11.5 0 1380 15931 0 204 2355 0 68 762 0 55 635 0
(Nate:room b 21AO 1.8 0 20 36 0 0 0 0 0 0 0 0 0 0
pelmetw c 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
1s displ. d 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
for slab e 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
floors) f 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
12 Irfiltratiorn t 29.8 26 201 5981 526 30 894 79 0 0 0 0 0 0
Ventilation 0 0 0 0 0 0 0 0
13 Subtotal loss=6+8..+11+12 ••• 88388 - TM' 9513 - "' 6536 .... '•' 2333
Less external healing 0 "' 0 - 0 . 'TM 0 •••
Less transfer •" 0 0 " 0 TM• 0
Heating redistribution 0 _ '•• 0 •'" »" 0 _ "`• 0
14 Duct loss 5% 4868 - 5% 476 "" 5% 327 .... 5% 117
15 Total loss=13+14 104336 .... 9969 "" TM' 6863 .... "' 2460 ••"
16 hs.gains: People @ 300 36 ...• 10800 4 - 1200 4 •TM• 1200 4 '"" 1200
Appl. @ 1200 0 '•« 0 0 "" 0 0 •"` 0 0 "" 0
17 Subtot RSH gain=7+8..+12+16 «• 36025 »" '•"' 3193 "" "• 1926 •TM• "• 1413
Less external coding TM' 0 «« •••• 0 ••• 0 'TM •« 0
Less transfer « •• 0 «•• ••« 0 ••• 0 ••• 0
Cooling redistribution ••• 0 »» 0 « 0 - •» 0
18 Duct gain 0% •"• 0 0% •« 0 «0% "' 0 • 0% •» 0
19 Total RSH gain=(17+18)'PLF 1.00 '"' 36025 1.00 '"" 3193 1.001928 1.0D •'• 1413
20 Air required(cfm) 1550 1550 148 137 X102 83 36 81
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
wrllghtts ft- 2016-Dec-0708:33:02
Right-SufteO Universal 2017 17.0.16 RSU25116 Page 1
. ...slseatl.langeworthylDocumentslYorklPmjmt2.mp Calc=MJ7 From Door faces: N
Right-J®Worksheet JOC:
Entire House !Date: Dar;05,2015
CERRONE Plan: 59 devin
MANUAL J:7th Ed.
1 Name of noun ENTRY CLOSET BEDROOM BEDROOM2
2 Length of exposed wall 12.0 ft 5.0 ft 24.0 ft 20.0 ft
3 Room dimensions 8.0 x 6.0 It 4.0 x 5.0 It 120 x 120 It 10.0 x 10.0 It
4 Ceilings 1 Condit.Option 8.0 It I heat/ood 8.0 It heat/cool 8.0 It heal/oatl 8.0 It he:et/cod
TYPE OF CST HTM Area Load(Btuh) Area two(Btuh) Area Load(Btuh) Area Load(Stuh)
EXPOSURE NO. Hlg Clg (H� Htg Clg (ftp Htg Clg (ftp Ht9 CIg (ftT) Htg Clg
5 Gross a 12MO 27 0.6 24 "' "'• 40 •« 0 •• -,„ 0 •• •••
Exposed b 12MO 27 0.6 0 "' '"" 0 "*" « 108 "' 0 "«
walls and c 14AO 37.7 4.7 72 »" 0 " 108 `« 180 «
partitions d 15EO 6.4 0 0 « •»• 0 «*• 0 •„ 0 "»
e 0 0 111111 « "" 111111 «" '• 111111 '•• !11!11 "« `•
f 0 0 nun
6 Window and a 3D0 26.7 » 0 0 '""" 0 0 "" 15 401 •,"' 0 0
"•" 3 "••
glass doors b 3D0 26.7 » 0 0 '«" 0 0 "" 15 401 , 0 790 ••"
Heating c 0 0 0 "` 0 0 "• 0 0 ••" 0 0 '«
d o 0 0 0 0 " 0 0 0 0 ...
e 0 0 0 „• 0 0 " 9 0 0 0
f o 0 0 «« 0 0 « o o «• 0 0
7 Window and North 17.6 0 «« 0 0 "" 0 15 - 264 0 " 0
glass doors NE/NW 0 0 «« 0 0 '•'" 0 0 •"'" 0 0 """• 0
Coding E/W 626 0 «" 0 0 «"` 0 15 ..,. 939 0 ""« 0
SE/SW 0 0 ••"` 0 0 « 0 0 ... 0 0 ""•• 0
South 30.6 0 •"" 0 0 «"' 0 0 `« 0 30 "« 905
Horz 0 0 "• 0 0 •'"' 0 0 "` 0 0 •" 0
8 Other doors 810D0 34.0 7.6 0 0 0 18 598 134 0 0 0 0 0 0
b 1180 27.2 6.1 0 0 0 0 0 0 0 0 0 0 0 0
C 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 Net a 12MO 27 0.6 24 66 15 23 62 14 0 0 0 0 0 0
exposed b 1240 27 0.6 0 0 0 0 0 0 93 255 57 0 0 0
walls and c 14AO 37.7 4.7 72 2717 341 0 0 0 93 3510 441 150 5677 713
partitions d 16EO 6.4 0 0 0 0 0 0 0 0 0 0 0 0 0
e 0 0 111111 0 0 111111 00 111111 0 0 111111 0 0
r o o 111111 a o 111111 o 0 111111 0 0 111111 0 0
10 Ceilings aC pa 21.5 10.8 0 0 0 0 0 0 0 0 0 0 0 0
b 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
C 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
d 0 0 111111 0 0 111111 0 0 HIM 0 111111 0 0
e 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
f 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
11 Floras a 19AO 11.5 0 48 554 0 20 231 0 144 1662 0 100 1154 0
(Note:rain b 21AO 1.8 0 0 0 0 0 0 0 0 0 0 0 0 0
perimeter c 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
is dspl. d 0 0 111111 0 0 111111 0 o 11111 0 0 111111 0 0
for slab e 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
floors) f 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0
12 Infiltration t 29.8 26 0 0 0 18 521 46 30 894 79 30 681 77
Ventilation 0 0 0 0 0 0 0 0
13 Subtotal loss=6+8..+11+12 »» 3337 "••• ••« 1410 """" .... 7122 "`• `„• 8503
Less external heating •»• 0 „•• „„ 0 •••• »» 0 •••• „« 0 »,•
Less transfer »» 0 «•• •••• 0 „•• ,«• 0 •„• •••• o »••
Healing redistribution 0 ,•» ••» 0 •'•• »» 0 •... `«• 0 •„•
14 Duct loss 5% 187 «" 5% 70 "" 5% 358 "'• 5% 425
15 Total loss=13+14 "" 3504 «« » 1480 "" 7478 """' 8928
16 IM.gains: People 300 4 ' 1200 4 '"`• 1200 4 - 1200 4 "" 1200
Appl. a 1200 0 "" 0 0 "'« 0 0 """" 0 0 "" 0
17 Sublet RSH ga1n=7+8..+12+16 .... «^ 1556 """ «« 1393 ••« „•. 2980 •••• •••• 2898
Less external cooling 0 „„ o "'« »„ 0 „ » 0
Less transfer .". „. 0 •••• „„ o •„ •• o ,„ « 0
Coding redistribution '•"" '«• 0 •••• «„ 0 '•„ «», 0 •,•• '•"• 0
18 Duct gain 0% "• 0 0% "« 0 0% •" 0 0% '« o
19 Total RSH gain=(17+18)`PLF 100 1556 1.00 ««. 1383 1.00 ••" 2980 1.00 "• 2896
20 Air required(cfm) ... 52 67 22 60 111 128 133 125
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
A -pp- wrightsoftl 2016-Dec-0708:33:02
RghFork%P Universal 2017 77.0.18 R rent D 8 Page 2
...slscdt.lengewMhy\Documents\YcrklPm)eot2.rup Calc=MJ7 Fmnt Daor faces: N
Right-A)Worksheet job:
Entre House Date: Dec 05,2012
CERRONE Plan: 59 deli,
MANUAL J:7th Ed.
1 Named mom BATH KITCHEWGR BASEMENT
2 Length of exposed wall 6.0 It 58.0 It 156.0 ft
3 Room dimesiors 9.0 x 6.0 ft 1.0 x 689.0 ft 50.0 x 28.0 ft
4 Ceilings Condit,Option 8.0 ft heaNccd 8.0 ft heattood 8.0 ft heat/cool
TYPE OF CST HTM Area Load(Btuh) Area Load(stun) Area Load(Btuh) Area
EXPOSURE NO. Htg CIg (ft2) Hig Clg (ft=) Hlg Clg (ft') Htg cig Hig Clg
5 Gross a 12MO 27 0.6 0 ••• 25 «• «• 0 » •, ,•• ••
Exposed b 12MO 27 0.6 0 TM 234 «.. «. 0 « ,.,.
walls and c 14AO 37.7 4.7 54 189 » ••• o •• »•
partitions d 15E0 6.4 0 0 "' "" 0 «• 1248 •• •,• •»
e 0 0 111111 "' «•' 111111 »« •' !!1111 "' •` •« •^
f 0 0 111111 «'" "•"" 111111 '•« TM'" I!!I!! "•• "•' •�•• •«•
6 Wirxlays and a 3D0 26.7 •' 0 0 •'•' 43 1149 """ 0 0 •••• TM»
glass doors b 3D0 26.7 '• 0 0 'TM• 30 801 ,,•• 0 0 •••• «••
Healing c 0 " 0 0 '»• 0 0 ""• 0 0 "" TM•
e 0 0 0 ^« 0 0 0 0 «•
r o 0 0 '^ 0 0 0 0
7 Window and North 17.6 0 •^` 0 43 ••• 757 0 »" 0 ^`•
glass cl o NE/NW 0 0 ^' 0 0 `•' 0 0 "' 0
Coding E/W 62.8 0 •" 0 0 "" 0 0 ••" 0 "•
SE/SW 0 0 •• 0 0 « • 0 0 ••• 0 ^••
South 30,6 0 ^• 0 30 ••« 918 0 ••• 0 •••
Horz 0 0 0 0 •••• 0 0 "' 0 "•
e Other doors a 10D0 34.0 7.6 0 0 0 0 0 0 0 0 0
b 1180 27.2 6.1 0 0 0 0 0 0 21 570 128
C 0 0 0 0 0 0 0 0 0 0 0
9 Net a 12MO 27 0.6 0 0 0 25 68 15 0 0 0
exposed b 12MO 2.7 0.6 0 0 0 191 523 117 0 0 0
walls and c 14A0 37.7 4.7 54 2038 256 169 BW1 754 0 0 0
partitions tl 15EO 6.4 0 0 0 0 0 0 0 1227 7899 0
e 0 0 Hill 0 0 111111 0 0 11111! 0 0
f 0 0 111111 0 0 111111 0 0 111111 0 0
10 Callings a C pa 21.5 10,8 0 0 0 0 0 0 1400 30151 15075
b 0 0 111111 0 0 111111 0 0 111111 0 0
c 0 0 111111 0 0 Iglu 0 0 111111 0 0
d 0 0 m111 0 0 111111 0 0 111111 0 0
e 0 0 111111 0 0 111111 0 0 1111, 0 0
f 0 0 111111 0 0 11!!!! 0 0 111111 0 0
11 Floors a 1940 11.5 0 54 623 0 689 7954 0 0 0 0
(Note:room b 21AO 1.8 0 0 0 0 0 0 0 20 36 0
perimeter c 0 0 111111 0 0 111111 0 0 1111" 0 0
is disp. d 0 0 Mill 0 o mut 0 0 111111 0 0
fm slab e 0 0 11m1 0 0 !11111 0 0 111111 0 0
floors) f 0 0 111111 0 0 IIII!I 0 0 111111 0 0
12 Infiltration t 29.8 26 0 0 0 73 2175 191 21 626 55
Ventilation 0 0 0 0 0 0
13 Subtotal 1oss=6+8.+11+12 •" 2881 - ••' 18871 "" 39282 ^«
Less external heating ••• 0 ,„• 0 « 0
Less baMefer ^• 0 ,.„ 0 0 '
Heating redistribution 0 ••« _ 0 _ 0
14 Duct loss 5% 133 »•• 5% 934 « 5% 1984 '^
15 Total loss=13+14 »• 2794 "" ••• 19605 « `» 41246 «'
16 IM.gains: People @ 300 4 '»' 1200 4 «• 1200 0 ""« 0 '«
Appl. @ 1200 0 0 0 '•« 0 0 0 •••
17 Sublet RSH gain=7+8..+12.16 «• 1458 «„ `•« 3953 "" "' 15258 '•'• •«
Less external coding „• " 0 ••» 0 ••• 0 •«
Less transfer «• 0 0 ••• 0 •«
Cools g redistribution ••• 0 0 0 •«
18 Duct gain 0% 0 D% ' 0 0% 0 `^
19 Total RSH gain=(17+18)•PLF 1 ....00 • 1456 1.00 « 3953 1.00 •' 15258 «•
20 Air required(cfm) 42 63 291 170 „ 613 657
Calculations approved by ACCA to meet all requirements of Manual J"7th Ed.
* Wright �Tt' Right-Sulle®Unlversa1207717.0.16 RSU25116 2016-Dec-07 08:33:02Page 3
...s\scott.lengmorthy\Documents\York\Pmject2.mp Calc-MJ7 Front Doorfaces: N
Window Data job:
Date: Dec 05, 2016
By:
C E R RO N E Plan: 59 devi n
W S O G L S S N I S O O W C W S
N K R L O T H G N H V V H H N H
D Y I A W R A L C C R R G T A A
W Z E M D Z L O X Y T M R R
MASTER BEDROOM
3D0 n n e y n n 2 90.0 1.0 0.0 0.0 5.0 17.6 15.0 0.0
3D0 n w e y n n 2 90.0 1.0 0.0 0.0 5.0 62.6 15.0 0.0
BEDROOM 3
3D0 n n e y n n 2 90.0 1.0 0.0 0.0 5.0 17.6 15.0 0.0
3D0 n e e y n n 2 90.0 1.0 0.0 0.0 5.0 62.6 15.0 0.0
BEDROOM 2
3D0 n S e y n n 2 90.0 1.0 0.0 0.0 5.0 30.6 29.6 0.0
KITCHEN/OR
3D0 n n e y n n 2 90.0 1.0 0.0 0.0 5.0 17.6 43.0 0.0
3D0 n S e y n n 2 90.0 1.0 0.0 0.0 5.0 30.6 30.0 0.0
wri htsoft° 2016-Dec-07 06:age 1
9 Rlght-Suite®Universal 2017 17.0.16 RSU25116 Page 1
AC0, ...s\scotl.langewonhy\Documents\York\Prcjecl2.rup Cale=MJ7 Front Door faces: N
GRAJNY onsulting, LLC
69 Hayden Point Loop
Diamond Point, NY 12824
518 221-3240
06/20/2017
Cerrone Construction LLC
51 Oak Valley Way
Queensbury,NY 12804
Inspection Address: 25 Devin Court, Queensbury NY 12804
Report Number: 0620175
Dear Steven:
The Blower Door Test to verify infiltration rate of the subject property was performed on
06/20/2017. This was done to verify mandatory requirements of 2015 IECC Code as
amended by the NYS Uniform Code Supplement. This report does not imply that full
compliance of above codes has been met.It's verified the infiltration rates only.
GRAJNY Consulting, LLC is pleased to submit the following report.
The following data was provided:
- Square Footage of the house, including conditioned basement=2,800 SF
- Volume of the house, including conditioned basement=23,800 CF
Based on above,the following test data was collected:
- Infiltration Rate, including conditioned basement at 50 Pascal=729 CFM
- ACH50,Actual Changes per Hour at 50 Pascal=729X60/23,800=1.8<3
The Instruments used for test were provided by the Energy Conservatory Digital Gauge
DG-3 rated accuracy=+/- 1%,calibrated minimum once per year.
Thank you for selecting our company. We appreciate the opportunity to be of service.
Please call this office if there are any questions.
Sincerely,
Stan Grajny, PE
RESNET HERS Energy Rater 5609922
NYS PE 065406-1
JM Climate Pro® Fiber Class Blowing Wool
Your home has been professionally insulated to provide superior thermal resistance.
J .� r
Homeowner's Name i Date
-
Address
cityI t 17 \k l ' State /1 r zip
RECORD OF INSTALLATION /
BlUVVIND 1NDUL RATES AND RULLS
Nck CaflttnfL'don If RBtroSt' 8-VALUE THICKNESS AREAINSULATED
age,brofit Depth of Previous Insulation h,. Ceilings sq.1t
Number of trip used %j3 EstimatedR-veYWaofPreviousdnstallation m. sq.1l.
� Walls so.h.
Area Insulated k
'
n
ted 1[` " . Types of Previous Insulation in Anic
sq.
Thickness of B15ulation h.
r, f Floors :n s4 it.
R•value of Insulation -
_ .� _, uf. sq.it,
CLIMATE PRO INSULATION, RAG WEIGfIT-31.5 LB.NOMINAL
R.VALUE 'IEf1U�lUNC9NSfAL,6'ED SEfTLEG'iNICKNE33(MJ RAGS PERUMSD.PL ffjtANIUMNET M1INMUNVYEIDRT
(%mgjLeFBTU) TKICkAESSlie.).. CDVERADE{sgft.76a91. (WeJaq.t41
To obtain an insulation Installed insulation Expected thickness Minimum number Contents of this bag The weight per sq.ft
resistance(RI of should not be less after long-[arm settling begs per 7,800 sq.ft. should not cover of installed insulation
[hen: has occured of net area: more than: should not be less than:
tl Al 4.3 4.B 209 0.150
13 5.0 5.0 5.7 76 0.179
19 7.2 i.2 BA 118 0.266
22 8.3 8.3 9.9 101 0.310
25 9.7 9.7 11.8 85 0.311
30 11.1 111 73.7 73 0.432
38 13.8 13.8 17.7 56 0.559
44 157 75.7 1 48 0
49 �,-' 17.3 / 17.3 23.5 43 Die
60 7 207 29.5 34 8
Sae rawrse fac&lamune aEoa ��n ��a�Pm�atr�,.;�[a,�dla�n/l.
h[srlation Contractor Signature \y Data
Company Collins & CO. ss Interstate Ave.Albany, NY 12205 Phone(518)456-1297
Home Builder Signature Data
Company Address Phone
J�
Johns Manville
Pornaxa intsrniativa.can 7.80085a4I0.9 snc-m 5m D 2623 Johns Manville.71717th street,Denver.0080202
Map Reference: \
The Village at Sweet Road
Map of a Subdivision plan
made for l
Cerrone Builders
Dated: February 5, 2014 / jz
Last Revised: July 30, 2014 / RIP-RAP
By: Van. Dusen & Steves l l
I . Filed: September 30, 2014
RIP
'38 �
RIP-RAP _ 133.50,
I _
` ...P...t:::..
Lands of d` l
a f
The Vfflacje at Sweet Road HOA - a4
N The �a
e
� n
0
V
d
/ 1
o r �1
C° / Story - _ - — age a of
O N t
o
O -
S
_ W
r.
- e
r
r
e
1\ l 2
m
e -
R
0
/
[IOU,
- - a
u t d
� o
e tIOA
- -o
W
/
a
- 1
kln
- 33.
9
/ :
_
. ..:.::::...........::
......:....:.......
.
/
_ -Area
-
- - ----- - — -
_
-- -
- - -
0.30 Acres
13252.1 S Feet
' _ a
,
138.80
! N 84'14102"
W
talc aoX -
Cabie TV
]j
NOTES:
BENEFI T r
EWk
ANTS, RESTRICTIONS INCLUDING FROM RIGHTS, EASEMENTS,
1. JARCEL BE SUBJECT TO AND/OR
MOVEN
1 1: AN EASEMENT GRANTED To NIAGARA MOHAWK POWER CORPORATION &
VERIZON NEW YORK INC. RECORDED IN THE WARREN COUNTY CLERK'S
. : IAL S
OFFICE IN BOOK 5120 OF DEEDS, AT PAGE 10
} � 1.2.= DECLARATION OF COVENANTS, RESTRICTIONS, EASEMENTS AND. LIENS OF
" ---_ -- THE VILLAGE AT SWEET ROAD HOMEOWNERS' ASSOCIATION INC.
,`.,s:
RECORDED IN THE WARREN COUNTY CLERKS OFFICE IN BOOK 5175 OF
So 13") DEEDS, AT PAGE 148.
0
L Abp S 1.3: RIGHT-OF-WAY AND. EASEMENT TO THE TOWN OF QUEENSBURY FOR SEWER
� RECORDED IN THE WARREN COUNTY CLERK'S OFFICE IN BOOK 5157 OF
DEEDS, AT PAGE 248.
:Datel une 2
f
Dus 'UNAUTHORIZE9 ALTERATION OR ADDITION TO A SURVEY _ �( y] $' �r �7 (� j' -Scale 1"=20r
' MAP BEARING A ULENSED LAND SURVEYORS SEAL IS A Map of a Serve ma`ve So� _
i
VN OF SE(;{ION SUB-DIVISION 2,OF THE NEW YORK
YOYORK STATE EDUCATIOATIO N LAW.'
Ste -ves 'ONLY COPIES FROM THE ORIGINAL OF THIS SURVEY - - -
MARKED WH}I AP{ORIGINAL CF THE LAND SURVEYORS
SEAL SHALL BE 60NSIDERED TO BE VALID TRUE COPIES.- ���''''y+yt
'CERTIFICATION]INDICATED HEREON SIGNIFY THAT
THIS SURVEY WA,'PREPARED IN ACCORDANCE WITH THE _ -
errone Builders
EXISTING CODE 9F PRACTICE FOR LAND SURVEYORS ADOPTEDBY THE NEW YO
�TT _ LAND SURVEYORS S IDT CERTIFICATIONS SHALL RUN(ONAL ONLY
i TO THE PERSON{FGR WHOM THE SURVEY IS PREPARED,AND = -
SHEET i OF 9
ON HIS BEHALF j0 THE TITLE COMPANY,GOVERNMENTAL �t .y g� /'� T�� 'q/ '
' 'g, �7 e� 9 ry AGENCY AND LE!5NG INSTITUITTON LISTED HEREON,AND Town of Queen bury, Warren Bounty, New fork
169 Haviland Road Queensbury, New York 1(2804 � TO THE ASSIGNEE."OF THE LENDING INSTITUTION." CfKRONE BUILDERS
(518) 792 -6474 New York Lic. No. 50135 NO DATE DESCRIPTION
. - -
of
DWG NO 052�7
i