Loading...
RC-000459-2017 TOWN OF QUEENSBURY 742 Bay Road, Queensbury,NY 12804-5904 (518)761-8201 Community Development- Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-000459-2017 Date Issued: Friday, January 19, 2018 This is to certify that work requested to be done as shown by Permit Number RC-000459-2017 has been completed. Tax Map Number: 296.14-2-20 Location: 32 DEVIN CT Owner: CERRONE BUILDERS, INC. Applicant: CERRONE BUILDERS, INC. This structure may be occupied as a: SFD w/gas FP 1782 s.f. Garage 528 s.f. By Order of Town Board TOWN OF QUEENSBBURY Issuance of this Certificate of Occupancy DOES NOT relieve the /1 property owner of the responsibility for compliance with Site Plan, V Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY OL 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development- Building&Codes (518)761-8256 BUILDING PERMIT Permit Number: RC-000459-2017 Tax Map No: 296.14-2-20 Permission is hereby granted to: CERRONE BUILDERS,INC. For property located at: 32 DEV IN CT In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Tyne of Construction Owner Name: CERRONE BUILDERS,INC. Single Family-New $390,000.00 Owner Address: 1589 State Route 9 Total Value $390,000.00 Fort Edward,NY 12828 Contractor or Builder's Name/Address Electrical Inspection Agency CERRONE BUILDERS,INC. 1589 State Route 9 Fort Edward,NY 12828 Plans&Specifications SFD w/gas FP 1782 s.f. Garage 528 s.f. $1,335.60 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,August 9,2018 (if a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of Qensbury n Vidne a , 2017 SIGNED BY: (mit('/ �-VJ for the Town of Queensbury. Director of Building&Code Enforcement office Use Only `J`� - 1 PRINCIPLE STRUCTURE PERMIT Permit#: fLC -� ZO APPLICATION Permit Fee:$ 85 bo 742 Bay Road,Qubenstit ry,NY 12804 "Rec Fee:$ P:518-761.8256 nueemburynet / Invoice#: 2090 Project Location: V N �✓ 1 Tax Map ID#: Subdivision Name: ✓ f �� 'TowNsp.RESOLUTI NO-201 : $050 recreation fee for new dwelling units: single family,duplexes/two-family, multiple family, apartmen a, condominiums,townhouses, and/or manufactured &modular homes, but not mobile homes. This Is In additio i to the permit fee(s). CONTACT INEORMA ION: • Applicant: ^i Name(s): �c�/jN {� Mailing Address,C/S 1' Cell Phone: Land Line: �) Email: je' 0 PrImary Ow s : Name(s): Mailing Address, C/S Cell Phone: Land Land Line: __L ...J Email• • Contralao s Business Name: Contact Name(s): Mailing Address,C/ JUL J l 9tt17 Cell Phone: I Land Line: Email: • Architects nee s Business Name: i CL��fi Contact Name(s): Mailing Address, C/S . '�✓ Cell Phone: Land Line: 6 Email: /J,, Contact Person for Building&Code Compliance: •2z_ea/ � ��rne� Cell Phone: ) _�d l l '/ Land Line: Email: Town of aUWJburV Wh*%& a Enforxmn Mnd*Structure Application ReNsed February 2017 PROJECT INFORMATION: TYPE: ommercial Residential WORK CLASS: /Single-Family —Two-Family _Multi-Family(#of ) Townhouse _Business Office _Retail —Hotel/Motel _IndustriaUWareh se _Garage(#ofcars--j _Other(describe ) STRUCTURES U REFOOTAGE: GARAGESQUAREFOOTAGE: P floor. It U 1ST floor: 2nd floor: 2nd floor: and floor. Total square feet: 411 floor. Total square feet: ADDITIONAL PR ECT INFORMATION: 1. Estimated Cost of Construction:$ 000 2. Proposed use of the building: 3. If Commerch I or Industrial, indicate the name of the business: 4. Source of He A(circle one): Ga Oil Propane Solar Other: (Fireplaces need a separate Wel Suming Appliances&Chimney Application,one per appliance) S. Are there an structures not shown on the plot plan? YES C0 Explain: 6. Are there an easements on the property? YES NO 7. SITE INFORN ATION: l a.What is tt e dimensions or acreage he parcel? "d b. Is this a corner lot? YES c.Will the gi ade be changed as a result of the construction? YES d.What is tI le water source? PUBLI PRIVAT4 WELL e. Is the par el on SEWER or a PRIVATE SEPTIC system? Town of Queens" a sisms Coo Enforcement Principe Structure Appkahon Revised Feon ary 204 DECLARATIO : 1. 1 acknowledge that no construction shall commence prior to issuance of a valid building permit and work will be comp)ated within a 12 month period. 2. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. 1 certify that the a plication, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances, and in conformance with local zoning regulations. 4. 1 acknowledge the prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree the above: PRINT NAME: SIGNATURE: DATE: Town of QoffrAhoWu ty& .Enforcement Pdndple Structure APpltutim Redsed PeWUMV 2017 FUEL BURNING APPLIANCE & Office Use only CHIMNEY APPLICATION Permit#: Permit Fee:$ of loan Invoicet#• 742 Bay Road,Queensbury, NY 12804 P:518-761-8256 www.iiueensbury.net I Project Locatio : //1 ��� loe ZO Tax Map ID#: Room of Install: 41//yc ,'P Planned Install Date: **SONE APPLICATION PER APPLIANCE** CONTACT IN TION: Applicant . Name(s): Mailing Address,C/ ' Cell Phone: /' ��^ Loynd Line: �) Email: r A ' • PrImary Owner(s): Name(s): Mailing Address,C/ /Z: Cell Phone:_ Land Line: Email: Installer Bu Ider: Business Name: Contact Name(s): Mailing Address, C/ /Z Cell Phone:_ ) Land Line: _ Email Contact:Person for Buildi� & Code Compliance: Celf Phone: _( ) "�/ " 1�1/ _Land Line: _( ) Email Fuel Burning Appliance&Chimney Application Revised March 2017 1 FUEL BURNING AP UANa t FORMATION: TYPE OF DEVICE: Stove _Fireplace Insert _Fireplace Fuel Fired Equip ent(Garage Only, 18"clearance per IMC 304.3) _Fireplace,factoryuilt** 1 ?� 2 "*Manufacturer's na e: ��/'�%/Li Model#: 152-36 SOURCE OF HEAT: Wood Coal _Pellet Gas ZB,cv oa'e tle C. CHIMNEY INFORMATION: _Masonry: _bkck _brick _stone _Flue: _tie _steel —size, in inches _Material*: / _do ble-wall 1_triple-wall_insulated (*Manufacturers na e: �/Cf7/L� Model#: ADDITIONAL INFORMATION: 1. Two inspectioi is are required. A rough-in inspection, prior to installation and a final Inspection, after Installation. 2. Manufacturers installation manual must be available at the time of inspection. 3. Masonry firep aces&chimneys require plans to be submitted. 4. Twenty-four( 4)hour notification is required for inspections. o_gdKatlon:Con ronstallation must conform to NYS Fire Prevention&Building Code and/or manufacturer requirements. The app Icantor owner agrees to comply with all applicable laws,ordinances,regulations and all conditions.that are pa of these requirements and also will allow the inspector to enter the premises to perform the required inspections. I have read and agree to the above: PRINT NAME: SIGNATURE: AADATE: 3D / Fuel Burning Appliance&Chimney Application Revised March 2017 REScheck Software Version 4.6.4 Compliance Certificate Project Cerrone Builders Inc Energy Code: 2015 IECC Location: Glens Falls, New York Construction Type: Single-family Project Type: New Construction Conditioned Floor Area: 1,782 1`11:2 Glazing Area 12% Climate Zone: 6 (7635 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 32 Devin Court VISION Engineering, LLC Lot 20 Sweet Rd Subdiv 206 Glen Street Queensbury, NY 12804 Suite 56 Glens Falls, NY 12801 �ompliance: Passes using LIA trade-off Compliance: 0.0%Better Than Code Maximum UA: 280 Your UA: 280 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or U-Factor UA Ceiling 1: Raised or Energy Truss 1,782 38.0 0.0 0.025 45 Floor 1:All-Woad joistrrruss:Over Outside Air 10 30.0 0.0 0.033 0 Wall 1:Wood Frame, 16"o.c. 1,900 21.0 0.0 0.057 94 Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 171 0.290 50 Door 1:Solid 18 0.140 3 Door 2: Solid 200.200 4 Door 3: Glass ' 40 .,I, I 0.290 12 Basement Wall 1:Solid Concrete or Masonry 1,482 0.0 15.0 0.044 64 Wall height: 7.8' Depth below grade: 7.3' JUL 3 1 2017 Insulation depth:7.8' Window 2:Vinyl/Fiberglass Frame:Double Pane - 7 I 0.400 3 Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 --' 0.290 5 Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258- DES-CER Page 1 of 10 Lot 20 Devin Court\1258 RESCHECK.rck Compliance StatemSwithpe Thesed building design described here is consistent with the building plans, specifications,and other calculations submittmit application.The proposedSbu' ghasbeen designed to meet the 2015 IECC requirements in RESchegk V�sion 4. ply with the mandatory requir en liste a REScheck Inspection C ecklist. Name-Tfle 'Signature e r LW' vn i s A F O0�1P Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES -CER Page 2 of 10 Lot 20 Devin Court\1258 RESCHECK.rck REScheck Software Version 4.6.4 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/As sumptions & Re .ID 103.1, Construction drawings and ❑Complies 103.2 documentation demonstrate ❑Does Not [PRIII energy code compliance for the ❑Not Observable building envelope.Thermal envelope represented on ❑Not Applicable j ___construction documents. 103.1 .Construction drawings and -'ir❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR31' lighting and mechanical systems. ❑Not Observable USystems serving multiple []Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR212 on loads calculated per ACCA Cooling: ' Cooling: ❑Not Observable Manual J or other methods Btu/hr Btu/hr approved by the code official. []Not Applicable j Additional Comments/Assumptions: 1 I High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258- DES-CER Page 3 of 10 Lot 20 Devin Court\1258 RESCHECK.rck Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1 Conditioned basement wall R-_ R- ❑Complies See the Envelope Assemblies [F0411 'insulation R-value.Where interior R R- ❑Does Not table for values. insulation is used,verification ❑Not Observable may need to occur during :Insulation Inspection. Not ❑Not Applicable .required in warm-humid locations :in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies [F0511 :insulation installed per ❑Does Not manufacturer's instructions. ❑Not Observable ❑Not Applicable 402,2.9 Conditioned basement;;all ft ft ❑Complies See the Envelope Assemblies [FO6]1 'insulation depth of burial or ❑Does Not table for values. !distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies [FO11]2 to protect exposed exterior ❑Does Not insulation and extends a ❑Not Observable minimum of 6 in, below grade. ❑Not Applicable 403.9 Snow-and ice-melting system ❑Complies [FO12)2 :controls installed. ❑Does Not v3 ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 IHigh Impact(Tier 1) fir;;; Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES -CER Page 4 of 10 Lot 20 Devin Court\1258 RESCHECK.rck Section Plans Vered Field Verified # Framing/ Rough-In Inspection Vafue Value Complies? Comments/Assumptions & Req.ID _ 402.1.1, Door U-factor. U-_ U-_ ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR11' ❑Nat Observable k4 ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U-_ ❑Complies See the Envelope Assemblies 402.3.1, average) ❑Does Not table for values. 402.3.3, 402.3.6, ❑Not Observable 402.5 ❑Not Applicable [FR211 303.1.3 U-factors of fenestration products ' '❑Complies [FR4]1 are determined in accordance ❑Does Not - with the NFRC test procedure or ❑Not Observable taken from the default table ❑Not Applicable 402.4.1.1 '.Air barrier and thermal barrier ❑Complies [FR2311 'installed per manufacturer's ❑Does Not instructions. ❑Not Observable I ❑Not Applicable j 402.4.3 Fenestration that is not site built ❑Complies [FR2011 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/1.5.2/A440 ❑Not Observable or has infiltration rates per NFRC 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR1612 sealed at housing/interior finish []Does Not and labeled to indicate <_2.0 cfm ❑Not Observable leakage at 75 Pa. ❑Not Applicable 403.2.1 :Supply and return ducts in attics ❑Complies [FR1211 :insulated >= R-8 where duct is ❑Does Not ->= 3 inches in diameter and >_ ❑Not Observable R-6 where< 3 inches.Supply and return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. _ 403.3.3.5 :Building cavities are not used as ❑Complies [FR1513 ducts or plenums. - ❑Does Not 4 !❑Not Observable ❑Not Applicable 403,4 HVAC piping conveying fluids R- R- ❑Complies [FR1712` J above 105 aF or chilled fluids ❑Does Not :below 55 of are insulated to a-R- =4i. l q3 ❑Not Observable ❑Not Applicable j 403.4.1 Protection of insulation on HVAC ❑Complies [FR2411 piping. ❑Does Not V, ❑Not Observable ❑Not Applicable j 403.5.3 Hot water pipes are insulated to R- R- ❑Complies [FR18]2 >_R-3. ❑Does Not i... ❑Not Observable El Not Applicable 403.6 Automatic or gravity dampers are ❑Complies [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable ❑Not Applicable 11 High Impact(Tier 11 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES-CER Page 5 of 10 Lot 20 Devin Court\1258 RESCHECK.rck Additional Comments/Assumptions: 1 I High Impact(Tier 1) Medium Impact(Tier 2) 1,3� Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES-CER Page 6 of 10 Lot 20 Devin Court\1258 RESCHECK.rck Section Plans Verified Field Verified i # Insulation Inspection Value Value Complies? Comments/Assumptions i& Req.ID, __ __ 303.1 All installed insulation is labeled ❑Complies [IN13]2 orthe installed R-values ❑Does Not provided. ❑Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2•6 ❑ Wood ❑ Wood ❑Does Not ;table for values. [IN111 ❑ Steel ❑ Steel ❑Not Observable ❑Not Applicable j 303.2, Floor insulation installed per '- "" i❑Complies 402.2.7 manufacturer's instructions and , ,, _❑Does Not [IN211 in substantial contact with the '�jQNot Observable underside of the subfloor,or floor framing cavity insulation is in ❑Not Applicable j contact with the top side of sheathing,or continuous insulation is installed on the underside of floor framing and :extends from the bottom to the top of all perimeter floor framing members. 402.1.1, :Wall insulation R-value.If this is a R- R-_ ❑Complies See the Envelope assemblies 402.2.5, mass wall with at least'/,of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass j❑ Mass ❑Not Observable [IN311 exterior,the exterior insulation ;requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable j 303.2 Wall insulation is installed per ` ` - ❑Complies [I1,1411 manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 1 High Impact(Tier 1) 12' Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258- DES -CER Page 7 of 10 Lot 20 Devin Court\1258 RESCHECK.rck Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions &Req.ID 402.1.1, Ceiling insulation R-value. R- R-_ ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402,2.2• ❑ Steel j❑ Steel ❑Not Observable [FII] 402.2.6 Not Applicable 303.1.1.1,]Ceiling insulation installed per - ❑Complies 303.2 ]manufacturer's instructions. ❑Does Not [F12]1 Blown insulation marked every 300 ft2. EI Observable ❑Not Applicable j Rented attics with air permeable ❑Complies + ';insulation include baffle adjacent ❑Does Not +f to soffit and eave vents that ❑Not Observable :,extends over insulation. ❑Not Applicable 402.2.4 Attic access hatch and door R-_ R- ❑Complies [FI311 insulation >_R-value of the ❑Does Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50=_ I ACH 50 =_ ;❑Complies [FI17]1 ;ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. j❑Not Observable ❑Not Applicable j 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 :❑Complies [FI4]1 cfm/100 ft2 across the system or ft' ❑Does Not <=3 cfm/100 ft2 without air ❑Not Observable .handler@ 25 Pa. For rough-in ❑NotA Applicable 'tests,verification may need to pP .occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [FI27]1 'determine air leakage with ftz ft2 -❑Does Not either: Rough-in test:Total 'leakage measured with a ❑Not Observable .pressure differential of 0.1 inch ❑Not Applicable j w.g.across the system including :the manufacturer's air handler enclosure if installed at time of !test.Postconstruction test:Total .leakage measured with a pressure differential of 0.1 inch w.g. across the entire system _.including the manufacturer's air handler enclosure. 403.3.2.1 '.Air handler leakage designated ❑Complies [F12411 by manufacturer at<=2%of ❑Does Not design air flow. ❑Not Observable ❑Not Applicable 403.11 Programmable thermostats ❑Complies [F1912 installed for control of primary ❑Does Not -heating and cooling systems and initially set by manufacturer to ❑Not Observable code specifications. ❑Not Applicable j 403.1.2 Heat pump thermostat installed ❑Complies [F11012 on heat pumps. ❑Does Not ❑Not Observable ❑Not Applicable 403.5.1 Circulating service hot water ❑Complies [Fill]' systems have automatic or ❑Does Not :accessible manual controls. ❑Not Observable ❑Not Applicable 11 High Impact(Tier 1) 12 IMedium Impact(Tier 21 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES -CER Page 8 of10 Lot 20 Devin Court\1258 RESCHECK.rck Section Plans Verified Field Verified # Flnal Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 All mechanical ventilation system ❑Complies [F12512 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy []Not Observable -,;and air flow limits. ❑Not Applicable , 403.2 --'.;Hot water boilers supplying heat ❑Complies [FI26]2 'through one-or two-pipe heating ❑Does Not systems have outdoor setback ❑Not Observable control to lower boiler water temperature based on outdoor ❑Not Applicable temperature. 403.5.1.1 Heated water circulation systems ❑Complies [F128]2 have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply ❑Not Observable pipe.Gravity and thermos- ❑Not Applicable j syphon circulation systems are not present.Controls for circulating hot water system pumps start the pump with signal '..for hot water demand within the ;occupancy. Controls automatically tum off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. _ 403.5.1.2 Electric heat trace systems ❑Complies [FI2912 comply with IEEE 515.1 or UL ❑Does Not 515.Controls automatically ❑Nat Observable adjust the energy input to the heat tracing to maintain the ❑Not Applicable j desired water temperature in the piping. _ 403.5.2 :Water distribution systems that ❑Complies [F13012 have recirculation pumps that []Does Not pump water from a heated water supply pipe back to the heated ❑Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the fi pump and limit the temperature of the water entering the cold water piping to 1049F. 403.5.4 Drain water heat recovery units ❑Complies IFI3112 tested in accordance with CSA ❑Does Not 855.1. Potable water-side pressure loss of drain water heat ❑Not Observable recovery units < 3 psi for ❑Not Applicable j individual units connected to one or two showers.Potable water- side pressure loss of drain water heat recovery units<2 psi for individual units connected to -three or more showers. _ 404.1 75%of lamps in permanent ❑Complies [FI611 fixtures or 75%of permanent ❑Does Not 'fixtures have high efficacy lamps. Does not apply to low-voltage ❑Not Observable lighting. ❑Not Applicable 404.1.1 Fuel gas lighting systems have ❑Complies [F12311 no continuous pilot light. ❑Does Not M ❑Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES-CER Page 9 of 10 Lot 20 Devin Court\1258 RESCHECK.rck Section Plans Verified Field Verified # Final Inspection Provisions Valu e Value Complies? o Cmments/Assumptions & Req.ID 401.3 Compliance certificate posted. ❑Complies [9712 El Does Not ❑Not Observable ❑Not Applicable 303.3 ~�H7'Manufacturer manuals for ❑Complies [F11813 :mechanical and water heating ❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2' Medium Impact(Tier 2) 13 Low Impact(Tier 31 Project Title: Cerrone Builders Inc Report date: 07/21/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1258 - DES -CER Page 10 of 10 Lot 20 Devin Court\1258 RESCHECK.rck a - 2015 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass& Door Rating U-Factor SHGC Window 0.29 Door 0.29 Heating &Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name' Date' Comments Manual S Compliance Report Job: 1258 Date: Jul 28,2017 Entire House By: SILL CERRONE BUILDERS Plan: 1258 QUEENSBURY,NY 12804 Project • • For: CERRONE QUEENSBURY, NY 12804 Cooling Equipment Design Conditions Outdoor design DS: 85.0'F Sensible gain: 27747 Btuh Entering coil DB: 75.5'F Outdoor design WB: 71.0°F Latent gain: 6157 Btuh Entering coil WB: 63.0'F Indoor design DB: 75.0'F Total gain: 33904 Btuh Indoor RH: 50% Estimated airflow: 1500 cfm Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: Split AC Manufacturer: Model: Actual airflow: 1500 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% Heating Equipment Design Conditions Outdoor design DB: -4.0°F Heat loss: 92827 Btuh Entering coil DB: 64.5°F Indoor design DB: 68.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: Model: Actual airflow: 1500 cfm Output capacity: 0 Btuh 0% of load Temp. rise: 0 OF 296.14-2-20 RC-000459-2017 Cerrone Builders JUL 3 1 2017 32 Devin Court, Lot 20 SFD w/FP 1782 s.f., Garage 528 s.f. Meets are all requirements of ACCA Manual S. 2017-Jul-28 14:47:08 wrightsoft' Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACC% ...cott.langeworthy\Documents\York\32 DEVIN CT.wp Calc=MJ8 Front Door facesN t Residential PlansExaminer Review • Form ACCP. _ 5Mar • D— • •a• Equipment, D15 Mar 09 �cedm.ecaa�dr� QUEENSBURYNY Header Information Contractor: CERRONE BUILDERS REQUIRED ATTACHMENTS ATTACHED Manual J1 Form(and supporting worksheets): Yes E] No ❑ Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes E] No ❑ OEM performance data(heating,cooling,blower): Yes No Fj Building plan#: 1258 Manual D Friction Rate Worksheet: Yes No Fj Duct distribution sketch: Yes E] No r-1Home address(Street or Lot#,Block,Subdivision): , Entire House HVAC LOAD CALCULATION (IRC M 1401 Design Conditions Buildinq Construction Information Winter Design Conditions Building Outdoor temperature: _4 °F Orientation: Front Door faces North Indoor temperature: 68 °F North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 92827 Btuh Number of bedrooms: 0 Conditioned floor area: 5325 fP Summer Design Conditions Number of occupants: 0 Outdoor temperature: 85 °F Indoor temperature: 75 °F Windows RJ�j� Grains difference: 28 gr/Ib @60% RH Eave overhang depth: 0 It Sensible heat gain: 30830 Btuh Internal shade: none Latent heat gain: 6841 Btuh Blintls,dnpes,etc. Ondow Total heat gain: 37671 Btuh Number of skylights: 0 HVAC EQUIPMENT • 1 Heating Equipment Data Cooling Equipment Data Blower Data Equipment tile: Gas furnace E(Vigment%pe: SplitAC Heating cfm: 1500 umace,He pump,Boller,etc. Ir ontlRionar,Heat pump,etc. Cooling cfm: 1500 Model: Model: Static pressure: 0 in H2O + Fan's rated external static pressure for design ahtiow, Heating output capacity: 0 Btuh Total cooling capacity: 0 Btuh Heat pumps-capacity at winter design outdoor conditions Sensible cooling capacity: 0 Btuh Aux.healing output capacity: 0 Btuh Latent cooling capacity: 0 Btuh HVAC DUCT DISTRIBUTION SYSTEM ! 1 Design airflow: 1500 cfm Longest supply duct: 0 ft Duct Materials Used Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct: Total device pressure losses: 0 in H2O Total effective length(TEL): 0 it Available static pressure(ASP): 0 in H2O Friction rate: Q iN100R Branch duct: Sheet metal Friction Rate=ASP+(Tax 10 I declare the load calculation,equipment,equipment selection a • cluctriesign were rigorouslyperformed based on the building p - • _ - above. I understand the claims made on - forms will be subjectto review and verification. Contractor's printed name: Contractor's signature: Date: Reserved 'Home qualifies for MJ1AE Form based on Abridged Edition Checklist +{+ wrightSO Right-SudedD Universal 2017 17.0,16 RSU25116 Project Summa Job: 1258 t Date: Jul 28,2017 Entire House By: SLL CERRONE BUILDERS Plan: 1258 DUEENSBURY,NY 12804 Promect Information For: CERRONE QUEENSBURY, NY 12804 Notes: Desicin Information Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 OF Outside db 85 OF Inside db 68 OF Inside db 75 OF Design TD 72 OF Design TD 10 OF Daily range M Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 84149 Btuh Structure 26160 Btuh Ducts 8678 Btuh Ducts 1588 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh (none) 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 92827 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 24972 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Semi-loose Fireplaces 1 (Average) Structure 3408 Btuh Ducts 2748 Btuh Central vent (0 cfm) 0 Btuh Heating Cooling (none) Area(ft' 5325 5325 Equipment latent load 6157 Btuh Volume k 47925 47925 Air changes/hour 0.46 0.23 Equipment total load 31129 Btuh Equiv.AVF(cfm) 363 184 Req. total capacity at 0.70 SHR 3.0 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating Input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Low output baseboard 700 Btuh/ft Total cooling 0.054 cfm/Btuh Total low baseboard 133 ft Actual air flow 0 in H2O High output baseboard Air flow factor 0.82 Total high baseboard Static pressure Space thermostat Load sensible heat ratio Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft 2017-Juk2814:47:08 9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACCA ...cotl.lanlimorthyMocumentsWork\32 DEVIN CT.rup Calc=MJ8 Front Door laces: N AED Assessment Job: 1258 Date: Jul 28,2017 Entire House By: SLL CERRONE BUILDERS Plan: 1258 QUEENSBURY, NY 12804 Project Information For: CERRONE QUEENSBURY, NY 12804 Design C • Location: Indoor: Heating Cooling Glens Falls AID, NY, US Indoor temperature (°F) 68 75 Elevation: 335 ft Design TD (°F) 72 10 Latitude: 43°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 48.0 27.6 Dry bulb(°F) -4 85 Infiltration: Daily range(°F) - 20 ( M ) Wet bulb (°F) - 71 Wind speed (mph) 15.0 7.5 Test for • • Exposure Hourly Glazing Load 14,000-- 12,000-- 10,000-- 8.000-- 6,000-- 4,000-- 2,000-- 8 4,00012,00010,0008,0006,0004,000- 2,0008 9 10 11 12 13 14 15 16 17 18 19 20 Hour of Day /Mowry /Av>,W / AEDIml Maximum hourly glazing load exceeds average by 37.4%. House does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 714 Btuh (PFG - 1.3*AFG) ' WrlghtSOft' Right-Suite®universal 201717.0A6 RSU25116 2017-Jul-28 14:age 1 �- Page 1 .4C(K ._cotLlangeworthy\Documents\York\32 DEVIN CT.mp Calc=MJB Front Door faces: N Right-J® Worksheet Job: 1258 Entire House Date: Jul 28,2017 CERRONE BUILDERS Pian: 12 8 OUEENSBURY.NY 12804 1 Room name Entire House Room2 2 Exposed wall 558.0 ft 186.0 ft 3 Room height 9.0 it d 9.0 ft heat/cod Room dim 4 Rooensions 1.0 x 1775.0 ft 5 Room area 5325.0 ft' 1775.0 ft2 Ty Construction 1.1-value Or HTM Area (ft2) Load Area (ft5 Load number (Stutfill (BtulVft') or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cod Gross N/P/S Heat Cool Gross N/P/S Heat Cod 6 11 12C.Om 0.091 n 6.55 1.50 1431 1337 8760 20D8 477 477 3125 716 II----GD 1D-c2Dv 0.570 n 41.04 16.36 45 0 1847 738 0 0 0 0 11D0 0.390 n 28.08 838 49 49 1376 411 0 0 0 0 12C-Osw 0.091 a 6.55 1.50 1080 1040 6814 1562 360 330 2162 495 11 1Dc2ov 0.570 a 41.04 58.17 40 0 1642 2327 30 0 1231 1745 l}/ 12C-Osw 0.091 5 6.55 1.50 1431 1339 8773 2011 477 477 3125 716 I�-fD` 1Dc2ov 0.570 S 41.04 30.57 50 0 2052 1529 0 0 0 0 11DO 0.390 s 28.08 8.38 42 42 1179 352 0 0 0 0 VJ, 12C-Osw 0.091 w 6.55 1.50 1080 990 6486 1486 360 330 2162 495 �C 1Dc2cv 0.570 w 41.04 58.17 90 0 3694 5235 30 0 1231 1745 C 1613-30ad 0.032 - 230 1.44 3550 3550 8179 5112 0 0 0 0 F 19A-19bscp 0.049 - 276 0.38 1775 1775 4907 682 1775 1775 4907 682 6 c)AED excursion 714 -467 Emelope bss/gain 55710 24163 1 17945 6128 12 a) Infiltration 28439 1998 9480 665 b) Roan ventilation 0 0 0 0 13 Internal gains: Occupants Q 230 0 0 0 0 Appliances/other I 1 0 0 Subtotal(lines 6 to 13) 84149 26160 27425 6793 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 84149 26160 27425 6793 15 Duct loads 10% 6% 86781 1588 10% 6% 2828 412 Total roan load 92827 27747 30253 7205 Lo vlHigh Baseboard/Cool Air 186 133 1500 61 43 3139 _ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wright5oft' 2017-Jul-2814:47:08 . ;A Right-Suite®Universal 2077 77.0.7616 ...cott.langewanhy\Documents\York\32 DEVIN CT.rup CeIc=MJ8 Front Door feces: N Page 1 Right-J® Worksheet Date: 12528,2017 Entire House y CERRONE BUILDERS Plan: 15258 QUEENSBURY,NY 12804 1 Room name Roan3 Room4 2 Exposed wall 186.0 ft 18.0 It 3 Room height 9.0 ft tleaUcod 9.0 ft heat/cool 4 Room dimensions 1.0 x 1775.0 It 10.0 x 8.0 ft 5 Room area 1775.0 ft2 80.0 ft' Ty Construction U-value Or HTM Area (ft') Load Area (ftp Load number (Btuh1ftMF) (BtuWft2) a perimeter (ft) (Btuh) a perimeter (ft) (8tuh) Heat Cod Gross Witt Heat Cod Gross WP/S Heat Cod 6 % 12C-0sw 0.091 n 6.55 1.50 477 477 3125 716 0 0 0 0 I�-(D; 1D-c2ov 0.570 n 41.04 18.36 0 0 0 0 0 0 0 0 11DO 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0 12C4Osw 0.091 a 6.55 1.50 360 360 2359 541 0 0 0 0 11 1Dc2ov 0.570 a 41.04 58.17 0 0 0 0 0 0 0 0 16 12C-0sw 0.091 a 6.55 1.50 477 417 3125 716 90 90 590 135 tDc2ov 0.670 s 41.04 30.57 0 0 0 0 0 0 0 0 11D0 0.390 s 28.08 8.38 0 0 0 0 0 0 0 0 l4/ 12C-0sw 0.091 w 6.55 1.50 360 360 2359 541 72 57 373 86 Y-C 1Dc2ov 0.570 w 41.04 58.17 0 0 0 0 15 0 616 872 C 16B30ad 0.032 - 2.30 1.44 1775 1775 4090 2556 80 80 184 115 F 19A-19bscp 0.049 - 2.76 0.38 0 0 0 0 0 0 0 0 6 c)AEDexcursion -369 373 Envelope loss/geln 15058 4700 1763 1581 12 a) Infiltration 9480 665 917 64 b) Room ventilation 0 0 0 0 13 Internal gaits: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines fi to 13) 24537 5366 2580 1646 Less external load 0 0 0 0 Less transfer 0 0 0 0 RedistritxAion 0 0 0 0 14 Subtotal 24537 5366 2680 1646 15 Duct loads 10% 6% 2530 326 10% 6% 276 100 Total roan load 270a5691 2957 1745 LowlHigh Baseboard/Cod Air 1 54 39 We 6 4 94 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ,a,k -F�F wrightsofC2017-Jul-2814:47:06 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 2 ...cott.langeworthy\Documents\York\32 DEVIN CT.mp Calc=MJ8 Front Doorfaces: N Right-J® Worksheet Job: 1258 Entire House Date: Jul 28,2017 CERRONE BUILDERS Plan: 1258 DUEENSBURY,NY 12804 1 Roam name Room5 Room6 2 Exposed wall 0 ft 0 ft 3 Room height 9.0 It heaucod 9.0 ft heat/cod 4 Roon dimensions 7.0 x 6.0 It 7.0 x 6.0 ft 5 Room area 420 ft- 420 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btutyftk*F) (Btuwft' a Perimeter (ft) (Btuh) or penmeter (ft) (Btuh) Heat Cod Gross WP/S Heat Cod Gross WP/S Heat Cod 6 1p/ 12C-0sw 0.091 n 6.55 1.50 0 0 0 0 0 0 0 0 CLCD 1Dc2av 0.570 n 41.04 16.36 0 0 0 0 0 0 0 0 11D0 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0 lQ/ 12C-0sw 0.091 a 6.65 1.50 0 0 0 0 0 0 0 0 11 T--G 1Dc2w 0.570 a 41.04 58.17 0 0 0 0 0 0 0 0 lt/ 12C-Osw 0.091 s 6.55 1.50 0 0 0 0 0 0 0 0 IF---GD 1Dc20v 0.570 s 41.04 30.57 0 0 0 0 0 0 0 0 11DO 0.39D s 28.08 8.38 0 0 0 0 0 0 0 0 12C-Osw 0.091 w 6.55 1.50 0 0 0 0 0 0 0 0 t—C 1Dc2ov 0.670 w 41.04 58.17 0 0 0 0 0 0 0 0 C 1611-30ad 0.032 • 230 1.44 42 42 97 60 42 42 97 60 F 19A-19bscp 0.049 - 276 0.38 0 0 0 0 0 0 0 0 6 c)AED excursion -4 4 Envelope loss/gain 97 57 97 57 12 a) Infiltration 0 0 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 97 57 97 57 Less extemal load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 97 57 97 57 15 Dud loads 10% 6% 10 3 10% 6% 10 3 Total room load 107 60 107 60 LowlHigh Baseboard/Cod Air 0 0 3 0 0 3 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. . 1. -Fk wrilglrtsoft' 2017-Jul-2814:47:08 Rightkk32 D Universal 2017 17.0.16 Front16 Page 3 ...colt.langewonhy\Documentslyork\32 DEVIN CT.rup Calc=MJB Front Daor faces: N Right-J® Worksheet Job: 1258 Entire House Date: Jul 28,2017 CERRONE BUILDERS Plan: 12 8 DUEENSSURY,NY 12804 1 Roan name Roon7 Rorn9 2 Exposed wall 420 ft 220 ft 3 Raxn height 9.0 It heaUcool 9.0 ft heat/cod 4 Room dmensios 1.0 x 261.0 It 1.0 x 1620 ft 5 Roan area 261.0 ft- 1620 ft2 Ty Construction U-value Or HTM Ani (ft2) Load Area (ft2) Lard number (BtuWftMF) (Btutvft2) or perimeter (ft) (Btuh) a perimeter (ft) (Bluh) HeatCod Gross N/P/S Heat cat Gross N/P/S Heat Cod 6 W 12C-Osw 0.091 n 6.55 1.50 135 135 885 203 108 83 544 125 I�----GD 1D-c2ov 0.570 n 41.04 16.36 0 0 0 0 25 0 1026 409 11DO 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0 VrJ 12C-Osw 0.091 a 6.55 1.50 0 0 0 0 90 90 590 135 11 `C 1Dc2ov 0.570 a 41.04 58.17 0 0 0 0 0 0 0 0 15! 12C-Osw 0.091 s 6.55 1.50 0 0 0 0 0 0 0 0 1Dc2ov 0.570 5 41.04 30.57 0 0 0 0 0 0 0 0 11DO 0.390 5 28.08 8.38 0 0 0 0 0 0 0 0 V}/ 12C-Osw 0.091 w 6.55 1.50 243 198 1297 297 0 0 0 0 —G 1Dc2ov 0.570 w 41.04 58.17 45 0 1847 2617 0 0 0 0 C 16B-30ad 0.032 - 230 1.44 261 261 601 376 162 162 373 233 F 19A-19bscp 0.049 - 2.76 0.38 0 0 0 0 0 0 0 0 6 c)AED excursion 1130 -63 Envelope loss/gain 4630 4623 25331 839 12 a) Infiltration 2141 150 1121 79 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/dher I 1 0 0 Subtotal(lines 6 to 13) 6771 4773 3654 918 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 6771 4773 3654 918 15 Duct loads 10% 6% 698 290 10% 6% 377 56 Taal room load 7489 5063 4031 973 Low High Baseboard/Cat Air 15 11 274 81 6 53 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrl htsoTt- 2017-Jul-2814:47:08 A 9 Right-Sulte®Universal 2017 17.0.16 RSU25116 Page 4 ...coll.langeworthy\Documents\York\32DEVINCT.mp Calc=MJ8 Front Doorfaces: N Right-J® Worksheet Job: 1258 Entire House Date: Jul 28,2017 CERRONE BUILDERS L: 1258 QUEENSBURY, NY 12804 1 Room narne Room10 Room11 2 Exposed wall 9.0 ft 0 it 3 Room height 9.0 ft heat/cool 9.0 ft heal/cool 4 Room dimensions 6.0 x 9.0 ft 6.0 x 20 it 5 Room area 54.0 ft- 120 W Ty Construction U-value Or HTM Am (it-) Load Area (ftp Load number (Btul0i-F) (Btutvft� a perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cad Grass N/P/S Heat Cod Gross N/P/S Heat Cod 6 1213-Osw 0.091 n 6.55 1.50 0 0 0 0 0 0 0 0 1Dc2ov 0.570 n 41.04 16.36 0 0 0 0 0 0 0 D 11DO 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0 12C-0sw 0.091 a 6.55 1.50 81 71 465 107 0 0 0 0 11 1D-c2ov 0.570 a 41.04 58.17 10 0 410 582 0 0 0 0 Vf/ 12C-0sw 0.091 s 8.55 1.50 0 0 0 0 0 0 0 0 1Dc2ov 0.570 s 41.04 30.57 0 0 0 0 0 0 0 0 11DO 0.390 5 2808 8.38 0 0 0 0 0 0 0 0 t12C-0sw 0.091 w 6.55 1.50 0 0 0 0 0 0 0 0 —G 1Dc2ov 0.570 w 41.04 58.17 0 0 0 0 0 0 0 0 C 1813-30ad 0.032 - 230 1.44 54 54 124 78 12 12 28 17 F 194-19bscp 0.049 - 276 0.38 0 0 0 0 0 0 0 0 6 c)AED excursion 48 -1 Envelope loss/gain 1000 814 28 16 12 a) Infiltration 459 32 0 0 b) Room ventilation 0 0 0 0 13 Intemal gains: Occupants @ 230 0 00 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 1459 846 28 16 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1459 846 28 16 15 Dud loads 10% 6% 150 51 10% 6% 3 1 Taal room load 1609 897 30 17 LoxlHigh Baseboard/Cod Air 3 2 48 0 0 1 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 41- wrightsoft- 2017-Jul-28 14:age 5 Rightkk32 D Universal 2017 17.0.168 Front16 Page 5 ...cott.langewathy\Documents\Vork132 DEVIN CT.rup CeIc=MJB Front Door/aces: N Right-JO Worksheet Dale: 1258 Entire Entire House y CERRONE BUILDERS Ptan: 1258 QUEENSBURY,NY 12804 1 Rowe name ROwn12 Room13 2 Exposed wall 35.0 ft 18.0 ft 3 Room height 9.0 It heaVcool 9.0 ft heal/cod 4 Room dimensions 14.0 x 16.0 ft 1.0 x 125.0 ft 5 Rwxn area 224.0 ft' 125.0 W Ty Construction U-value Or HTM Area (ft-) Load Area (ftp Load r mber (Btutyft-F) (Btuh/ft� or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) HealCad Gross WP/S Heat Cod Gross N/P/S Heat Cod 6 141 12C-0sw 0.091 n 6.55 1.50 0 0 0 0 0 0 0 0 I�----GD 1Dc2ov 0.570 n 41.04 16.38 0 0 0 0 0 0 0 0 11DO 0.390 n 28.08 8.38 0 0 0 0 0 0 0 0 l4/ 12C-0sw 0.091 a 6.55 1.W 144 144 943 216 45 45 295 68 11 T-C 1Dc2ov 0.570 a 41.04 56.17 D 0 0 0 0 0 0 0 T 12C-0sw 0.091 s 6.55 1.50 125 101 662 152 117 96 629 144 1D-c2Dv 0.570 s 41.04 30.57 25 0 1026 764 0 0 0 0 11D0 0.390 s 26.08 8.38 0 0 0 0 21 21 590 176 W 12C-05w 0.091 w 6.55 1.50 45 45 295 68 0 0 0 0 t-C 1D-c2ov 0.570 w 41.04 58.17 0 0 0 0 0 0 0 0 C 166-30ad 0.032 - 230 1.44 224 224 516 323 125 125 288 180 F 19A-19bscp 0.049 - 276 0.38 0 0 0 0 0 0 0 0 6 c)AED excursion 123 41 Envelope loss/gain 3442 1645 1802 527 12 a) Infiltration 1784 125 917 64 b) Room ventilation 0 0 0 0 13 Internal gairs: Oxupants® 230 0 0 0 0 Appiiartces/other 0 0 Subtotal(lines 6 to 13) 5228 1770 2719 591 Less extenat load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 5226 1770 2719 591 15 Duct loads 10% 6% 539 107 10% 6%1 280 36 Total room load 5765 187112999 627 LowlHigh Baseboard/Cod Air 12 a 101 6 4 34 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft' 2017Jul-28 14:47:08 s\Yorkk32Right-SulD universal 17.0.168 Fro tib Page 6 ...cott.langeworthylDocuments\York\32 DEVIN C7.rup Calc=MJa Front Door faces: N Right-J® Worksheet Job: 1258 Entire House Date: Jul 28,2017 CERRONE BUILDERS Plan: 12 e DUEENSBURY,NY 12804 1 Room name Room14 ROOm15 2 Exposed wall 0 It 42.0 ft 3 Room height 9.0 R heat/cool 9.0 It heat/Cool 4 Room dmensions 5.0 x 10.0 ft 1.0 x 723.0 it 5 Room area 50.0 ft2 723.0 W Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (BtuNftx°F) (BtuNW) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cod Gross N/P/S Heat Cod Gross N/P/S Heat Cod 6 fpr 12C-0sw 0.091 n 6.55 1.50 0 0 0 0 234 165 1081 248 ll----GD 1D-c2ov 0.570 n 41.04 16.36 0 0 0 0 20 0 821 327 11DO 0.390 n 28.08 6.38 0 0 0 0 49 49 1376 411 14/ 12C-Osw 0.091 a 6.55 1.50 0 0 0 0 0 0 0 0 11 f1Dc2ov 0.570 a 41.04 58.17 0 0 0 0 0 0 0 0 19/ 12C-0sw 0.091 s 6.55 1.50 0 0 0 0 144 96 642 147 �`CD 1Dc2ov 0.570 5 41.04 30.57 0 0 0 0 25 0 1025 764 11DO 0.390 a 28.08 8.38 0 0 0 0 21 21 590 176 V71 12C-Osw 0,091 w 6.55 1.50 0 0 0 0 0 0 0 0 ---C 1Dc2ov 0.570 w 41.04 58.17 0 0 0 0 0 0 0 0 c 16B-00ad 0.032 - 2.30 1.44 50 5o 115 72 723 723 1666 1041 F 19A-19bscp 0.049 - 2.76 0.38 0 0 0 0 0 0 0 0 6 c)AED excursion -5 -5 Emelopeloss/gain 115 67 7201 3110 12 a) Infhration 0 0 2141 150 b) Room ventilation 0 0 0 0 13 Intemal gars: Occupants 230 0 0 0 0 Appliances/other 0 0 Subtotal(liras filo 13) 115 67 9342 3260 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 115 67 9342 3260 15 Duct loads 10% 6% 12 4 10% 6% 963 198 Tota roam load 1 127 71 10305 3458 Low11-figh Baseboard/Cod Air 0 01 4 21 15 187 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrightsof , 2017-Ju42814:47:08 Right-Sufte4D Universal 2017 17.0.16 RSU25116 Page 7 ...cott.langmonhy\Documents\York\32 DEVIN CT mp Calc=MJB From Door faces: N r I HAVE PERSONALLY MEASU ED THE DISTANCE PRO STRUCTU E(S) OR SIGN S) RE D E + I A - �a 3 2' IJ,Zb JUL 3 1 2017 296.14-2-20 RC-000459-2017 Cerrone Builders 32 Devin Court, Lot 20 SFD w/FP 1782 s.f., Garage 528 s.f. a Fiher Mass BlovAng Insulation Certificate of Insulation ` SHOULD NOT BE LESS TOM TO OBTAIN A THERMAL RESISTANCE OF: RAGS PEO iDDO SD.F7, CONTENTS OF BAG SHOULD NOT COVER MORE THAN: SHOULD NOT BE LESS THAN: Number of Bags sq.ft. in. in. R-60 31.4 31.9 22.00 22.00 R-49 25.2 39.7 18.50 18.50 ' R-44 22.4 44.6 16.75 16.75 R-38 19.1 52.5 14.50 14.50 14.9 67.1 A-30 11.75 11.75 �� 10.25 10.25 R-26 12.8 77.9 e R-22 92.9 8.75 8.75 10.8 R-1 9 9.3 107.4 7.75 7.75 R-13 6.2 161.7 5.25 5.25 R-1 1 5.3 190.5 4.50 4.50 This is to certify that. CertainTeed InsulSafe'SP fiber Glass Insulation has been installed to the manufacturer's recommendations and will achieve an.R-Value* of : using ' .bags of insulation to covert ' square feet of area at a minimum installed thickness of I L 7_inches. 'z 1 l�' 1� X lY zip Street Address G I - Date � ed hnst` r} ' i -% Co e State License Number(if required) parry i S } City,State,zip Keep this certificate with your other valuable papers.if you ever sell this property,this certificate should be passed on to the purchaser. t *The higher the R-Value,the greater the insulating power.Ask your seller for the fact sheet on R.-Values. ttainTeed SAINT-GOEtAIN Cartairireed Corporation P.O.Box 860 760 E.Swedoeford Read Valley Forge,PA 19492 vkwv+-certelntoad.comllneul+rtion F, Fiber Glass Blov:ing Insulation Certificate of Insulation MINIMUM SETTLED THICKNESS GE BAG REQUIREMENTS MAXIMUM COVERA MINIMUM INITIAL INSTALLED THICKNES TO OBTAIN A THERMAL RESISTANCE OF BAGS PER 1000SO.R. CONTENTS OF BAG SHOULD NOT COYER MGflE THAN: SHOULD NOT BE LESS THAN: SHOULD NOT BE LESS THAN Number of Bags sq,ft. in, 4 in. R-60 31.4 31.9 22.00 22.00 R-49 25.2 39.7 18.50 18.50 R-44 22.4 44.6 16.75 16.75 R-38 19.1 52.5 14.50 14.50 R-30 14.9 67.1 11.75 11.75 R-2.6 12..8 77.9 10.25 10.25 R-22 10.8 92.9 8.75 8.75 R-19 9.3 107.4 7.75 7.75 R-13 6.2 161.7 5.25 5:25 R-11 5.3 190.5 4.50 4.50 This is to certify that CertainTeed InsulSafe®SP Fiber Glass Insulation has been installed to the manufacturers recotnmenclations and will achieve an R-Valu ,e* of. using_j�`.__bags of insulation to cover j square feet of area at a minimum installed thickness of ,>.inches. r`, l,t t _✓�` lA r lei , �v E (.a' f_. State Zip u reet Address vate� } S' 1 ller) Company (( State License Number(if required) City,State,Zip Keep this certificate with your other valuable papers.if you ever sell this property,this certificate should be passes!on to the purchaser. *The higher the R-value,the greater the insulating power.Ask your seller for the fact sheet on R-Values. CGI" inTeed � kl SIUB1T808AIN t �.. .d CortainTood Corporation P.O.Box 860 750 E.8wedeaford Road Vatley Forge,PA 19482 www.certalrftoed.oom/tneuiatlon RAJNY onsulting, LLC 69 Hayden Point Loop Diamond Point, NY 12824 518 221-3240 01/18/2018 " ' Cerrone Construction LLC 51 Oak Valley Way Queensbury,NY 12804 Inspection Address: 32 Devin Court, Queensbury NY 12804 Report Number: 0118181 Dear Steven: The Blower Door Test to verify infiltration rate of the subject property was performed on 01/18/2018. This was done to verify mandatory requirements of 2015 IECC Code as amended by the NYS Uniform Code Supplement. This report does not imply that full compliance of above codes has been met.It's verified the infiltration rates only. GRAJNY Consulting,LLC is pleased to submit the following report. The following data was provided: - Square Footage of the house, including conditioned basement=3,492 SF - Volume of the house, including conditioned basement=29,682 CF Based on above,the following test data was collected: - Infiltration Rate,including conditioned basement at 50 Pascal=956 CFM - ACH50,Actual Changes per Hour at 50 Pascal=956X60/29,682=1.9<3 The Instruments used for test were provided by the Energy Conservatory Digital Gauge DG-3 rated accuracy=+/- I%,calibrated minimum once per year. Thank you for selecting our company. We appreciate the opportunity to be of service. Please call this office if there are any questions. Sincerely, Stow(�r0q wy Stan Grajny, PE RESNET HERS Energy Rater 5609922 NYS PE 065406-1 I MAP REFERENCE: THE VILLAGE AT SWEET ROAD MAP OF A SUBDIVISION PLAN MADE FOR CERRONE BUILDERS DATED: FEBRUARY 5, 2014 LAST REVISED: JULY 30, 2014 BY: VAN DUSEN & STEVES FILED: SEPTEMBER 30, 2014 1 LEGEND CIRF = CAPPED IRON ROD FOUND OS = SANITARY SEWER LATERAL OW = WATER SERVICE �x = LIGHT CO =CLEAN OUT O 2 V � w Utilities 21 10 O -4SphO7t O / \ Spp, F \ N \> N o �O V. � N J co 20 � Area = `�� �� OPEN SPACE AREA 133310.1 Sq. Ft. ± ��/ (OS-4) 10.31 Acres ± A, / 135.00, N 76==22 W NOTES: / r -Q 1. PARCEL MAY BE SUBJECT TO AND/OR BENEFIT FROM RIGHTS, EASEMENTS, COVENANTS INCLUDING: FINAL S • c�F ���� 1.1. AN EASEMENT GRANTED TO NIAGARA MOHAWK POWER CORPORATION & VERIZON NEW YORK INC. RECORDED IN THE Sj 0, WARREN COUNTY CLERK'S OFFICE IN BOOK 5120 OF DEEDS, AT PAGE 10. A 1j, JA 18 201 1.2. DECLARATION OF COVENANTS, RESTRICTIONS, EASEMENTS a -� AND LIENS OF THE VILLAGE AT SWEET ROAD HOMEOWNERS' OF ASSOCIATION, INC. RECORDED IN THE WARREN COUNTY T C?���t�i � � F DEEDS AT PAGE 148. CLERK'S OFFICE IN BOOK 5175 0 � � {� �� , GO���S����� DEVELOPMENT 1.3. RIGHT-OF-WAY AND EASEMENT TO THE TOWN OF QUEENSBURY 50135 FOR SEWER RECORDED IN THE WARREN COUNTY CLERK'S OFFICE IN BOOK 5167 OF DEEDS, AT PAGE 248. Dater January 10, 2018 s e "UNAUTHORIZED ALTERATION OR ADDITION TO A SURVEY Map of a Survey for Scale 1"=30' MAP BEARING A LICENSED LAND SURVEYORS SEAL IS A ll� (� VIOLATION OF SECTION 7209,SUB-DIVISION 2,OF THE T VxC/.' NEW YORK STATE EDUCATION LAW." Joanne Frances. Van Stone S t e V e s "ONLY COPIES FROM THE ORIGINAL OF THIS SURVEY MARKED WITH AN ORIGINAL OF THE LAND SURVEYORS �� SEAL SHALL BE CONSIDERED TO BE VALID TRUE COPIES." "CERTIFICATIONS PREPARED HEREON SIGNIFY THAT And THIS SURVEY WAS PREPARED IN ACCORDANCE WITH THE _ _ P T/T EXISTING CODE OF PRACTICE FOR LAND SURVEYORS ADOPTED LandS u r V J o r s LANDBY HSURVEYOE NEW RS.SAID CERTIFICATIONS SHALLK STATE ASSOCIATION OF PROFESSIONAL TO THE PERSON FOR WHOM THE SURVEY IS PREPARED,AND Donald James King SHEET 1 OF 1 ON HIS BEHALF TO THE TITLE COMPANY,GOVERNMENTAL (7 AGENCY AND LENDING INSTITUTION LISTED HEREON,AND 169 Haviland Road Queensbury, New York 12804 TO THE ASSIGNEES OF THE LENDING INSTITUTION." Town of Queensbury, Warren County, New York King (518) 792-8474 New York Lie. No. 50135 NO. DATE DESCRIPTION DWG. N0. 05-247—LOT 20 1 296. 14-2-20 3a Jin