Loading...
20170511_LONG EAF Full Environmental Assessment Form Part 1 -Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review,and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information;indicate whether missing information does not exist, or is not reasonably available to the sponsor; and,when possible,generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A&B. In Sections C,D&E,most items contain an initial question that must be answered either"Yes"or"No". If the answer to the initial question is"Yes",complete the sub-questions that follow. If the answer to the initial question is"No",proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the project sponsor to verify that the information contained in Part lis accurate and complete. A.Project and Sponsor Information. Name of Action or Project: Aviation Hospitality,LLC Hotel Development Project Project Location(describe,and attach a general location map): 524 Aviation Road; East of the exit 19, northbound exit ramp, behind the Ambrosia Diner Brief Description of Proposed Action(include purpose or need): The applicant is proposing to construct a new 4 story,92 room,hotel on the site which was previously occupied by a Howard Johnson motor inn.The applicant is proposing to construct a driveway which will provide a remote connection to Aviation Road and the adjacent Pyramid Mall over lands to be retained by the current owner. Ingress/egress easements as appropriate will be granted to the applicant by the owner over these lands to allow for access. The project includes construction of parking areas,outdoor amenity spaces,requisite utilities and stormwater management areas. Name of Applicant/Sponsor: Telephone:617-308-0213 Aviation Hospitality,LLC c/o Mr.Bhavik Jariwala E-Mail: bjariwala@oakfieldhospitality.com Address: 906 Route 9 City/PO:Queensbury State:NY Zip Code:12804 Project Contact(if not same as sponsor;give name and title/role): Telephone:518-438-9900 Joshua O'Connor E-Mail: joconnor@bohlereng.com Address: 17 Computer Drive City/PO: State: Zip Code: Albany NY 12205 Property Owner (if not same as sponsor): Telephone: PCGF, NEWCO,LLC E-Mail: Address: 4 Clinton Square City/PO: State: Zip Code: Syracuse NY 13202 Page 1 of 13 B.Government Approvals B.Government Approvals,Funding,or Sponsorship. ("Funding"includes grants,loans,tax relief,and any other forms of financial assistance.) Government Entity If Yes:Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council,Town Board, ❑Yes®No or Village Board of Trustees b. City,Town Or Village ®Yes❑NO Town of Queensbury Planning Board May 15,2017 Planning Board or Commission c. City Council,Town Or ®Yes❑NO Town of Queensbury Zoning Board of Appeals May 15,2017 Village Zoning Board of Appeals d. Other local agencies ®Yes❑NO Town of Queensbury Building Department July 2017 e.County agencies ®Yes❑NO Warren Washington Industrial Development May 2017 Agency;financin inducement and PILOT f.Regional agencies ®Yes❑No g. State agencies ®Yes❑NO NYSDOT; Driveway connection to Rt 254(Aviation April 2017 Road h.Federal agencies ❑Yes®No i. Coastal Resources. i. Is the project site within a Coastal Area,or the waterfront area of a Designated Inland Waterway? ❑YesmNo ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? ❑YesmNo iii. Is the project site within a Coastal Erosion Hazard Area? ❑Yes[Z]No C.Planning and Zoning C.1.Planning and zoning actions. Will administrative or legislative adoption,or amendment of a plan,local law,ordinance,rule or regulation be the ❑YesmNo only approval(s)which must be granted to enable the proposed action to proceed? • If Yes,complete sections C,F and G. • If No,proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2.Adopted land use plans. a.Do any municipally- adopted (city,town,village or county)comprehensive land use plan(s)include the site ®Yes❑No where the proposed action would be located? If Yes,does the comprehensive plan include specific recommendations for the site where the proposed action ❑YesmNo would be located? b.Is the site of the proposed action within any local or regional special planning district(for example: Greenway ❑YesmNo Brownfield Opportunity Area(BOA);designated State or Federal heritage area;watershed management plan; or other?) If Yes,identify the plan(s): c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, ❑YesmNo or an adopted municipal farmland protection plan? If Yes,identify the plan(s): Page 2 of 13 C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. m Yes❑No If Yes,what is the zoning classification(s)including any applicable overlay district? ESC-ENCLOSED SHOPPING CENTER b. Is the use permitted or allowed by a special or conditional use permit? m Yes❑No c.Is a zoning change requested as part of the proposed action? ❑Yes[Z]No If Yes, i. What is the proposed new zoning for the site? CA.Existing community services. a.In what school district is the project site located? Queensbury School District b.What police or other public protection forces serve the project site? Warren County Sheriff and New York State Police c.Which fire protection and emergency medical services serve the project site? Queensbury Central Volunteer Fire Company d.What parks serve the project site? Hovey Pond Park D.Project Details D.1.Proposed and Potential Development a.What is the general nature of the proposed action(e.g.,residential,industrial,commercial,recreational;if mixed,include all components)? commercial b. a.Total acreage of the site of the proposed action? 56.66 acres b.Total acreage to be physically disturbed? 5.53 acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 56.85 acres c.Is the proposed action an expansion of an existing project or use? ❑Yes®No i. If Yes,what is the approximate percentage of the proposed expansion and identify the units(e.g.,acres,miles,housing units, square feet)? % Units: d.Is the proposed action a subdivision,or does it include a subdivision? ®Yes❑No If Yes, i. Purpose or type of subdivision? (e.g.,residential,industrial,commercial;if mixed,specify types) commercial ii. Is a cluster/conservation layout proposed? ❑Yes®No iii. Number of lots proposed? two iv. Minimum and maximum proposed lot sizes? Minimum 2.07 acres Maximum 2.50 acres e.Will proposed action be constructed in multiple phases? ❑Yes®No i. If No,anticipated period of construction: months ii. If Yes: • Total number of phases anticipated • Anticipated commencement date of phase 1 (including demolition) month year • Anticipated completion date of final phase month _year • Generally describe connections or relationships among phases,including any contingencies where progress of one phase may determine timing or duration of future phases: Page 3 of 13 f.Does the project include new residential uses? ❑Yes®No If Yes,show numbers of units proposed. One Family Two Family Three Family Multiple Family four or more Initial Phase At completion of all phases g.Does the proposed action include new non-residential construction(including expansions)? ®Yes❑No If Yes, i.Total number of structures one(1) ii. Dimensions(in feet)of largest proposed structure: 66'+/- height; 80'+/-width; and 223 +/-length iii. Approximate extent of building space to be heated or cooled: 62,660 square feet h.Does the proposed action include construction or other activities that will result in the impoundment of any ®Yes❑No liquids,such as creation of a water supply,reservoir,pond,lake,waste lagoon or other storage? If Yes, i. Purpose of the impoundment: stormwater ii. If a water impoundment,the principal source of the water: ❑ Ground water®Surface water streams ❑Other specify: iii. If other than water,identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure(e.g.,earth fill,rock,wood,concrete): D.2. Project Operations a.Does the proposed action include any excavation,mining,or dredging,during construction,operations,or both? ❑Yes®No (Not including general site preparation,grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i.What is the purpose of the excavation or dredging? ii. How much material(including rock,earth,sediments,etc.)is proposed to be removed from the site? • Volume(specify tons or cubic yards): • Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged,and plans to use,manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? ❑Yes®No If yes,describe. v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? ❑Yes❑No ix. Summarize site reclamation goals and plan: b.Would the proposed action cause or result in alteration of,increase or decrease in size of,or encroachment ❑Yes®No into any existing wetland,waterbody,shoreline,beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected(by name,water index number,wetland map number or geographic description): Page 4 of 13 ii. Describe how the proposed action would affect that waterbody or wetland,e.g. excavation,fill,placement of structures,or alteration of channels,banks and shorelines. Indicate extent of activities,alterations and additions in square feet or acres: iii. Will proposed action cause or result in disturbance to bottom sediments? ❑Yes❑No If Yes,describe: iv. Will proposed action cause or result in the destruction or removal of aquatic vegetation? ❑Yes[-]No If Yes: • acres of aquatic vegetation proposed to be removed: • expected acreage of aquatic vegetation remaining after project completion: • purpose of proposed removal(e.g.beach clearing,invasive species control,boat access): • proposed method of plant removal: • if chemical/herbicide treatment will be used,specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c.Will the proposed action use,or create a new demand for water? mYes❑No If Yes: i. Total anticipated water usage/demand per day: 9,790 gallons/day ii. Will the proposed action obtain water from an existing public water supply? ®Yes❑No If Yes: • Name of district or service area: Queensbury Water Department • Does the existing public water supply have capacity to serve the proposal? ®Yes[-]No • Is the project site in the existing district? ®Yes❑No • Is expansion of the district needed? ❑Yes®No • Do existing lines serve the project site? ®Yes[]No iii. Will line extension within an existing district be necessary to supply the project? [-]Yes ONo If Yes: • Describe extensions or capacity expansions proposed to serve this project: • Source(s)of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? ❑ Yes®No If,Yes: • Applicant/sponsor for new district: • Date application submitted or anticipated: • Proposed source(s)of supply for new district: v. If a public water supply will not be used,describe plans to provide water supply for the project: vi.If water supply will be from wells(public or private),maximum pumping capacity: gallons/minute. d.Will the proposed action generate liquid wastes? m Yes❑No If Yes: i. Total anticipated liquid waste generation per day: 9,790 gallons/day ii. Nature of liquid wastes to be generated(e.g.,sanitary wastewater,industrial;if combination,describe all components and approximate volumes or proportions of each): Sanitary wastewater iii. Will the proposed action use any existing public wastewater treatment facilities? ®Yes❑No If Yes: • Name of wastewater treatment plant to be used: Glens Falls Wastewater Treatment Plant • Name of district: West Queensbury Sanitary Sewer District • Does the existing wastewater treatment plant have capacity to serve the project? ®Yes❑No • Is the project site in the existing district? ®Yes❑No • Is expansion of the district needed? ❑Yes oNo Page 5 of 13 • Do existing sewer lines serve the project site? ®Yes❑No • Will line extension within an existing district be necessary to serve the project? ❑Yes®No If Yes: • Describe extensions or capacity expansions proposed to serve this project: iv. Will a new wastewater(sewage)treatment district be formed to serve the project site? ❑Yes®No If Yes: • Applicant/sponsor for new district: • Date application submitted or anticipated: • What is the receiving water for the wastewater discharge? V. If public facilities will not be used,describe plans to provide wastewater treatment for the project,including specifying proposed receiving water(name and classification if surface discharge,or describe subsurface disposal plans): vi. Describe any plans or designs to capture,recycle or reuse liquid waste: e.Will the proposed action disturb more than one acre and create stormwater runoff,either from new point ®Yes❑No sources(i.e.ditches,pipes,swales,curbs,gutters or other concentrated flows of stormwater)or non-point source(i.e. sheet flow)during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? Square feet Or -0.03 acres(impervious surface)72,335 Pre-development Impervious,59,148 Post-development Impervious Square feet or 3.72 acres(parcel size) ii. Describe types Of new point sources. Discharge to existing stormwater management systems and/or sheet flow discharge to owner controlled parcels iii. Where will the stormwater runoff be directed(i.e.on-site stormwater management facility/structures,adjacent properties, groundwater,on-site surface water or off-site surface waters)? Stormwater will be directed to groundwater via infiltration practices. It is not anticipated that the site will create any discharge • If to surface waters,identify receiving water bodies or wetlands: • Will stormwater runoff flow to adjacent properties? ®Yes❑No iv. Does proposed plan minimize impervious surfaces,use pervious materials or collect and re-use stormwater? ®Yes❑No f. Does the proposed action include,or will it use on-site,one or more sources of air emissions,including fuel ❑Yes®No combustion,waste incineration,or other processes or operations? If Yes,identify: i.Mobile sources during project operations(e.g.,heavy equipment,fleet or delivery vehicles) ii. Stationary sources during construction(e.g.,power generation,structural heating,batch plant,crushers) iii. Stationary sources during operations(e.g.,process emissions,large boilers,electric generation) g.Will any air emission sources named in D.2.f(above),require a NY State Air Registration,Air Facility Permit, [-]Yes®No or Federal Clean Air Act Title IV or Title V Permit? If Yes: i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet ❑Yes®No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application,the project will generate: • Tons/year(short tons)of Carbon Dioxide(CO2) Tons/year(short tons)of Nitrous Oxide(N20) • Tons/year(short tons)of Perfluorocarbon(PFCs) • Tons/year(short tons)of Sulfur Hexafluoride(SF6) • Tons/year(short ton)of Carbon Dioxide equivalent of Hydroflourocarbons(HFCs) • Tons/year(short ton)of Hazardous Air Pollutants(HAPS) Page 6 of 13 h.Will the proposed action generate or emit methane(including,but not limited to,sewage treatment plants, ❑Yes®No landfills,composting facilities)? If Yes: i. Estimate methane generation in tons/year(metric): ii.Describe any methane capture,control or elimination measures included in project design(e.g.,combustion to generate heat or electricity,flaring): i.Will the proposed action result in the release of air pollutants from open-air operations or processes,such as ❑Yes®No quarry or landfill operations? If Yes:Describe operations and nature of emissions(e.g.,diesel exhaust,rock particulates/dust): j.Will the proposed action result in a substantial increase in traffic above present levels or generate substantial ❑Yes®No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected(Check all that apply): ❑Morning ❑Evening ®Weekend ®Randomly between hours of 5 to 6 ii. For commercial activities only,projected number of semi-trailer truck trips/day: 0 iii. Parking spaces: Existing o Proposed 102 Net increase/decrease 102 iv. Does the proposed action include any shared use parking? ❑Yes®No v. If the proposed action includes any modification of existing roads,creation of new roads or change in existing access,describe: Proposed action envisions reconfiguration of the existing driveway connection to Rt 254 along with a connection to the adjacent loop road surrounding Aviation Mall vi. Are public/private transportation service(s)or facilities available within'/z mile of the proposed site? ®Yes❑No vii Will the proposed action include access to public transportation or accommodations for use of hybrid,electric ®Yes❑No or other alternative fueled vehicles? viii.Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing ®Yes❑No pedestrian or bicycle routes? k.Will the proposed action(for commercial or industrial projects only)generate new or additional demand ®Yes❑No for energy? If Yes: i. Estimate annual electricity demand during operation of the proposed action: 550,000 kWh ii. Anticipated sources/suppliers of electricity for the project(e.g.,on-site combustion,on-site renewable,via grid/local utility,or other): Grid/Local Utility iii. Will the proposed action require a new,or an upgrade to,an existing substation? ❑Yes®No 1.Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations: • Monday-Friday: lam-6pm • Monday-Friday: 24 hours • Saturday: • Saturday: 24 hours • Sunday: • Sunday: 24 hours • Holidays: • Holidays: 24 hours Page 7 of 13 m.Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ®Yes❑No operation,or both? If yes: i. Provide details including sources,time of day and duration: Typical construction related noises ii. Will proposed action remove existing natural barriers that could act as a noise barrier or screen? ❑Yes®No Describe: There are no existent natural barriers n.. Will the proposed action have outdoor lighting? ®Yes[]No If yes: i. Describe source(s),location(s),height of fixture(s),direction/aim,and proximity to nearest occupied structures: Downward directed parking lot lighting at 20'tall,first floor building lighting at ingress/egress points. Patio lighting at front entrance and side patio. ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? ®Yes❑No Describe:Tree line along southern and western property lines are being adjusted. o. Does the proposed action have the potential to produce odors for more than one hour per day? ❑Yes®No If Yes,describe possible sources,potential frequency and duration of odor emissions,and proximity to nearest occupied structures: p.Will the proposed action include any bulk storage of petroleum(combined capacity of over 1,100 gallons) ❑Yes®No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s)to be stored ii. Volume(s) per unit time (e.g.,month,year) iii. Generally describe proposed storage facilities: q.Will the proposed action(commercial,industrial and recreational projects only)use pesticides(i.e.,herbicides, ❑Yes ®No insecticides)during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? ❑ Yes ❑No r.Will the proposed action(commercial or industrial projects only)involve or require the management or disposal ® Yes ❑No of solid waste(excluding hazardous materials)? If Yes: i. Describe any solid waste(s)to be generated during construction or operation of the facility: • Construction: 2 tons per week (unit of time) • Operation: 1 tons per month (unit of time) ii. Describe any proposals for on-site minimization,recycling or reuse of materials to avoid disposal as solid waste: • Construction: Efficient construction methods will be employed to minimize waste • Operation: A typical solid waste recycling program will be employed iii. Proposed disposal methods/facilities for solid waste generated on-site: • Construction: Roll-off dumpster to be collected by truck • Operation: Dumpster and periodic collection Page 8 of 13 s.Does the proposed action include construction or modification of a solid waste management facility? ❑ Yes® No If Yes: i. Type of management or handling of waste proposed for the site (e.g.,recycling or transfer station,composting,landfill,or other disposal activities): ii. Anticipated rate of disposal/processing: • Tons/month,if transfer or other non-combustion/thermal treatment,or • Tons/hour,if combustion or thermal treatment iii. If landfill,anticipated site life: years t.Will proposed action at the site involve the commercial generation,treatment,storage,or disposal of hazardous ❑Yes®No waste? If Yes: i. Name(s)of all hazardous wastes or constituents to be generated,handled or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization,recycling or reuse of hazardous constituents: v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? ❑Yes❑No If Yes:provide name and location of facility: If No:describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: E.Site and Setting of Proposed Action E.1.Land uses on and surrounding the project site a.Existing land uses. i. Check all uses that occur on,adjoining and near the project site. ❑ Urban ❑ Industrial ® Commercial ❑ Residential(suburban) ❑ Rural(non-farm) ❑ Forest ❑ Agriculture ❑ Aquatic ® Other(specify): State Highway Right of Way(1-87) ii. If mix of uses,generally describe: b.Land uses and covertypes on the project site. Land use or (within project area) Current Acreage After Change Covertype Acreage Project Completion (Acres+/-) • Roads,buildings,and other paved or impervious surfaces 2.63 2.94 +0.31 • Forested 0 0 0 • Meadows,grasslands or brushlands(non- agricultural,including abandoned agricultural) 3.59 3.28 0.31 • Agricultural 0 0 0 (includes active orchards,field,greenhouse etc.) • Surface water features (lakes,ponds,streams,rivers,etc.) 0 0 0 • Wetlands(freshwater or tidal) 0 0 0 • Non-vegetated(bare rock,earth or fill) 0 0 0 • Other Describe: Page 9 of 13 c.Is the project site presently used by members of the community for public recreation? [:]Yes✓❑No i. If Yes: explain: d.Are there any facilities serving children,the elderly,people with disabilities(e.g.,schools,hospitals,licensed ®Yes❑No day care centers,or group homes)within 1500 feet of the project site? If Yes, i. Identify Facilities: Queensbury School and New Meadows School e.Does the project site contain an existing dam? ❑Yes®No If Yes: i. Dimensions of the dam and impoundment: • Dam height: feet • Dam length: feet • Surface area: acres • Volume impounded: gallons OR acre-feet ii. Dam's existing hazard classification: iii. Provide date and summarize results of last inspection: f.Has the project site ever been used as a municipal,commercial or industrial solid waste management facility, ❑Yes®No or does the project site adjoin property which is now,or was at one time,used as a solid waste management facility? If Yes: i. Has the facility been formally closed? ❑Yes❑ No • If yes,cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: g.Have hazardous wastes been generated,treated and/or disposed of at the site,or does the project site adjoin ❑Yes®No property which is now or was at one time used to commercially treat,store and/or dispose of hazardous waste? If Yes: i. Describe waste(s)handled and waste management activities,including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site,or have any ❑Yes® No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site ❑Yes®No Remediation database? Check all that apply: ❑ Yes—Spills Incidents database Provide DEC ID number(s): ❑ Yes—Environmental Site Remediation database Provide DEC ID number(s): ❑ Neither database ii. If site has been subject of RCRA corrective activities,describe control measures: iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? ®Yes❑No If yes,provide DEC ID number(s):V00141 iv. If yes to(i),(ii)or(iii)above,describe current status of site(s): As of January 26. 1998 a dissolved and free product petroleum contamination plume was present at the location. Historic product thickness varied to as high as 1.44 feet in thickness. Dissolved levels were as high as 7-10,000 PPB.A public water supply is present throughout the area,several remediation systems have been utilized at the location.A corrective action plan was implemented by the volunteer to address on-site contaminants. Page 10 of 13 v. Is the project site subject to an institutional control limiting property uses? ❑YesONo • If yes,DEC site ID number: • Describe the type of institutional control(e.g.,deed restriction or easement): • Describe any use limitations: • Describe any engineering controls: • Will the project affect the institutional or engineering controls in place? ❑Yes❑No • Explain: E.2. Natural Resources On or Near Project Site a.What is the average depth to bedrock on the project site? tbd feet b.Are there bedrock outcroppings on the project site? ❑YesoNo If Yes,what proportion of the site is comprised of bedrock outcroppings? % c.Predominant soil type(s)present on project site: (HnB) Hinckley cobbly sandy loam, 94 % (OaB)Oakville loamy fine sand 6 % d.What is the average depth to the water table on the project site? Average: feet e.Drainage status of project site soils:® Well Drained: 100%of site ❑ Moderately Well Drained: %of site ❑ Poorly Drained %of site f.Approximate proportion of proposed action site with slopes: ® 0-10%: 92 %of site ® 10-15%: 3 %of site ® 15%or greater: 0.4 %of site g.Are there any unique geologic features on the project site? ❑YesoNo If Yes,describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies(including streams,rivers, ❑YesoNo ponds or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? ❑YesoNo If Yes to either i or ii,continue. If No,skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, ❑Yes®No state or local agency? iv. For each identified regulated wetland and waterbody on the project site,provide the following information: • Streams: Name Classification Lakes or Ponds: Name Classification • Wetlands: Name Approximate Size • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired El Yes[Z]No waterbodies? If yes,name of impaired water body/bodies and basis for listing as impaired: i.Is the project site in a designated Floodway? ❑Yes®No j.Is the project site in the 100 year Floodplain? ❑Yes®No k.Is the project site in the 500 year Floodplain? ❑Yes®No 1.Is the project site located over,or immediately adjoining,a primary,principal or sole source aquifer? ®Yes❑No If Yes: i. Name Of aquifer:Principal Aquifer Page 11 of 13 in. Identify the predominant wildlife species that occupy or use the project site: emergent mammals brushland birds n.Does the project site contain a designated significant natural community? ❑Yes®No If Yes: i. Describe the habitat/community(composition,function,and basis for designation): ii. Source(s)of description or evaluation: iii. Extent of community/habitat: • Currently: acres • Following completion of project as proposed: acres • Gain or loss(indicate+or-): acres o.Does project site contain any species of plant or animal that is listed by the federal government or NYS as ❑Yes®No endangered or threatened,or does it contain any areas identified as habitat for an endangered or threatened species? p. Does the project site contain any species of plant or animal that is listed by NYS as rare,or as a species of ❑YesONo special concern? q.Is the project site or adjoining area currently used for hunting,trapping,fishing or shell fishing? ❑YesoNo If yes,give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a.Is the project site,or any portion of it,located in a designated agricultural district certified pursuant to ❑Yesg]No Agriculture and Markets Law,Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: b.Are agricultural lands consisting of highly productive soils present? ❑YesmNo i. If Yes: acreage(s)on project site? ii. Source(s)of soil rating(s): c. Does the project site contain all or part of,or is it substantially contiguous to,a registered National ❑Yesg]No Natural Landmark? If Yes: i. Nature of the natural landmark: ❑Biological Community ❑ Geological Feature ii. Provide brief description of landmark,including values behind designation and approximate size/extent: d.Is the project site located in or does it adjoin a state listed Critical Environmental Area? ❑Yesg]No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 12 of 13 e.Does the project site contain,or is it substantially contiguous to,a building,archaeological site,or district ❑Yes®No which is listed on,or has been nominated by the NYS Board of Historic Preservation for inclusion on,the State or National Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: El Archaeological Site ❑Historic Building or District ii. Name: iii. Brief description of attributes on which listing is based: f.Is the project site,or any portion of it,located in or adjacent to an area designated as sensitive for ❑Yes®No archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory? g.Have additional archaeological or historic site(s)or resources been identified on the project site? ❑Yes®No If Yes: i.Describe possible resource(s): ii. Basis for identification: h.Is the project site within fives miles of any officially designated and publicly accessible federal,state,or local ❑Yes®No scenic or aesthetic resource? If Yes: i. Identify resource: ii. Nature of,or basis for,designation(e.g.,established highway overlook,state or local park,state historic trail or scenic byway, etc.): iii. Distance between project and resource: miles. i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers ❑Yes®No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? ❑Yes❑No F.Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal,please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name Date Signature Title Page 13 of 13