RC-000459-2017 TOWN OF QUEENSBURY
742 Bay Road, Queensbury,NY 12804-5904 (518)761-8201
Community Development- Building & Codes (518) 761-8256
CERTIFICATE OF OCCUPANCY
Permit Number: RC-000459-2017 Date Issued: Friday, January 19, 2018
This is to certify that work requested to be done as shown by Permit Number RC-000459-2017
has been completed.
Tax Map Number: 296.14-2-20
Location: 32 DEVIN CT
Owner: CERRONE BUILDERS, INC.
Applicant: CERRONE BUILDERS, INC.
This structure may be occupied as a: SFD w/gas FP 1782 s.f.
Garage 528 s.f. By Order of Town Board
TOWN OF QUEENSBBURY
Issuance of this Certificate of Occupancy DOES NOT relieve the /1
property owner of the responsibility for compliance with Site Plan, V
Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement
Planning Board or Zoning Board of Appeals.
TOWN OF QUEENSBURY
OL 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development- Building&Codes (518)761-8256
BUILDING PERMIT
Permit Number: RC-000459-2017
Tax Map No: 296.14-2-20
Permission is hereby granted to: CERRONE BUILDERS,INC.
For property located at: 32 DEV IN CT
In the Town of Queensbury,to construct or place at the above location in accordance with application together
with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform
Building Codes and the Queensbury Zoning Ordinance
Tyne of Construction
Owner Name: CERRONE BUILDERS,INC. Single Family-New $390,000.00
Owner Address: 1589 State Route 9 Total Value $390,000.00
Fort Edward,NY 12828
Contractor or Builder's Name/Address Electrical Inspection Agency
CERRONE BUILDERS,INC.
1589 State Route 9
Fort Edward,NY 12828
Plans&Specifications
SFD w/gas FP 1782 s.f.
Garage 528 s.f.
$1,335.60 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,August 9,2018
(if a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the Town of Qensbury n Vidne a , 2017
SIGNED BY: (mit('/ �-VJ for the Town of Queensbury.
Director of Building&Code Enforcement
office Use Only
`J`� - 1
PRINCIPLE STRUCTURE PERMIT Permit#: fLC -� ZO
APPLICATION Permit Fee:$ 85 bo
742 Bay Road,Qubenstit ry,NY 12804 "Rec Fee:$
P:518-761.8256 nueemburynet
/ Invoice#: 2090
Project Location: V N �✓ 1
Tax Map ID#: Subdivision Name: ✓ f ��
'TowNsp.RESOLUTI NO-201 : $050 recreation fee for new dwelling units: single family,duplexes/two-family,
multiple family, apartmen a, condominiums,townhouses, and/or manufactured &modular homes, but not mobile
homes. This Is In additio i to the permit fee(s).
CONTACT INEORMA ION:
• Applicant: ^i
Name(s): �c�/jN {�
Mailing Address,C/S 1'
Cell Phone: Land Line: �)
Email: je' 0
PrImary Ow s :
Name(s):
Mailing Address, C/S
Cell Phone: Land Land Line: __L ...J
Email•
• Contralao s
Business Name:
Contact Name(s):
Mailing Address,C/ JUL J l 9tt17
Cell Phone: I Land Line:
Email:
• Architects nee s
Business Name: i CL��fi
Contact Name(s):
Mailing Address, C/S . '�✓
Cell Phone: Land Line: 6
Email: /J,,
Contact Person for Building&Code Compliance: •2z_ea/ � ��rne�
Cell Phone: ) _�d l l '/ Land Line:
Email:
Town of aUWJburV Wh*%& a
Enforxmn Mnd*Structure Application ReNsed February 2017
PROJECT INFORMATION:
TYPE: ommercial Residential
WORK CLASS:
/Single-Family —Two-Family _Multi-Family(#of )
Townhouse _Business Office _Retail —Hotel/Motel
_IndustriaUWareh se _Garage(#ofcars--j _Other(describe )
STRUCTURES U REFOOTAGE: GARAGESQUAREFOOTAGE:
P floor. It U 1ST floor:
2nd floor: 2nd floor:
and floor. Total square feet:
411 floor.
Total square feet:
ADDITIONAL PR ECT INFORMATION:
1. Estimated Cost of Construction:$ 000
2. Proposed use of the building:
3. If Commerch I or Industrial, indicate the name of the business:
4. Source of He A(circle one): Ga Oil Propane Solar Other:
(Fireplaces need a separate Wel Suming Appliances&Chimney Application,one per appliance)
S. Are there an structures not shown on the plot plan? YES C0 Explain:
6. Are there an easements on the property? YES NO
7. SITE INFORN ATION: l
a.What is tt e dimensions or acreage he parcel? "d
b. Is this a corner lot? YES
c.Will the gi ade be changed as a result of the construction? YES
d.What is tI le water source? PUBLI PRIVAT4 WELL
e. Is the par el on SEWER or a PRIVATE SEPTIC system?
Town of Queens" a sisms Coo Enforcement Principe Structure Appkahon Revised Feon ary 204
DECLARATIO :
1. 1 acknowledge that no construction shall commence prior to issuance of a valid building permit and
work will be comp)ated within a 12 month period.
2. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to
fees and department approval.
3. 1 certify that the a plication, plans and supporting materials are a true and complete statement and/or
description of the work proposed, that all work will be performed in accordance with the NYS Building
Codes,local building laws and ordinances, and in conformance with local zoning regulations.
4. 1 acknowledge the prior to occupying the facilities proposed I, or my agents, will obtain a certificate
of occupancy.
5. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all
newly constructed facilities prior to issuance of a certificate of occupancy.
I have read and agree the above:
PRINT NAME:
SIGNATURE: DATE:
Town of QoffrAhoWu ty& .Enforcement Pdndple Structure APpltutim Redsed PeWUMV 2017
FUEL BURNING APPLIANCE & Office Use only
CHIMNEY APPLICATION Permit#:
Permit Fee:$
of
loan
Invoicet#•
742 Bay Road,Queensbury, NY 12804
P:518-761-8256 www.iiueensbury.net
I
Project Locatio : //1 ��� loe ZO Tax Map ID#:
Room of Install: 41//yc ,'P Planned Install Date:
**SONE APPLICATION PER APPLIANCE**
CONTACT IN TION:
Applicant .
Name(s):
Mailing Address,C/ '
Cell Phone: /' ��^ Loynd Line: �)
Email: r A '
• PrImary Owner(s):
Name(s):
Mailing Address,C/ /Z:
Cell Phone:_ Land Line:
Email:
Installer Bu Ider:
Business Name:
Contact Name(s):
Mailing Address, C/ /Z
Cell Phone:_ ) Land Line: _
Email
Contact:Person for Buildi� & Code Compliance:
Celf Phone: _( ) "�/ " 1�1/ _Land Line: _( )
Email
Fuel Burning Appliance&Chimney Application Revised March 2017
1
FUEL BURNING AP UANa t FORMATION:
TYPE OF DEVICE:
Stove _Fireplace Insert _Fireplace
Fuel Fired Equip ent(Garage Only, 18"clearance per IMC 304.3)
_Fireplace,factoryuilt** 1 ?� 2
"*Manufacturer's na e: ��/'�%/Li Model#: 152-36
SOURCE OF HEAT:
Wood Coal _Pellet Gas ZB,cv oa'e tle C.
CHIMNEY INFORMATION:
_Masonry:
_bkck _brick _stone
_Flue:
_tie _steel —size, in inches
_Material*: /
_do ble-wall 1_triple-wall_insulated
(*Manufacturers na e: �/Cf7/L� Model#:
ADDITIONAL INFORMATION:
1. Two inspectioi is are required. A rough-in inspection, prior to installation and a final Inspection, after
Installation.
2. Manufacturers installation manual must be available at the time of inspection.
3. Masonry firep aces&chimneys require plans to be submitted.
4. Twenty-four( 4)hour notification is required for inspections.
o_gdKatlon:Con ronstallation must conform to NYS Fire Prevention&Building Code and/or manufacturer
requirements. The app Icantor owner agrees to comply with all applicable laws,ordinances,regulations and all
conditions.that are pa of these requirements and also will allow the inspector to enter the premises to perform the
required inspections.
I have read and agree to the above:
PRINT NAME:
SIGNATURE: AADATE: 3D /
Fuel Burning Appliance&Chimney Application Revised March 2017
REScheck Software Version 4.6.4
Compliance Certificate
Project Cerrone Builders Inc
Energy Code: 2015 IECC
Location: Glens Falls, New York
Construction Type: Single-family
Project Type: New Construction
Conditioned Floor Area: 1,782 1`11:2
Glazing Area 12%
Climate Zone: 6 (7635 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
32 Devin Court VISION Engineering, LLC
Lot 20 Sweet Rd Subdiv 206 Glen Street
Queensbury, NY 12804 Suite 56
Glens Falls, NY 12801
�ompliance: Passes using LIA trade-off
Compliance: 0.0%Better Than Code Maximum UA: 280 Your UA: 280
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont.
Assembly or U-Factor UA
Ceiling 1: Raised or Energy Truss 1,782 38.0 0.0 0.025 45
Floor 1:All-Woad joistrrruss:Over Outside Air 10 30.0 0.0 0.033 0
Wall 1:Wood Frame, 16"o.c. 1,900 21.0 0.0 0.057 94
Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 171 0.290 50
Door 1:Solid 18 0.140 3
Door 2: Solid 200.200 4
Door 3: Glass ' 40 .,I, I 0.290 12
Basement Wall 1:Solid Concrete or Masonry 1,482 0.0 15.0 0.044 64
Wall height: 7.8'
Depth below grade: 7.3' JUL 3 1 2017
Insulation depth:7.8'
Window 2:Vinyl/Fiberglass Frame:Double Pane - 7 I 0.400 3
Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 --' 0.290 5
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258- DES-CER Page 1 of 10
Lot 20 Devin Court\1258 RESCHECK.rck
Compliance StatemSwithpe
Thesed building design described here is consistent with the building plans, specifications,and other
calculations submittmit application.The proposedSbu' ghasbeen designed to meet the 2015 IECC requirements in
RESchegk V�sion 4. ply with the mandatory requir en liste a REScheck Inspection C ecklist.
Name-Tfle 'Signature e
r LW'
vn
i s
A F
O0�1P
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES -CER Page 2 of 10
Lot 20 Devin Court\1258 RESCHECK.rck
REScheck Software Version 4.6.4
Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/As
sumptions
& Re .ID
103.1, Construction drawings and ❑Complies
103.2 documentation demonstrate ❑Does Not
[PRIII energy code compliance for the ❑Not Observable
building envelope.Thermal
envelope represented on ❑Not Applicable j
___construction documents.
103.1 .Construction drawings and -'ir❑Complies
103.2, documentation demonstrate ❑Does Not
403.7 energy code compliance for
[PR31' lighting and mechanical systems. ❑Not Observable
USystems serving multiple []Not Applicable
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is Heating: Heating: ❑Complies
403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not
[PR212 on loads calculated per ACCA Cooling: ' Cooling: ❑Not Observable
Manual J or other methods Btu/hr Btu/hr
approved by the code official. []Not Applicable j
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 13 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258- DES-CER Page 3 of 10
Lot 20 Devin Court\1258 RESCHECK.rck
Section Plans Verified Field Verified
# Foundation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1 Conditioned basement wall R-_ R- ❑Complies See the Envelope Assemblies
[F0411 'insulation R-value.Where interior R R- ❑Does Not table for values.
insulation is used,verification ❑Not Observable
may need to occur during
:Insulation Inspection. Not ❑Not Applicable
.required in warm-humid locations
:in Climate Zone 3.
303.2 Conditioned basement wall ❑Complies
[F0511 :insulation installed per ❑Does Not
manufacturer's instructions. ❑Not Observable
❑Not Applicable
402,2.9 Conditioned basement;;all ft ft ❑Complies See the Envelope Assemblies
[FO6]1 'insulation depth of burial or ❑Does Not table for values.
!distance from top of wall. ❑Not Observable
❑Not Applicable
303.2.1 A protective covering is installed ❑Complies
[FO11]2 to protect exposed exterior ❑Does Not
insulation and extends a ❑Not Observable
minimum of 6 in, below grade.
❑Not Applicable
403.9 Snow-and ice-melting system ❑Complies
[FO12)2 :controls installed. ❑Does Not
v3 ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 IHigh Impact(Tier 1) fir;;; Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES -CER Page 4 of 10
Lot 20 Devin Court\1258 RESCHECK.rck
Section Plans Vered Field Verified
# Framing/ Rough-In Inspection Vafue Value Complies? Comments/Assumptions
& Req.ID _
402.1.1, Door U-factor. U-_ U-_ ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR11' ❑Nat Observable
k4 ❑Not Applicable
402.1.1, Glazing U-factor(area-weighted U- U-_ ❑Complies See the Envelope Assemblies
402.3.1, average) ❑Does Not table for values.
402.3.3,
402.3.6, ❑Not Observable
402.5 ❑Not Applicable
[FR211
303.1.3 U-factors of fenestration products ' '❑Complies
[FR4]1 are determined in accordance ❑Does Not -
with the NFRC test procedure or ❑Not Observable
taken from the default table ❑Not Applicable
402.4.1.1 '.Air barrier and thermal barrier ❑Complies
[FR2311 'installed per manufacturer's ❑Does Not
instructions. ❑Not Observable I
❑Not Applicable j
402.4.3 Fenestration that is not site built ❑Complies
[FR2011 is listed and labeled as meeting ❑Does Not
AAMA/WDMA/CSA 101/1.5.2/A440 ❑Not Observable
or has infiltration rates per NFRC
400 that do not exceed code ❑Not Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR1612 sealed at housing/interior finish []Does Not
and labeled to indicate <_2.0 cfm ❑Not Observable
leakage at 75 Pa. ❑Not Applicable
403.2.1 :Supply and return ducts in attics ❑Complies
[FR1211 :insulated >= R-8 where duct is ❑Does Not
->= 3 inches in diameter and >_ ❑Not Observable
R-6 where< 3 inches.Supply and
return ducts in other portions of ❑Not Applicable
the building insulated >= R-6 for
diameter>= 3 inches and R-4.2
for< 3 inches in diameter. _
403.3.3.5 :Building cavities are not used as ❑Complies
[FR1513 ducts or plenums. - ❑Does Not
4 !❑Not Observable
❑Not Applicable
403,4 HVAC piping conveying fluids R- R- ❑Complies
[FR1712` J above 105 aF or chilled fluids ❑Does Not
:below 55 of are insulated to a-R-
=4i. l q3 ❑Not Observable
❑Not Applicable j
403.4.1 Protection of insulation on HVAC ❑Complies
[FR2411 piping. ❑Does Not
V, ❑Not Observable
❑Not Applicable j
403.5.3 Hot water pipes are insulated to R- R- ❑Complies
[FR18]2 >_R-3. ❑Does Not
i... ❑Not Observable
El Not Applicable
403.6 Automatic or gravity dampers are ❑Complies
[FR19]2 installed on all outdoor air ❑Does Not
intakes and exhausts. ❑Not Observable
❑Not Applicable
11 High Impact(Tier 11 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES-CER Page 5 of 10
Lot 20 Devin Court\1258 RESCHECK.rck
Additional Comments/Assumptions:
1 I High Impact(Tier 1) Medium Impact(Tier 2) 1,3� Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES-CER Page 6 of 10
Lot 20 Devin Court\1258 RESCHECK.rck
Section Plans Verified Field Verified
i # Insulation Inspection Value Value Complies? Comments/Assumptions
i& Req.ID, __ __
303.1 All installed insulation is labeled ❑Complies
[IN13]2 orthe installed R-values ❑Does Not
provided. ❑Not Observable
❑Not Applicable
402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2•6 ❑ Wood ❑ Wood ❑Does Not ;table for values.
[IN111 ❑ Steel ❑ Steel ❑Not Observable
❑Not Applicable j
303.2, Floor insulation installed per '- "" i❑Complies
402.2.7 manufacturer's instructions and , ,, _❑Does Not
[IN211 in substantial contact with the '�jQNot Observable
underside of the subfloor,or floor
framing cavity insulation is in ❑Not Applicable j
contact with the top side of
sheathing,or continuous
insulation is installed on the
underside of floor framing and
:extends from the bottom to the
top of all perimeter floor framing
members.
402.1.1, :Wall insulation R-value.If this is a R- R-_ ❑Complies See the Envelope assemblies
402.2.5, mass wall with at least'/,of the ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.6 wall insulation on the wall ❑ Mass j❑ Mass ❑Not Observable
[IN311 exterior,the exterior insulation
;requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable j
303.2 Wall insulation is installed per ` ` - ❑Complies
[I1,1411 manufacturer's instructions. ❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 1 High Impact(Tier 1) 12' Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258- DES -CER Page 7 of 10
Lot 20 Devin Court\1258 RESCHECK.rck
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
&Req.ID
402.1.1, Ceiling insulation R-value. R- R-_ ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402,2.2• ❑ Steel j❑ Steel ❑Not Observable
[FII]
402.2.6 Not
Applicable
303.1.1.1,]Ceiling insulation installed per - ❑Complies
303.2 ]manufacturer's instructions. ❑Does Not
[F12]1 Blown insulation marked every
300 ft2.
EI Observable
❑Not Applicable j
Rented attics with air permeable ❑Complies
+ ';insulation include baffle adjacent ❑Does Not
+f to soffit and eave vents that ❑Not Observable
:,extends over insulation.
❑Not Applicable
402.2.4 Attic access hatch and door R-_ R- ❑Complies
[FI311 insulation >_R-value of the ❑Does Not
adjacent assembly. ❑Not Observable
❑Not Applicable
402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50=_ I ACH 50 =_ ;❑Complies
[FI17]1 ;ach in Climate Zones 1-2, and ❑Does Not
<=3 ach in Climate Zones 3-8. j❑Not Observable
❑Not Applicable j
403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 :❑Complies
[FI4]1 cfm/100 ft2 across the system or ft' ❑Does Not
<=3 cfm/100 ft2 without air ❑Not Observable
.handler@ 25 Pa. For rough-in ❑NotA Applicable
'tests,verification may need to pP
.occur during Framing Inspection.
403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies
[FI27]1 'determine air leakage with ftz ft2 -❑Does Not
either: Rough-in test:Total
'leakage measured with a ❑Not Observable
.pressure differential of 0.1 inch ❑Not Applicable j
w.g.across the system including
:the manufacturer's air handler
enclosure if installed at time of
!test.Postconstruction test:Total
.leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
_.including the manufacturer's air
handler enclosure.
403.3.2.1 '.Air handler leakage designated ❑Complies
[F12411 by manufacturer at<=2%of ❑Does Not
design air flow.
❑Not Observable
❑Not Applicable
403.11 Programmable thermostats ❑Complies
[F1912 installed for control of primary ❑Does Not
-heating and cooling systems and
initially set by manufacturer to ❑Not Observable
code specifications. ❑Not Applicable j
403.1.2 Heat pump thermostat installed ❑Complies
[F11012 on heat pumps. ❑Does Not
❑Not Observable
❑Not Applicable
403.5.1 Circulating service hot water ❑Complies
[Fill]' systems have automatic or ❑Does Not
:accessible manual controls. ❑Not Observable
❑Not Applicable
11 High Impact(Tier 1) 12 IMedium Impact(Tier 21 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES -CER Page 8 of10
Lot 20 Devin Court\1258 RESCHECK.rck
Section Plans Verified Field Verified
# Flnal Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
403.6.1 All mechanical ventilation system ❑Complies
[F12512 fans not part of tested and listed ❑Does Not
HVAC equipment meet efficacy []Not Observable
-,;and air flow limits.
❑Not Applicable ,
403.2 --'.;Hot water boilers supplying heat ❑Complies
[FI26]2 'through one-or two-pipe heating ❑Does Not
systems have outdoor setback ❑Not Observable
control to lower boiler water
temperature based on outdoor ❑Not Applicable
temperature.
403.5.1.1 Heated water circulation systems ❑Complies
[F128]2 have a circulation pump.The ❑Does Not
system return pipe is a dedicated
return pipe or a cold water supply ❑Not Observable
pipe.Gravity and thermos- ❑Not Applicable j
syphon circulation systems are
not present.Controls for
circulating hot water system
pumps start the pump with signal
'..for hot water demand within the
;occupancy. Controls
automatically tum off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists. _
403.5.1.2 Electric heat trace systems ❑Complies
[FI2912 comply with IEEE 515.1 or UL ❑Does Not
515.Controls automatically ❑Nat Observable
adjust the energy input to the
heat tracing to maintain the ❑Not Applicable j
desired water temperature in the
piping. _
403.5.2 :Water distribution systems that ❑Complies
[F13012 have recirculation pumps that []Does Not
pump water from a heated water
supply pipe back to the heated ❑Not Observable
water source through a cold ❑Not Applicable
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
fi pump and limit the temperature
of the water entering the cold
water piping to 1049F.
403.5.4 Drain water heat recovery units ❑Complies
IFI3112 tested in accordance with CSA ❑Does Not
855.1. Potable water-side
pressure loss of drain water heat ❑Not Observable
recovery units < 3 psi for ❑Not Applicable j
individual units connected to one
or two showers.Potable water-
side pressure loss of drain water
heat recovery units<2 psi for
individual units connected to
-three or more showers. _
404.1 75%of lamps in permanent ❑Complies
[FI611 fixtures or 75%of permanent ❑Does Not
'fixtures have high efficacy lamps.
Does not apply to low-voltage ❑Not Observable
lighting. ❑Not Applicable
404.1.1 Fuel gas lighting systems have ❑Complies
[F12311 no continuous pilot light. ❑Does Not
M ❑Not Observable
❑Not Applicable
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES-CER Page 9 of 10
Lot 20 Devin Court\1258 RESCHECK.rck
Section Plans Verified Field Verified
# Final Inspection Provisions Valu e Value Complies? o
Cmments/Assumptions
& Req.ID
401.3 Compliance certificate posted. ❑Complies
[9712 El Does Not
❑Not Observable
❑Not Applicable
303.3 ~�H7'Manufacturer manuals for ❑Complies
[F11813 :mechanical and water heating ❑Does Not
systems have been provided.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 2' Medium Impact(Tier 2) 13 Low Impact(Tier 31
Project Title: Cerrone Builders Inc Report date: 07/21/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES -CER Page 10 of 10
Lot 20 Devin Court\1258 RESCHECK.rck
a -
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 15.00
Floor 30.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Glass& Door Rating U-Factor SHGC
Window 0.29
Door 0.29
Heating &Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name' Date'
Comments
Manual S Compliance Report Job: 1258
Date: Jul 28,2017
Entire House By: SILL
CERRONE BUILDERS Plan: 1258
QUEENSBURY,NY 12804
Project • •
For: CERRONE
QUEENSBURY, NY 12804
Cooling Equipment
Design Conditions
Outdoor design DS: 85.0'F Sensible gain: 27747 Btuh Entering coil DB: 75.5'F
Outdoor design WB: 71.0°F Latent gain: 6157 Btuh Entering coil WB: 63.0'F
Indoor design DB: 75.0'F Total gain: 33904 Btuh
Indoor RH: 50% Estimated airflow: 1500 cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipmenttype: Split AC
Manufacturer: Model:
Actual airflow: 1500 cfm
Sensible capacity: 0 Btuh 0% of load
Latent capacity: 0 Btuh 0% of load
Total capacity: 0 Btuh 0% of load SHR: 0%
Heating Equipment
Design Conditions
Outdoor design DB: -4.0°F Heat loss: 92827 Btuh Entering coil DB: 64.5°F
Indoor design DB: 68.0°F
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Gas furnace
Manufacturer: Model:
Actual airflow: 1500 cfm
Output capacity: 0 Btuh 0% of load Temp. rise: 0 OF
296.14-2-20 RC-000459-2017
Cerrone Builders
JUL 3 1 2017 32 Devin Court, Lot 20
SFD w/FP 1782 s.f., Garage 528 s.f.
Meets are all requirements of ACCA Manual S.
2017-Jul-28 14:47:08
wrightsoft' Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1
ACC% ...cott.langeworthy\Documents\York\32 DEVIN CT.wp Calc=MJ8 Front Door facesN
t
Residential PlansExaminer Review • Form
ACCP. _ 5Mar
• D— • •a• Equipment, D15 Mar 09
�cedm.ecaa�dr�
QUEENSBURYNY
Header Information
Contractor: CERRONE BUILDERS REQUIRED ATTACHMENTS ATTACHED
Manual J1 Form(and supporting worksheets): Yes E] No ❑
Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes E] No ❑
OEM performance data(heating,cooling,blower): Yes No Fj
Building plan#: 1258 Manual D Friction Rate Worksheet: Yes No Fj
Duct distribution sketch: Yes E] No r-1Home address(Street or Lot#,Block,Subdivision): , Entire House
HVAC LOAD CALCULATION (IRC M 1401
Design Conditions Buildinq Construction Information
Winter Design Conditions Building
Outdoor temperature: _4 °F Orientation: Front Door faces North
Indoor temperature: 68 °F North,East,West,South,Northeast,Northwest,Southeast,Southwest
Total heat loss: 92827 Btuh Number of bedrooms: 0
Conditioned floor area: 5325 fP
Summer Design Conditions Number of occupants: 0
Outdoor temperature: 85 °F
Indoor temperature: 75 °F Windows RJ�j�
Grains difference: 28 gr/Ib @60% RH Eave overhang depth: 0 It
Sensible heat gain: 30830 Btuh Internal shade: none Latent heat gain: 6841 Btuh Blintls,dnpes,etc. Ondow
Total heat gain: 37671 Btuh Number of skylights: 0
HVAC EQUIPMENT • 1
Heating Equipment Data Cooling Equipment Data Blower Data
Equipment tile: Gas furnace E(Vigment%pe: SplitAC Heating cfm: 1500
umace,He pump,Boller,etc. Ir ontlRionar,Heat pump,etc. Cooling cfm: 1500
Model: Model: Static pressure: 0 in H2O
+ Fan's rated external static pressure for
design ahtiow,
Heating output capacity: 0 Btuh Total cooling capacity: 0 Btuh
Heat pumps-capacity at winter design outdoor conditions Sensible cooling capacity: 0 Btuh
Aux.healing output capacity: 0 Btuh Latent cooling capacity: 0 Btuh
HVAC DUCT DISTRIBUTION SYSTEM ! 1
Design airflow: 1500 cfm Longest supply duct: 0 ft Duct Materials Used
Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct:
Total device pressure losses: 0 in H2O Total effective length(TEL): 0 it
Available static pressure(ASP): 0 in H2O Friction rate: Q iN100R Branch duct: Sheet metal
Friction Rate=ASP+(Tax 10 I
declare the load calculation,equipment,equipment selection a • cluctriesign were rigorouslyperformed based on the building
p
-
• _ - above. I understand the claims made on - forms will be subjectto review and verification.
Contractor's printed name:
Contractor's signature: Date:
Reserved
'Home qualifies for MJ1AE Form based on Abridged Edition Checklist
+{+ wrightSO Right-SudedD Universal 2017 17.0,16 RSU25116
Project Summa Job: 1258
t Date: Jul 28,2017
Entire House By: SLL
CERRONE BUILDERS Plan: 1258
DUEENSBURY,NY 12804
Promect Information
For: CERRONE
QUEENSBURY, NY 12804
Notes:
Desicin Information
Weather: Glens Falls AP, NY, US
Winter Design Conditions Summer Design Conditions
Outside db -4 OF Outside db 85 OF
Inside db 68 OF Inside db 75 OF
Design TD 72 OF Design TD 10 OF
Daily range M
Relative humidity 50 %
Moisture difference 28 gr/Ib
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 84149 Btuh Structure 26160 Btuh
Ducts 8678 Btuh Ducts 1588 Btuh
Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh
(none)
0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 92827 Btuh Use manufacturer's data n
Rate/swing multiplier 0.90
Infiltration Equipment sensible load 24972 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Semi-loose
Fireplaces 1 (Average) Structure 3408 Btuh
Ducts 2748 Btuh
Central vent (0 cfm) 0 Btuh
Heating Cooling (none)
Area(ft' 5325 5325 Equipment latent load 6157 Btuh
Volume k 47925 47925
Air changes/hour 0.46 0.23 Equipment total load 31129 Btuh
Equiv.AVF(cfm) 363 184 Req. total capacity at 0.70 SHR 3.0 ton
Heating Equipment Summary Cooling Equipment Summary
Make Make
Trade Trade
Model Cond
AHRI ref Coil
AHRI ref
Efficiency 80AFUE Efficiency 0 SEER
Heating Input 0 Btuh Sensible cooling 0 Btuh
Heating output 0 Btuh Latent cooling 0 Btuh
Low output baseboard 700 Btuh/ft Total cooling 0.054 cfm/Btuh
Total low baseboard 133 ft Actual air flow 0 in H2O
High output baseboard Air flow factor 0.82
Total high baseboard Static pressure
Space thermostat Load sensible heat ratio
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wri htsoft 2017-Juk2814:47:08
9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1
ACCA ...cotl.lanlimorthyMocumentsWork\32 DEVIN CT.rup Calc=MJ8 Front Door laces: N
AED Assessment Job: 1258
Date: Jul 28,2017
Entire House By: SLL
CERRONE BUILDERS Plan: 1258
QUEENSBURY, NY 12804
Project Information
For: CERRONE
QUEENSBURY, NY 12804
Design C •
Location: Indoor: Heating Cooling
Glens Falls AID, NY, US Indoor temperature (°F) 68 75
Elevation: 335 ft Design TD (°F) 72 10
Latitude: 43°N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 48.0 27.6
Dry bulb(°F) -4 85 Infiltration:
Daily range(°F) - 20 ( M )
Wet bulb (°F) - 71
Wind speed (mph) 15.0 7.5
Test for • • Exposure
Hourly Glazing Load
14,000--
12,000--
10,000--
8.000--
6,000--
4,000--
2,000--
8
4,00012,00010,0008,0006,0004,000-
2,0008 9 10 11 12 13 14 15 16 17 18 19 20
Hour of Day
/Mowry /Av>,W / AEDIml
Maximum hourly glazing load exceeds average by 37.4%.
House does not have adequate exposure diversity (AED), based on AED limit of 30%.
AED excursion: 714 Btuh (PFG - 1.3*AFG)
' WrlghtSOft' Right-Suite®universal 201717.0A6 RSU25116 2017-Jul-28 14:age 1
�- Page 1
.4C(K ._cotLlangeworthy\Documents\York\32 DEVIN CT.mp Calc=MJB Front Door faces: N
Right-J® Worksheet Job: 1258
Entire House Date: Jul 28,2017
CERRONE BUILDERS Pian: 12 8
OUEENSBURY.NY 12804
1 Room name Entire House Room2
2 Exposed wall 558.0 ft 186.0 ft
3 Room height 9.0 it d 9.0 ft heat/cod
Room dim
4 Rooensions 1.0 x 1775.0 ft
5 Room area 5325.0 ft' 1775.0 ft2
Ty Construction 1.1-value Or HTM Area (ft2) Load Area (ft5 Load
number (Stutfill (BtulVft') or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)
Heat Cod Gross N/P/S Heat Cool Gross N/P/S Heat Cod
6 11 12C.Om 0.091 n 6.55 1.50 1431 1337 8760 20D8 477 477 3125 716
II----GD 1D-c2Dv 0.570 n 41.04 16.36 45 0 1847 738 0 0 0 0
11D0 0.390 n 28.08 838 49 49 1376 411 0 0 0 0
12C-Osw 0.091 a 6.55 1.50 1080 1040 6814 1562 360 330 2162 495
11 1Dc2ov 0.570 a 41.04 58.17 40 0 1642 2327 30 0 1231 1745
l}/ 12C-Osw 0.091 5 6.55 1.50 1431 1339 8773 2011 477 477 3125 716
I�-fD` 1Dc2ov 0.570 S 41.04 30.57 50 0 2052 1529 0 0 0 0
11DO 0.390 s 28.08 8.38 42 42 1179 352 0 0 0 0
VJ, 12C-Osw 0.091 w 6.55 1.50 1080 990 6486 1486 360 330 2162 495
�C 1Dc2cv 0.570 w 41.04 58.17 90 0 3694 5235 30 0 1231 1745
C 1613-30ad 0.032 - 230 1.44 3550 3550 8179 5112 0 0 0 0
F 19A-19bscp 0.049 - 276 0.38 1775 1775 4907 682 1775 1775 4907 682
6 c)AED excursion 714 -467
Emelope bss/gain 55710 24163 1 17945 6128
12 a) Infiltration 28439 1998 9480 665
b) Roan ventilation 0 0 0 0
13 Internal gains: Occupants Q 230 0 0 0 0
Appliances/other I 1 0 0
Subtotal(lines 6 to 13) 84149 26160 27425 6793
Less external load 0 0 0 0
Less transfer 0 0 0 0
Redistribution 0 0 0 0
14 Subtotal 84149 26160 27425 6793
15 Duct loads 10% 6% 86781 1588 10% 6% 2828 412
Total roan load 92827 27747 30253 7205
Lo vlHigh Baseboard/Cool Air 186 133 1500 61 43 3139
_ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wright5oft' 2017-Jul-2814:47:08
. ;A Right-Suite®Universal 2077 77.0.7616
...cott.langewanhy\Documents\York\32 DEVIN CT.rup CeIc=MJ8 Front Door feces: N Page 1
Right-J® Worksheet Date: 12528,2017
Entire House y
CERRONE BUILDERS Plan: 15258
QUEENSBURY,NY 12804
1 Room name Roan3 Room4
2 Exposed wall 186.0 ft 18.0 It
3 Room height 9.0 ft tleaUcod 9.0 ft heat/cool
4 Room dimensions 1.0 x 1775.0 It 10.0 x 8.0 ft
5 Room area 1775.0 ft2 80.0 ft'
Ty Construction U-value Or HTM Area (ft') Load Area (ftp Load
number (Btuh1ftMF) (BtuWft2) a perimeter (ft) (Btuh) a perimeter (ft) (8tuh)
Heat Cod Gross Witt Heat Cod Gross WP/S Heat Cod
6 % 12C-0sw 0.091 n 6.55 1.50 477 477 3125 716 0 0 0 0
I�-(D; 1D-c2ov 0.570 n 41.04 18.36 0 0 0 0 0 0 0 0
11DO 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0
12C4Osw 0.091 a 6.55 1.50 360 360 2359 541 0 0 0 0
11 1Dc2ov 0.570 a 41.04 58.17 0 0 0 0 0 0 0 0
16 12C-0sw 0.091 a 6.55 1.50 477 417 3125 716 90 90 590 135
tDc2ov 0.670 s 41.04 30.57 0 0 0 0 0 0 0 0
11D0 0.390 s 28.08 8.38 0 0 0 0 0 0 0 0
l4/ 12C-0sw 0.091 w 6.55 1.50 360 360 2359 541 72 57 373 86
Y-C 1Dc2ov 0.570 w 41.04 58.17 0 0 0 0 15 0 616 872
C 16B30ad 0.032 - 2.30 1.44 1775 1775 4090 2556 80 80 184 115
F 19A-19bscp 0.049 - 2.76 0.38 0 0 0 0 0 0 0 0
6 c)AEDexcursion -369 373
Envelope loss/geln 15058 4700 1763 1581
12 a) Infiltration 9480 665 917 64
b) Room ventilation 0 0 0 0
13 Internal gaits: Occupants @ 230 0 0 0 0
Appliances/other 0 0
Subtotal(lines fi to 13) 24537 5366 2580 1646
Less external load 0 0 0 0
Less transfer 0 0 0 0
RedistritxAion 0 0 0 0
14 Subtotal 24537 5366 2680 1646
15 Duct loads 10% 6% 2530 326 10% 6% 276 100
Total roan load 270a5691 2957 1745
LowlHigh Baseboard/Cod Air 1 54 39 We 6 4 94
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
,a,k -F�F wrightsofC2017-Jul-2814:47:06
Right-Suite®Universal 2017 17.0.16 RSU25116 Page 2
...cott.langeworthy\Documents\York\32 DEVIN CT.mp Calc=MJ8 Front Doorfaces: N
Right-J® Worksheet Job: 1258
Entire House Date: Jul 28,2017
CERRONE BUILDERS Plan: 1258
DUEENSBURY,NY 12804
1 Roam name Room5 Room6
2 Exposed wall 0 ft 0 ft
3 Room height 9.0 It heaucod 9.0 ft heat/cod
4 Roon dimensions 7.0 x 6.0 It 7.0 x 6.0 ft
5 Room area 420 ft- 420 ft2
Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load
number (Btutyftk*F) (Btuwft' a Perimeter (ft) (Btuh) or penmeter (ft) (Btuh)
Heat Cod Gross WP/S Heat Cod Gross WP/S Heat Cod
6 1p/ 12C-0sw 0.091 n 6.55 1.50 0 0 0 0 0 0 0 0
CLCD 1Dc2av 0.570 n 41.04 16.36 0 0 0 0 0 0 0 0
11D0 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0
lQ/ 12C-0sw 0.091 a 6.65 1.50 0 0 0 0 0 0 0 0
11 T--G 1Dc2w 0.570 a 41.04 58.17 0 0 0 0 0 0 0 0
lt/ 12C-Osw 0.091 s 6.55 1.50 0 0 0 0 0 0 0 0
IF---GD 1Dc20v 0.570 s 41.04 30.57 0 0 0 0 0 0 0 0
11DO 0.39D s 28.08 8.38 0 0 0 0 0 0 0 0
12C-Osw 0.091 w 6.55 1.50 0 0 0 0 0 0 0 0
t—C 1Dc2ov 0.670 w 41.04 58.17 0 0 0 0 0 0 0 0
C 1611-30ad 0.032 • 230 1.44 42 42 97 60 42 42 97 60
F 19A-19bscp 0.049 - 276 0.38 0 0 0 0 0 0 0 0
6 c)AED excursion -4 4
Envelope loss/gain 97 57 97 57
12 a) Infiltration 0 0 0 0
b) Room ventilation 0 0 0 0
13 Internal gains: Occupants 230 0 0 0 0
Appliances/other 0 0
Subtotal(lines 6 to 13) 97 57 97 57
Less extemal load 0 0 0 0
Less transfer 0 0 0 0
Redistribution 0 0 0 0
14 Subtotal 97 57 97 57
15 Dud loads 10% 6% 10 3 10% 6% 10 3
Total room load 107 60 107 60
LowlHigh Baseboard/Cod Air 0 0 3 0 0 3
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
. 1. -Fk wrilglrtsoft' 2017-Jul-2814:47:08
Rightkk32 D Universal 2017 17.0.16 Front16 Page 3
...colt.langewonhy\Documentslyork\32 DEVIN CT.rup Calc=MJB Front Daor faces: N
Right-J® Worksheet Job: 1258
Entire House Date: Jul 28,2017
CERRONE BUILDERS Plan: 12 8
DUEENSSURY,NY 12804
1 Roan name Roon7 Rorn9
2 Exposed wall 420 ft 220 ft
3 Raxn height 9.0 It heaUcool 9.0 ft heat/cod
4 Room dmensios 1.0 x 261.0 It 1.0 x 1620 ft
5 Roan area 261.0 ft- 1620 ft2
Ty Construction U-value Or HTM Ani (ft2) Load Area (ft2) Lard
number (BtuWftMF) (Btutvft2) or perimeter (ft) (Btuh) a perimeter (ft) (Bluh)
HeatCod Gross N/P/S Heat cat Gross N/P/S Heat Cod
6 W 12C-Osw 0.091 n 6.55 1.50 135 135 885 203 108 83 544 125
I�----GD 1D-c2ov 0.570 n 41.04 16.36 0 0 0 0 25 0 1026 409
11DO 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0
VrJ 12C-Osw 0.091 a 6.55 1.50 0 0 0 0 90 90 590 135
11 `C 1Dc2ov 0.570 a 41.04 58.17 0 0 0 0 0 0 0 0
15! 12C-Osw 0.091 s 6.55 1.50 0 0 0 0 0 0 0 0
1Dc2ov 0.570 5 41.04 30.57 0 0 0 0 0 0 0 0
11DO 0.390 5 28.08 8.38 0 0 0 0 0 0 0 0
V}/ 12C-Osw 0.091 w 6.55 1.50 243 198 1297 297 0 0 0 0
—G 1Dc2ov 0.570 w 41.04 58.17 45 0 1847 2617 0 0 0 0
C 16B-30ad 0.032 - 230 1.44 261 261 601 376 162 162 373 233
F 19A-19bscp 0.049 - 2.76 0.38 0 0 0 0 0 0 0 0
6 c)AED excursion 1130 -63
Envelope loss/gain 4630 4623 25331 839
12 a) Infiltration 2141 150 1121 79
b) Room ventilation 0 0 0 0
13 Internal gains: Occupants @ 230 0 0 0 0
Appliances/dher I 1 0 0
Subtotal(lines 6 to 13) 6771 4773 3654 918
Less external load 0 0 0 0
Less transfer 0 0 0 0
Redistribution 0 0 0 0
14 Subtotal 6771 4773 3654 918
15 Duct loads 10% 6% 698 290 10% 6% 377 56
Taal room load 7489 5063 4031 973
Low High Baseboard/Cat Air 15 11 274 81 6 53
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrl htsoTt- 2017-Jul-2814:47:08
A 9 Right-Sulte®Universal 2017 17.0.16 RSU25116 Page 4
...coll.langeworthy\Documents\York\32DEVINCT.mp Calc=MJ8 Front Doorfaces: N
Right-J® Worksheet Job: 1258
Entire House Date: Jul 28,2017
CERRONE BUILDERS L: 1258
QUEENSBURY, NY 12804
1 Room narne Room10 Room11
2 Exposed wall 9.0 ft 0 it
3 Room height 9.0 ft heat/cool 9.0 ft heal/cool
4 Room dimensions 6.0 x 9.0 ft 6.0 x 20 it
5 Room area 54.0 ft- 120 W
Ty Construction U-value Or HTM Am (it-) Load Area (ftp Load
number (Btul0i-F) (Btutvft� a perimeter (ft) (Btuh) or perimeter (ft) (Btuh)
Heat Cad Grass N/P/S Heat Cod Gross N/P/S Heat Cod
6 1213-Osw 0.091 n 6.55 1.50 0 0 0 0 0 0 0 0
1Dc2ov 0.570 n 41.04 16.36 0 0 0 0 0 0 0 D
11DO 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0
12C-0sw 0.091 a 6.55 1.50 81 71 465 107 0 0 0 0
11 1D-c2ov 0.570 a 41.04 58.17 10 0 410 582 0 0 0 0
Vf/ 12C-0sw 0.091 s 8.55 1.50 0 0 0 0 0 0 0 0
1Dc2ov 0.570 s 41.04 30.57 0 0 0 0 0 0 0 0
11DO 0.390 5 2808 8.38 0 0 0 0 0 0 0 0
t12C-0sw 0.091 w 6.55 1.50 0 0 0 0 0 0 0 0
—G 1Dc2ov 0.570 w 41.04 58.17 0 0 0 0 0 0 0 0
C 1813-30ad 0.032 - 230 1.44 54 54 124 78 12 12 28 17
F 194-19bscp 0.049 - 276 0.38 0 0 0 0 0 0 0 0
6 c)AED excursion 48 -1
Envelope loss/gain 1000 814 28 16
12 a) Infiltration 459 32 0 0
b) Room ventilation 0 0 0 0
13 Intemal gains: Occupants @ 230 0 00 0
Appliances/other 0 0
Subtotal(lines 6 to 13) 1459 846 28 16
Less external load 0 0 0 0
Less transfer 0 0 0 0
Redistribution 0 0 0 0
14 Subtotal 1459 846 28 16
15 Dud loads 10% 6% 150 51 10% 6% 3 1
Taal room load 1609 897 30 17
LoxlHigh Baseboard/Cod Air 3 2 48 0 0 1
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
41- wrightsoft- 2017-Jul-28 14:age 5
Rightkk32 D Universal 2017 17.0.168 Front16 Page 5
...cott.langewathy\Documents\Vork132 DEVIN CT.rup CeIc=MJB Front Door/aces: N
Right-JO Worksheet Dale: 1258
Entire Entire House y
CERRONE BUILDERS Ptan: 1258
QUEENSBURY,NY 12804
1 Rowe name ROwn12 Room13
2 Exposed wall 35.0 ft 18.0 ft
3 Room height 9.0 It heaVcool 9.0 ft heal/cod
4 Room dimensions 14.0 x 16.0 ft 1.0 x 125.0 ft
5 Rwxn area 224.0 ft' 125.0 W
Ty Construction U-value Or HTM Area (ft-) Load Area (ftp Load
r mber (Btutyft-F) (Btuh/ft� or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)
HealCad Gross WP/S Heat Cod Gross N/P/S Heat Cod
6 141 12C-0sw 0.091 n 6.55 1.50 0 0 0 0 0 0 0 0
I�----GD 1Dc2ov 0.570 n 41.04 16.38 0 0 0 0 0 0 0 0
11DO 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0
l4/ 12C-0sw 0.091 a 6.55 1.W 144 144 943 216 45 45 295 68
11 T-C 1Dc2ov 0.570 a 41.04 56.17 D 0 0 0 0 0 0 0
T 12C-0sw 0.091 s 6.55 1.50 125 101 662 152 117 96 629 144
1D-c2Dv 0.570 s 41.04 30.57 25 0 1026 764 0 0 0 0
11D0 0.390 s 26.08 8.38 0 0 0 0 21 21 590 176
W 12C-05w 0.091 w 6.55 1.50 45 45 295 68 0 0 0 0
t-C 1D-c2ov 0.570 w 41.04 58.17 0 0 0 0 0 0 0 0
C 166-30ad 0.032 - 230 1.44 224 224 516 323 125 125 288 180
F 19A-19bscp 0.049 - 276 0.38 0 0 0 0 0 0 0 0
6 c)AED excursion 123 41
Envelope loss/gain 3442 1645 1802 527
12 a) Infiltration 1784 125 917 64
b) Room ventilation 0 0 0 0
13 Internal gairs: Oxupants® 230 0 0 0 0
Appiiartces/other 0 0
Subtotal(lines 6 to 13) 5228 1770 2719 591
Less extenat load 0 0 0 0
Less transfer 0 0 0 0
Redistribution 0 0 0 0
14 Subtotal 5226 1770 2719 591
15 Duct loads 10% 6% 539 107 10% 6%1 280 36
Total room load 5765 187112999 627
LowlHigh Baseboard/Cod Air 12 a 101 6 4 34
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrightsoft' 2017Jul-28 14:47:08
s\Yorkk32Right-SulD universal 17.0.168 Fro tib Page 6
...cott.langeworthylDocuments\York\32 DEVIN C7.rup Calc=MJa Front Door faces: N
Right-J® Worksheet Job: 1258
Entire House Date: Jul 28,2017
CERRONE BUILDERS Plan: 12 e
DUEENSBURY,NY 12804
1 Room name Room14 ROOm15
2 Exposed wall 0 It 42.0 ft
3 Room height 9.0 R heat/cool 9.0 It heat/Cool
4 Room dmensions 5.0 x 10.0 ft 1.0 x 723.0 it
5 Room area 50.0 ft2 723.0 W
Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load
number (BtuNftx°F) (BtuNW) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)
Heat Cod Gross N/P/S Heat Cod Gross N/P/S Heat Cod
6 fpr 12C-0sw 0.091 n 6.55 1.50 0 0 0 0 234 165 1081 248
ll----GD 1D-c2ov 0.570 n 41.04 16.36 0 0 0 0 20 0 821 327
11DO 0.390 n 28.08 6.38 0 0 0 0 49 49 1376 411
14/ 12C-Osw 0.091 a 6.55 1.50 0 0 0 0 0 0 0 0
11 f1Dc2ov 0.570 a 41.04 58.17 0 0 0 0 0 0 0 0
19/ 12C-0sw 0.091 s 6.55 1.50 0 0 0 0 144 96 642 147
�`CD 1Dc2ov 0.570 5 41.04 30.57 0 0 0 0 25 0 1025 764
11DO 0.390 a 28.08 8.38 0 0 0 0 21 21 590 176
V71 12C-Osw 0,091 w 6.55 1.50 0 0 0 0 0 0 0 0
---C 1Dc2ov 0.570 w 41.04 58.17 0 0 0 0 0 0 0 0
c 16B-00ad 0.032 - 2.30 1.44 50 5o 115 72 723 723 1666 1041
F 19A-19bscp 0.049 - 2.76 0.38 0 0 0 0 0 0 0 0
6 c)AED excursion -5 -5
Emelopeloss/gain 115 67 7201 3110
12 a) Infhration 0 0 2141 150
b) Room ventilation 0 0 0 0
13 Intemal gars: Occupants 230 0 0 0 0
Appliances/other 0 0
Subtotal(liras filo 13) 115 67 9342 3260
Less external load 0 0 0 0
Less transfer 0 0 0 0
Redistribution 0 0 0 0
14 Subtotal 115 67 9342 3260
15 Duct loads 10% 6% 12 4 10% 6% 963 198
Tota roam load 1 127 71 10305 3458
Low11-figh Baseboard/Cod Air 0 01 4 21 15 187
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
Wrightsof , 2017-Ju42814:47:08
Right-Sufte4D Universal 2017 17.0.16 RSU25116 Page 7
...cott.langmonhy\Documents\York\32 DEVIN CT mp Calc=MJB From Door faces: N
r
I HAVE PERSONALLY MEASU ED THE DISTANCE
PRO STRUCTU E(S) OR SIGN S)
RE D E
+ I
A -
�a
3
2' IJ,Zb
JUL 3 1 2017 296.14-2-20 RC-000459-2017
Cerrone Builders
32 Devin Court, Lot 20
SFD w/FP 1782 s.f., Garage 528 s.f.
a
Fiher Mass BlovAng Insulation
Certificate of Insulation
` SHOULD NOT BE LESS TOM
TO OBTAIN A THERMAL RESISTANCE OF: RAGS PEO iDDO SD.F7, CONTENTS OF BAG SHOULD NOT COVER MORE THAN: SHOULD NOT BE LESS THAN:
Number of Bags sq.ft. in. in.
R-60 31.4 31.9 22.00 22.00
R-49 25.2 39.7 18.50 18.50
' R-44 22.4 44.6 16.75 16.75
R-38 19.1
52.5 14.50 14.50
14.9
67.1
A-30 11.75 11.75
�� 10.25 10.25
R-26 12.8 77.9
e R-22
92.9 8.75 8.75
10.8
R-1 9 9.3 107.4 7.75 7.75
R-13 6.2 161.7 5.25 5.25
R-1 1 5.3 190.5 4.50 4.50
This is to certify that. CertainTeed InsulSafe'SP fiber Glass Insulation has been installed to the manufacturer's recommendations and will
achieve an.R-Value* of : using ' .bags of insulation to covert ' square feet of area at a minimum installed thickness of I L 7_inches.
'z 1 l�' 1� X lY zip
Street Address G
I - Date
� ed hnst` r} '
i -%
Co e State License Number(if required)
parry
i S }
City,State,zip
Keep this certificate with your other valuable papers.if you ever sell this property,this certificate should be passed on to the purchaser.
t *The higher the R-Value,the greater the insulating power.Ask your seller for the fact sheet on R.-Values.
ttainTeed
SAINT-GOEtAIN
Cartairireed Corporation P.O.Box 860 760 E.Swedoeford Read Valley Forge,PA 19492 vkwv+-certelntoad.comllneul+rtion
F,
Fiber Glass Blov:ing Insulation
Certificate of Insulation
MINIMUM SETTLED THICKNESS
GE
BAG REQUIREMENTS MAXIMUM COVERA MINIMUM INITIAL INSTALLED THICKNES
TO OBTAIN A THERMAL RESISTANCE OF BAGS PER 1000SO.R. CONTENTS OF BAG SHOULD NOT COYER MGflE THAN: SHOULD NOT BE LESS THAN: SHOULD NOT BE LESS THAN
Number of Bags sq,ft. in, 4 in.
R-60 31.4 31.9 22.00 22.00
R-49 25.2 39.7 18.50 18.50
R-44 22.4 44.6 16.75 16.75
R-38 19.1 52.5 14.50 14.50
R-30 14.9 67.1 11.75 11.75
R-2.6 12..8 77.9 10.25 10.25
R-22 10.8 92.9 8.75 8.75
R-19 9.3 107.4 7.75 7.75
R-13 6.2 161.7 5.25 5:25
R-11 5.3 190.5 4.50 4.50
This is to certify that CertainTeed InsulSafe®SP Fiber Glass Insulation has been installed to the manufacturers recotnmenclations and will
achieve an R-Valu ,e* of. using_j�`.__bags of insulation to cover j square feet of area at a minimum installed thickness of ,>.inches.
r`, l,t t _✓�` lA r lei ,
�v E (.a' f_. State Zip
u reet Address vate�
}
S' 1 ller)
Company (( State License Number(if required)
City,State,Zip
Keep this certificate with your other valuable papers.if you ever sell this property,this certificate should be passes!on to the purchaser.
*The higher the R-value,the greater the insulating power.Ask your seller for the fact sheet on R-Values.
CGI" inTeed
� kl SIUB1T808AIN
t
�.. .d
CortainTood Corporation P.O.Box 860 750 E.8wedeaford Road Vatley Forge,PA 19482 www.certalrftoed.oom/tneuiatlon
RAJNY onsulting, LLC
69 Hayden Point Loop
Diamond Point, NY 12824
518 221-3240
01/18/2018 " '
Cerrone Construction LLC
51 Oak Valley Way
Queensbury,NY 12804
Inspection Address: 32 Devin Court, Queensbury NY 12804
Report Number: 0118181
Dear Steven:
The Blower Door Test to verify infiltration rate of the subject property was performed on
01/18/2018. This was done to verify mandatory requirements of 2015 IECC Code as
amended by the NYS Uniform Code Supplement. This report does not imply that full
compliance of above codes has been met.It's verified the infiltration rates only.
GRAJNY Consulting,LLC is pleased to submit the following report.
The following data was provided:
- Square Footage of the house, including conditioned basement=3,492 SF
- Volume of the house, including conditioned basement=29,682 CF
Based on above,the following test data was collected:
- Infiltration Rate,including conditioned basement at 50 Pascal=956 CFM
- ACH50,Actual Changes per Hour at 50 Pascal=956X60/29,682=1.9<3
The Instruments used for test were provided by the Energy Conservatory Digital Gauge
DG-3 rated accuracy=+/- I%,calibrated minimum once per year.
Thank you for selecting our company. We appreciate the opportunity to be of service.
Please call this office if there are any questions.
Sincerely,
Stow(�r0q wy
Stan Grajny, PE
RESNET HERS Energy Rater 5609922
NYS PE 065406-1
I
MAP REFERENCE:
THE VILLAGE AT SWEET ROAD
MAP OF A SUBDIVISION PLAN
MADE FOR
CERRONE BUILDERS
DATED: FEBRUARY 5, 2014
LAST REVISED: JULY 30, 2014
BY: VAN DUSEN & STEVES
FILED: SEPTEMBER 30, 2014
1
LEGEND
CIRF = CAPPED IRON ROD FOUND
OS = SANITARY SEWER LATERAL
OW = WATER SERVICE
�x = LIGHT
CO =CLEAN OUT
O 2
V �
w
Utilities 21
10
O -4SphO7t O / \ Spp, F
\ N
\> N
o
�O V.
�
N
J
co
20 �
Area = `�� �� OPEN SPACE AREA
133310.1 Sq. Ft. ± ��/ (OS-4)
10.31 Acres ± A, /
135.00,
N 76==22 W
NOTES: /
r -Q
1. PARCEL MAY BE SUBJECT TO AND/OR BENEFIT FROM RIGHTS,
EASEMENTS, COVENANTS INCLUDING: FINAL S
• c�F ����
1.1. AN EASEMENT GRANTED TO NIAGARA MOHAWK POWER
CORPORATION & VERIZON NEW YORK INC. RECORDED IN THE Sj 0,
WARREN COUNTY CLERK'S OFFICE IN BOOK 5120 OF DEEDS,
AT PAGE 10.
A 1j, JA 18 201
1.2. DECLARATION OF COVENANTS, RESTRICTIONS, EASEMENTS
a -�
AND LIENS OF THE VILLAGE AT SWEET ROAD HOMEOWNERS' OF
ASSOCIATION, INC. RECORDED IN THE WARREN COUNTY T C?���t�i � �
F DEEDS AT PAGE 148.
CLERK'S OFFICE IN BOOK 5175 0 � � {� �� , GO���S����� DEVELOPMENT
1.3. RIGHT-OF-WAY AND EASEMENT TO THE TOWN OF QUEENSBURY 50135
FOR SEWER RECORDED IN THE WARREN COUNTY CLERK'S
OFFICE IN BOOK 5167 OF DEEDS, AT PAGE 248.
Dater January 10, 2018
s e "UNAUTHORIZED ALTERATION OR ADDITION TO A SURVEY Map of a Survey for Scale 1"=30'
MAP BEARING A LICENSED LAND SURVEYORS SEAL IS A
ll� (� VIOLATION OF SECTION 7209,SUB-DIVISION 2,OF THE T
VxC/.' NEW YORK STATE EDUCATION LAW." Joanne Frances. Van Stone
S t e V e s "ONLY COPIES FROM THE ORIGINAL OF THIS SURVEY
MARKED WITH AN ORIGINAL OF THE LAND SURVEYORS ��
SEAL SHALL BE CONSIDERED TO BE VALID TRUE COPIES."
"CERTIFICATIONS PREPARED HEREON SIGNIFY THAT And
THIS SURVEY WAS PREPARED IN ACCORDANCE WITH THE _
_ P T/T EXISTING CODE OF PRACTICE FOR LAND SURVEYORS ADOPTED
LandS u r V J o r s LANDBY HSURVEYOE NEW RS.SAID CERTIFICATIONS SHALLK STATE ASSOCIATION OF PROFESSIONAL
TO THE PERSON FOR WHOM THE SURVEY IS PREPARED,AND Donald James King
SHEET 1 OF 1
ON HIS BEHALF TO THE TITLE COMPANY,GOVERNMENTAL
(7 AGENCY AND LENDING INSTITUTION LISTED HEREON,AND
169 Haviland Road Queensbury, New York 12804 TO THE ASSIGNEES OF THE LENDING INSTITUTION." Town of Queensbury, Warren County, New York King
(518) 792-8474 New York Lie. No. 50135 NO. DATE DESCRIPTION DWG. N0. 05-247—LOT 20
1
296. 14-2-20
3a Jin